PERFORMANCE BOND REMINDERS:
Spring Prairie 4 — We are working with them to get their bond amount resolved.
Two 4-Plexes by Gateway West — Chris Sund will be doing a bond for the concrete and landscaping.
OLD BUSINESS:
First American Title — 219 E. Center; new office building. They will be getting additional plans in
soon. This will be on the agenda next week.
KRMC — 320 Sunnyview Lane; G.I. Building (new digestive health building). This will be going off
the north of the existing building, right near the Women's/Children's Clinic. They are planning for an
April start. The PUD for KRMC will be going to Council on the 6th. The second reading will be
March 20th. If it is approved, then it will be ready at the end of April. We just received the full set of
drawings on the G.I. Building. They will need to give us the parking analysis. ARC review will be
required. This will be on the agenda for next week.
McDonald's — 1110 Hwy 2 W; new building to replace existing. They are planning on starting in
March. Everything has been resolved with Fincher. Tabler mentioned that they still need to get the
approaches changed. This will be on the agenda for next week.
Rivals — 1250 Hwy 2 W; remodel of old Sizzler/Tree Frog. Sports bar. No major site changes.
They have a CUP for their casino use. Sorensen sent them an e-mail recently about meeting with
Public Works regarding how they will grade the sidewalks across the approaches. They are
concerned about the electric and utility boxes they need to work around. Tabler stated Public Works
is okay with those. On the SE corner of the building, they were going to put in a platform and railing
for some mechanic equipment. This will be on the agenda for next week.
Immanuel Lutheran — 20 Claremont; Phase 2 of the expansion of existing retirement community.
Phase 3 has also come in now, which is just an interior remodel and some touch-up on the outside.
We essentially approved the overall site layout when Phase I came in. Some of us met yesterday
with them regarding the bike path. We wanted the easement on the west property boundary. We
agreed to narrow down the sidewalk from 10' to 6'. Their CUP said there needed to be an easement
on their site plan, but not the construction of the bike path. They started to do some of the site work
and went ahead and built the garbage enclosure there without the City's approval or permits. We will
have to work around it now. They have fill material piled up high on the bank that is around 50'
across that may be in the MDT right-of-way. Freyholtz will check on this as it could be an issue.
They are willing to work with us as long as it doesn't cost them anything. We will submit to them
our ideal path layout with options to make it a buildable easement. Discussion was held regarding
where to locate the path. We need to get together next week to decide what we are going to do.
This will be on the agenda for next week.
Copperwood Brewing — 409 —1 st Avenue East; convert existing retail (the old American Carpet) to
a micro -brew and tap room. This is a Change of Use. All changes are interior, along with a new sign
outside. They are being pro -active on this project, and have submitted their pre-treatment design.
Their main issue is wastewater. They also have questions as to how they will handle their storm
sewer. This will be on the agenda for next week.
Montana Coffee Traders —111 S Main. They are doing some work on the front of the building that
will go to ARC. In the back, they are removing a portion of the (Osbourne) building. They will be
backfilling the existing crawl space, and doing interior remodeling. They haven't shown their parking
or garbage area yet. This will be going to ARC next week, and on our agenda for next week.
Spring Prairie 4 (mini -anchor) — Old Reserve/Hwy 93 N; new retail. The anchor north of Hobby
Lobby, with one pad but two tenants. Most of the site work is done there. They will be coming in at
the end of March for ARC. This will be on the agenda for next week.
NEW BUSINESS: None.
PLANNING OFFICE ITEMS:
KRMC PUD — See above under Old Business.
2
OTHER REPORTS:
Stillwater Bend — An application for 56 acres west of the Kalispell North Town Center at Rose
Crossing and Hwy 93 N behind Falkor came in for a PUD Place Holder. They are asking for a
Commercial B-2 zone on the front and then it would just be high -density residential in the back along
the river.
The meeting was adjourned at 10:42 a.m.