Westside Interceptor Project - Schedule 1 Bid Results & Tabulation5/9/2018 QUESTCDN: Project Bid Results Previous Next Close Window Print Results Project Bid Results SCHEDULE 1 - WESTSIDE INTERCEPTOR PROJECT (Quest project #5655598) Owner: City of Kalispell, MT 201 1st Avenue East Kalispell, MT 59901 ph: 406-758-7727 contact: Keith Haskins e-mail: khaskins@kalispell.com Soliciting agent: Robert Peccia & Associates - Kalispell, MT Contact: Robert Peccia and Associates Phone: 406-752-5025 E-mail: iwargo@rpa-kal.com Bid Date: 04/12/2018 02:30 PM MDT Owner Project Number: CITY OF KALISPELL Award Date: Comments: Award Status: Pending Bid Result/Award (no information presently available) Information: Letting Bid Tabulation: view Company/Contact LHC, Inc David Steely S & L Underground, Inc Shem Johnson Western Municipal Construction, Inc Jock Clause Downing Underground Inc Randy Downing Phone/E-mail 406-758-6420 dave@lhcmt.com 208-267-7996 admire@slunder.com 406-254-2106 rnelson@wmc-i.com Amount Awarded $3,322,741.09 $4,489,455.50 406-755-0960 $5,211,121.00 randy@downingconstructioninc.com https://www. q uestcd n.com/questcdn/projects/prj_view/project_view. html?&proj browse=true&jobNo=5655598&rowl d=5655598&projType=project 1 /1 <b>SCHEDULE 1</b> - WESTSIDE INTERCEPTOR PROJECT (#5655598) Owner: <b>City of Kalispell, MT</b> Solicitor: <b>Robert Peccia &Associates</b> -Kalispell, MT 04/12/2018 02:30 PM MDT LHC, Inc S & L Underground, Inc. Western Municipal Construction, Inc Downing Underground Inc. Line Item Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension $313221741.09 $318681800.00 $414891455.50 $5,211,121.00 1 1 Mobilization, Bonding and Submittals (5% Max) LS 1 $631731.14 $631731.14 $1851000.00 $1851000.00 $1801000.00 $1801000.00 $2601000.00 $2601000.00 2 2 Construction Surveys LS 1 $311171.69 $311171.69 $261000.00 $261000.00 $261500.00 $261500.00 $261000.00 $261000.00 3 3 Material Testing LS 1 $721127.39 $721127.39 $501000.00 $501000.00 $541000.00 $541000.00 $351000.00 $351000.00 4 4 Traffic Control -Devices DAY 180 $447.27 $801508.60 $450.00 $811000.00 $100.00 $181000.00 $365.00 $651700.00 5 5 Traffic Control - Flaggers DAY 30 $11038.70 $311161.00 $11400.00 $421000.00 $11200.00 $361000.00 $11200.00 $361000.00 6 6 Asphalt Surfacing Removal SY 9550 $11.42 $1091061.00 $4.00 $381200.00 $5.00 $471750.00 $2.00 $191100.00 7 7 Concrete Flatwork Removal SY 25 $30.62 $765.50 $25.00 $625.00 $37.00 $925.00 $15.00 $375.00 8 8 Concrete Curb Removal LF 190 $9.28 $11763.20 $20.00 $31800.00 $9.00 $11710.00 $3.00 $570.00 9 9 Miscellaneous Work LS 1 $461478.02 $461478.02 $401000.00 $401000.00 $331000.00 $331000.00 $61000.00 $61000.00 10 10 Survey Monuments EA 7 $315.41 $21207.87 $800.00 $51600.00 $432.00 $31024.00 $750.00 $51250.00 11 11 Dewatering LS 1 $1121116.56 $1121116.56 $1751000.00 $1751000.00 $3211350.00 $3211350.00 $4401000.00 $4401000.00 12 12 Erosion Control & Stormwater Permitting LS 1 $181196.94 $181196.94 $501000.00 $501000.00 $301650.00 $301650.00 $121000.00 $121000.00 13 13 Manhole - 48" Sanitary Sewer (Type 2 -Eccentric) EA 2 $41251.36 $81502.72 $61500.00 $131000.00 $31835.00 $71670.00 $41700.00 $91400.00 14 14 Manhole - 60" Sanitary Sewer (Type 2 -Eccentric) EA 2 $51459.11 $101918.22 $81000.00 $161000.00 $51525.00 $111050.00 $61900.00 $131800.00 15 15 Manhole - 72" Sanitary Sewer (Type 1 -Flat Top) EA 12 $51471.67 $651660.04 $91000.00 $1081000.00 $61170.00 $741040.00 $71500.00 $901000.00 16 16 Manhole - 72" Sanitary Sewer (Type 2 -Eccentric) EA 10 $61592.52 $651925.20 $101000.00 $1001000.00 $61800.00 $681000.00 $81200.00 $821000.00 17 17 Manhole - 72" Sanitary Sewer (Type 3 -Eccentric, Interior Drop) EA 6 $81369.94 $501219.64 $121000.00 $721000.00 $91170.00 $551020.00 $91975.00 $591850.00 18 18 Pipe -Buried: 8" Sanitary Sewer Main (ASTM D3034 - SDR 35) LF 40 $105.94 $41237.60 $75.00 $31000.00 $108.00 $41320.00 $104.00 $41160.00 19 19 Pipe -Buried: 18" Sanitary Sewer Main (ASTM F679 - PS 46) LF 1090 $71.16 $771564.40 $90.00 $981100.00 $162.00 $1761580.00 $105.00 $1141450.00 20 20 Pipe -Buried: 30" Sanitary Sewer Main (ASTM F679 - PS 46) LF 7690 $108.99 $8381133.10 $155.00 $111911950.00 $212.55 $116341509.50 $283.00 $211761270.00 21 21 Existing Sewer Service -Connect to New EA 13 $342.37 $41450.81 $21500.00 $321500.00 $900.00 $111700.00 $21200.00 $281600.00 22 22 Existing Sanitary Sewer Main Connection EA 15 $21785.03 $411775.45 $41500.00 $671500.00 $41760.00 $711400.00 $61400.00 $961000.00 23 23 Existing Forcemain Connection EA 2 $31281.51 $61563.02 $21400.00 $41800.00 $71750.00 $151500.00 $31375.00 $61750.00 24 24 Water Main Vertical Adjustment EA 4 $41438.11 $171752.44 $71500.00 $301000.00 $71305.00 $291220.00 $51000.00 $201000.00 25 25 Existing Water Main Connection EA 9 $11274.58 $111471.22 $41500.00 $401500.00 $21240.00 $201160.00 $61600.00 $591400.00 26 26 Pipe -Buried: 8" Water Main (PVC C900, DR 18) LF 2100 $48.18 $1011178.00 $70.00 $1471000.00 $50.00 $1051000.00 $66.00 $1381600.00 27 27 Valve -Buried: 8" Gate Valve EA 17 $11978.13 $331628.21 $11200.00 $201400.00 $21200.00 $371400.00 $11240.00 $211080.00 28 28 Fire Hydrant Assembly EA 4 $51438.17 $211752.68 $61500.00 $261000.00 $51075.00 $201300.00 $41885.00 $191540.00 29 29 New Water Service -with Meter EA 16 $21677.82 $421845.12 $31500.00 $561000.00 $21750.00 $441000.00 $21580.00 $411280.00 30 30 New Water Service -without Meter EA 8 $931.07 $71448.56 $21800.00 $221400.00 $11350.00 $101800.00 $11825.00 $141600.00 31 31 Existing Water Service -Vertical