Loading...
Sidewalk & Curbing Construction Bid TabulationSidewalk &Curbing Construction (#5568486) Owner: City of Kalispell, MT Solicitor: City of Kalispell, MT 03/08/2018 03:00 PM MST sandon construction co inc Section Ti Line Item Item Code Item Description UofM Quantity Unit Price Extension 1$41300.70 Base Bid 1 1 Project Mobilization LS 1 $21600.00 $21600.00 2.A 2.A 4" Concrete Pavement, 100 SF or Less SF 1 $10.65 $10.65 2.13 2.13 4" Concrete Pavement, 101 to 240 SF SF 1 $5.95 $5.95 2.0 2.0 4" Concrete Pavement, 241 SF or More SF 1 $5.65 $5.65 3 3 6" Concrete Pavement SF 1 $8.55 $8.55 4 4 8" Concrete Pavement SF 1 $17.85 $17.85 S.A S.A Concrete Curb &Gutter, 50 LF or Less LF 1 $23.00 $23.00 5.13 5.13 Concrete Curb &Gutter, 51 LF or More LF 1 $20.00 $20.00 6.A 6.A Concrete Standup Curb, 50 LF or Less LF 1 $21.00 $21.00 6.13 6.13 Concrete Standup Curb, 51 LF or More LF 1 $20.00 $20.00 7 7 Concrete Valve Collar EA 1 $525.00 $525.00 8 8 Concrete Manhole Collar EA 1 $575.00 $575.00 9.A 9.A Concrete Removal, 4 Inches and Less SF 1 $1.75 $1.75 9.13 9.13 Concrete Removal, More Than 4 Inches SF 1 $2.30 $2.30 10 10 Concrete Curb Removal LF 1 $3.50 $3.50 11 11 4" Irrigation Sidewalk Sleeve EA 1 $30.00 $30.00 12.A 12.A Landscape -Reseed SF 1 $2.00 $2.00 12.13 12.13 Landscape -Resod SF 1 $3.50 $3.50 13 13 Truncated Dome Panel EA 1 $285.00 $285.00 14 14 3/4" Crush Gravel CY 1 $75.00 $75.00 15 15 Laborer HR 1 $65.00 $65.00 Base Bid Total: $4,300.70