Loading...
04. Public WorksPUBLIC WORKS Fund No, 1000 Public Works Administration 1581764 1000 Central Garage 71 1 55 2500 Special Street Maintenance ,7,2 220 Gas Tax 200 Light Maintenance 196,818 2401 .Decorative Light Maintenance ,5 225 MAGI Grt 1861000 4290 Sidewalk & Curb Construction 25,000 4 SID 344 Old School Station 2,593,884 5210 Water Fund $ 6,6961,772 5310 Sewer OperatingfWastewater Treatment 17, 0 , 55 5349 Storm Sewer I,7 5510 Solid 'waste 896,061 7�1 PUBLIC WORKS - ADMINISTRATION FUND: GENERAL 1000410430100 EXPENDITURE SUMMARY ACTUAL BUDGET ACTUAL BUDGET FY04/05 FY05l06 FY05l06 FYQb/Q'i Personal Services $66,977 $138,3041 1 , 2, 464 Materials & Services $9,594 $12,6669,91 1 , 300 Capital Outlay so $17,850 $17,429 PROGRAM DESCRJPTION The responsibility of the Public Works Administration/Engineering Department is the design, construction, maintenance and administration of the Citys infrastructure. These areas include streets, curls, sidewalks, traffic signals, signa e, water production and distribution, storm water drainage, sewage collection, wastewater treatment and equipment maintenance. FY 07 BUDGET HIGHLIGHTS Line Item Detail : Public Works 110 Personnel Services The reorganization and succession plan redistributes salary splits to better reflect where time is actually spent. No new FT 's were added. 215 Computer Supplies & Support - $2,500 1,500 AutoCAD upgrades 1,000 software upgrades and other computer related instructions 354 Contract S i e /Par in -$350 Increased to reflect actual costs. FY06 ACCOMPLISHMENTS mvided administrative and support services for management of Water, Sewer Collection, Storm Drainage, Wastewater Treatment, Solid Waste enterprise funds, Street Maintenance, equipment t maintenance and supporting, administrative and engineering assistance to all other General Fund departments of the City. • Hired a Con struction Manager to ensure a higher degree of conformity to City standards within subdivision developments. 89 PUBLIC WORKS - ADMINISTRATION FUND: GENERAL 0004I U-4301 flU Personal Services: TE' 110 Salaries and payroll costs 153 Health Insurance 155 Retirement Total Personal Services Materials & Services: 210 Ogee Supplies 13 Small Office Equipment. 15 Computer Supplies & Support 216 Computer Equipment 9 Other Supplies 241 Consumable Tools 320 pntin 331 Publication 335 Membership & .dues 345 Telephone & Communications 354 Contract Srvice-larking 362 Equipment Maintenance 9 Radio faint. fir. Supplies 73 School & Travel Subtotal Capital Outlay: 944 Vehicles TOTAL EXPENDITURE DETAIL ACTUAL FY04f05 BUDGET .....FY05l�6 ACTUAL FYti5/06 BUDGET FYQ6/07 w4wPPORMP00.0"I 1.0 1. 53,974 $111,310 $89,710115,54 ,575 $20,285 $15,176 $19,910 $3,428 $6,709 $5,569 $7,007 $6,977 $138,304 $110,455 $142,464 1,45 $1,350 $,88 $1,850 19 $25 48 $2,000 1039 $2,500 $1,88 $2,500 $938 9 $15 $1,500 $1,054 $1,750 $1,795 $1,750 $86 $30 39$300 6 25 47 $.51 $1,43 $1,000 $896 $ 1,€1 $549 $1,166 $1,172 $1,200 835 5 674 $1,000 $135 1 375 35 21 $3 $$300 3 $300 $1,850 $2,00088 $t 9,594 $12,66 $9,918 $16,300 so $17,850 $17,429 ..................................................................................................................................................................................................................................... . 76,571 $168,820 $137,802 $158,764 90 PUBLIC WORKS,,CENTRAL GARAGE RIND: GENERAL 10[}0-410-431330 EXPENDITURE SUMMARY ACTUAL BUDGET ACTUAL BUDGET FY04/45 FY05/06 FY05l05 FY06/07 Personal Services $149,302 $145,437 $142,355 $1561204 Maintenance &Opration , 7 S227,550 $244,410 $250,950 Capital Outlay , 00 $6,400 34 , 99 791387 $393,165 $407,154 PROGRAM DESCRIPTION e Central Garage is responsible for maintaining all city vehicles and equipment in a safe and dependable condition at the lowest cost per mile, or hour, with the least inconvenience to each department. An extensive record keeping system for repairs and maintenance is maintained. and recommendations are provided to insure the City is ,receiving cost effective use of vehicles and equipment. FY 07 BUDGET HIGHLIGHTS .dine Item Mail: CENTRAL GARAGE 215 Computer Supplies & Support - $3,500 Renew software license for the All Data Repair Manuals & replace laptop computer. umt laptop is over 4 years old and not working properly. 218 Equipment -$3-R50 2, 00 Heavy Duty Truck 'transmission .hack 1 Gas & Oil - $94,000 (increased due to cost of fuel) * provided passenger vehicle and equipment repair and maintenance services for 18 6 equipment items for er, er eney services, park maintenance, street maintenance, water, sewer, wastewater treatment, and construction, in 14 City General .fund Departments and Ent rprise Fu nd 0peratina ,Divisions, a total of 99 repair orders. * fired and trained a new mechani c. New mechanic attended a Cummins training school for engine management controls and computer controlled systems, • John Lyons returned to his position as Shop Foreman after a year of military tour in Iraq. - Saved over $6,000 by purchasing a storage container for tiro storage in place of building an enclosure next to City shop. PUBLIC WORKS -CENTRAL GARAGE FUND: GENERAL 000410-431330 Personal Services: TE' 110 Salaries and payroll costs 121 Overtime 153 Health Insurance 155 Retirement Total personal Services Maintenance & Operations: 210 Office Supplies 215 Computer Supplies & Support 218 Equipment (NonCapital) 221 Safety Equip & Supplies 229 Other Supplies 231 Gas and Oil 232 Motor Vehicle Parts 233 Tires 238 Filters 241 Consumable Tools 322 Books 341 Electricity 32 Water 344 Natural Gas 345 Telephone & Communications 354 Contract Services -repairs 362 Equipment Ma int 366 Building Maim 69 Radios 373 School & Travel 38,9 Medical Services Total M Capital Outlay 90 Machinery & Equipment 920 Tire Storage Building Total Capital Outlay TOTAL BUDGET EXPENDITURE DETAIL ACTUAL FY04i05 BUDGET FY05f06 ACTUAL FYOSIOG BUDGET FY06l07 3 3 115 f 13 $112,439 SIIO1029 $116,046 1,946 $2,000 98 $2,000 24,805 $24,480 $25,396 31,368 6,9 8 $6,518 $6.,432 S6,390 149,302 $145,437 $142,355 $156,204 44 00 308 00 1,500 $2,000 $1,549 $3,500 o 0 0 $3,050 67 S250 27 00 $2,434 $3,000 $3,448 $3.000 72, 14 $89,000 S100,328 $94,000 59,098 59,000 $65,291 S'S64,0 0 15,922 $18,000 $28,682$2-3,000 $2,578 $3,600 $4,367 $4,300 1,127 $1,500 895 $1,500 2 4 3500 $158 S300 $1,828 $2,000 $1,764 $2,000 74 1 00 90 M0 7,959 $7.200 i 0,196 $10,200 0 5 0 75 28,98 f $36,000 $25,O 19 S36,000 1, 1 5 1 $1,000 251 $1.1000 1,106 00 S118 5 00 0 20 so 250 1 74 $3,000 S1,093 $3,000 1 7,597 $227,550 $244,410 S1250,950 0 0 so 0 $6,400 $6,400 so o $6,400 6400 0 346, 99 S379,397 $393,165 $407,154 92 SPACIAL STREET MAINTENANCE FUND: 2500421430240 PROJECTED REVENUE AND FUND SUMMARY ACTUAL BUDGET ACTUAL BUDGET FY04105 FY05/05 FY05f06 'Y05107 BEGMNING CASH 0100 CASH: Operating $34 ,377 S457,567 $434,846 $556,402 10107 Cash, designated for REPLACEMENT* $35,000 $70,000 $70,000 $60,853 10108 Cash, designated S & C repair so REVENUE 343011 Sidewalk repair penalty $3,500 343012 Public Works Charges $13,140 4,000 S19,725 14,000 331050 MDOT Grant -Transportation Plan $75,000 363010 Maintenance Assessments $1,008,553 $1,05608 $1,097,19 $1,138,000 363040 Penalty It L Interest $5,137 $5,000 $6,3665,000 381050 Lease/INTERNAL LOAN 1 0,000 0 S80,000 371010 Investment $3,493 $2,500 $14,593 $10,000 Total Revenue $1,030,323 $1,248,188 $1,137,793 $1.325,500 Total Available $1,405,700 $IJ75,755 $1,642,639 S 1,94 ,757 EXPENDITURES trmt Depar e t 00, 54 $1,277,657 $981,237 $11428,592 Capital Replacement 5 ,000 $44,145 $68.500 Total ,digs MM54 $1,335,657 $1,025,392 $ ,497,092 ENDING CAS 0 100 Cash Caffy Over, OPERATING $434,846393,09 55 ,40 414, 10 10 107 Cash, designated REPLACEMENT* 70,000 S47,000 $60,855 $27,355 10108 ax, designated S & C repair $3,500 Total Cats $504, 44019 17, 57 $442,165 * Adding $35,000 per year to replacement, using $6,5 0 FY2007 Resolution 5138 adopted Aug1, 2006 Cu rrL t. rates 006-� Oft7 rate vacant land 0.0 1 0 1 2 acre residential $0,0101 acre 0% commercial $0,0149 100% commercial $0.0157 3 SPECIAL STREET MAINTENANCE FUND: 2500-421-430240 EXPENDITURE SUMMARY F�� I I ACTUAL BUDGET I ACTUAL I BUDGET FY04/05 FY05106 FY05/06 E`Y06/07 ,Personal Services $590,763 $684,232 $601 fiW $716,070 Materials and Services $199,483 $264,071 $270,566 S334M 0 Debt Service $70,350 $721434 $92,128 $62,574 Capital Outlay $40,258 $256,920 $16,883 3 15,037 Replacement .funds ,000 $44,145 $68,500 $900,854 $1,335,657 $1,025,382 $1,497,092 PROGRAM DESCRIPTION Special Street. Maintenance funds will be primarily used for street sweeping, flushing, leaf pick-up, sanding,: deicing, snow plowing and snow removal. The overall goal is to maintain all city streets in a clean, safe and drivable condition during all seasons. The Special Street Maintenance lands also supports Traffic Signs & Signals. Traffic Signs & Signals is responsible for determining proper sign location, maintenance of signs, striping of crosswalks and streets, maintenance of'traffic signals and placement of emergency signage here needed to provide the safe and orderly passage of vehicles and pedestrians in the City of Kalispell. This division supports the Police Department for emergency traffic control and street blockage for parades and other unique events. 94 SPECIAL STREET MAINTENANCE FUND: 250042 I-430240 FY 07 BUDGET HIGHLIGHTS Line Item Detail Cont.: Street Division 110 Personnei Services - .2 5 of FTE moved to Storm Fund for street sweeping. The reorganization and succession plan redistributes salary splits to better reflect where time is actually spent. No new E's were added. 355 Contract Services Aerial Mapping - $13,750 l ,'750 25% Due to unprecedented rapid growth, we are updating our existing 3 2 sections ofbase mapping and expanding another 32 sections outward to provide accurate mapping data for increasingly critical facilities planning, water quality, and storm water drainage issues. (Costs shared w/Water, Sewer, andStorm) 358 Impact Analysis � Carryover $7,000 Senate liii 18 3 was passed into I aw by the Montana legislature in C Y 2005. This new law allows Cities to establish and collect impact fees related to the cost of supplying municipal services necessary to support growth. The law sets out very specific requirements for the establishment of impact fees. In order to be in compliance with the law, an Impact Fee Study is necessary. This effort will establish the correct Street impact Fee, and will be co sistent with other work related to water, sewer, storm, parks, police and fire, and will ensure full compliance of all City impact fees with the requirements o SB 185. 362 Equipment Maintenance - $13,500 #2 0 rebuild liner on Intemational tandem truck #300 $2,300 ,disc equipment repair & maintenance 4,500 Tire chains and cutting edges on graders & Loaders for snow removal. $3,500 Brooms for Sweepers 0 Building Addition - Carryover $180,000 ,000 loan from Community Development ent wlsa a interest rate as board of investrmuts A 60' 60' steel building addition. The street department has currently outgrown their space. They have several pieces of bigh value equipment that are presently being stored outside and exhibiting signs of deterioration due to weather. The a didou would allow this equipment to be secured inside and weather protected. 33 Transportation Plan Update � Carryover $75,000 city/ S75.,000 grant State will match 5 0% up to f75,000. This will provide a comprehensive update of the Kai Area Transportation Plan. This plan is now 11 years out of date and will be updated to ensure the projects and priorities are current and consistent with communitycommu-nity needs. A consultant has been hired for the work. 940 Machinery & Equipment »- $68,500 (Carryover $26,500 & New Appropriation , 0 Replacement funds Carryover $26,500- One Ton 4x4 dual rear wheels w/ dumping flatbed. Replacing a 1976 one ion flatbed, New Appropriation $42,000 - Used Single Axle Dump Truck w[New Plow & Sander. Replacing a 1972 single axle truck and sander. 