Loading...
14. Capital Improvement Plan - 2018 Preliminary BudgetCAPITAL IMPROVEMENT PLAN PAGE FUND Dept. # 1 1000 410 PUBLIC WORKS 1 1000 412 FACILITIES 1 1000 413 POLICE 1 1000 416 FIRE 1 1000 420 PLANNING 1 2230 440 AMBULANCE 1 2394 420 BUILDING 1 2500 421 STREETS 2 2215 436 PARKS 2 2600 436 FORESTRY 2 5160 430 AIRPORT 2 5210 447 WATER 3 5310 454 SEWER 3 5310 455 WWTP 3 5349 453 STORM SEWER 3 5510 460 SOLID WASTE 4 6010 410 CENTRAL GARAGE 4 6030 403 INFORMATION TECHNOLOGY CITY OF KALISPELL FIVE YEAR CAPITAL IMPROVEMENT PLAN DEPARTMENT DESCRIPTION 2018 2019 2020 2021 2022 TOTAL PUBLIC WORKS ADMIN §VEHICLE REPLACEMENT (287,426, 409, 410, 402, 425,800) $50,000 $75,000 $25,000 $25,000 $175,000 1000-410-430100-= ROBOTIC TOTAL STATION $37,000 $37,000 TOTAL $37,000 $50,000 h 5 000 $25,000 S25,00 $212,000 CITY FACHdIIES-MAINT PARKS AND RECREATION FRONT OFFICE REORGINAZATION $10,000 $10,000 1000-412-411230 CITY HALL PARTITIONS $7,000 $7,000 TOTAL $17,000 SO F $ SO S17,000 POLICE VEHICLE REPLACEMENT- MARKED PATROL (2 veh. Purchased one year 3 the next) $81,000 $123,000 $85,000q $125,000 $125,000 $539,000 1000-413-42014x-xxx VEHICLCLE REPLACEMENT- UNMARKED VEHICLES $18,000 $18,000 $18,500 $18,500 $40,000 $113,000 VEHICLE REPLACEMENT- MCU/ SRT VEHICLES $20,000 $25,000 $19,000 $64,000 INTERVIEW RECORDING SYSTEM $12,000 $12,000 ELECTRONIC TICKETING $53,500 $53,500 RADAR TRAILER $10,000 IS184,000 $10,000 REPLACE PARKING TICKET STATION IN EAGLES LOT $16,000 $16,000 TOTAL $182,500 $169,000 $103,5 $168,500 $807,500 FIRE S.C.B.A REPLACEMENT BOTTLES $66,000 or$66,000 1000-416-420400-xxx $0 TOTAL SO $66,000 SO $0 $66,000 PLANNING AND ZONING REPLACEMENT- 2005 Chevy Malibu Sedan $15,000 $15,000 1000-420-411020-xxx INVEHICLE $0 TOTAL $15,000 SO SO $15,000 AMBULANCE TRANSPORT AMBULANCE $185,000 $370,000 2230-440-420730-xxx LIFE PAK 15 CARDIAC MONITORS $130,000 $130,000 TOTAL $0 $315,000 SO $500,000 BUILDING VEHICLEREPLACEMENT- 2006 Impala Sedan $35,000 $35,000 2394-420-420530-xxx MVEHICLE REPLACEMENT- 2005 Chevy Malibu Sedan $15,000 $15,000 VEHICLE REPLACEMENT - 2008 Sierra Pickup - upgrade to 4X4 $35,000 $35,000 COMPUTER EQUIPMENT - GIS Server $10,000 $10,000 BUILDING IMPROVEMENT - Stairwell Awning $10,000 $10,000 BUILDING IMPROVEMENT - Stairwell Repairs $10,000 $10,000 TOTAL $105,000 $10,000 SO $115,000 SPECIAL STREET MAINT TSM 5- 3 AVE E / 4TH AVE E COUPLET $19,514 $19,514 2500-421-430240-xxx TSM 10-2 ST E / WOODLAND AVE (HSIP FUNDED) $260,193 $260,193 TSM 12- 18TH ST / AIRPORT ROAD $260,193 $260,193 TSM 15- 4TH AVE E / 2ND ST E $19,514 $19,514 TSM 16- WHITEFISH STAGE ROAD / WEST EVERGREEN DRIVE $182,135 $182,135 TSM 17- CONRAD DRIVE / WOODLAND PARK