Loading...
Westside Interceptor Project - Schedule 5 Bid Results & Tabulation5/9/2018 QUESTCDN: Project Bid Results Previous Next Close Window Print Results Project Bid Results SCHEDULE 5 - WESTSIDE INTERCEPTOR PROJECT (Quest project #5671134) Owner: City of Kalispell, MT 201 1st Avenue East Kalispell, MT 59901 ph: 406-758-7727 contact: Keith Haskins e-mail: khaskins@kalispell.com Soliciting agent: Robert Peccia & Associates - Kalispell, MT Contact: Robert Peccia and Associates Phone: 406-752-5025 E-mail: iwargo@rpa-kal.com Bid Date: 05/03/2018 02:30 PM MDT Owner Project Number: CITY OF KALISPELL Award Date: Comments: Award Status: Pending Bid Result/Award (no information presently available) Information: Letting Bid Tabulation: view Company/Contact Phone/E-mail Downing Underground Inc. 406-755-0960 Randy Downing randy@downingconstructioninc.com Cutting Edge Excavation, LLC 406-755-0001 Marc Blanden cuttingedgemarc@gmail.com LHC, Inc 406-758-6420 David Steely dave@lhcmt.com Thompson Contracting 406-293-0603 Incorporated Libby MT lthompsoncontracting@hotmail.com Levi Thompson S & L Underground, Inc. 208-267-7996 Shem Johnson admin@slunder.com Amount Awarded $985,731.00 $997,799.00 $1,054,520.18 $1,214,707.00 $1,286,658.00 https://www. q uestcd n.com/questcdn/projects/prj_view/project_view. html?&proj browse=true&jobNo=5671134&rowld=5671134&projType=project 1 /1 <b>SCHEDULE 5</b> - WESTSIDE INTERCEPTOR PROJECT (#5671134) Owner: <b>City of Kalispell, MT</b> Solicitor: <b>Robert Peccia &Associates</b> -Kalispell, MT 05/03/2018 02:30 PM MDT Downing Underground Inc. Cutting Edge Excavation, LLC LHC, Inc Thompson Contracting Incorporated Libby MT S & L Underground, Inc. Line Item Item Code Item Description Uo Quantity Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension 9 $9851731.00 $9971799.00 $110541520.18 $112141707.00 $112861658.00 1 1 Mobilization, Bonding and Submittals (5% Max) LS 1 $461274.00 $461274.00 $491000.00 $491000.00 $501000.00 $501000.00 $481000.00 $481000.00 $601000.00 $601000.00 2 2 Construction Surveys LS 1 $81500.00 $81500.00 $101000.00 $101000.00 $91500.00 $91500.00 $801000.00 $801000.00 $151000.00 $151000.00 3 3 Material Testing LS 1 $291500.00 $291500.00 $101000.00 $101000.00 $171650.00 $171650.00 $401000.00 $401000.00 $301000.00 $301000.00 4 4 Traffic Control -Devices DAY 90 $67.00 $61030.00 $400.00 $361000.00 $439.50 $391555.00 $375.00 $331750.00 $450.00 $401500.00 5 5 Traffic Control - Flaggers DAY 10 $980.00 $91800.00 $11200.00 $121000.00 $10.00 $100.00 $11500.00 $151000.00 $11500.00 $151000.00 6 6 Asphalt Surfacing Removal SY 330 $2.00 $660.00 $16.00 $51280.00 $13.61 $41491.30 $2.50 $825.00 $4.00 $11320.00 7 7 Concrete Flatwork Removal SY 50 $15.00 $750.00 $50.00 $21500.00 $23.49 $11174.50 $2.50 $125.00 $6.00 $300.00 8 8 Concrete Curb Removal LF ILS 1 1272 $5.00 $61360.00 $7.00 $81904.00 $7.04 $81954.88 $4.00 $51088.00 $8.00 $101176.00 9 9 Dewatering 1 $131000.00 $131000.00 $81500.00 $81500.00 $11700.00 $11700.00 $651000.00 $651000.00 $151000.00 $151000.00 10 10 Erosion Control & Stormwater Permitting LS ILF 1 $101000.00 $101000.00 $381540.20 $381540.20 $291725.00 $291725.00 $351000.00 $351000.00 $201000.00 $201000.00 11 11 Pipe - Trenchless: 10" Sanitary Sewer Force Main (HDPE DR 11) 1530 $143.00 $2181790.00 $105.00 $1601650.00 $102.00 $1561060.00 $160.00 $2441800.00 $120.00 $1831600.00 12 12 Pipe -Buried: 10" Sanitary Sewer Force Main (PVC C900, DR 18) LF 4540 $77.00 $3491580.00 $74.00 $3351960.00 $57.50 $2611050.00 $70.00 $3171800.00 $120.00 $5441800.00 13 13 Valve -Buried: 10" Plug Valve EA 6 $31925.00 $231550.00 $31700.00 $221200.00 $31900.00 $231400.00 $61250.00 $371500.00 $61000.00 $361000.00 14 14 Existing Forcemain Connection EA 3 $61500.00 $191500.00 $41000.00 $121000.00 $31600.00 $101800.00 $81500.00 $251500.00 $81500.00 $251500.00 15 15 Type II Bedding CY 1540 $38.75 $591675.00 $36.00 $551440.00 $76.00 $1171040.00 $55.00 $841700.00 $45.00 $691300.00 16 16 Imported Trench Backfill - Type A CY 6594 $16.50 $1081801.00 $13.70 $901337.80 $20.00 $1311880.00 $17.00 $1121098.00 $18.00 $1181692.00 17 17 Imported Trench Backfill - Type B LF ICY 480 $50.00 $241000.00 $59.00 $281320.00 $76.50 $361720.00 $20.00 $91600.00 $40.00 $191200.00 18 18 Crushed Base Course Gravel 60 $94.00 $51640.00 $135.00 $81100.00 $108.00 $61480.00 $25.00 $11500.00 $28.00 $11680.00 19 19 Asphalt Surfacing TON 90 $121.00 $101890.00 $110.00 $91900.00 $120.00 $101800.00 $130.00 $111700.00 $125.00 $111250.00 20 20 Concrete Curb LF 127 $28.00 $31556.00 $46.00 $51842.00 $32.50 $41127.50 $48.00 $61096.00 $45.00 $51715.00 21 21 Concrete Flatwork - 6" Thick with Base Gravels SY 50 $90.00 $4,500.00 $116.00 $51800.00 $110.00 $51500.00 $175.00 $81750.00 $75.00 $31750.00 22 22 Irrigation System Removal, Repairs &Replacement LS 1 $121400.00 $121400.00 $51350.00 $51350.00 $41500.00 $41500.00 $101000.00 $101000.00 $281000.00 1$221000.00 $281000.00 23 23 Vegetation Restoration -Lawn LS 1 $91400.00 $91400.00 $701000.00 $701000.00 $1171500.00 $1171500.00 $151000.00 $151000.00 $221000.00 24 24 Marker Post EA 27 $125.00 $31375.00 $125.00 $31375.00 $56.00 $11512.00 $125.00 $31375.00 $125.00 $31375.00 25 25 Pavement Markings LS 1 $11200.00 $11200.00 $31800.00 $31800.00 $41300.00 $41300.00 $31500.00 $31500.00 $61500.00 $61500.00 Base Bid Total: $985,731.00 r $997,799.00 $1,054,520.18 $1,214,707.00 $1,286,658.00