9 SPECIAL STREET MAINTENANCE FUND: 2500-421-430240 FY 07 BUDGET HIGHLIGHTS-con't. Line Item Detail Cont.: Street Division Debt Service 10 S57,900 Principal lint. payment to Montana a Board of Investments and an intcmal loan. $22,590 Single Axle Snowplow & Banner Truck - 3rd year of 5 year debt schedule. 13,03 5 Les n-To Structure - 3rd year of 5 year debt service. 2,275 Building Addition - 1 st year o f 5 year de, bt. schedule. FY 06 ACCOMPLISHMENTS Street Division 4k Street Department maintained 120 miles of streets and alleys. 4k Awarded a contract to add a 0' x 6 0' addition to the street division's storage bulIdi ng. Utilized the Pavement Management program for scheduling yearly street improvements. * Continued the annual spring -time Downtown cleanup campaign • rack Sealed 15 blocks of City streets. Prepp d and paved Woodland Park parking lot, • Prepped and paved the basketball court at Empire Estates. • Prepped and paved approach and parking area for Armory Well, Constructed walkway from Summit Ridge Drive to Summit Ridge Park. Prepped and patched water main and service line cut outs. • Assisted the Solid Waste Division to remove brush and yard debris from city alleys. •Removed 7,050 cubic yards of leaves to be composted. Removed approximately 850 cubic yards of sweeping from City Streets. 4k Assisted Serer Division to raise manhole covers up to asphalt grade. Replaced a 1976 one tors truck with a new flatbed trued.. •Replaced a 1972 two tors truck with a used 2000 FL 70 truck for hauling the Patch King asphalt carrier. FY 07 BUDGET HIGHLIGHTS Line Item I . pi a 18 Equipment(Non Capital) - $12,000 $2, 00 Paint Machine Trailer $3 0 Cordless Impact Driver $1 0 Ohm Meter $1,200 Air Compressor & Hose Reel $ , 0 ) Traffic Counters $ 00 L. op Finder 300 ' 3 legged "der $0 Supplies - Parts Bin. on Boom Truck $550 % of Plasma Cutter (costs shard w/S wer, Central Garage & Water) SPECIAL STREET MAINTENANCE FUND: 2500-421-430240 Line Item Detail: Traffic Signs & Signals 242 Street Signs - $25,000 10,00 0 increase needed for increased cost of materia]s, and growth that has occurred in the C it s, and to fund the safe roues to school program which will provide safe pedestrian corridors. 243 Traffic Signals - $12,000 7, 00 needed for LED Pedestrian Signal Head Replacements ents 54 Contract Services - $17,000 4,000 - Repairs Maintenance I ,000 - Temporary Help - Spring/Summer. The TSS department has had FTE}s since it was forrned in 1984. Since that time the department has experienced a substantial increase in the work load, andmquests for an additional FTE Dave been left unfunded for the last 4 years, This gives us the ability to hire a temporary worker during the busier part of the year. 54 Building Maintenance - $4,000 City personnel to construct an equipmept shelter of ` the west side of the TSS building. 10/ 20 Debt Service -$4,171 Principal, $503 Interest GMC 314 Ton Pickup - 3rd year of 5 year debt schedule. FY 06 ACCOMPLISHMENTS Traffic Signs & Signals • Changed out all the green incandescent bulbs in the traffic signals to an energy efficient, highly visible LED bulb. • Replaced all the old street name signs in the Northridge area with the new standard street signs. 4k Using the new self propelled striper city crews more than doubled the amount of curbs and intersections they were able to paint. 4 Replaced the trade signal vehicle loop for souls bound traffic at Center & l st Ave, W. • Repaired the outlets on the luminaire poles on West Center Street. Installed reflective strips on stop signs, school crossing signs, and speed limit signs throughout the City. Used 8 tons of thereto plastic to mark crosswalks an d railroad crossings. • Installed Spring and Fall Hockaday banners on Main St and the downtown area. Repaired, replaced and installed numerous street signs throughout the City. * Maintained luminaries for str etscape lights, decorative lights, alley lights, and airport lighting. • Signed and barricaded for all major parades, city repairs and emergencies. t Eliminated all sight obstructions of City street signs. 97 SPECIAL STREET MAINTENANCE FUND: 2500-021-430240 EXPENDITURE DETAIL STREET DIVISION Personal ser i v'. 110 Salaries and payroll costs 121 Overtime 153 Health Insurance 155 Retirement Total Personal Services Materials and Services: 216 Computer Equiprnentlsupplies 218 Equipment (Non Capital) 221 Safety Equipment 224 Janitorial supplies 229 Other Supplies 21 Gas & Oil 241 Consumable tools 341 Electric 342 'water 345 Telephone 354 Contract Services $4,0 0 sidewalk cleaning) 355 Contract Services x Aerial Mapping 358 Impact Fee Study 2 Equipmentl aint.lsuppli s 366 Building faint. 369 ,radio Maintenance 73 School & Tr vc) 388 Medical services/drug test 510 Liability Insurance 12 Uninsured loss -deductible 521 Central Garage Transf"cr 522 Administrative Transfer 528 Data PTocessing Transfer Subtotal 1 ACTUAL BUDGET ACTUAi., BUDGET I FY04/05 FY05l05 FY05/06 FY06l07 11.05 $345,98 $14,092 $79,100 $21,381 11.05 $43,91 $25, 00 $95,940 $22,79 11.05 $383,056 $9,187 $76,09 $22 ,90 11.00 $446,734 $22,00 $1 0,33 $2, 12 $46 1,241 $574,420 $491,212 $595,308 $750 900 $1.' 4 $1,500 $ $7,00 $1,083 $3,00 $937 500 $1,20 $90 324 $300 $37 $350 $584 $1,200 $1,10 $1,00 $1 ,822 $11,400 $20,854 $1 6X0 S6 $700 $1,8 4 $1,200 $87 $850 $702 $850 $74 $100 $90 $10 $11 $50 $25 $90 $12,429 $18,750 $22,477 $23,00 $45 $00 $0 $13,750 $0 $15,00 $7,437 $7,5; $,1 03 $4,500 $,458 $13,50 $804 $750 $811 $2,000 $5 $11000 $225 $50 2,240 $1,8 $3 5 $1, 0 $8 $70 $48 $00 $16,020 $15,890 $19,559 $22,0 $0 $3,500 $0 $1,300 $65,000 $5,000 $5,000 $5,00 $25,20 $34,041 $34,041 $3,203 $3,700 $5,030 $ ,030 $5,094 $145,55 $190,1 1 $191,996 $220,50 10/ 20 Debt Service-Principal/Interest $ 5,934 S67,861 $ 7,555 $57,900 98 'T. SPECIAL STREET MAINTENANCE FUND: 2500421-430240 EXPENDITURE DETAIL -con't. ACTUAL BUDGET ACTUAL BUDGET `Y04/05 FY05/06 FY05f06 FY06f07 capital outlay: 840 Masi Grant Tr nfer-Sweepers 920 Building(carryover) 933 Transportation Plan 'Update 944 Veh icle 14„ % survey van) Subtotal capital outlay 43045 Replacement Funds: 940 Machinery & Equipment Subtotal Replacement TOTAL STREET DIVISION TRAFFIC SIGN &SIGNALS Personal Services: `T E's 110 Salaries 112 Severance 121 Overtime 153 HealthInsurance 155 Retirement Total Personal Services Maintenance & Operations: 218 Equipment (Non Capital) 221 Safety Equip & Supplies 224 Janitorial Supplies 229 Other Supplies 241 Consumable Tools 242 Street Signs 243 Trade Signals 245 Barricade Materials 41 Electricity 345 T le. & Communications 354 Contract Services 22,721 11,920 75,00 1 A93 .............. 16,883 1,37 15,0 24,214 $256,920 $16,883 $315,037 58,00 $44,145 S68,500 5,00 9744 1 47 $44,145 S69,500 3 7 0 2.0 2.0 2.0 2.0 $92,548 $86,47 $86,086 $90,199 12,796 0 so 2,959 $3,000 $6.116 $7,000 14,523 $15,396 $12,894 $16,146 6706 5,09 $5,352 73417 $129, 522 $109,812 $110,448 $120,762 $6,192 $3,050 $3,559 $12,000 168 150 $1,261 55 $355 450 482 50 771 65 825 85 1,291 700 794 $1,300 14,346 $15,000 $23,122 $2,000 2,356 $12MO $5,305 $12,000 353 $2,500 $2�307 $2,500 5,147 $5,2 0 $5,503 $5,600 576 550 70 70 $2M54 $15,000 $10,793 $17,000 CON'T. 99 SPECIAL STREET MAINTENANCE FUND: 2500-021-430240 EXPENDITURE DETAIL-con't. F`� ACTUAL I BUDGET I ACTUAL, I I BUDGET FY04105 FY05/06 FY05/05 Y06/07 Maintenance a e, a : Cont. 362 Equipment Maintenance 9 4 4 0 $1,4 9 $1,000 366 Building Maintenance $ 6 ►4 0 $ 51 $4,000 369 Radio Maintenance $6 50 $ $5 373 b i & Travel S1,918 $1,000 $1,911 $ .X 428 Paint Materials $1 ,547 $13,000 $16,619 SM550 510 Liability Insurance $2,9 3, 1, 0 1 4P 512 Uninsured Loss -deductible $ $5 0 0 $500 532 Office Rent. %Moo Subtotal M & 0 $53,628 $73,910 $7 , 70 i 14�350 Debt Service: TSS 610/620 Debt /Principal/Interest $4,416 S4,573 $4,573 $4f674 Subtotal Debt Service $4,416 S4,573 $4,573 $4f674 Capital Outlay: 940 Machinery & Equipment $16, 44 Subtotal capital outlay $16,044 $ $0 $ Total Traffic Signals 3 131�2394786 Grand Total - Street & Signs 01 4 $1,3359657 1, �3 ,497,092 0 GAS TAX FUND: 2420421-430240 PROJECTED REVENUE AND FUND SUMMARY ACTUAL BUDGET ACTUAL BUDGET FY04/05 FY05i06 FY05l06 FY06/07 GMNING CASH 10100 CASH REVENUE 335040 Caps 'fax Apportionment t 371010 Interest 383010 Operating Transfer Total Revenue TOTAL ,I. E EXPENDITURES Street Department ENDING CASH CASH $328, l ,3 5 $219,335 $250,884 $300,857 $ , 5 $31, $2,500 $318fi22 $11,270 $318,622 $6,500 $303,682 $321,1223,$325,122 $3, .1 $50,57 $549,227 $576,006 $ 1 ,335 $159,527 $250,884 $172.,706 Section i 5-70-1 1 MCA requires the State to locate gas tax reve-n ues to cities, town s and counties. One-haIf of the c ity's alloc a ion is based on populatj oTi and or e-hailf on street and alley mileage. The funds may be used for construction, reconstruction, maintenance and repair of streets, right of ways and alleys. The funds cannot be spent for equipment purchases. GAS TAX FUND: 2420-421430240 Materials and Services Capital Outlay EXPENDITURE SUMMARY ACTUAL I BUDGET ACTUAL BUDGET FY04/05 Y05/05 FY05/06 FY06i07 3" 3,195 $295,800 $235.518 530 9, 0 $85,130 $62,825 $78,000 13,0 5 $380,930 $298,343 $403,300 PROGRAM DESCRIPTION Funds received from Gas Tax will be used to support the street and alley maintenance/construction program, This program is accomplished by prioritizing construction and maintenance projects through the use of the pavement management in onnation system. 102 GAS TAX FUND: 2420-421-430240 FY 07 BUDGET HIGHLIGHTS Line Item Detail: 354 Contract Services - $40,000 Striping city strets. 360 Contract Labor/Maintenance - $17,000 This line item is for snow removal or construction support. 935 5th Ave EX Roadway Reconstruction - $8,000 Area in front of ear wash has deteriorated past the point of patching. The asphalt will be stripped and repaved. 955 Conrad Sidewalks - $20,000 Install a 9 1 / ' ft wide sidewalk adjacent to the Woodland Ave. side of the Conrad mansion and relocate crosswalk.. 956 Sidewalk Replacement - Carryover $20,000 New Appropriation $5,000 $7.5,000- (includes carryover) To be used for a matching program to assist borne wners with replacing bad sidewalks. 957 Alley Paving - $25,000 Pave approximately 10 alleys a year and overlay existing alleys with remaining funds. FY 06 ACCOMPLISHMENTS Submitted an application to MDT Urban Highway Pavement Preservation program requesting funds for reconstructing S. Meridian Road and overlaying Airport Road. if approved construction is prgjected to take place in 2008. .7 residents utilized the 50150 sidewalk program to replace 8 1/2 blocks of sidewalks. i Paved 19 aIIeys using the new funding, allocation. for alley paving. i Striped approximately 24,500 linear ft ofCity streets and 2,250 sq R ofpavement arking . Provided dust control on alleys and City streets. • provided snow and ice control activities in accordance with the adopted snow plan. GAS TAX FUND: 2420-421-430240 Materials and Services -Streets 231 Cias & Oil 344 Natural Gas 354 Contract Services -striping 360 Contract Services/Maintenance 368 Overlays & Chipseals 369 radio Maintenance 452 Gravel 53 Materials -Contract Preparation 471 De-fc-er/Road Oil 72 Asphalt 73 Crack Scaling Material 533 Equip eW Rental Total Materials & Services Streets Capital Outlay 934 1 st Ave E Parking Lot Construction 935 Rdway reconstruction-5th Ave. EX 430234 Sidewalks 1 Alleys: 955 Conrad Sidewalk 956 Sidewalk Construction 957 Alley Paving Total Capital Total EXPENDITURE DETAIL ACTUA., BUDGET ACTUAL BUDGET FY04/05 FY05J06 FY05/06 FY06/07 $16fiM $17,500 $20,745 $22,500 089 $5,000 $5,582 $8,00 $47,816 $40, 00 $20,310 $ 0,000 ,2 4 $17,000 $1,677 $17,000 253,0 1 $130,000 $146,244 $150,000 30 $0 300 $1,999 $,000 $1,586 $,00 , 6 $10,000 0 $10,000 $12,099 35MO $17,430 $35,000 $ 3,829 $25,000 $18,039 $25,000 $ 16 $5,000 0 $5,000 $3,50 $5,000 $3,905 $6,500 373,195 $295,00 $235,518 $325,300 8,000 $20,000 $39,70 $60,130 $39,153 S25,000 $25,000 $23,672 S25,000 $39,870 $85,130 $62,825 71000 $4 13,05 $380,930 $29,3 $03,300 104 LIGHT MAINTENANCE 2400-410-430263 PROJECTED REVENUE AND FUND SUMMARY ACTUAL BUDGET ACTUAL BUDGET "1 F1 BEGINNING CASH 10100 CASH: $35,802 S58,471 $58,471 $89,193 REVENUES 3 63010 Maintenance Assessments 363040 Penalty Interest 381050 Inception of lease/loan -5 year TOTAL AVAILABLE EXPENDITURES Street Lighting ENDING CASH 1€1100 CASH-. 