Loading...
Westside Interceptor Project - Schedule 4 Bid Results & Tabulation5/9/2018 QUESTCDN: Project Bid Results Previous Next Close Window Print Results Project Bid Results SCHEDULE 4 - WESTSIDE INTERCEPTOR PROJECT (Quest project #5671051) Owner: City of Kalispell, MT 201 1st Avenue East Kalispell, MT 59901 ph: 406-758-7727 contact: Keith Haskins e-mail: khaskins@kalispell.com Soliciting agent: Robert Peccia & Associates - Kalispell, MT Contact: Robert Peccia and Associates Phone: 406-755-5025 E-mail: iwargo@rpa-kal.com Bid Date: 05/03/2018 02:30 PM MDT Owner Project Number: CITY OF KALISPELL Award Date: Comments: Award Status: Pending Bid Result/Award (no information presently available) Information: Letting Bid Tabulation: view Company/Contact LHC, Inc David Steely Downing Underground Inc Randy Downing S & L Underground, Inc. Shem Johnson Phone/E-mail 406-758-6420 dave@lhcmt.com 406-755-0960 randy@downingconstructioninc.com 208-267-7996 admin@slunder.com Amount Awarded $2,799,977.90 $2,908,000.00 $3,296,430.00 https://www.questcdn.com/questcdn/projects/prj_view/project_view. html?&projbrowse=true&jobNo=5671051 &rowld=5671051 &projType=project 1 /1 <b>SCHEDULE 4</b> - WESTSIDE INTERCEPTOR PROJECT (#567105 1) Owner: <b>City of Kalispell, MT</b> Solicitor: Robert Peccia &Associates -Kalispell, MT 05/03/2018 02:30 PM MDT LHC, Inc Downing Underground Inc. S & L Underground, Inc. Section Til Line Item Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Unit Price Extension Base Bid Section -Required Completion $217991977.90 $219081000.00 $312961430.00 1 1 Mobilization, Bonding and Submittals (5% Max) LS 1 $681000.00 $681000.00 $1431576.00 $1431576.00 $1501000.00 $1501000.00 2 2 Construction Surveys LS 1 $301600.00 $301600.00 $211000.00 $211000.00 $321000.00 $321000.00 3 3 Material Testing LS 1 $411600.00 $411600.00 $351000.00 $351000.00 $351000.00 $351000.00 4 4 Traffic Control -Devices DAY 180 $305.00 $541900.00 $35.00 $61300.00 $250.00 $451000.00 5 5 Traffic Control - Flaggers DAY 30 $10.00 $300.00 $980.00 $291400.00 $11200.00 $361000.00 6 6 Asphalt Surfacing Removal SY 3250 $9.71 $311557.50 $2.00 $61500.00 $2.00 $61500.00 7 7 Concrete Flatwork Removal SY 40 $22.13 $885.20 $14.00 $560.00 $6.00 $240.00 8 8 Concrete Curb Removal LF 70 $6.49 $454.30 $3.00 $210.00 $8.00 $560.00 9 9 Miscellaneous Work LS 1 $161500.00 $161500.00 $101000.00 $101000.00 $351000.00 $351000.00 10 10 Building Demolition LS 1 $51000.00 $51000.00 $51000.00 $51000.00 $121000.00 $121000.00 11 11 Survey Monuments EA 1 $765.00 $765.00 $900.00 $900.00 $700.00 $700.00 12 12 Fence Removal &Replacement LF 610 $26.12 $151933.20 $28.00 $171080.00 $28.00 $171080.00 13 13 Temporary Fence -Install and Remove LF 775 $8.36 $61479.00 $18.00 $131950.00 $14.00 $101850.00 14 14 Dewatering LS 1 $21650.00 $21650.00 $1001000.00 $1001000.00 $251000.00 $251000.00 15 15 Erosion Control & Stormwater Permitting LS 1 $121200.00 $121200.00 $201000.00 $201000.00 $201000.00 $201000.00 16 16 Manhole - 60" Sanitary Sewer (Type 1 -Flat Top) EA 10 $41675.00 $461750.00 $51000.00 $501000.00 $61500.00 $651000.00 17 17 Manhole - 60" Sanitary Sewer (Type 2 -Eccentric) EA 29 $51510.00 $1591790.00 $51400.00 $1561600.00 $71500.00 $2171500.00 18 18 Manhole - 72" Sanitary Sewer (Type 3 -Eccentric, Interior Drop) EA 1 $101125.00 $101125.00 $101500.00 $101500.00 $91500.00 $91500.00 19 19 Pipe -Buried: 8" Sanitary Sewer Main (ASTM D3034 - SDR 35) LF 160 $124.18 $191868.80 $139.00 $221240.00 $120.00 $191200.00 20 20 Pipe -Buried: 21" Sanitary Sewer Main (ASTM F679 - PS 46) LF 2530 $76.53 $1931620.90 $112.00 $2831360.00 $118.00 $2981540.00 21 21 Pipe -Buried: 24" Sanitary Sewer Main (ASTM F679 - PS 46) LF 8050 $79.77 $6421148.50 $117.00 $9411850.00 $124.00 $9981200.00 22 22 Pipe -Buried: 27" Sanitary Sewer Main (ASTM F679 - PS 46) LF 3970 $93.31 $3701440.70 $131.00 $5201070.00 $134.00 $5311980.00 23 23 Pipe Anchor - 27" Sanitary Sewer Main EA 27 $558.21 $151071.67 $11200.00 $321400.00 $450.00 $121150.00 24 24 Culvert - 12" (CMP) LF 60 $51.95 $31117.00 $105.00 $61300.00 $65.00 $31900.00 25 25 Type II Bedding -Type II CY 2540 $77.28 $1961291.20 $29.00 $731660.00 $38.00 $961520.00 26 26 Pipe Insulation LF 900 $36.60 $321940.00 $41.00 $361900.00 $22.00 $191800.00 27 27 Imported Trench Backfill - Type A CY 17200 $19.22 $3301584.00 $7.82 $1341504.00 $18.00 $3091600.00 28 28 Imported Trench Backfill - Type B LF 60 $74.54 $41472.40 $55.00 $31300.00 $48.00 $21880.00 29 29 Flowable Fill -Trench Backfill or Pipe Encasement CY 20 $163.70 $31274.00 $165.00 $31300.00 $155.00 $31100.00 30 30 Trench Plug EA 2 $21850.00 $51700.00 $11450.00 $21900.00 $11600.00 $31200.00 31 31 Stabilization Fabric SY 3200 $3.60 $111520.00 $1.00 $31200.00 $2.00 $61400.00 32 32 Select Subbase Gravel CY 2750 $29.42 $801905.00 $24.50 $671375.00 $26.00 $711500.00 33 33 Crushed Base Course Gravel CY 1485 $30.93 $451931.05 $29.00 $431065.00 $28.00 $411580.00 34 34 Asphalt Surfacing TON 830 $57.41 $471650.30 $83.00 $681890.00 $85.00 $701550.00 35 35 Concrete Curb LF 70 $31.34 $21193.80 $28.00 $11960.00 $35.00 $21450.00 36 36 Concrete Flatwork - 4" Thick with Base Gravels SY 40 $103.70 $41148.00 $90.00 $31600.00 $75.00 $31000.00 37 37 Landscape Tree EA 25 $679.14 $161978.50 $520.00 $131000.00 $500.00 $121500.00 38 38 Irrigation System Removal, Repairs &Replacement LS 1 $21632.06 $21632.06 $81400.00 $81400.00 $201000.00 $201000.00 39 39 Vegetation Restoration -Field LS 1 $1821550.00 $1821550.00 $31525.00 $31525.00 $251000.00 $251000.00 40 40 Vegetation Restoration -Lawn LS 1 $811650.00 $811650.00 $900.00 $900.00 $151000.00 $151000.00 41 41 Marker Post EA 33 $54.54 $11799.82 $125.00 $41125.00 $150.00 $41950.00 42 42 Pavement Markings LS 1 $1.00 $1.00 $21600.00 $21600.00 $61500.00 $61500.00 Base Bid Total: $2,799,977.90 $2,908,000.00 $3,296,430.00