08-10-06 Site Review MinutesSITE DEVELOPMENT REVIEW COMMITTEE SUMMARY Thursday, August 10, 2006 Building Department Conference Room ATTENDING: Frank Castles, Asst. City Engineer Jeff Clawson, Plans Examiner Sean Conrad, City Planner Brent Christopherson, Fire Marshal P. J. Sorensen, Zoning Administrator, Chair Mark Crowley, Construction Manager Roger Krauss, Asst. Police Chief Guests: Bill Schottelorb and Toby McIntosh (Western Building Center) Hear the Public: None. Performance Bond Reminders: Stillwater Bluffs bond will be called in due to incomplete work on the lift station, among other things. OLD BUSINESS: Town Pump — nothing new Holiday Inn Express — New plans came in this morning. Hutton Ranch — Frank is waiting on video of the sewer before issuing the letter to certify the infrastructure for the building permits. Fire access will need to be inspected. The overall parking plan was submitted earlier today. 121 Financial Drive (Health & Human Services) — new office building — Public Works needs storm drainage calculations and plans. Brent discussed relocation of the hydrant with them recently. Office Solutions — 700 Sunset Blvd; loading dock addition and remodel — The loading dock does not work under zoning for a number of different reasons. They may move forward with the interior expansion with an admin CUP. The exterior facelift is fine. They will add a sidewalk along the highway. Approved by site review provided that the front parking spaces are modified by closing the western -most space, changing the next space to an HC aisle, the next space to an HC space, and leaving the eastern -most space intact. Western Building Center — 1745 — 3rd Ave E; addition to existing store — They brought an updated site plan. Brent will work with them to get the Knox locks at all gates. Drainage has been approved. They will add landscaping to shield the fence from 3rd Ave. Approved by Site Review. Hilton Garden Inn — Hwy 93 S; new hotel; they will need to tweak the parking lot configuration. Frank sent a letter to Hilton's engineer regarding the pump house and his concerns. NEW BUSINESS: None PLANNING OFFICE ITEMS: Sunset Court — Cluster Development north of Three Mile Subdivision. There are a number of significant issues, including (1) insufficient access for cars, fire, and pedestrians; (2) lots smaller than 4500 sq ft min size; (3) utility main extensions; (4) need for a fire turnaround, i.e. cul-de-sac or hammerhead; (5) potential requirement for a 60 ft dedicated right-of-way; (6) snow storage and drainage; and (7) hydrants. Wade — 5th Ave E apartments — suggest connection with property to the south. They need fire access to the back of the rear building. The driveway needs to be 24 ft, with signs indicating a fire lane. Mail box location is important, and probably works best in the front as shown. Curb/gutter/sidewalk/boulevard. Discussion on "Cobblestone Lane" as a street and the appropriate addressing. OTHER REPORTS: Westwood — Zoning and Building are ready for permits. The Building Dept needs to have the development agreement signed, the Fire Dept access approved, and the Public Works certification prior to issuing permits. Heritage Bank — They are dropping the ATM, and agreed to add a connector sidewalk from the northern access to the front door. Stillwater/Reserve — Stop signs have been installed. Sec. 36/USFS — Road between the new USFS building and Glacier High was discussed. The meeting was adjourned at 3:45 p.m. cc: Police City Manager Bldg Fire Planning Parks Comm. Dev. Public Works FCAOA MDOT