17 , 49 1, 7 S 1 86,340 9 $72,300 $190,873 1J 4 $59,000 S200,000 $1,000 $171,096 $259,540 51,057 $201,000 $206,898 $318,011 975 9 ,i9 $148,427 $243,388 S220,335 S196,818 5 .471 1 ! 41623 $89,193 $93,375 105 LIGHT MAINTENANCE FUND: 2400-4 U-43a2b3 EXPENDITURE SUMMARY ACTUAL BUDGET ACTUAL BUDGET / i 1 '7 Personal ervices 0 so ,414 Materials and Services $148,427 a-'88 $220,335 $17 , 04 Debt Service $ $0 so $17MO $14,.7 $243,388 $220,335 $ 1 9, 18 PROGRAM DESCRIPTION The Stre t Li ghti ng District is provided to improve visibility during darkness and to promote safe and efficient use of street facilities. This is accomplished by reducing pedestrian accidents .t night, by reducing vandalism, and by reducing other crimes. Budget provides for payment of electricity for City sheet. lights. Line Item .detail: 110 Salaries - a portion of assessment coordinator's salary is charged to this account. We previously paid the County for billing costs. Management ofassessments is a fa ction ofpublic works. 106 LIGHT MAINTENANCE FUND: 2400410430263 EXPENDITURE DETAIL ACTUAL BUDGET ACTUAL BUDGET Y4 Y 1FY06/07 Personal Services; FT 1 1 o Salaties $5,016 153 Healtbinsurance 1 ,o 89 155 1tirrct 309 es: Materials and Services: 44 Lighting Supplies 341 Electricity 354 Gi 3, light replacement program 522 Administrative Transfer Total Debt Serviee Pnncipal -5 year Interest •-4% Total Debt o o $6,414 4,4 1,00 $2,001 $4,500 13 , 9 1 ,000 $137,306 $145,000 7 ,300 $59,399$0 $4,648 $12,000 $16,041 $16,710 3,9 ,94 $148,427 $243,3880,33 1 t 4 1 ,000 ,90 o so so $17,900 Total $148,427 $243,388 $220,3351, 107 DECORATIVE LIGHT MAINTENANCE FUND: 230I -4I 0-430263 PROJECTED REVENUE AND FUND SUMMARY BEGINNING SH 10 100 CASK REVENUES 363010 Maintenance Assessments 363040 Penalty & Interest TOTAL AVAILABLE EXPENDITURES Street Lighting ENDING CASH 10100 CASE: ACT[JAL FBUDGET I ACTUA[, BUDGET FY04/05 F'Y05/06 FY05/06 FY06/07 7, 697 $3,946 $3,946 $3.085 $4,199 29 S6,336 25 $6,311 5 S6,328 5 $4,228 $6,361 $6,361 $6,378 11,925 $10,307 $10,307 $9,463 7,979 S10,000 $7,2226,50 3,9 6 307 $3,085 $2,963 `Note: Pro es in the district are assessed by fron t foota ge. S 1.50 per foot, 108 DECORATIVE LIGHT MAINTENANCE FUND: -4 3 3 Materials and Services EXPENDITURE SUMMARY ACTUAL BUDGET ACTUAL BUDGET FY04/05 FY05/06 FY05l06 FY06I07 $7,979 $10,0007,$6,500 PROGRAM DESCRIPTION The Decorative Street Light Maintenance District is provided as an aesthetic; feature in the business district as we11 as to promote beauti ft cation by I andscap ing and other appurtenances. The Downtown ,businesses sold bonds purchased the lights in the mid 1 0's. DECORATIVE LIGHT MAINTENANCE FUND: 2401410-43 0263 EXPENDITURE SUMMARY !DETAIL ACTUAL BUDGET . .. .... .... ACTUAL I BUDGET FY04/05 FY05/06 FY05/06 FY06107 Materials and Services 44 Lighting Supplies $5 $1 �50 $625 $1,000 341 Electricity $3,004 $4,500 $3,0 7 $4X 360 Repair & Main . Service $4,921 $4MO $3,500 $1,500 Total M& S VX9 $1 . 0 7 ,5 0 Total Budget $7,979 S10,000 $7.222 S61500 Um MT. AIR & CONGESTION GRANT FUND: 2825... STREET. ...421....FUNCTION ... .430240 PROJECTED REVENUE AND FUND SUMMARY .GINNING CASH CASH: Operating REVENUES 383010 Transfer from Gas Tax 33 055 MAGI Grant for Sweepers 383010 "rransf r from Scorn Total Revenue TOTAL AVAILABLE EXPENDITURES AMAL OUTLAY ENDING CASH ASH- Operating ACTUAL, BUDGET ACTUAL BUDGET FY04/05 FY05/06 FY05f06 FY06/07 o so so so $2 ,721 $146,585►o $0 so so so o so 0 $161.000 $5,000 $1 9, f o so $18 100 $169,306 so o $18 ,000 $169,306 $o $o $186,000 $o so $o so MAGI Sweeper Grant - FY07 the amount of the 13. 2% match is approximately $25x0o and will be transferred from the Storm Maintenance Fund. III MT. AIR & CONGESTION GRANT FUND: 2825...STREET....421....FUNCT ON....43Q240 EXPENDITURE SUMMARY ACTUAL BUDGET ACTUAL BUDGET FY04/05 FY05l06 FY05/06 FY06/07 Capital Outlay $169,3060 so $186,000 $169,306 $0 so $186,000 PROGRAM DESCRIPTION Th e MAGI grant is a program to help sotve Air Quality p rob lems. FY 07 BUDGET HIGHLIGHTS The Department of Transportation has indicated the MAC] program will fund equipment purchases in this fiscal Year. The City proposes to purchase a new street sweeper. The it 's match amount would be 13, % of the sweeper cost. The match amount will be taken f om the Storm Drainage Maintenance Fund. 112 MT. AIR & CONGESTION GRANT FUND: M .. STREET'.. ..42 L. -FUNCTION. - A3 0240 Capital Improvements; 940 Strcet Sweeper TOTALS EXPENDITURE DETAIL ACTUAL BUDGET ACTUAL BUDGET FY04/05 FY05/06 FY05/06 FY06/07 6 ,30 0$186,000 $169,306 so so $186,000 113 SIDEWALK & CURB CONSTRUCTION FUND: 4290-4I Q-43U234.... PROJECTED REVENUE AND FUND SUMMARY BEGINNING CASH 10 100 CASH: REVENUES 381004 .proceeds S & C Warrants 373017 Owner Contribution TOTAL AVAILABLE EXPENDITURES Construction Costs 'ENDING CASH 10100 CASH: ACTUAL BUDGET ACTUAi. BUDGET FY44/05 FY05/05 FY05/06 FY06/07 5.71 o 31, 3 $50,000 $22,85025,000 3,93 $50,000 $22,85025, 31, 3 $50,000 $17,134 $25,000 $37,409 S50,000 $17,134 $25,000 p P. 5,7 1 0 so 114 SIDEWALK & CURB CONSTRUCTION ND: - -3 23 ... . 430234 937 Sidewalk Construction 522 Administration EXPENDITURE SUMMARY /DETAIL ACTUAL BUDGET I .. I ACTUAL BUDGET FY04f05 FY05/06 FY05/06 FY06/07 1, 93 $45,000 S22,850 so ,0 1,93 $50,000 $22,850 PROGRAM DESCRIPTION The sidcwalk and curb iconstruction fund is used to record expenditures for replacing sidewalks and curbs which residents request or which the City orders in. The costs are paid for by the property owner. They are billed for the cost of construction plus % for administration. The property owner can have the cost put on the tax notice for a period o f 8 years. The City sells sidewalk and curb warrants for the arno nt of the assessment - The sidewafk and curb construction fund appropriations have been changed due to the implementation of the matching program. This gives us budget authority to sell sidewalk &. curb warrants. SID 344 CONSTRUCTION (Old School Station) FUND: 4244-410-43 U315 . PROTECTED REVENUE AND FUND SUMMARY BEGINNING CASH 10100 CASH: REVENUES 381004 Proceeds SID BONDS 37 10 10 Interest Total Revenue TOTAL AVAILABLE EXPENDITURES Construction Costs ICING CASH 10 100 CASH: amended BUDGET ACTUAL RUDG T 'Y / 51FY06/07 0 $2,568,884 $4,520,000 $4,520,000 so 2,0 $4,520,000 $4,520,000 $25,000 4,52 ,0 0 $4,520,000 S2,593,884 $4,520,000 $1,951,1162,5 ,884 2,8,884 so SID 344 CONSTRUCTION (Old School Station) FUND: 4244-410-430315. EXPENDITURE SUMMARY /DETAIL BUDGET ACTUAL BUDGET FY05/06 FY05/06 FY05/07 950 CONSTRUCTION $ , 72,000 $1,343,880 $2,624,903 Transfer to Bond reserve $226,000 S226MOO Transfer to Revolving fund $226,000 $226,000 Administrative transfer $40,000 Cost of Issuance $15 ,0 0 $155,236 $4,520,000 $1,95 1 , 116 $2, 24N PROGRAM DESCRIPTION ID bonds for construction of i n frastrueture were sold for the 01d School Station Project. The district, comprised of 55 ac res, wiII contain both a Industrial T IF district and a Tec nology TI F district. Infrastructure includes a water well, sewer, storm sewer-, stmets and lighting. Water and sewer limes to the project area 2 miles south of the City were paid for by the developers. The property is annexed. CATER FUND (Operations & Biding) FUND: 5210-447-43(}550 PROJECTED REVENUE AND FUND SUMMARY ACTUAL BUDGET ACTUAL BUDGET FV 4/ 5 Y 5/ Y 5/FY06/07 BEGINNING CASH 10100 Operating $730,673 $885,043 $885,043 $1,179,249 10104 By 93 S Const $393,381 0 10120 Plant investment ►802,643 $1,795,557 $1,795,557 $2,498,482 10125 Meter Replacement. $74,259 $82,484 $82,484 $99,579 10107 Capital Improvement Reserve -target $100,000 3070 $60,000 $60,000 $90,000 10127 Emergency l esery -target $100,000 $20,000 $40,000 407000 $60,000 Adj. to Cash/ a/r & Bond Reserves 1 / , ' ,2 4 2,€133,179 $2,863,084 $2,869,368 $3,927,310 RIEVENUES 343210 M etex d Water Sales-r06+10% $1,560,892 $17750,000 $1,847,953 $2,020,000 343230 Meter Replacement Fee-'06+10% $58,475 $66,000 $67,095 $72,600 343225 Hookup Fees -plant investment cash $1,273,030 $1,000,000 S928,390 $850,000 343260 M 1se.-Instal fat] onJ e onneetl ent $69,727 $5,07000 $37,775 $60,000 23104 Revenue Bond 2004 Issue - B01 #2 $117,074 0 0 0 23105 Revenue Bored 2005 issue - 1 01 #3 $230,320 $315,000 0 0 2310.E Revenue Bond 2006 issue - 1,023,550 $290,713 $1,500,000 371010 Interest Eamings $32,909 $30,000 $67,271 $407000 Interest Earrings - Plaint Inv. Aces, $83,897 $85,000 Reimbursement by SID 344 $139,000 $0 Total Revenue $3,342,427 $4, 93,550 $3,323,094 $4,627,600 Total Available $5,375,606 $7,256,634 $6,192,4 2 $ ,554,910 XPNSS Water Department Facilities 1,743, 57 $2,43.3,717 $1,950,650 $2,567,794 from plant investment funds $237,667 $1097,950 $259,362 $2,406,654 from meter replacement funds $50,250 $50,000 $50,000 $65,000 Bonded projects $683,956 $1,323,428 $323,428 $1,500,000 Billing $124,543 1277112 $121,712 $157,325 Total All Departments $2,840,073 $6,032,207 $2,7€15,152 $67696,773 ENDING CASH Operating $885,043 $733,214 $1,179,249 $1,074,130 Plant Investment 1,795,557 6471607 $2,498,482 8417828 Meter Replacement $82,484 $98,484 $99,579 $107,179 Capital ImprovementReserve-target $300,000 $60,000 $90,000 "$- 90,000 $1207000 Emergency Reserve target $100,000 $40,000 $60,000 $60,000 $80,000 Total rash $2,863,084 $1,629.305 $3,927,310 $2,223,137 F 05, FY06 S 5 ,000 ofplant investment fees used to pay dc bt service; S 100,000 for fYO7 11 WATER OPERATIC)NS FUND: 5210-447-4345501560 EXPENSE SUMMARY F� ACTUAL, BUDGET ACTUAL BUDGET FY04/05 FY05/46 FY05f06 "Y06/07 Personal Services 91 A86 $598,563 $542,829 $606,694 Maintenance & Operations $481,686 $504,369 $448,756 $643,585 Debt Service $405,246 $524,1774 7,2 3 $518,015 Capital Outlay $45,239 $366,608 $41,842349,50 Capital € tlay-Bonded $683,956 $1,323,4283 3. 1,5 , 0 Capital Outlay -Plant Investment funds $237,667 $2,097,950 $259,362,40 , 54 CapitalOutlay-Meter Funds 5 30 $50,000 $50,000 $65,000 Depreciation/Replacement $320,000 $440,00044 ,000 $450,000 ,715,530 $5,905,095 $2,583,440 $6,539M8 PROGRAM DESCRIPTION The water facilities budget accounts for the costs associated with providing safe, potable and palatable water for the needs of the domestic, institutional, industrial and commercial consumers and to provide adequate pressure and flow to meet fire fighting and irrigation needs. Maintenance f the five wells and Noffsinger Springy; as grater sources along with maintenance of the distribution system, storage facilities, fire hydrants, values, meters and related controls is an integral part of the function of this department. This budget i responsible for pumping and treating millions of gallons annually. FY 07 BUDGET HIGHLIGHTS Line Item Detail: Water Pend 110 Personnel Services The reorganization and succession plan redistributes salary splits to better reflect where time is actually spent. o new E's were added. 214 GIS SuppliesEquipment - $4,200 increase needed for installation expenses for re-establishing the G IS base station at the new City ball and, a grater tight, lockable storage container for surveying supplies lath, stakes, risers; lids, rebar, etc. , and a surveyor truck cover. 