03-02-18 City Manager ReportfTYOF ira - City of Kalispell - _is, OFFICE OF THE CITY MANAGER - 1A OVA Information Memorandum 3/2/2018 1. Building Department Two major permits were issued this past week. Fresh Life Church was issued a permit for interior work atl40 I" Ave E. The estimated project valuation is $500,000. Glacier Bank was also issued a permit for tenant improvements at 2240 Hwy 93 S. The project is also valued at $500,000. Staff also completed 18 Fire Life Safety building inspections as we continue to cover the south Kalispell US 93 corridor. Staff also conducted 10 Short Term rental inspections as part of our on -going fire inspection program. 2. Planning Department Staff continues to work on drafting an urban renewal plan for the Downtown in anticipation of implementing some of the concepts outlined in the Downtown Plan. Staff also made a presentation to the Kalispell Daybreak Rotary this past week on the status of the Kalispell Trail and will be making presentations this coming week to the Sunrise Lions and Immanuel Lutheran Home on the status of the Kalispell Trail and Glacier Rail Park. The Planning Board will discuss a pair of two -lot major subdivisions at the March 13 Planning Board meeting. Both are located on Village Loop in north Kalispell. The Board will hear a request to subdivide the existing lot at 105 Village Loop into two lots. This site contains the new PTA office building. The intent will be to create an additional developable lot. Likewise, a .43-acre vacant lot at 60 Village Loop Drive is being proposed to be split into two separate developable lots. Finally, the Board will hold a work session on Rockwood Ranch Annexation, PUD and Preliminary Plat in anticipation of a public hearing in April. This project contains 89 acres and is located south of Three Mile, west of West Spring Creek and north Two Mile. The applicants are proposing 196 single-family lots and 26 townhouse lots for a total of 222 building lots and 3.2 acres of neighborhood commercial use. 3. Police Department This past week officers have participated as instructors at the Montana Law Enfrocement Academy, teaching firearms and defensive tactics. Additional officers participated as instructors in sexual assault prevention at the United way and as a participant in the Montana Executive Leadership Academy. 4. Fire Department Since the last update, the Kalispell Fire Department has received 150 calls for service and has conducted 2 outreach trainings with 15 individuals in attendance. With the start of the new year, we are seeing local facilities and companies report their Tier II reports as required by the EPA's Emergency Planning and Community Right -to - Know Act (EPCRA) Hazardous Chemical Inventory Reporting. The reports that are supplied to us are reviewed by fire department personnel and filed for use if an incident occurs. 5. Information Services IT staff prepared the website training sessions with 20 City staff members. The Civic Plus trainer will be onsite training March 13 -16. The current website migrated to CivicPlus will be shared with the website redesign committee on 3/2. If all goes as planned, the redesigned website launch date is 3/29. IT staff installed the Zoom application for web conferencing at City Hall. 6. Community Development A Request for Qualifications was advertised in January seeking a consultant team to work with the City to design and engineer the Kalispell TIGER trail development project. Six Statements of Qualification were received by the February deadline and are under review by a selection committee. The City expects to select a qualified firm in the coming weeks. The intent is to have this consultant in place in early May to begin working with the local community in a public design process to determine the look of the trail and location of the complete street to be built with TIGER grant funds. In support of this effort, a volunteer advisory committee of roughly 25 people will meet regularly with City staff to help guide the trail and complete street design process, participate in community events related to this project, and act as ambassadors in the community to share the progress of the project. The design process is expected to be completed in September with project engineering to follow through winter months. The existing railroad tracks are expected to be removed in late 2019 and the trail and complete street to be constructed in 2020. 2 7. Public Works WWTP Boiler Replacement Replacement of the WWTP's boiler is underway. This project replaces the 2004 main boiler that heats the primary digester and the primary digester building. The fire tubes inside the old boiler were corroded from methane and were leaking water inside the boiler from the closed loop heating system. The installation is being performed by the staff at the WWTP. The ability to use methane gas, a byproduct of the plant's digesters, provides significant savings in natural gas costs. The new boiler will be fully functional once piping repairs on the primary digester are complete and the primary digester is back in service. The entire project should be complete sometime in April. Engineering Division The Engineering Division is responsible for the design and construction oversite of infrastructure capital projects each year. Projects currently being designed for construction this spring/summer include: • Sewer Main Slip -lining for 5th Alley East from 7th St to 1 Oth St, 3rd Alley West from 1 Oth St to 11 th St, 11 th St W from 2nd Alley to 3rd Alley, and 6th Alley WN from Wyoming to Colorado • Water Main Replacement for 9th Ave W from 6 St W to 8 St W • Stormwater Drainage Improvements for Two Mile Drive from Hawthorn to Meridian Rd • Shop Complex Pavement and Drainage Restoration. Project includes the replacement of the degraded asphalt surface inside the fenced area of the City Shop Complex, improved drainage to eliminate building flooding, and the installation of a new storm water quality treatment device • Sylvan Drive Stormwater Detention Rehabilitation. Project includes the rehabilitation of the detention facility through dredging and reestablishment of pond volume dimensions, potential slope stabilization, and a new outfall structure. 8. Parks and Recreation Park Staff have finished assembling the 21 foot walking bridge that was purchased by Paws to Play. Once the weather warms, we will schedule the bridge installation. Forestry work continues with contractors removing 90 dead or dying trees and trees that need train pruning. Wood that is not being chipped is being donated to the Flathead High School woods program where it will be milled, dried, and then used in student projects. While this helps keep our disposal costs down on these removal projects, it also reduces the cost of the woods program to the students. Kalispell Parks and Recreation has been busy developing new logos to rebrand several programs. The new Picnic in the Park logo is finished and sponsorship packets for the 2018 summer season will be going out next week. Our new logos for our "Camp Woodland" Summer Day Camp and "Cairo's Kids" Afterschool program are in the final stages of development and will be released shortly. IICNIC Our Little Dribblers Basketball program is at capacity with 200 children registering for the program this year. Due to demand, we are going to look at moving the program from Russell Elementary to a larger gym next year (Edgerton or Rankin). A larger gym would allow us to split the court and play 2 concurrent games. 9. Finance Department Budget The fiscal year 2019 budget process is under way. The finance department is formatting budgets and updating personnel cost schedules. Many personnel cost are preliminary estimates due to expiring contracts and undetermined health and workers' compensation insurance estimates. The City's fiscal year 2019 debt service cost is also being updated for the budget and includes estimates for some of the fiscal year 2018 Montana State Board of Investment (BOI) borrowings. Fiscal year 2018 Board of Investment borrowing included a spray gator for the parks department that has not yet been purchased. Currently, BOI loans have a rate of 3.15%, subject to adjustment every February. All City debt other than the BOI and the 2012 Westside TIF note ($500,000) are fixed rate. Accounts Payable and Pam For December and January, accounts payable processed 595 checks to pay at least 1,145 invoices from approximately 500 vendors. Total amount of accounts payable checks issued was $4,772,242. For December and January, payroll processed 1,076 payments (checks and direct deposit) to pay employees and employee benefit providers. Total amount of payroll checks and direct deposits issued was $2,359,557. Utili . Billing There were 10 new commercial water and sewer accounts set up in December and January. Most of these (9) new accounts were changes in ownership. There were 87 new residential water and sewer accounts set up in December and January. Most of these (65) new accounts were changes in ownership. Ten new residential accounts were taking possession from the builder/contractor. The utility billing clerks processed about 18000 bills for water and sewer service in December and January. Water charges for services were about $408,000. Sewer charges for services were about $769,000. fl