DRIVE $130,096 TSM 24-TRAFFIC SIGNAL SYNCHRONIZATION -US 93 AND HWY 2 (MDT FUNDED) $247,183 $247,183 TSM 26- TRAFFIC PLAN UPDATE SCHEDULE (CITY'S PORTION) $65,048 $65,048 PM -MILL, OVERLAY AND CHIP SEAL PROJECTS $500,000 $500,000 00,0004 $500,000 $500,000 $2,500,000 PM-STRIPPINGPROJECTS $30,000 $30,000 ,30,000 $30,000 $30,000 $150,000 RH4TH AVE E FROM CENTER TO 14TH ST E (BOND) (Coordination with water project phases) $903,500 $903,500 RH-8TH AVE W FROM 7ST W TO I ITH ST E (Coordination with water project phases) $683,878 $683,878 SHOP COMPLEX PAVEMENT RESTORATION (Split b/t wtr, swr, storm, streets, solid wst) $38,200 $38,200 COLD STORAGE ROOF REPLACEMENT $31,500 $31,500 SALT BRINE STORAGE TANK (CARRYOVER) $11,000 $11,000 HEAVY TRUCKS REPLACEMENT - (12 YD)(263,311,246,305) $360,000 100,000 $525,000 HEAVY TRUCKS REPLCMNT - (ICE MELT/WATER TRUCK)(330,338,361)(MACI MATCH) $24,500 $50,000 $50,000 $124,500 SKID STEER LOADER REPLACEMENT(337) $65,000 $65,000 VEHICLE REPLACEMENT -UP TO 1 TON(259,327,200,210,430,214) $45,000 $30,000 $90,000 $250,000 STREET SWEEPER- (PRICE REFLECTS GRANT MATCH) (306,350,351) $43,000 $43,000 $43,000 $129,000 BACKHOE REPLACEMENT (244) 05,000 $105,000 MOTOR GRADER REPLACEMENT (PRICE FOR USED REPLACEMENT) (3 73) I 20, $200,000 FRONT END LOADER REPLACEMENT (371) $210,000 $210,000 ASPHALT PAVER REPL. (PRICE FOR USED REPLACEMENT) (309) $240,000 $240,000 SUPPORT EQUIPMENT REPLACEMENT - FLAIL MOWER (339) 70,000 $70,000 SUPPORT EQUIPMENT REPLACEMENT - CRACK SEALER (325) $50,000 $50,000 SUPPORT EQUIPMENT REPLACEMENT -TRAILER (385) $25,000 $25,000 SUPPORT EQUIPMENT REPLACEMENT - TRAILER (Needed to haul Paver) $25,000 $25,000 SUPPORT EQUIPMENT REPLACEMENT - AIR COMPRESSOR (398) $15,000 $15,000 SUPPORT EQUIPMENT REPLACEMENT - SANDER/DE-ICER COMBO UNIT $30,000 $30,000 SUPPORT EQUIPMENT REPLACEMENT - AIRLESS STRIPER & LINE DRIVER $20,000 $20,000 SUPPORT EQUIPMENT REPLACEMENT - MOBILE PRESSURE WASHER $8,000 $8,000 SUPPORT EQUIPMENT REPLACEMENT - GRAPHIC PLOTTER $8,000 $8,000 SUPPORT EQUIPMENT REPLACEMENT - PIPE THREADER $9,000 $9,000 SUPPORT EQUIPMENT NEW - VARIABLE MESSAGE BOARD $20,000 $20,000 $40,000 SUPPORT EQUIPMENT NEW - GRINDLAZER $11,000 $11,000 SUPPORT EQUIPMENT NEW - WAVETRONIX DETECTION FOR TRAFFIC SIGNAL $16,000 $16,000 TOTAL $2,519,638 $1,945,392 $1,065,193 $1,010, $7,677,454 I CITY OF KALISPELL FIVE YEAR CAPITAL IMPROVEMENT PLAN DEPARTMENT DESCRIPTION 2018 2019 2021 TOTAL PARKS NEWLAWRNCE PARK- EXPANDED PARKING $45,000 $45,000 2215-436-460xxx- WOODLAND PARK- STABALIZE POND PERIMITER $75,000 $75,000 WOODLAND PARK- PAINT LOG PAVILLION $18,000 $18,000 WOODLAND PARK- CAMP CENTER EXTERIOR PAINTING $20,000 $20,000 DEPOT