119 WATER UPERATIONS FUND: 5 210-447-4305 50/S SQ Line Item tail: continued 18 Equipment (Non Capital) - $6,800 00 {- Well Sounder $550 - Meter Van Shelving $250 - PH Tester 1 Safety Equipment & Supplies - $4,500 1, 900 - Ladder Fll protection 1,00 - Gas Detector Y 07 BUDGET HIGHLIGHTS 00 - Apeter 40 - Chlorine Analyzer Kit 1,500 - Meta Detectors 800 - 1,00 Watt. Generator ,00 - 3" Diaphragm Pump 550 - % of Plasma Cutter 4 Contract Services - $75,000 5,500 - Contract Mowing at Well Sites $1,300 U-Dig fees $40,000 Temporary Contract Help 12,000 - Estimated System Repairs $3,000 Generators Testing & faint. Contract ,000 - Leak Detection 355 Contract Services Aerial Mapping - $13,750 13.7 5 0 5% Due to unprecedented rapid growth, we are updating our existing 3 2 sections of base mapping and expanding another 32 sections outward to provide accurate mapping data for increasingly critical facilities planning, water quality, and storm water drainage issues. (Costs shared w/Spec Street, Sewer, and Storm) 8 Impact Analysis - Carryover $5,000 Senate .bill 185 was passed into law by the Montana legislature in CY 2005. This new law allows Cities to establish and collect impact fees related to the cost of supplying municipal services necessary to support growth. The law sets out very specific requirements for the establishment of impact fees. The law also sets out requirements for reviewing, and validating fees that were in effect prior to the passage of Sly 185. In order to be in compliance with the law are Impact Fee Study is necessary The City completed a Water late and SDC analysis as part of its most recent rate study. This cf'for't will provide for the validation of that earlier effort to ensure compliance with the requirements of SB 185. 41i Meter Change out - $115,000 948 The meter change -out program is nearly complete after experiencing some delays due to the extremely high number of new meter service requests the past two years_ spite new meter requests ofnearly 400 per year, City field crews have been able to change over all but. 320 meters out of an original project total of 6,000 meters. Ofthe 320 to be replaced. approximately O are sewer service meters, and 100 are irrigation meters. 1n addition, this line item now includes an annual appropriation of $65,000 which was previously shown separately in the water budget. These funds are for replacements of worm or defective existing meters and are provided via the $0.65/month meter replacement fee on water/sewer service accounts. 120 WATER OPERATIONS FIND:5210447-430550/560 FY 07 BUDGET HIGHLIGHTS - conft. Line Item Detail: continued 422 Hydrants - $15,000 ,0 0 increase is for bacteria water sample hydrants. Due to increased growth the number of sampling the City is required to do has also increased. These sample hydrants will give us dedicated, safe sites to take samples. Capital Outlay 934 Replace 1 " Water Main & Connect Buffalo Hill Well to Reservoir 1 1 ,000 (Carryover $75,000 & New ►pproprla ion $80,000 The 18 Inch diameter water line connecting reservoir # I and reservoir #2 1s leaking badly and 1s located beneath structures on Buffalo Hills golf course. A new line will be installed along a different alignment to avoid the existing structures. In addition, this project wi11 be amended to include installation of a new connection from Buffalo Hi11s well # 1 to res r of r # l . This will a 11ow for filling reservoir # l when reservoir #2 is out of service. The Iine replacement between reservoirs is a critical item and necessary to ensure the ability to maintain one reservoir iri-service whil mai ntenance is done on the other. This cannot be done at this time due to the poor condition of the 18 inch line. 940 Machinery& Equipment - $112,000 Low Profile Tandem Truck.. This will allow us to eontinue the turnover ofused trues. The 1994 Ford would be passed to the Street Department. A low profile truck works more efficiently when leading heavy items i.e., concrete, asphalt) minimizing risk of injury. This truck has been requested for the last five years. 944 Vehicles - Carryover $25,000 Carryover $25,000 - 3/4 Ton 4x4 Pickup True - Currently having to borrow a truck from other departments for the meter replacement program. 958 Colorado St., Ist. Ave. 1. ., Knolls Loop, & Washington St. Loops - $165.,000 ($82,51)0 Plant Investment Funds) The facility plan identified a number of loop installations that will improve service quality and increase capacity. A. portion of the work will be funded from plant investment fees and the remainder will be funded from rates. The looping will reduce dead ends and help to sustain pressure during periods of high demand. Capital outlay -plant Investment Funds 357 all pelI Facility Pla n Phase II - Carryover $93,000 This project will provide for the expansion of the 2002 Facility Plan to include new facilities to support orderly growth of the community. The 2002 Facility Plan focused on expansion requirements for existing facilities to meet growth demands. The new effort will Identify facilities needed to support growth in areas where growth is occurring. It is intended that these new fac€lities will be provided by development but should be specified by the City in order to eusure Full and success ful integration into the it 's existing infrastructure. 121 WATER OPERATIONS FUND:5210-447-430550/560 Capital Outlay -Plant Investment Funds Cont. 956 Upper Zone Storage $2,773,674 (Carryover S 1,9 73,6 74 & New Appropriation$800,000) Storage in the: upper pres ure zone is presently Imited to 100,000 00 gallons and must be au gmcnted by booster pumping from the lower zone to meet domestic, commercial and fire: demands. The deficiency on storage was identified in the facility plan as a critical need to be addressed. Recent explosive: development in this service zone magnified the need for additional storage to ensure we meet demands and can adequately support the Fire Department during a fire emergency. This project anticipated adding an additional 1,000,000 gallons minimum of critical storage. preliminary engineering confirined the most cost-effective option to be a tank size of 2,000,000 gallons. The tank will be an in -ground design. An excellent site has been located and we are negotiating with the property owner. An additional appropriation of $800,000 is needed for the increased storage capacity. 957 Upper Zone Production - Carryover $750,000 .Production capacity in the upper pressure zone is deficient by approximately 1,200 gallons per minute. A portion oft i project will provide for the rehabilitation of Grandview Well #1 which is plagued with excessive sand production and also is contaminated by iron bacteria, The remaining component of the project will be to develop additional production capacity sufficient to meets the requirements identified in the CiWs Facility Plan 2002. FY 06 BUDGET ACCOMPLISHMENTS 22 fire hydrant replacements and 18 fire hydrant repairs. Added 47,920 linear feet of new water main to City system. Replaced 1,03 5 old water meters in our system and installed 3 4 3 n ew water meters. Installed 5 9 new water maim taps, repaired 15 service lines, 12 main breaks, 8 gate valves, and 9 curb boxes, • Crew continued to work closely with MDOT, prime contractor and others on the Meridian Road Piro ect. •Completed replacement of all interior wiring at Noffisinger Spring pump station. • ,Installed seeurity wire and upgraded alarms at Noffsinger Spring Pump Station (recommended in vulnerability study). • Installed spill proof containment vessel for fuel storage at l off inger Springs DEQ requirement). Installed rain gutters at Noffsinger Springs & Buffalo Hill well house, r Awarded bid to HDR/EES and begin working with them on the Impact Fee Analysis. The Impact Advisory committee was also forined. • Awarded bid to Schellinger Construction to begin constructing infrastructure tructure at Old School Station (SID 3 4 Coordinated with developers and upsized several water mains saving the City 3,1 .€I. 122 WATER OPERATIONS FUND: 521fl-44743Ii554 EXPENSE DETAIL ,ACTUAL BUDGET ACTUAL BUDGET F 1 1FY06/07 Personal Services: FTEIS 9.20 11.20 11.20 10.95 110 Salaries & Wakes $35,207 $42,799 $423,,764 $477,809 121 Overtime/Call Cuts 11 M27 $13,500 $10,491 $13,500 153 Health Insurance $71,588 $95,0468 ,€17J $87,143 155 PERD $23,664 $27,218 ►25,495 $2,242 Total Personal Services S491,4 $59 ,5 33 $542,829 $6061694 Maintenance & Operations. 210 Office Supplies 43 350 20 350 213 Small Office quip 500 191 $2,000 214 GIS Supplies $569 $1,200 911 $4,200 215 Computer Supplies &. Support $1,383 $1,200 70 1, 00 216 Compute` Equipment $41086, 00 $5,099 5�000 218 Equip. (Non Capital) 3,53 $2,300 $1, l 52 $7,320 221 Safety Equip &. Supplies $244 $ 00 $1,686 $4,500 224 Janitorial Supplies 740 $550 94 00 226 Chlorine, & Chemical 7� 73 $8,500 $12.033 $13,000 229 Other Supplies $713 $2,000 $844 I. M 231 Gas & Oil $14,420 $15�500 $17,1881' ,5 241 Consumable Tools $1,1 1 $1,500 $2,832 $2,000 312 Postage $2,810 $2,500 S291 $3,000 320 Printing 12 $3,000 S2,186 S2,000 335 Membership & Dues 304 $1,200 $808 $1,200 336 Public Water r Supply Fee $13,532 $15.000 $22,575 $15,000 341 Electricity $113,897 $137,500 $125,660 140,000 342 Water/Sewer 421 350 390 450 344 Natural Gas $10,151 $11.000 $1 4.04 $15,000 345 Communications $5, 4 $7,000 $ ,415 $7,000 49 lab Services $12,598 $ 17,000 $7,29 $210,000 353 Auditing 2, 50 S3,000 $3,000 $3,000 354 Contract Services $3 , 97 $65.000 S30,602 $75,000 35 Contract Services - Aerial Mapping 123 $13,750 356 Consultants$ ,5 0 $5,000 750 $10,000 123 WATER OPERATIONS 5210-447-430550 EXPENSE DETAIL ACTUAL FY04/05 BUDGET FY05l06 ACTUAL FY05/06 BUDGET FY06/07 Maintenance & Operations -continued: 357 Vulnerability Assessment $18,348 $0 $5,417 so 358 Impact Fee Study $15�0 0 $7,437 $7,563 360 Repair & Maintenance 2 $,00 $0 $6,000 362 Equipment Maintenance 791 $5,000 $2, 96 $5,000 33 Office Equip Maintenance $75 $0 0 366 Building Maintenance $9,797 $12,5 0 $ .11,489 $15,000 367 Facility Maintenance $ 0.13 $0 0 $ 369 Radio Maintenance $295 5 V 0 5$500 373 School & Travel $2,566 $4.200 $2,214 $4,200 380 Training Materials $ 0 0 0 388 Medical/Drug Testing $53 0 31 0 395 Equipment Rental $1,021 $1,500 $0 $1,50 410 Construction Materials $2,730 $7, 0 $17,827 $15,00 421 Meters $48,760 $5 , 0 22 Hydrants $1,355 $10,000 $8, 33 $15,000 23 ,materials - Mains $ ,31 $10,000 $9,5 0 $15,000 424 Materials - Service Pi es D O 7 $10,000 $5, 0 $10,000 425 Materials - Pumps 2, 1 $3,500 $3,206 $4,500 510 Property & Liability Ins. $201296 $22,000$27,39 $30MO 512 Uninsured lass -deductible $1,000 S5,000$2, 45 $2,50 521 Central Garage Transfer $8,500 $8,000 $,00 $8,500 522 Administrati ve Transfer $ 2,464 $ 1,1 11159 $66,414 528 Data Processing Transfer K700 $8,960 $8,960 $9,088 52 Office Rent $10,0 810 Bad Debt Expense $335 $1,5 $ ,27 ,500 Total Maintenance & Operations $481,686 $504,369 $448,756 S643,585 490200 Debt Service- ALL BOLDS & LDS; i 1 1 2 1 3° Principal, Interest, fiscal lees $405,246 $524, 177 $477,223 $518,0 15 C n1t. 124 WATER UPERATIQNS 521 Q-447-430SS(l EXPENSE DETAIL ACTUAL BUDGET ACTUAL BUDGET FY04/05 FYUS/flb ----------------------- FY05106 FY06/07 APITAOUTLAY Capital Outlay: Operating 920 Building 933 late Study (carryover) 934 Replace Water Main (Golf Course) 940 Equipment 944 Vehicles 950 Meridian Rd Water Main 88% 958 Four Looped Projects 50%) Capital Outlay -Bonded 931 US 93 S. -CARRY OVER 946 Hydrant Installs -phase I11 (carryover) 947 1 orthem Lights Project 948 Meters -capital pry -phase 111(carryover) 956 Upper Zone Storage (Bond) 430555 CapitalOutlay-Plant Investment Funds 37 Facility Plan Phase 11 941 Meters (new services) 930 Contract Main Upsize (plant inv. Aeet 942 Electrical Upgrade & Telemetry 953 Meridian lid Water Main 12%) 954 Utility Infrastructure SI Reimbursement) (cost split w/sew r) 956 Upper ,one Storage 957 Upper Zone Production 958 Four Looped Projects 5 %) Capital Outlay -Mete- Funds 948 Meters -Replacement S Total Capital Outlay 510400 Depreciation 831 Depreciation expense Total Water Facilities $2,715,530 $5,9 5,095 $2,583,440 $ ,539.448 125 IV12 31,527 $398.886 6,4 $5,274 $219,472 $237,67 $1,920 $718 so $75,0 0 $155,000 $0 $112,000 $30,088 S24,6200 $259,6 0 $16,504 so $82,500 $o so $93,917 $42,59 $0 $0 $ 2291511 $2 0,5 9 $ $1,000,000 $1,500,000 93,000 €1, 0 $71000 $35,400 $139,000 1. 