11-22-06 Site Review MinutesSITE DEVELOPMENT REVIEW COMMITTEE SUMMARY Wednesday, November 22, 2006 Building Department Conference Room ATTENDING: Paul Burnham, Assoc. Civil Engineer Jeff Clawson, Plans Examiner Tom Jentz, Planning Director P. J. Sorensen, Zoning Administrator, Chair Jennifer Young, Recreation Supervisor Frank Castles, Asst. City Engineer Mark Crowley, Construction Manager F. Ray Ruffatto, Fire Inspector Sandy Wheeler, Comm. Dev. Mgr. Kathy Kuhlin, Recording Secretary Guests: Toby McIntosh, Sharon Jackola, and Shane Jackola from Jackola Engineering. Hear the Public: None. Performance Bond Reminders: None. OLD BUSINESS: Eisingers — W Reserve/Hwy 93 — they are finalizing their flood study. It shows where the drainage pipe comes down, which is supposedly out of the flood plain. Jackola Office — Kelly Court/Hwy 93 S; new office building. 5,760 sq. ft. They added the van accessible parking space, and have shown the roof structure. They plan to share the circulation with a bank that will go in behind their building. Setbacks were discussed by Tom and P.J., and they felt that the proposed drawing was appropriate. The water pipe is shown stubbed in as a I". They are not planning on sprinklering the building. The proposed sign was discussed. Sign within 50' of intersection of property line and easement - setback by 15' from each line or have clear air space from 42" to 72". A landscape planter could be put in there that is not over 3-1/2' total or a sign that size. Clear vision triangles. Kelly Road is private. They would like to put in a flag pole in the front. They will have screen walls that are going around the project. Their lighting was discussed. They would like to have landscape lighting. Storm drainage was discussed. This subdivision's storm drainage was supposedly dealt with previously as a whole. Toby will contact Schwartz engineering regarding this. Mark thought the developer was bonded with the City to put in 43 street trees along the boulevard. Jennifer was not aware of this. They will do their site lighting to City standards. They want to get some ground work done right away as far as earth work. They need to be sure their water runs to the gutters. They will probably add one sewer basin. This will need to go through Architectural Review. This portion of the project is passed through Site Review with the conditions discussed above. NEW BUSINESS: None. PLANNING OFFICE ITEMS: None. OTHER REPORTS: 19 Appleway — this project has been approved by all departments and will go forward. Hammerguist Office Building — They are planning on remodeling what was previously known as the Bright Side Laundromat and using it as their new office. The meeting was adjourned at 10:50 a.m. cc: Police City Manager Bldg Fire Planning Parks Comm. Dev. Public Works FCAOA MDOT