PARK -REPAIR AND PAINT EXTERIOR RESTROOMS $5,000 $5,000 DRY BRIDGE PARK- PEDESTRIAN WALKWAY $135,000 $135,000 DRY BRIDGE PARK- ACCESSIBLE FISHING PIER $20,000 $20,000 THOMPSON MEMORIAL PARK - PLAYGROUND $29,000 $29,000 LIONS PARK- PLAYGROUND $40,000 $40,000 WESTERN PARK- COMPLETE DEVELOPMENT? $270,000 $270,000 KIDSPORTS MAINTENANCE STORAGE BUILDING $50,000 $50,000 KIDSPORTS 35 GPM WELL $25,000 $25,000 KIDSPORTS ASPHALT PRESERVATION $25,000 $25,000 KIDSPORTS GATOR UTILITY VEHICLE $14,000 $14,000 POOL PAINT LAZY RIVER $35,000 $35,000 POOL REMODEL WOMENS SHOWER $5,500 $5,500 TORO 5900 $90,000 $80,000 KUBOTA $50,000 $50,000 HIGHWAY 93 TRAIL ALIGNMENT STUDY $30,000 $30,000 RECREATION VAN- 15 PASSENGER $18,000 $18,000 3/4 TON PICKUP SNOWPLOW WITH TOMMY LIFT $22,000 $22,000 1/2 TON PICKUP $15,000 rr $15,000 TOTAL $236,500 $157,000 5163,000� $315,000 $1,026,500 FORESTRY BANDIT CHIPPER 2600-436-460433-, 3/4 TON PICKUP WITH TOMMY LIFT TOTAL AIRPORT MAIN RUNWAY- THIN OVERLAY 5160-430430310-= WEST SIDE TAXIWAY AND ACCESS POINTS -PULVERIZE AND OVERLAY Projects identified are presented for EAST SIDE TAXIWAY AND ACCESS POINTS- PULVERIZE AND OVERLAY current footprint and use. The NORTH FUEL ISLAND ACCESS ROAD- PULVERIZE AND OVERLAY update of the Urban Renewal Plan my alter the approach of the CIP. MAIN HANGAR TAXIWAY -PULVERIZE AND OVERLAY NORTH WEST AIRPORT ROAD CONNECTOR- PULVERIZE AND OVERLAY CRACK SEAL (RYAN LANE LOTS, HANGAR & TAXIWAY ACCESS POINTS & FUEL ISLANDS TOTAL WATER 5210-447-430550-x $55,000 $,000 $za,00 $24za,000 555,000 SO � $24,000 $0 579,000 $372,000 $372,000 $255,516 $255,516 $362,167 $14,280 $14,280 $41,446 $41,446 $56,000 $56,000 $14,794 $14,794 $386,7941 $311,242 22,167 $56,000 $1,116,203 8TH AVE W. MAIN REPLACEMENT FROM CENTERTO I ITH ST $2,455,975 $2,455,975 4TH AVE. E. MAIN REPL. (BOND) (CNTERTO 3 ST TO 14 ST E CORD W/STREET, STORM CIP) $1,923,555 $1,923,555 7TH AVE WN LOOP FROM 6TH AVE WN TO E NEVADA ST $382,605 $382,605 MISC CONTRACT MAIN UPSIZE $200,000 $150,000 $150,004 $150,000 $150,000 $800,000 METERS -NEW $45,600 $45,600 $45,600 $45,600 $45,600 $228,000 METERS -REPLACEMENTS $110,000 $110,000 $110,000 $110,000 $110,000 $550,000 1ST AVENUE WN - 8" REPLACEMENT FROM NEVADA TO MONTANA $888,707 0 $888,707 CONSTRUCT GROSSWIELLER WELL (CARRYOVER) $961,746 $961,746 SCADA SYSTEM UPGRADES $15,000 $15,000 $15,000 $15,000 $15,000 $75,000 LIBERTY STREET WATER MAIN PRJ 0 $384,722 $384,722 ALTITUDE/PRV VALVE AT ELEVATED TANK (50 % GROWTH) $140,843 $140,843 6TH AVE WN FROM IDAHO TO INTERSECTION OF NEVADA & 7TH AVE WN $1,024,01 $1,024,019 LOWER ZONE RESERVOIR ROOF REPAIRS $3,500, $3,500,000 9TH AVE W FROM 6TH ST W TO 8TH ST W, 8TH ST