23,55 $750,000 $50,250 $50,000 93,000 $55,4 3 $13 X $96,1 12. $1K€ 00 $2,51 $33,15 $0 $7 , 63 1. 53,4 7 $5,43 $ 14,51 $82,500 $50,000 $65,000 1,017,112 $3,837,986 $ 74,632 $4,321,154 $320,000 $440,000 $440,000 $450,000 WATER BILLING FUND: 5210-047-430560 EXPENSE SUMMARY r��� ACTUAL I BUDGET I ACTUAL ... I BUDGET FY04f05 FY05/06 FY05106 FY06/07 Personal Services S90,038 $87,1363, 1 $100,794 Materials and Sc-rvices $34,5053, 7 3, 1 15 31 S124,543 1 7, 1 1 1, 1$157�325 PROGRAM DESCRIPTION The City bi11s cult rners for water service on a bi-monthly schedule. The administrative fee effecti ve 3uly 1 st is S 3.5 5 per biIing period. This generates approximately S 15 5,000. FY07 BUDGET HIGHLIGHTS Line Item Detail: 110 Personnel Services The organization and succession plan redistributes salary splits to better reflect whew time is actually spent. No new FTC's were added. 210 Office sup ples and Furniture $2,500. It is unknown whether the Clerks will have bui It in cab irretry or will need furniture for the rove across the street. 218 Computers $3,000. Replace 4 year old computers when we move. 54 Contract Services 46,825 Includes 7 5 0 to Grizzly Security to pick up util ity b iUs at the grocery store locations and 375 5% of the cost to here Grizzly Security take daily deposits to the bank (costs shared with Fiance). 'maintenance contract for ADG software for the Utility Billing program i 0 year. Additional ,00 for bank charges and credit card fees. 3,75 - 0% cost of upgrading the sewer/water billing software to a GPS reading system. The upgrade will add features which include backflow detection, low battery alert, and early leak detection. The G PS radio read system is also faster and more effi cient. FY06 BUDGET ACCOMPLISHMENTS water a storncrs can now access heir water accents through our w bsite. The customer is able to see history and well as charts and graphs of their usage. They have an option to pay on line by debit or credit card. Bills can be e- ail d. 126 WATER BILLING FUND: 5210447430560 EXPENSE DETAIL ACTUAL BUDGET ACTUAL BUDGET FY04105 FY05/06Y Y' Personal Services: TE' - 1.85 1.85 1.,85 2.00 110 Sales fir. Wages 153 Health Insurance 155 PER Total Personal Services Maintenance & Operations: 210 Office u plies fa itu re 218 Computers & supplies 335 Memberships & Dues 33 Auditing 354 Contract Services 355 Postage/Other Billing Costs 33 School & Travel 522 Administrative Transfer 528 Data Processing Transfer 532 lent Total Maintenancc & Operations $71,928 $6,25 $65,626 $79,735 $14,010 S14045 $13,953 $16,31 4,10 $4^6 $4,012 $4,740 $90,039 $706 s8V91 $100,794 $90 1 0 $5 $2,500 5 9 S2,000 so $3,000 $10 $300 14 S300 $1,200 $1,200 $1,200 1,20 4;22 $5,750 5,59 $6,825 1 , 26 $14X0 $14, 93 $15,000 116 S1,000 $424 $1,000 4,54 $4,221 $4,221 $5,221 9,200 11 ,325 $11,32-511,4 5 10,€100 $34,505 $39,9763 ,12 l $56,531 Total Water Billing $124,543 S127012 $121,712 $157,325 127 WATER FUND sz i o-447-49axxx DEBT SERVICE DETAIL ACTUAL BUDGET ACTUAL BUDGET FY04/05 L FY05/06 FY05{06 FY06/07 BOARD OF INVESTMENTS 49 545 Debt Service -Loader; 610 Principal $5,158 620 Interest 403 490210 Debt Service-B 1 Bonds 03: 3103 Principal $97,384 620 Interest $23,297 49 215 Debt Service-B 1 Bonds 2 4: 610 Principal S 18.646 620 Interest $4,502 490220 Debt Service-BO I Bowels 2 00 5: Estimate 610 Principal 0 20 Interest REVENUE BONDS 490250 Debt Service-2001 WRF Loan - 4%: 610 Principal $30,000 620 Interest $26,860 490200 Debt Service-2004 Revenue Bond:( includes Refunding 199 610 Ninci al $120,000 620 1ntrst $78,389 630 Fiscal Agent Fees/issue costs 7 GRAND TOTAL 405,246 128 5,454 $11,041 368 � 0 97,384 $97,384 S97,384 33,744 $28,672 $32,378 5 € !X0 $49,616 $49,616 1 ,150 $17,092 $20,033 52,000 $16,190 $46,986 $20MOO $8,373 21, 85 $30,000 $31,0003 2, 000 S25,220 $25,6604,€0 1 5, 0 $125,000 $130MO 66,57 S66,507 63,83 35 3 350 524,177 $477,223 $518,015 SEWER- SANITARY OPERATIONS, BILLING, WASTEWATER TREATMENT FUND. 53 1 PROJECTED REVENUE E AND FUND SUMMARY EING CA 10100 Operating, 10 122124 "** ' T1 TP Plant Inv. Account 1€1125 *WVVTP Equipmcnt Rep I/ verb 1012 **** Sewer replacement 10123SANITARY sewer Plant Inv. Account Adjustments to Cash REVENUES 343310 SEWER S ERVIC E-billed 343335 Hoof up-WWTP 343330 wk-Sewer 371010 1 terestiop rations *** Interest-Wl`P capital irnprovenient * Interest -Sanitary Plant Invest. Aect. 343360 ise. 204 Revenue Bonds + 1 % reserve SID 344 Reimbursement W TP bonding or future Hookups Total Revenue Total Available EXPENSES Billing Sanitary Operations/capit l *** Sewer replacement .1m revenue bon * from plant investment funds iVVVTP operating/capital *** from capital improv, Funds & bond ** from Evergreen equip. apt. Funds Add unfunded depreciation to cash ENDING CASH Operating *** rWTP Plant Inv. Account * W1"P Equipment Repl/Evergreen **** Sewer equip. Tepla ent * SANITARY .Plant Inv, A"aunt ACTUAL LFY041�5 BUDGET FY05/�6 ACTUAL FY05l46 BUDGET FYU6/Ui $799, 91 $8 33,# 8 $974,718 $1.33 ,450 S2,688,667 $3,255, 10 $3,255,610 $3,588, 98 $2,527,820 $2,567,569 $2,567,569$2,493,530 $320,000 $284,445 $284,445 $312,055 $977,698 $1,424,6 0 $1,413,010 $1,708,9 8 $272 $ $8,14 $o $7,314,348 $8,395,352 $8387,212 $9,439,041 $2,785,094 $2,875,000 S3,038,070 $3,15 ,€ 00 $72 , 790 $ 500, 0 $ 548,7 7 $500,000 $52 ,992 $ 5 ,1 0 $ 97,172: $350,000 19,3 3 $2 , 00 $92,702 $9 ,000 $ 8,464 $50,000 $85,656 S85AO $3 t169 $30,000 $118,647 $75,000 13,121 $15.000 $61,4 1 $ 0,000 $961 $1, 0 $5,159 $2, 00 $294,706 $108,321 $118,321 $0 $139,00 $0 $0 $o $8,700,000 $0 $10,000,000 $4,458,630 $12.793,321 $4,455,875 $14,312.000 $11,772,978 $21,188.673 $12,843, 87 $23,751,041 $112,848 $127,56€1 $128,717 $158,722 S1,062,439 $1,326,611 $978,606 $1,. 67,65 $22390 $54..000 $ 2 94, 70 $0 $o so $62,181 S406,920 $137,745 $71 ,7 1 $1,891,146 $2,032,743 $1, 07,€137 $2,269,015 $130,754 $12,299. 86 $276,604 $13,163,404 $339,009 $ 27,554 $469,989 $382,00 $3,893,083 $1 ,720,474 $3,921, 88 $18,311,5 3 $65,163 $155,163 $155,16 $1980 $874318 $8 3,955 $1,336.450 $865,879 $3,255,610 $128,22. $3,588,€198 $2,441,432 $2,567,5 9 $2,400,309 $2,493,530 $1,009,146 $284,445 $155,945 $312, 55 $358,055 $1,413,010 $1,496,770 $1.708,908 $1, 77,147 $8,395... ..............,352 . . $4,98 , 41 $9,439, 41 $6,051,660 Budget designates $100,000 for Serer replacement account. Budget to fund debt win}ice with system development c ar es for $83, 7 % wwtp $58,262; sanitwy $2.4,97 129 SEWER - UPERATIUNS FUND: 5 3 I 0-454-43 0620-63fl145 5-43 U640 EXPENDITURE SUMMARY I I I I R ACTUAL BUDGET ACTUAL BUDGET FY04/05 FY05106 FY05/46 FY06/07 Personal Services $252,511 $263,735 $285,221 $312,127 Maintenance & Operations $158,68t $209,562 $207.665 302,515 Capital Outlay $362,932 $392,200 $24,606 $550,176 Capital Outlay -Replacement Funds $22,390 $54,000 Plant Investment Funds $3,573 $406,920 $137,745 $716,791 Debt Service $246,153 $255,951 $255,951 $104,832 Depreciation 25% funded) $205,163 $205,163 $205,163 $298,000 $1,22%0 13 $1,733,531 $1,138,741 $2,338,441 PROGRAM DESCRIPTION It is the responsibility of the Sewer M aint nance Div1 sion to operate and maintain the sewer col I e tion and transmi ssion system. Maintenance procedures include; jet rodding, flushing, TV inspection, mechanical and chemical cleaning methods as required. FY 07 BUDGET HIGHLIGHTS Line Item Dieta11: Sever Fund 110 Personnel Services -.includes an additional .5 FTE .5 FTE - this is a full time position with the salary being split between Sewer and Storm. The reorganization and succession plan redistributes salary splits to better reflect where time is actually spent. No new "la's were added in the reorganization and succession plan. 14 GIS Supplies & Equipment - $4,300 Increase needed for installation expenses for re-establishing the GIS base station at the new City liall# and a water tight, lockable storage container for surveying supplies (lath, stales, risers, lids, rebar, etc.), and a surveyor truck cover. 215 Computer Software & Supplies - $46,000 Updatino 1 lift station alarms with dialog elite auto dialers Frith modem, pump cycle option and surge protection. 1,000 Misc Supplies & Support 130 SEWER - OPERATIONS FUND: 5310-454-430630 FY 07 BUDGET HIGHLIGHTS Line Item Detail OW—' Sever Fund 1 Safety Equipment & Sup p]l s - 5, 00 , 100 inerease for safety harness, tripod winch & gas monitor. 354 Contract Sere-1cs - ,Q $4,500 Generators Testing & Maint. Contract $1,300 U-d ig Fees $8,500 Estimated System Repairs 50 Coveralls $5,000 Temporary ,help-Spring/Summer - Needed in order to maintain our maintenance scbedulc, particularly the old clay pipe section of town where we have an excessive amount of tree roots. 55 Contract Services AerlaI Mapping - S 13,750 13,7 % Due to unprecedented rapid growth, we are updating our existing 32 sections of base mapping and expanding another 3 2 sections outward to provide accurate mapping data for increasingly critical facilities planning, water quality, and storm water drainage issues. (Costs shared w ater, Sewer, andStorm) 358 1mpa et Analysis - Carryover $7,563 Senate Bill 185 was passed into law by the Montana legislature is CY 2005. This new law allows Cities to establish and collect impact fees related to the cost of supplying municipal services necessary to suppoTt growth. The law sets out very specific requirements for the establishment of impact fees, The law also sets out requirements for reviewing and validating fees that were in effect prior to the passage of SB 185. Un order to be in compliance with the later, are Impact Fee Study is necessary. The City completed a Sewer fate and SDC analysis as part of its most regent rate study. This effort will provide for the validation of that earlier effort to ensure compliance with the requirerncnts of SB 1 . 5 ateriajs - Pumps/Lift Stations $12,000 $3,500 increased cost for odor & grease i,mprernnts. Capital Outlay: 951 Lit Station 3 Force main - Carryover 1 3,9 0 plant investment fees) Upsize of lift station nu. ber 3 force main (Hwy 9 Grandview) to Dandle additional flows from developmcnt_ Existing pumps have unused capacity due to restrictions on the existing force main. This upgrade was identified in the facility plan. 934 Peterson School Pipe Replacement - Carryover $26,500 This is project S E W 15 from the capital improvement plan to replace 3 00 feet of deteriorated -inch dia meter clay pipe with a new -inch PVC sewer in the alley behind Peterson School_ A. manhole will also be replaced. 13 SEWER - OPERATIDNS FUND: 531 0-454-43U630 FY 07 BUDGET HIGHLIGHTS Line Item Detail Cont.: Sewer Pond 950 2 nd Street East Ailey S I i p Lining (between 4th & 5th Avenue) - C ar over $60,000 & 3 rd Alley West 1 I p Lin1n (between I Ot h & I I th Street) - New Appropriation - ,00 The 2nd St. E. slip lining will rehabilitate a deteriorated. clay ,pipe severer in a narrow alley. Replacement would be extremely difficult. Cracks have weakened the sewer and allowed roots to be a continuous maintenance problem. Lining the sewer is recommended to avoid difficult and costly r construction. The new appropriation is for an additional slip lining project on 3 rd Alley West between 1 Oth & l 1 th Street, TV inspections show that this portion of the main is also in poor condition and a good choice for slip lining. Combining these two projects ensures the best price possible. 