Adjustment EA 2 $270.89 $541.78 $600.00 $11200.00 $21300.00 $41600.00 $920.00 $11840.00 32 32 Temporary Water LS 1 $121244.82 $121244.82 $351000.00 $351000.00 $231000.00 $231000.00 $281500.00 $281500.00 33 33 Manhole - 48" Storm Drain Manhole EA 1 $61453.37 $61453.37 $61500.00 $61500.00 $21650.00 $21650.00 $61000.00 $61000.00 34 34 Curb Inlet - 48" Combination Manhole Inlet EA 1 2 $31483.20 $61966.40 $61500.00 $131000.00 $21550.00 $51100.00 $61000.00 $121000.00 35 35 Curb Inlet - 30" Storm Drain Inlet JEA 1 4 $2,667.24 $10,668.96 $41500.00 $18,000.00 $1,800.00 $71200.00 $5,000.00 $20,000.00 36 36 Pipe -Buried: 12" Storm Drain (PVC SDR 35) LF 135 $76.77 $101363.95 $80.00 $101800.00 $70.00 $91450.00 $230.00 $311050.00 37 37 Storm Water Vaults & 30" PVC Storm Mains (ASTM F679 - PS 46) LS 1 $411615.00 $411615.00 $351000.00 $351000.00 $481000.00 $48,000.00 $55,306.00 $551306.00 38 38 Type II Bedding CY 4530 $71.85 $3251480.50 $28.00 $1261840.00 $45.00 $2031850.00 $43.50 $1971055.00 39 39 Pipe Insulation LF 1250 $35.94 $441925.00 $42.00 $521500.00 $52.00 $651000.00 $58.00 $721500.00 40 40 Imported Trench Backfill - Type A CY 4400 $19.44 $851536.00 $16.00 $701400.00 $20.00 $881000.00 $22.25 $971900.00 41 41 Imported Trench Backfill - Type B LF 7070 $45.03 $3181362.10 $48.00 $3391360.00 $50.00 $3531500.00 $47.00 $3321290.00 42 42 Flowable Fill -Trench Backfill or Pipe Encasement CY 150 $127.35 $191102.50 $150.00 $221500.00 $190.00 $281500.00 $175.00 $261250.00 43 43 Trench Plug EA 6 $21366.54 $141199.24 $31000.00 $181000.00 $21680.00 $161080.00 $11300.00 $71800.00 44 44 Stabilization Fabric SY 10300 $1.48 $151244.00 $4.00 $411200.00 $1.50 $151450.00 $0.90 $91270.00 45 45 Select Subbase Gravel CY 2750 $31.00 $851250.00 $16.00 $441000.00 $38.00 $1041500.00 $41.00 $1121750.00 46 46 Crushed Base Course Gravel CY 2600 $40.86 $1061236.00 $24.00 $621400.00 $41.00 $1061600.00 $42.50 $1101500.00 47 47 Asphalt Surfacing TON 2410 $66.00 $1591060.00 $70.00 $1681700.00 $89.70 $2161177.00 $73.00 $1751930.00 48 48 Concrete Curb LF 120 $31.02 $31722.40 $45.00 $51400.00 $30.00 $31600.00 $29.00 $31480.00 49 49 Concrete Flatwork - 4" Thick with Base Gravels SY 25 $443.96 $111099.00 $65.00 $11625.00 $88.00 $21200.00 $89.00 $21225.00 50 50 Vegetation Restoration -Field LS 1 $331041.00 $331041.00 $351000.00 $351000.00 $171700.00 $171700.00 $41000.00 $41000.00 51 51 Vegetation Restoration -Lawn LS 1 $311196.59 $311196.59 $61000.00 $61000.00 $121000.00 $121000.00 $11200.00 $11200.00 52 52 Marker Post EA 4 $54.59 $218.36 $250.00 $11000.00 $180.00 $720.00 $125.00 $500.00 53 53 Pavement Markings LS 1 $11898.78 $11898.78 $81000.00 $81000.00 $61000.00 $61000.00 $11000.00 $11000.00 Base Bid Total: $3,322,741.09 F $3,868,800.00 $4,489,455.50 $5,211,121.00