W BIT 8TH AVE W & LOTH AVE W $625,000 $625,000 2ND AVENUE WEST - CENTER TO 6TH STREET WEST $1,156,266 $1,156,266 SHOP COMPLEX PAVEMNT RESTORATION (Split b/t wtr, swr, storm, street, solid wst)CARRY $38,200 $38,200 PARKS METERING PHASE I AND PHASE B $30,000 $30,000 8TH STREET WEST FROM IOTH AVENUE WEST TO 13TH AVENUE WEST $416,000 $416,000 OLD SCHOOL STATION FREQUENCY DRIVE ADDITION $45,000 $45,000 FACILITY PLAN $300,000 $300,000 WATER STORAGE FACILITY $5,400,000 $5,400,000 VEHICLE REPL.-UP TO I TON(220,270,275,272) $25,000 $65,000 $25,000 $115,000 TRENCH ROLLER REPLACEMENT(271) $27,000 $27,000 BACKHOE REPLACEMENT(249,222) $130,000 $130,000 $260,000 HEAVY TRUCKS REPLACEMENT - (12 YD)(221) $175,000 $175,000 RIDING MOWER REPLACEMENT $10,000 $10,000 SUPPORT EQUIPMENT REPLACEMENT -TAPPING MACHINE $17,00 $17,000 TOTAL $4,735,101 53,122,418 $1,651,866 55,266J $21,929,638 2 CITY OF KALISPELL FIVE YEAR CAPITAL IMPROVEMENT PLAN DEPARTMENT DESCRIPTION 2018 2019 2 2021 TOTAL SEWER- 6TH ALLEY E. SOUTH OF 14 E ST. TO 13 ST E PIPE REPLACEMENT $204,900 $204,900 BILLING AND COLLECTION 5TH ALLEY E FROM 7 ST E TO 10 ST E SLIP LINING $74,746 $74,746 5310-454A30630-xxx 1ST ALLEY WN FROM MONTANA ST TO WASHINGTON ST SLIP LINING $49,783 $49,783 3RD ALLEY WEST; 10 ST W -11 ST W, AND 11 ST W- 2ND AVE W SLIP LINING $74,366 $74,366 SE 1/4 SECTION 36 LIFT STATION (100 % GROWTH) $398,688 $398,688 MANHOLE REHABILITATION & SEWER MAIN REPLACEMENTS/REPAIRS $50,000 $50,000 $50,004 $50,000 $250,000 WEST SIDE INTERCEPTOR-STILLWATER ROAD PROJECT (100 % GROWTH) $3,249,378 $3,249,378 WEST SIDE INTERCEPTOR - 3 MILE DR & SPRING CREEK PROJECT (CARRY AND NEW) $8,229,427 $8,229,427 MISC. SEWER CONTRACT MAINS AND FACILITY ENLARGMENTS $20Q000 $45,000 $45,000 $45,000 $380,000 FIRST ALLEY E AND W BETWEEN 7 ST W AND 9 ST W SLIP LINING $108,405 $108,405 6TH ALLEY WN FROM WYOMING ST TO COLORADO ST SLIP LINING $45,888 $45,888 6TH ALLEY EN; E OR.- E ID./ E WASH; 6TH ALLEY -7TH ALLEY SLIP LINING $57,321 $57,321 LIFT STATION COMMUNICATION UPGRADE $20,000 $20,000 120,000 $20,000 $100,000 GRANDVIEW LIFT STATION RELOCATION & UPSIZE (50 % impact) $460,000 $460,000 LIFT STATION #5A REMOVAL $244,572 $244,572 SHOP COMPLEX PAVEMNT RESTORATION (Split b/t wtr, swr, storm, street, solid wst) $38,200 $38,200 4TH ALLEY WN FROM CALIFORNIA TO UTAH $913,297 5TH ALLEY WN FROM MONTANA ST. NORTH TO END $759,978 $759,978 1ST AND 2ND AVE EN FROM WYOMING ST TO THE NORTH $1,001,878 $1,001,878 FACILITY PLAN UPDATE AND RATE ANALYSIS $200,000 $200,000 TOTAL $9,392,627 $535,409 $4,523,044 $1,361,450 $1,028,297 $16,840,827 SEWER-WWTPDAF REPLACEMENT -IUNIT $1,222,969 $1,222,969 5310-455-430643-xxx DIGESTED SLUDGE 