Loading...
09-13-07 Site Review MinutesSITE DEVELOPMENT REVIEW COMMITTEE SUMMARY Thursday, September 13, 2007 Building Department Conference Room ATTENDING: Paul Burnham, Assoc. Civil Engineer Sean Conrad, City Planner Chad Fincher, Parks Superintendent F. Ray Ruffatto, Deputy Fire Marshal Sandy Wheeler, Comm. Dev. Mgr. Jeff Clawson, Plans Examiner Mark Crowley, Construction Manager Charlie Johnson, Construction Manager P. J. Sorensen, Zoning Administrator, Chair Kathy Kuhlin, Recording Secretary Guests: Jim Williamson and Brett Walcheck from 48 North Engineering (Northland); James Freyholtz from MDOT; Toby Macintosh, Ned Halting, and Rory Young from Jackola Engineering; and Bruce Lutz from Sitescape Hear the Public: None. Performance Bond Reminders: None. OLD BUSINESS: 245 Windward Way — conversion of existing congregate care facility to medical office building (plus an addition) — sent in some responses. They need to get their drainage calculations to Mark. There are some profiles that were given to Mark. They have 68 parking spaces with two possible additions. Turning radius is okay. They will sprinkler the building. Boulevard width is a discrepancy. This will be on the agenda for next week to deal with the Public Works issues. 234 — 2nd Street West — addition to building and conversion to office — they will be required to repair the sidewalk and curb where there is a curb cut. This is passed by Site Review. NEW BUSINESS: Outlaw Inn — Hwy 93 S; site modifications (preliminary comments) — Jackola — Toby presented this project. They are doing some improvements out there. Two front entry ways with entrances into the conference center and a new patio area. They are making a new courtyard and a new water park in the future. New parking where the cabins are presently, upgrading present parking. They have 340 existing stalls. Parking will be based on the hotel/existing requirements. Loading areas on Third would be good. Could also put in parallel parking in the right-of-way that could be designated as a loading area. Work with Public Works on drainage, and lighting and landscaping will also need to be addressed. Their approach will be added or adjusted along with sidewalks to provide pedestrian access. These modifications will go in as the additional areas are added. The Fire Department may be interested in doing training with the cabins before they go away. Goacher — 1303 - 0 Avenue West, storage buildings and parking — There is a house sitting on this. Part of the building is office and part is a rented apartment. He wants to add a garage and a garage pad, parking, driveway, and access points. The roadway encroaches on his property. Everyone should drive by this property before next week. He will be submitting a better site plan. PLANNING OFFICE ITEMS: Northland Subdivision, Phase 4 — Zone change from R-4 to R-3. single family residence lots. Connect Northland drive -up to Four Mile. Extending the road through and proposing a connection to Summit Ridge. They will do a boundary line adjustment, and there is an agreement that the land would be dedicated when the final plat goes through. Sidewalk and the proposed parks were discussed. Chad suggested cash in lieu. Bruce thought they had already given an excess of parkland. Sean believes that this is a separate, stand-alone subdivision (not in their PUD). The parkland issue will be taken under advisement. They can increase their lot sizes with their proposed park since it is not going to count toward their parkland. They will still use some of their land for run off. Dry utilities need to stay in the five foot boulevard area. We will recommend they put the back of the sidewalk one foot from the boulevard. Meadowlark Montessori School — 9d' Street and 2nd Avenue East. This is an old house they are using for the school. Sidewalk, curb, and gutter. CUP was discussed. Off-street parking is an issue for them. They have two non -conforming street trees (Junipers) they will need to have replaced. They will also need to pave the alley. OTHER REPORTS: Glacier Town Center — they came in with the application. Willow Creek Proiect on Foys Lake — Turners will be coming back again on thus. Bay Ridge Subdivision — Coming in next week. 420 West Center — retail space where a salon will be going in (Kay Bradley). Interior remodel. Putting in some sinks and some walls. There is a parking issue. Only one restroom will be required. No other site issues. Community Development Director — Sandy informed the committee that the City has hired Kelly Danielson as our new Community Development Director. Appleway —Ray has been working with Jim Berry on this project. They are going to lose the five parking spaces just north of the handicapped space to provide the KFD with the access they need, and then add three spaces. They will stripe and sign the "no parking" between these signs. Mark told them to get a bond for the improvements they will do in the spring. Sportsman's Ski Haus (previous building) — Tom Jentz is encouraging Phil Harris to get rid of the sign. Ashley Heights — off Sunnyside — preliminary plat. They want to switch their parkland with Lot 13 because of the ten foot pedestrian bike path. He will need to provide an access for Public Works. The parkland will be slightly smaller with this change. He still needs to show the tot lot and the drainage. They may need to grade the road to road specifications instead of bike path specifications. Sean will let them know. Prairie View/Church Drive — The dust issue was discussed. Magnesium Chloride has been applied. They have agreed to use a water truck in addition as needed. The meeting was adjourned at 11:15 a.m. cc: Police City Manager FCAOA MDOT Bldg Fire City Clerk City Airport Planning Parks Conun. Dev. Public Works