55 Ba e k U p Generators - 7 2,000 ($54,000 replacement 0 10 1 Rep I agenerators in I ft stations #9 & # 10 and purchase a generator for lift station ##1 . The generator in I i ft station is very old and has broken down. Lift station # 10 has the same generator as #9 and noise is a problem. ,ber . Sincethe generator is so old it is more economical to replace the generator than spend money on noise control. Lift station 1 b serves w11 over a 100 homes and does not have a back up generator. Capital Outlay - Plant Investment Panels 357 KaIIspell Pae11ity Plan Phase I I - Carryover 84,000 This will provide update and enlarge .ent ofthe .aii spe11 facility Plan to include information on future critical facilities that would be constructed as part of new development, 1t will provide a comprehensive guide for growth of the sewer collection system infrastructureinftastructure for existing and new development, 957 Force ,amain & Litt Station #9 Fairway Blvd. Capacity Improvements 5% Plant Investment Funds & 36% Capital Outlay) - $696,467 1n combination with upsi ing of the force main this will increase capacity of this pump station by 276% from 185GPM to510GPM. Y 06 BUDGET ACCOMPLISHMENTS TS Operated and maintained 89 .1 miles of gravity sewer mains, 8 .7 miles of sewer force mains and 2 8 sewage lift stations, Added 44,3 4 71inear feet of new gravity main and 2 lifil stations to the City system. Updated 4 lift station alarms with auto dialers with modems, a pump cycle option and surge protection. • Rebuilt both pumps and replaced control module in lift station , * Repaired a broken sewer main on the 300 block of 6th Ave. West. • Installed a back-up generator in lift station # 9. Replaced failed pump in lift station ## a. • replaced a very critical manhole at Liberty and Meridian. 4 Fixed force main problem at Sports Complex for Parks Department. • Assisted Parks Department with sewer system at the new pavilion in Woodland Park. • Performed routirne cleaning of the old clay pipe sewer mains on the east and west side of Kalispell. •Brought sewer manhole covers up to asphalt grade. Continued TV inspection of new construction. Responded to several hundred Utility Location Requests. 3 SEWER,w OPERATIONS FUND: 53I (3-454-43063(; EXPENDITURE DETAIL ACTUAL UAL BUDGET ACTUAL BUDGET Y 1 "" '7 Personal Se .lies E's7 4.75 4.75 4.75r 110 Salaries &'images $196,342 $202,099 $215,4207,71 121 Overtime $6,299 $7,500 $5,791 $7,500 153 Health Insurance $38,628 $42,204 $51,140 $52,755 155 Retirement - PERD S11,242 $11,932 $12,870 $14,162 Total personal Services $252,511 $263,735 $285,221 $312,127 Maintenance & Operations: 210 Office Supplies S269 300 30 13 Small Office Equipment 0 250 $266 $2,000 214 GIS Equip/Supplies $586 $1,300 911 $4,300 215 Computer Software && Supplies 857 $14,000 $8,940 $46,000 216 Computer Equipment 553 $2,500 $1,284 S3,500 218 Equipment (Non Capital) $5,100 $8,500 $5,363 4M0 221 Safety Equip & Supplies $2,256 $1,500 77 l $5,600 224 Janitorial Supplies 457 50 8 750 229 Other Supplies 17 00 391 800 231 Gas &. Oil $4,377 $5,000 S7.762 $8,500 241 Consumable Tools $1,720 $1,200 $1,751 S 1.200 312 Postage & Shipping S 167 5 0 $46 S500 320 Printing 3 250 244 250 336 Licenses & Fees 20 350 S190 350 341 Electricity $23,070 $20,500 $28,117 $25,000 342 Water 102 125 123 125 344 Natural Gas $7,242 $6,200 S 9,734 11100 345 Telephone & Comm. $12,598 $12,000 $14,914 $17,000 353 Auditing $1,800 $1,800 11800 2,00 354 Contract Services $10,790 $20,000 $21,199 S20,000 355 Contract Services - Aerial Mapping $13,750 356 Consultants $17,804 so $10,000 358 Impact Fee Studer 0 S15,000 $7,347 $7,563 362 E uip ent Maintenance 0 S4MO $4,176 $4,500 366 Building Maintenance 1 .660 S5,000 $1,860 $2,500 39 Radio Maintenance 120 50 328 30 373 School &. Travel $1.460 S3,200 715 $3,200 38 Medical Services 492 50 323 50 395 Equipment ent Rental 38 3 0 so 300 SEWER � OPERATIONS FUND: 5310-454-430630 EXPENDITURE DETAIL ACTUAL BUDGET ACTUAL BUDGET 'Y 10 Ol 01 010" Maintenance & Operations-confinued.- 410 Construction Materials 1 ,981 $10,000 $13,252 $20,000 425 Materials - Pumps/Lift Pumps/LiftStations K361 $ ,500 $15,404 $12,000 510 property & Liability ins 1 2,993 $25,250 $15,493 S 1 MOO 521 Central Garage Transfer $4,000 $4,000 $4,000 $4,500 22 Administrative Transfer $30,023 $26,697 $26,697 $32,752 528 Data processing Transfer $5,500 $6,340 $6,340 $6,425 532 Office Rent $10,000 10 Bad .let expense 3 5 $2,500 $7,250 $2,500 Total Maintenance . Operations $158,681 $209,562 $207,665 $302,515 CapitalOutlay: 20 Buildings $4,558 $ 1,20 71 0 44 Vehicles $4,573 $28,700 $23,888 so 31 US 93 S. eeo stru t./Extension $294,706 so 51 Lift Station #3 Force main 24% 0 $58,080 $58,080 53 Lift Station ##3 randview/ 3 I prvmnt 4 7 $125,000 0 55 Back-up Generator Lit Sta. # 16 1 000 57 Force Main & Lift Sta. #9 Capacity l prvi nts (36%) $247,5 6 34 Peterson School Pipe Replacement $26,500 $26,500 50 2nd St. E. & 3rd Ave. W. Alley Slip Lining $60,000 $96,000 50 Liberty Station $58,608 so so 52 Manhole Rehabilitation so $92,000 $104,000 Total Capital outlay S362,932 $392,200 240} $550,176 430640 Capital Outlay -Sewer Replacement Funds 126) 9:55 Replace Back-up Generators Lift Sta. #9 & 910 $190,313 2.2,3 0 $54,000 43 635 Capital Outlay -Plant Investment Funds(10123) 357 Facility ility Plan phase 11 $84,000 S4,893 $84,000 51 Lift Station #3 Force main 76% 3,573 $183,920 $183,920 54 Utility infrastructure (SID Reimbursement) (cost split w/seiner) $139,000 55 Lift Station upsi x 132352 57 Farce Maim & Li fi Sta. # 9 Capacity Imp rvmnts 64% 44 , 71 Fetal .plant investment ent un s $3,573 $406,920 $137,745 $716,791 Debt Service 610 Principle, Interest, fiscal fees $246,153 $255,951 $255,951 $104,832 510400 Depreciation 31 Deprec iat.i n fund 1 0, 000 replacement) $205,163 $205,163 $205,163 $298,000 Total Sanitary Sever $1,419,326 S 1,733,531 $1,138,741 $2,338,441 134 WASTEWATER TREATMENT PLANT FUND: 5310-455-430640 EXPENDITURE SUMMARY Personal Serviees Materials and Services Capital Outlay -Capital Improvement. Debt Service W WTP Replacement/equip. Replacement Reserve F�� I ACTUAL BUDGET I ACTUAL I I BUDGET FY04/05 FY05l06 FY05/06 `l°06/07 $724,452 $780,757 $723,637 9007:01 13 ,753 $12,299,086 $280,203 $13,163,404 $508,231 $496,669 9609 $525,945 330 9 $527,554 $469,989 $382,000 $310,294 $310,294 $310,294 $327.293 $2,360,528 $14.859,383 $2,653,630 $15,814,419 PROGRAM DESCRIPTION The Wastewater Treatment Plant Facility is responsible for treating domestic wastewater to meet the discharge permit issued by the Montana Department of Environmental Quality, The treated wastewater is discharged to Ashley Creek in accordance with specific limitations, requirements, and conditions. Facility Maintenance: 7 buildings, 53 pumps, 14 gear reducers, 24 mixers, 6 large & 7 small submersible pumps, 1 scum buster pump. 2 00 valves of all sizes, 5 air compressors, 1 electric generator, 2 gas boilers 3 make-up air units, 8 ventilation fans, 16 electric heaters, I air conditioner, 3 gas heaters, 16 sand filters, 3 04 hp air blowers, 9 auto electric valves, 15 flow meters, 4 gas detectors, 2 programmable logic controllers, ultraviolet light disinfection units, 4 clarifiers, 11 bi -cells 1 equalization tank, 3 digesters, 2 fennenter tanks, dissolved air floatation tanks, 2 belt filter presses, 1 5000 gal. Alin tank, 2 pickups and 2 sludge trues. OBJECTIVES: WWTP 1. Monitor and adjust the wastewater treatment process to meet the discharge permit; monitor Ashley Creep above and below the plant discharge outlet to insure that this discharge meets certain pen -nit limitations. . Perform a minimum of 6,200 laboratory analyses per year to monitor and control the biological nutrient removal process, and perforn analyses of specific parameters to race the discharge permit requirements. 3. Continue efforts to reduce the inflow into the Plant which occurs. during rainfall events. . Continue work on the Pretreatment Program to control wastewater quality; monitor the sludge for heavy metals and nutrients to ensure that it is acceptable for disposal. . Performwork orders (approximately 1500 per year) to beep equipment and processes functioning properly; perform equipment repairs and respond to alarms quickly so that the treatment process is not interrupted. , Continue public relations (tours and articles) to educate the public on this unique process and the excellent quality of the treated wastewater, 135 WASTEWATER TREATMENT PLANT FUND: 5310-455-430640 FY 07 BUDGET HIGHLIGHTS Line Item .detail -Wastewater Treatment Plant 110 Personnel Services The reorganization plan redistributes salary splits to better reflect where time is actually spent. No new FT"s were added. 216 Computer Equipment - $3,500 Backup plant control computer; there is too much information on the computer to risk continuing with just one plant operations computer. 5 Alum - $20,000 Plant expansion will require the use of alum. 344 Natural Gas - $60,000 Increased cost and use of natural gas. 349 Lab Services - $6,500 Includes fish toxicity permit, landfill and sewer testing as required or needed. 355 Other Contract Services - $45,000 This line item includes rag/grit disposal, landfill biosoli s disposal, clerical support and other contract services. 356 Consultant - Electrical En eer - $10,000 Plant expansion may require additional troubleshooting. 357 Con uIta n t - 'dotal Mam m u m Daily Load (TM D - ,000 The State of Montana is under Federal Court order to deve lop a TM D L for pollutants flowing from the Flathead basin into Flathead Lake. These TM D L restrictions Dave potentially very serious consequences against the ity's historical ability to drain storm waters to Flathead tributaries and its community wastewater to Ashley creek. A TM D L that is un-necessarily restrictive could greatly impair the ity's ability to grow and would greatly raise the cost of treating community ity wastewater and storm water discharges. We have engaged an experienced consultant to advise the City and to provide assistance to the City for working with MDEQ to develop a satisfactory ` M L. 360 M a n to anee - Digester clean - $7,500 Remove 30,000 gallorns of heavy sludge From bottom of secondary clarifier cone to 40 acre site. 136 WASTEWATER TREATMENT PLANT FUND: 5310455430640 FY 07 BUDGET HIGH, GHTS- n' . Capital Outlay 357 Wastewater Treatment Plant Facility Plan - $40,000 The 2002 Facility Plan reeds to he updated to identify potential alternatives that consider the eventual implementation of strict discharge limits for the Flathead Lake TM L. The current expansion plan addresses current and intermediate term capacity needs. Other options for the future need to be identified. 920 Building carryover $91,920 Equipment ent storage building identified in the facility plan. 933 Plant expansion - Carryover $11,964,856 Design of Treatment Plant expansion according to recommendations made in the approved Preliminary ngineering Report. The amount shown is the total amount estimated for both phase I and phase 11 design and construction. This project will increase capacity to 5.4 MGD. Phases I &11 have been combined into a single project that will cause less disruption of normal plant operations. Future expansion will be dependent on the pace of community growth. Eventually the plant capacity will increase to more than 7.0 MGD. Replacement Funds: 940 Machinery & Equipment Replacement .fund - $232,000 4 0- Replace 4 effluent filters , - Replace effluent flow meter 1 , - Rebuild Taskmaster grinder pump , - .ep)ace polymer pump $200,000- Replace programmable logic control unit in Electrical Room FY 06 BUDGET ACCOMPLISHMENTS * Worked ed on plant expansion by responding to Technical Memorandums and amnding meetings. * Participated in plant odor control study. Completed secondary clarifier rehabilitation prgjea Focused efforts on what the impact wiII be for the WWT plant w hen the proposed TMDL restrictions are implemented. * Hired and trained a new ,Lab Chemist who replaced a depart]ng Lab Techni c ian. 137 WASTEWATER TREATMENT PLANT FUND: 5310-455-430640 EXPENDITU DETAIL ACTUAL BUDGET ACTUAL BUDGET '1FY06/07 Personal Services; T 's 6.80 7.80 7.80 7.40 1 10 Salaries & Wages$2671 15 $338,510 $294,259 $4 1,1 2 121 Overtime $12,679 $13,000 $11,635 $13,000 153 Health Insurance $51,102 $73,442 $49,350 $77,790 155 Retirement - P RD 1 ,403 $20,071 $17,5 4 $23,806 Total Personal Services $347,789 $4-45,023 $372,88 $515,58 Maintenance & Operations: 210 Office Supplies $90 $1,200 $1,47 $1,00 213 Small Office Equip 580 $800 $547 $1,500 215 Computer Supplies & Support. $577 $1,200 $690 $1,00 16 Computer Equipment $2,918 $2,500 $0 $3,500 221 Safety Equipment & Supply $3,077 $2,500 $3,609 $3,000 222 Lab Supplies $121794 $ ,000 $9,145 $7,500 224 Janitofial Supplies $82 $150 552 500 225 Alum $5,75 3 $ 157000 $10.502 $20,000 226 Chemicals $8,800 $10,000 $13,978 $10,000 229 Other Supplies $2,531 $3,500 $47206 $3,500 231 Gas & Oil S77716 $8,000 $10,951 97400 241 Consumable tools 17206 $2,500 $2, 07 $2,00 312 postage & Shipping $444 $1,000 $ ! 