3-WAY VALVE REPLACEMENT $15,000 $15,000 MISC REPLACEMENT ITEMS/MAINTENANCE/REPAIR $100,000 $100,000 $100,000j $500,000 EAST SECONDARY CLARIFIER COATING REHABILITATION I $58,672 $58,672 WEST PRIMARY CLARIFIER MECHANICAL REBUILD $50,616 SECONDARY CLARIFIER COVERS - NORTH AND SOUTH(carry $100,000, new $100,000) $200,000 $200,000 PRIMARY DIGESTER INSPECTION AND CLEANING $30,000 $30,000 SAND FILTERS MAINTENANCE AND REPLACEMENT (CARRYOVER) $200,000 $200,000 LIFT PUMP REPLACEMENTS $33,000 $33,000 AWWTP EFFLUENT QUALITY UPGRADE $4,602,572 AWWTP EFFLUENT QUALITY UPGRADE (2025) $3,156,049 $3,156,049 SECONDARY DIGESTER LIDS REPLCMNT (CARRYOVER $500,000, NEW$400,000) $900,000 $670,000 $1,570,000 SOLIDS DEWATERING CONSTRUCTION (CARRYOVER) $99,000 $99,000 PROCESS CONTROL 1 $118,352 $118,352 EF3 EFFLUENT FILTRREPLC FOR ADDT CAPACITY & IMPR PERFORMANCE (60 % IMPACT) $1,364,084 $5,456,336 $6,820,420 SECONDARY TREATMENT STANDY POWER (26% IMPACT) $144,652 $144,652 DIGESTER SLUDGE BOILER AND HEAT EXCHANGER OVERHAUL $75,000 $75,000 FACILITY PLAN UPDATE AND RATE STUDY $100,000 $100,000 T-WAS TANK ROOFING REPLACEMENT $32,000 $32,000 BIOSOLIDS ALTERNATE DISPOSAL ENGINEERING PHI, CONSTRUCTION PH2 $600,000 r $3,600,000 CHEMICAL STORAGE AND FEED -PHASE 3 $170,953 $170,953 HEAVY TRUCKS REPL.- (12 YD) (204,264) $150,000 $150,000 M4 $300,000 LARGE IMPLEMENT TRACTOR REPLACEMENT (502) $20,000 $20,000 VEHICLE REPLACEMENT -UP TO 1 TON (208)(209) $40,000 $30,000 $70,000 TOTAL $1,784,000 $3,173,709 S3,180,616 $1,617,621 $13,433,309 $23,189,255 STORMWATER 5349-453-430246-= STORM DRAIN CORRECTIONS COP-124 (Pipe conveyance from detention pond 124 in W Stillwater drainage) COP-118 (Pipe conveyance from detention pond 118 to Stillwater. Kalispell drainage area) STORMWATER FACILITY UPSIZING SYLVAN DRIVE STORMWATER REPAIR PHASE 2 NORTH MAIN STORM IMPROVEMENT ELMS STORMWATER IMPROVEMENT TWO MILE DRIVE DRAINAGE IMPRVMNT FROM HAWTHORN TO MERIDIAN SHOP COMPLEX PAVEMNT RESTORATION (Split b/t wtr, swr, storm, street, solid wst) STORMWATER QUALITY TREATMENT FACILITY - WYOMING STREET OUTFALL STORMWATER QUALITY TREATMENT FACILITY - 1ST AVE W SOUTH OF CITY SHOP DP-127 REG DETENTION POND FOR NEW DEVELOP AREAS N OF 3 MILE DR & W OF STILLWTF STORM FOR 4TH AVE E WATER PROJECT (BOND) (PRJ SPLIT W/WATER & STREETS) PIPELINE INSPECTION CAMERA TRUCK REPLACEMENT (281) VACUUM TRUCK REPLACEMENT (213) BACKHOE REPLACEMENT (286) (Replacing with an Excavator) VEHICLE REPLACEMENT -LIGHT VEHICLES UP TO 1 TON(661,288,212) SUPPORT EQUIPMENT REPL.