09-28-06 Site Review MinutesSITE DEVELOPMENT REVIEW COMMITTEE SUMMARY Thursday, September 28, 2006 Building Department Conference Room ATTENDING: Brent Christopherson, Asst. Fire Chief Sean Conrad, City Planner P. J. Sorensen, Zoning Administrator, Chair Jennifer Young, Recreation Supervisor Kathy Kuhlin, Recording Secretary Guests: Ned Halling, Jackola Engineering; Mark Waatti; and Mike Frasier Hear the Public: None. Performance Bond Reminders: None. OLD BUSINESS: Town Pump — 2910 Hwy 93 S — casino addition — no reply yet to our letter. Hilton Garden Inn — Hwy 93 S; new hotel — No updated site plans received yet. They are working with the fire department on some issues, i. e. fire extinguisher cabinet, etc. USFS — new facility; Spring Prairie PUD — Mike Frasier - This is going to Council on Monday. They have been working with Jennifer on the landscaping. We are waiting for their final revisions. 59 — 3"d Ave WN — new electrical contractor storage building — Jackola — this went through Architectural Review. They have some revised drawings. They are working with Susie on the drainage. Existing bushes will be part of the buffer. Jennifer said the landscaping looks good, but she requested a tree in the boulevard. They will work with her on this. They will also have to seed the boulevard. They are doing the final revisions on the lighting plan. This is moved through Site Review, subject to three conditions: finishing the lighting plan, drainage, landscaping, and they also need to submit two full size sets of their site plan. NEW BUSINESS: 19 Appleway — conversion of single-family residence to real estate office — They added on a handicapped ramp with a shared utility easement at the corner of the ramp that may need to be adjusted. They also have a shared driveway they put in without the adjoining property owner's permission. If the adjoining property owner agrees to this, it should work. They should have enough parking. They will probably need a fire hydrant on their side of Appleway. They have a 5 foot landscaping buffer, but Jennifer could use more detail. 424 Main St — change of use from office to coffee bar —They will be adding a handicapped bathroom on the main floor. This is moved through Site Review subject to approval by fire and building. PLANNING OFFICE ITEMS: Subdivision on Church Drive — Coming in from CTA with annexation request and PUD master plan for 100 acres. They will be dedicating land for a new fire station. We will need a preliminary parks plan. Willow Creek — Sean is still working with the Turners on this project. OTHER REPORTS: Holiday Inn Express — We have just received a new set of plans. They are working on the road extension, fire protection, and getting their performance bonds figured out. They will need three hydrants — two new and one relocated. They will also need an all-weather road, street signs, and fire flows completed. Their preliminary plat has already been approved. Three Mile Professional Building — The Veterans Administration (V.A.) is moving their clinic into this building. They are adding 7 parking spaces. There may be a need for additional handicapped spaces because of the use (clinic). Mike Frasier will check with Jeff on the handicapped parking. Montana Furniture — We passed this through previously, but they have now reduced the building and submitted a revised plan. Brent submitted in his comments for them to relocate their hydrant. They were allowed a Highway 93 address previously, so fire will request they display the address number on two sides of the building. No issues with the changed access. Scotty's — Certificate of Occupancy — the City will be putting in the new hydrant. The landscaping has not yet be put in, the shed has not been moved, they have temporary signs out that need to be taken out, and the parking doesn't line up with the plan. The lighting is also not according to the plan. Parks will accept bonding for the landscaping. The meeting was adjourned at 11:00 a.m. cc: Police City Manager Bldg Fire Planning Parks Comm. Dev. Public Works FCAOA MDOT