7 $1,000 335 Membership and Dues $744 750 547 $750 336 Licenses and Fees $5,558 $7,000 $ ,276 $7100 341 Electricity $2 1,519 $35 ,000 $261,980 $3 0,000 342 Water $ ,9 3 $ ,500 $7,004 $8,0€ 0 344 Natural Gas $38,734 $ 0,000 $6 ,084 $60,000 345 Telephone & Alarms $4,273 $3,500 $3,4 7 $3,000 349 Lab Services $8,910 $5,500 $5,730 $6,500 353 Auditing 2,160 $2,160 $2,1 0 $2,1 0 354 Contract Services -Glacier Gold $102,746 $110,000 $110, 340 $110,000 55 Other Contract Services $30,926 $45,000 $27,370 $45,000 356 Consultant - Electrical Engineer $3,047 $5,000 $11, 15 $10,000 357 Consultant - TMDL $17,8 4 $0 $2,329 $20,0€1 360 Maintenance Service -misc. S1,694 $7,500 $19,071 $7,500 138 WASTEWATER TREATMENT PLANT FUND: 5310-055-030640 EXPENDITURE DETAIL ACTiJAi. BUDGET ACTUAL BUDGET FY04/05 FY05/06 FY05/06 FY06/07 Maintenance & Operations -continued: 357 Wastewater Treatment Plant Facility Plan $407,000 360 Maintenance -Digester clean/inspect $0 $0 $0 $7,500 362 Equipment Maintenance $64,602 0 91 $ 366 Building Maintenance 4722 $3,500 $8,393 $4,000 369 Radio Maintenance 1 59 $1 0 373 Sebool & Travel $10,087 $12,000 $5,3201 , 380 Training Materials .3 5 $1,208 $1, 00 388 Medical Services 136 350 $508 S500 95 Equipment Rental 192 $1, 0 $1,000 510 Property Liability Insurance $32,735 $37,000 $34,977 $45, 0 521 Central Garage Transfer $4, 00 $3,500 $3,5003,5 22 Administrative Transfer $71,264 $79,087 $79,087 $ 5,421 528 Data PToces in , Transfer $5,000 $8,460 $8,460 $8,588 Total Maintenance & Operations724,452 $780,757 $723, 37 $900,019 Capital Outlay:. 933 Plant exp a n sio n-eng,co nstructoo 1 , 's (10 1 300X0 $276,604 $3,000,000 933 Plant exp n ion -en ,eon tructi n $130,753 $l 1,9 3,4 6 ,9 4, 5 921 capital outlay/ building carryover $3 0 $95,620 $3,599 $91,920 Total Capital Outlay $130,753 $12,299,080 $280,203 S 13,163,404 430645 WWTP Replacement and : g 1 1 5 362 Equipment Maintenance 940 ll aebin ry & Equipment Total Replacement Funds 49 210 Debt Service 610 Principal, interest, fiscal fees 31 * e rec./ a la ement Reserve Total Sewer Treatment 90,000 39,9 $437,554 $ 5,526 4414$232,000 1507000 $339, 9 $527,554 $469,989 $382,000 $,231 $496,669 $49,69 $525,945 $31 .294 $310,294 $31072 4 $327,293 $2,360,528 $14, 59,3 3 $2,653,630 $15,814,419 *Note: Replacement reserve is the amount of cash moved to the Evergreen/Kalispellequipment replacement account. Actual depreciation expense is $800,000. 139 SEWER BILLING FUND: 53 i 0-454-43062[i EXPENDITURE SUMMARY ACTUAL BUDGET ACTUAL BUDGET L ..FYfl4/05 FYOSlQb FY05/�6 �"Y06f07 Personal Services S7%956 $92,293 $ 4, $1 .720 Materials and Services $ 2, 92 $ 5, 7 $33,851 $ P2 $112,848 $127.560$ l 2 ,717 $159,722 PROGRAM DESCRIPTION The City bills customers for water service on a bi-monthly schedule. The administrative fee effective ,duly I st is $3.55, per billing period, FY 07 BUDGET HIGHLIGHTS Line Item Detail: 110 Personal Services The reorganization plan redistributes salary splits to better reflect where time is actually spent. No new PTE's were added, 1 1 18 Office supplies, furniture an computer needs Office supplies and fumitu re necessary for the move. 354 Contract Services -$6,825. Incl udes 7 5 0 to Grizzly Security to pick up utility biiis at the grocery store locations and S 3 7 510 of the cost to have Grizzly S ec u.rity take daily deposits to the bank (costs shaved with Finan , Maintenan e contract for ADO software for the Utility Billing Program is $500 year. Additional $375 for bank charges or customize software. $3,75€1 r % cost of upgrading the sewer/water billing software to a GPS reading system. The upgrade will add features which include backflow detection, low battery alert, and early leak detection!. The GPS radio read system is also faster and more efficient. 532 Office Rent Office rent to go toward debt service for new Laity Hall building 140 SEWED. BILLING FUND: 5310-454-430620 EXPENDITURE DETAIL F�*� I ACTUAL I BUG T I ACTUAL I BUDGET Pe nal Services: F' ' 110 alaries & Wages $64,673 $72,595 $71,758 $79,834 153 Health Insurance $11,314 $15,315 $18.772 $18,988 155 Retirement - PERD $3,969 $4,383 $4,336 $4,898 Total Personal Services $79,956 $92,293 $94,866 $103,720 Materials and Services: 215 office supplies/fumiture $2.500 218 computers/supplies $3, 335 Membership & Dues 1 D8 3 159 30 354 Contract services $4,136 $6,2503,3 6,825 55 Billing Costs/postage $13,363 $12,50014, 84 $15,000 373 School & Travel 11 1 NO 425 $1,000 522 Administrative transfer Pfi69 $3,892 3� 92 $4,892 528 Data Processing $1 ,5 11,325 11 X5 11 t485 532 Ogee Rent 1 U00 Total Materials and Services $32,892 $35,267 $33,851 $55,002 940 Capital Outlay: Total Billing Costs $112,848 $127,560 $128,717 $158,722 SEWER - OPERATIONS, BILLING, WASTEWATER TREATMENT FUND: 531 Q DEBT SERVICE SCHEDULE ACTUAL BUDGET ACTUAL BUDGET FY04/05 FY05/06 FYUS/OG FY06/07 SANITARY SEWER 490200 Debt Service-2 02 bonds: 610 Principle 13 ,19 15 ,110 $150,110 620 Interest/fiscal agent fees $8,667 S4,728 $4,7280 630 Bond issue costs -new bond 250 575 575 so 490204 .debt Service- 0041 on s: I1N 93 So, 610 Principle $53,000 $55,000 $55,000 $55,000 620 Interest/fiscal agent fees $40,472 $39,141 $39,141 $49,832 630 Fiscal Agent Fees 13 575 575 B1 loam: 49545 Debt Service -Loader: 610 Principle $5,158 $5,454 $5.,454 0 620 Interest 40 36 36 0 Total l Debt Service Sanitary Sewer $246,153 $255,951 $255,951 $104,832 WASTEWATER E TREATMENT PLANT 490210 Debt r vi e- 00 bonds: 610 Principal $171,810 $164,890 $164,890 $200,000 620 1ntcr-est $50,981 $46,084 46504 $40,890 630 Fiscal Agent Fees 575 575 S575 490215 Debt Service- R1~ Loa 610 Principal $206PO $214, 00 $214,000 $222,000 620 Interest $79,440 713120 710 0 $62,480 Carl Debt Service WWTP $508,231 $496,669 S496fi69 $525,945 Total Sewer d 7541,384 75 6 0 752 620 777 142 STORM SEWER FUND: 5 349-4 S 3 -4 3 OZ4b PROJECTED REVENUE AND FUND SUMMARY BUDGETACTUAL C 1 i BUDGET Y4 7 BEGINNING CASH 10100 CASH: Operating ing $664,461 $74 ,150 $748,150 $603,7 0 10193 Cash, Designated Capital Projects $237,576 so $ $350MO 1€1122 Cash, Capital Deserve $115,000 $1 6,112 $106,112 $143,112 1 127 Emergency Reserve erve 2 , 25, 00 $25,000 $25,000 Adjustments to Cash - Al , Comp Abs. ► ,952 13,239 $ REVENUES 343370 Storm Assessments -billed 363040 Penalty & interest 371010 Interest Total Revenue Total Available EXPENSES Operations/Capital Hwy 93 SCE, Project, Capital Projects Depreciation" funded portion. Debt Service Total Expenses ENDING CASH Operating Cash Cash, designated for Replacement Cash. designated for Capital Projects Capital Reserve ** (target S 140,€ 0 Emergency Reserve * (targetS25,000) $1,33,5 $879,262 S892,501 1021192 $39 ,075 S434,934 $463,616 $516,932 2, 5 $2,000 $2,808 $2,000 ,976 $9,000 $36,115 $25,000 $4 1,136 $445,934 $502,539 543�932 $1,434,221 $1,325,196 $1,395,040 $1,665,824 $226,538 $736,808 $261,719 $861,067 .322. 6 $0 so 35,100 $37,000 $37,000 $40,000 5,561 $5,822 $11,429 $ $59,959 $779,630 $310,14891,067 $74 ,150 $414,454 $603,780 S246,645 4,O $35,$35M00 $106,112 $143,112 $143,112. $143,112 $25,000 $25,000$25,000 S25,000 $ 79,2 62 $582,566 $1,121,892 $ 04, 75 ' Emergency Reserve and Capital Reserve targets from the rate study have been met. $40,000 designated for equipment replacement beginning in 2007 $350,000 designated for capital prqjects per the facility plan. 14 STORM SEWER FUND: 5349-453-430245 EXPENDITURE SUMMARY F`� I ACTUAL BUDGET I ACTUAL I I BUDGET FY44/05 FY05/06 FYQSIQf, FY06107 Personal Services S119,240 $180,3901 5,3.2 S274,277 Materials and Services $50,365 $158,938 $57,787 $244,290 Capital Improvements $379,793 $397,480 $38,600342,5 Debt Service $5,561 $5,822 $11,429 so Depmeiation $35,000 $37,000 $37,000 $40X0 589,95 9 $779,630 $310,148 9 1,07 PROGRAM DESCRIPTION The Storm Sewer Maintenance Division is responsible for the maintenance and operation of the Storm water collection., transmission, detention and disposal facilities of the City of Kalispell. The purpose of this system is to collect and properly dispose of storm water from snow melt, rainfall and other sources without going through the wastewater treatment plant. The division maintains over 34 miles of storm water facilities including catch basins, inlet culverts, storm drains, detention basins and o tfalls. RATE VACANT 0.002317 2 ACRE RESIDENTIAL 0,004480 12 ACRE Non-residential improved* 9 % COMMERCIAL 0.008036 1 % COMMERCIAL 0.010045 Resolution 5139 adopted by Council Aug. 21, 2006 Line Item Detail: STORM SEWER FUND 110 Perso naI Services - Includes t5 0 of a New FTE .5 FTE is a full tine position with the salary being split between Sever and Store. .25 FT E is a transfer from Special Street for street sweeping. The reorganization and succession plan rWistrib tes salary splits to better reflect where time is actually spent, No new FFE's were added in the reorganization and succession plan. 144 STORM SEWER FUND: 5349453-430245 FY 07 BUDGET HIGHLIGHTS Line Item Detail: STORM SEWER FUND 214 GIS Supplies & Equipment - $3,900 Increase needed for installation expenses for re-establishing the surveyor/GIsurveyor/GIS base station at the new City Hall, and a water tight lockable storage container for surveying supplies lath, stakes, risers, lids, r bar, etc.), and a surveyor truck coven. These supplies had previously been stored in the basement of City Hall. 355 Contract Services Aerial Mapping - $13,750 13,7 % D ue to unprecedented rapid growth, we are updating our existing 3 2 sections of base mapping and expanding another 32 sections outward to provide accurate mapping data for critical facilities planning, water quality, and storm water drainage issues. (Costs shared w/Water, Sewer, and Special Street) 356 Storm water Regulator. Compliance Fees - $15,000 ,000 increase is for costs related to our federally mandated storm water permit (i.e., lab work, publishing, mailings, permit fee). 357 Kalispell Facility Plan. Phase 1 - Carryover $81,000 This will provide update and enlargement of the Kalispell Facility Plan to include information on future critical facilities that would be constructed as part of new development. It will provide a comprehensive guide for growth of the storm collection system infrastructure for existing and new development. 358 Impact Analysis - Carryover $5,000 Serrate ,bill 18 5 was passed into law by the Montana legislature in C Y 2 005 This new law allows Cities to establish and collect impact fees related to the cost of supplying municipal services necessary to support growth. The law sets out very specific requirements for the establishment of impact fees. The law also sets out requirements for reviewing and validating fees that were in effect prior to the passage of Sly 185. In order to be in compliance with the law an Impact Fee Study is necessary. The City completed a Storm Fee analysis as part of its most recent Rate Analysis_ These fees were not implemented. This effort will update that earlier work and will validate compliance with the requirements of Sly 185. 