- TRAILER MOUNTED GENERATOR(260) SUPPORT EQUIPMENT REPLACEMENT - SUBMERSIBLE PUMPS TOTAL $100,000 $100,000 100,004 1003,5 $100,000 $500,000 $$ ,000 $ $4,263,296 $4,263,296 $230,000 $30,000 $30,000 $30,000 $30,000 $350,000 $390,000 $390,000 66,914 $166,914 $210,625 $210,625 $250,000 $250,000 $38,200 $38,200 $125,334 $125,334 $297,594 $297,594 $1,187,463 $1,187,463 $304,728 $304,728 $175,000 $175,000 00,0 $400,000 $130,000 1 $130,000 $40,000 $40,000 $37,000 $117,000 $45,000 $45,000 1 $50,000 $50,000 $1,482,928 $1,743,088 $696,914 S3,899,724 1$4,740,890 $12,563,544 SOLID WASTE GARBAGE TRUCK REPLACEMENT - SIDE ARM LOADER (323) $324,500 $324,500 5510-460-430840(5)-xxx GARBAGE TRUCK REPLACEMENT - SIDE ARM LOADER -REFURBISH (331,450) $85,000 $85,000 $170,000 GARBAGE TRUCK REPLACEMENT - REAR LOADER (316) (FY18 REPLC FLOOR) $20,000 $210,000 $230,000 TOTAL $20,000 $0 $295,0004 S409,500 $724,500 C CITY OF KALISPELL FIVE YEAR CAPITAL IMPROVEMENT PLAN DEPARTMENT DESCRIPTION VEHICLE REPLACEMENT -LIGHT VEHICLES -UP TO 1 TON(326) SUPPORT EQUIPMENT REPLACEMENT - TIRE BALANCER SUPPORT EQUIPMENT REPLACEMENT - TIRE CHANGER SUPPORT EQUIPMENT REPLACEMENT - AIR COMPRESSOR SUPPORT EQUIPMENT REPLACEMENT - WELDERS SUPPORT EQUIPMENT REPLACEMENT - WASTE OIL HEATER W/TANK SUPPORT EQUIPMENT REPLACEMENT - SCAN TOOL SUPPORT EQUIPMENT NEW ITEM -DIAGNOSTIC TOOL KIT TOTAL 2018 2019 2020 $35,000 $7,500 $6,000 $6,500 $6,000 2021 $5,500 $10,000 $10,000 $41,500 $19,500 $5,500 TOTAL $35,000 $7,500 $6,000 $6,500 $5,000 $10,500 $15,000 $15,000 $6,000 $10,000 S20, $96,500 SERVER- DOMAIN CONTROLLER $10,000 $10,000 SERVER- PRIMARY DOMAIN CONTROLLER $10,000 $10,000 SERVER - DATABASE (TYPE 1) $5,000 $5,000 SERVER - FILE SHARE SERVER $7,000 $7,000 SERVER- MAP AND CITYWORKS $10,000 $10,000 $20,000 SERVER - CLUSTER (3 FOR VMS) $33,000 $30,000 $63,000 SERVER- DATABASE (TYPE 2) $11,000 41 $11,000 SERVER- STORAGE (SAN) $30,000 $30,000 SERVER- WEB SERVER $8,000 $8,000 SERVER - STATION 62 $10,000 $10,000 SERVER- SECURITY CAMERA VIDEO REPOSITORY $10,000 $10,000 SERVER - DISK BBASED BACKUP $40,000 $40,000 NETWORK EQUIPMENT -SWITCH -CITY HALL(1) $4,000 $10,000 $14,000 NETWORK EQUIPMENT - SWITCH - PUBLIC SAFETY (2) $8,000 $8,000 $16,000 NETWORK EQUIPMENT - SWITCH - PARKS $3,000 $3,000 NETWORK EQUIPMENT - SWITCH - STATION 62 $4,000 $4,000 NETWORK EQUIPMENT - FIREWALL APPLIANCE (2) $25,000 $25,000 NETWORK EQUIPMENT - FIREWALL APPLIANCE FOR REMOTE SITES (3) $10,000 $10,000 NETWORK EQUIPMENT - ROUTER FOR STATION 62 $10,000 NETWORK EQUIPMENT - ROUTER FOR CITY SHOPS $8,000 $8,000 GENERATOR- CITY HALL SERVER ROOM $50,000 $50,000 TELEPHONE SYSTEM 100,000 $100,000 HARD DRIVE CRUSHER $7,000 $7,000 AV- CAMERA STATIONARY $6,200 $6,200 $12,400 AV -VIDEO SWITCHER $10,000 $19,000 AV - SWITCHER $10,000 $10,000 TOTAL 77,000 $101,200 162,000 $92,200 $90,000 $512,400 El