359 Consultants - Total Maximum Daily Load TMD - $20,000 The State of Montana is under Federal Court order to develop a TM DL for pollutants flowing from the Flathead basic€ into F1athcad .Lake. These TM ILL restrictions have potentially very serious eonseque ces against the City#s histodcal ability to dra€n storm waters to Flathead tributaries and its community wastewater to Ashley creel. A TM L that is unnecessarily restrictive could greatly impair the C ityfs ability to grow and would greatly raise the cost of treating community wastewater and storm water discharges. We have engaged an experienced consultant to advise the City and to provide assistance to the City for working with MDEQ to develop a satisfactory TMDL. 145 STORM SEWER FUND: 5349453-430246 FY 07 BUDGET HIGHLIGHTS - Con't. Line Item Detail; STORM SEWER FUND Cont. 362 Groundwater Monitoring - $25,000 The City has purchased or otherwise acquired numerous properties that were later found to have serious pollution problems that affect the groundwater. M D EQ has required the City to develop and maintain long-t.emi groundwater monit.orin.g plans for a number of pollutants. The monitoring is usually done on a quarterly basis for each site. This new budget jte . provides funs for this long-term monitoring obligation. capital Outlay; 840 MACI Grant Match - 7 - operating transfer to MACI grant The State has notified the City that. they will have funds avaiIa sle for air quality equip nt through the Montana Air Quality lnitiative(MAC 1 grant. We will be requesting a sweeper to replace a 1994 Elgin sweeper that we received through a M AI grant. We are budgeting S 25,000, which is approximately 13. % of the r ateh.in g funds that the City must provide. 953 Liberty Street Storm D ra in Improvements - Carryover 142,500 Storm drainage at the west end of Liberty Street is a problem because; the consultant designed system ds not function adequately. The current system is a drywelI and should be replaced with. a con v y ncc that properly drain s the area. 954 Northridge Heights Storm ,gain ,improvements Design - $100,000 The M eridian Road project i s in stalIing substantial new storm drainage improve m nts. The Capital Improvement flan identified additional new i mprovements in ad j acent neighborhoods that may be able to tale advantage of the 1 eridian Road facilities. "phis effort will perform preliminary engineering for these improvements. 5 Mosquito gain Lift Station Replacement Design - $40,000 It was hoped that this L.S. replacement could be avoided by connecting into new US 93 facilities. However, final design was not able to overcome grade differences between the systems. The old L.S. will be abandoned and a new L.S. built to lift flows from cast of US 93 into the new system. on 18th Street. FY 06 ACCOMPLISHMENTS • Maintained 34.8 miles of storm sewer mains. • Added 10,240 linear feet of storm drain to City system. • Added a new storm water pumping station southwest of the city shop. * Removed grit and potential pollutants from approximately 900 storm drain catch basins and monitored and maintained inflow and outflow at 5 dctcntion ponds_ • l rough.t storm manhole covers up to asphalt grade. Completed two projects eliminating cross connections at 4th Avenue West and 7th Street West. • Surveyed and designed a project to reduce storm water drainage problems at Fairway Blvd and Whitefish Stage Road. Surveyed and designed a project to reduce storm water drainage problems at l st Avenue West & 17th Street. ir -fired an Associate Civil Engineer to manage the storm water engineering for the City. 146 STORM SEWER FUND, 5349-453-430246 EXPENDITURE DETAIL. Personal Services* T' 110 Salaries & wages 121 e Overtime 153 Health Insurance 155 1 etiremer.t Subtotal .personal Services Materials and Services: 210 flee Supplies & Small Office Equip. 214 G1S Supplies & Equipment 215 Computer Supplies & Support 216 Computer Equipment 221 Safety Equip, & Supplies 229 Other Supplies 231 Gas & Oil 241 Consumable Tools 320 Printing -blue prints, etc. 45 Telephone & Communication 353 Auditing 34 Contract Services 55 Contract Services - Aerial lapping 356 Storm water Reg Compliance Program 358 Facility plan Phase 11 358 Impact Study 359 Consulta nts-T 1 34 Repair &.faint. Services 362 Groundwater M onitOrin 371 Curb & Getter (includes $4,000 cleaning) 373 School & Travel 388 Medical Services 410 Construction materials 510 Property & Liability Ins. 522 Administrative Transfer 28 Data Processing Transfer 2 l ase Payments/office rent Subtotal materials & services ACTUAL BUDGET ACTUAL BUDGE'' FY04/05 FY05/06 FY05/05 FY06107 .4 3.4 3.4 4. $3,3' $147,232 S139,264 217,11 1,3 4 S 1X0 $1,556 S2,000 17,41 $23,331 1 ,42 42,1 1 $ ,558 $8,083 $12,998 11 .24 $180.3 Q $1 5,332 $274,277 1,50 448 00 24 $3,900 5 3 5X0 21240 $5,000 $40 S500 $3,464 $3,000 $223 $150 $34 300 so so 0 $2,500 4,245 3000 $6 042 $7,000 $10 2 $408 $50 2 75 20 o$500 00 $ 00 $ 0 5,3 7 $9,000 $4,200 K000 $45 $0 S13,750 $ ; 38 $5,00 1 t240 S15MO $81 X0 $4,718 S81MOO $15,000 $7,4 7 $5,000 o$20MOO 1.C}$22 S1000 o $25,000 7,472 $5,500 $1,323 K500 $979 $1,5 0 $2,221 S2,500 $€1 S250 2,278 $8, 0 $782 SUN 3,371 $5,500 S5,463 S6,500 $10,850 $9.923 S9,823 $12,693 3,200 $2,4 5 S2,465 $2,497 S1,600 $1,600 S3,400 $7,600 $5 ,3 5 S158,938 $571787 $244,2 €1 17 STORM SEWER FUND: 5 349-453-43 U246 EXPENDITURE DETAIL-Cont. ACTUAL BUDGET ACTUAL BUDGET FY04105 FY05/06 FY05l06 FY06/07 Capital outlay: 40 MAGI Grant Match (Sweeper) 940 Machinery & Equipment- (carryover) 944 Vehicles 947 CrossConnections 951 Construction Hwy 93 So. 952 Storm Drain Correction funds 953 Liberty Street Storm Drain Improvements 954 Northfidge Heights Storm Drain Improvements Design 955 Mosquito .gain Lift Sta. Replacement. Design. Subtotal Capital Outlay 453 490225 Debt Service 610 Principal (paid off equipment 620 Interest 510400 1 Depreciation, (fund 40,00 TOTAL Storm Sever 25,000 $44,3 54 $1,860 $20,350 $20,300 t57 $224,3 $322�860 $2,1 2 $10,000 S18,30035,000 $142,500 $142,5 0 $1 0,00 $4,€0 $379,793 $397!A80 $38,600 $342,500 S5J58 $5,454 $11,41 0 $403 $368 S388$ $5,5 1 $5,22 $11,42 $ $3 , 0 $37,000 $125,000 $4 , 0 $58%959 S779,630$9,14S901,0-67 148 SOLID WASTE FUND: 55 0-454-43(}$40;430845 PROJECTED REVENUE AND FUND SUMMARY ACTUAL BUDGET ACTUAL BUDGET l06 FY05/06 FY06107 A.EGINNING CASH J 00 CASH: operating $223,463 S243,235 $ 43, 35 $253,543 1 0 1 *Replacement Ascot 341)436 $72,144 $7.,144 $172,144 10130 Bond Reserve 1 ,00 $16,000 $16,000 ange in Al , Comp.Abs- $2,835 $6,726 376,734 $331,379 $338,105 $425,687 RIEVENUES 3434 10 Assessments $598,201 $600,00 S610,088 S6091891 363040 Penalty & Interest $5,103 $41MOO $5,005 $5,000 371010 InterestEamings $4,291 $ , 00 $11, 60 PAO 'dotal Available $607,595 $606,500 $626,153 $620,891 94,29 $937,79 $964,258 $1,046,578 EXPENSES Operations $462,324 $2,715 $505,004 S548,062 Capital Outlay -operations so $4,233 $2,967 so Capital Outlay -replacement $162,292$248,000 Debt Service 2 ,334 2 ,0 4 $54,694 *D-epreciation/Rcplacement Fund $100,000 $100,0001 0* 00 $100,000 52,9 65M02 $662,665 $896,062 + UNFUNDED depreciation $10 ENDING CASH Operating, $241,235 S 196, 34 $253,543 $226,372 *. eplaaem lnl Account $72,144 $17-2,14-4 S172,144 $24,144 Bond Reserve $16,000 $16,000 Total Cash $33 ,379 $384,878 $425,687 $25,516 149 SOLID WASTE FUND: 5510-460-430840;430845 EXPENDITURE SUMMARY ACTUAL BUDGET ACTUAL BUDGET FY04l05 FY05l06 FY05/46 FY06/07 Personal Services $333,82.2 $3 1,832 $360J48 $3 9A07 Materials and Services $128,502 $158,883 $144,256 $178,6 5 Capital Outlay $o $4,23 $2,67 $ Capital Outlay_ Replacement $162,292 so $ $248,000 Debt Service/Board of Inv. $28,4 $28,54 $54,64 Depreciation & Replacement $100.000 $100,€ 00 $100,000 $1 WOW $752,950 $653,2 $662,65 $86,E12 PROGRAM DESCRIPTION The Solid Waste Operating Division is responsible for the collection, conveyance and disposal of all refuse accumulated within the city in an efficient and sanitary manner. GARBAgE, RATES The garbage rates: Residential: $90.00 per year Non -Residential: 30 Gal. 400 Gail. Current Current DUMPSTER Pick. up Rates Rates I Weekly $317. 0 $3 0.00 2Leely S534,00 $680.00 Weekly $8 _00 $1,020- 0 Resolution 5136 adopted Aug. 2.1, 2006 150 SOLID WASTE FUND: 55 I 0-46(i-43084Q;430845 FY 07 BUDGET HIGHLIGHTS Line Item Detail : Solid Waste Fund 110 Per on n el Services The reorganization and succession plan redistributes salary splits to better reflect where time is actually spent, No riew lei ks were added. 221 Safety Equipment & Supplies - $2,500 1,600 Sidearm Alarm Kit 940 Side Loader Garbage Truck - $220,000 Replacing a 1990 Volvo side ann garbage truck. 944 Vehicles - $28,000 1 Ton 40 Pickup w/Tornmy Lift & Snov�rplow FY 06 BUDGET ACCOMPLISHMENTS Collected 8,493 tons of garbage from residential and commercial accounts. • leaned, trimmed and eliminated aliey right-o way encroachments which interfered with refuse collection. • .Placed new 2005 rear -lead garbage truck into service, Repainted the office and break room in the Solid Waste building. • Passed a safety inspection of the Solid Waste budding. • Delivered 5 - 100 gallon containers to new customers • Delivered 37 ~ 300 gallon containers to new customers • Delivered 1 - 400 gallon containers to new customers 51 SOLID WASTE FUND: 55 i 0-46fl-430840;43fl845 Personal Services: FT 's 110 Salaries & Wages 121 Overtime/Call outs 153 Health Insurance 55 Retirement - PER Total Personal Services als and S�erlce; 213 Small Office Equipment 216 Computer Equipment & Support 218 Garbage Containers 221 Safety Equipment & Supplies 224 Janitorial Supplies 229 ether Supplies 231 Gas and Oil 241 Consumable Tools 31 Publications 341 Electricity j44 Natural Gas 345 Telephone 354 Contract Smices 355 Billing Costs -bounty 360 Repair & Maintenance 366 Building Maintenance 369 Radio Maintenance 373 School & Travel 388 Medical services 510 property & Liability insurance 512 Uninsured Loss - Deductible. 521 Central Garage Transfer 522 Administrative Transfer 528 Data Processing Transfer 5:2 Office tent Total 1 EXPENDITURE DETAIL ACTUAL BUDGET ACTUAL BUDGET FY04/05 FYAS/Ob FY05/06 FY06/07 262,43 $2-84,436 $28 3,1 6 $28 , ?5 $2,03 9 $5,000 $2,779 $5,000 $53.525 $55,38 $54,1 $57,541 15,822 $1 ,'758 $17,082 $17,207 $333,822 $31,32 $360,748 $3,47 $30 $1,5 €1 $157 $1,500 $ 721 $1,500 $2,22 $2,500 $13,555 $17,00 $1 ,872 $21 NO $11 $300 S2,3142 $2,500 $251 $400 $30 400 $254 $2,000 $235 $2,000 $20,979 $25,000 $30,221 $31,000 $421 S550 $1,144 $1,000 $245 $300 $0 $300 S1,145 i i V 2 2 E5 V 0 $3,231 $4100 $4, 82 $7M00 264 $400 $314 $400 $45 $0 so so $21 $750 $412 $750 $730 $500 $488 $00 $411 500 $220 $40 1, 86 $2,500 $3 5 $2,500 525 $750 $405 $750 $11,25 $1 ,000 $12, 1 $ 6.00 $0 $7,500 $934 $2.500 $32�000 $32.,0530 $32,000 $28,000 $ 5,412 $20,803 S20,803 $23,2 1 $ , 00 $5, 0 $5,030 S5,094 $,00 $122, 40 $149,933 $13 ,234 $1 7,0 5 152 SOLID WASTE FUND: 5510-460-430840;43 U845 EXPENDITURE DETAIL 430845 Washbay/Materials & Services 224 Janitofial Supplies 341 Electricity 342 Water 344 Natural Gas 0 .repair & faint Serviccs 366 Building Maintenance 430840 Capital Outlay: 920 Building 944 Vehicles 430840 Capital Outlay. Replacement funds 940 arb,;,Ye Truck 44 Vehicles Subtotal Capital Outlay 490545 Debt Service/Garbage Truck 610 Principal 620 Interest 510400 Depreciation (funding $1.00,000 for FY07 31 Depreciation expense ACTUAL BUDGET ACTUAL BUDGT FY04/45 FY05/06 FY05/06 FY06/07 $128 $35 $1 9 $3 0 $ 1 $1 t 100 $02 $1,000 $0 $250 $0 $20 $4,189 $5,000 $6,136 $7,500 $140 $1,500 $149 $1,50 $3 2 $75 $926 $17000 $5,6 2 $8,950 $8,022 $11,600 $1,920 $718 so $2,313 $2.249 $ $0 $4,233 $2,967 so $13 ,957 $ $0 $2 0A0 $ 9,335 so $0 $28,000 $16,292 $0 $0 $24,00 $ 6,544 $26,544 $53,089 $ $1,790 $1,510 $1,605 so $,334 $2,054 $54,64 so $100,00 $100,00 $100,00 $100,000 Total Solid Waste $752,90 $5,02 $662,665 $89102 5