10. Enterprise FundsENTERPRISE FUNDS Page Fund Dept 1-2 5160 Airport 166M 5 3-9 5210 Water ,739,2 3 10-15 5310 454 Sewer Operations & Billing 3,3911 3 16-20 5310 455 Waste Water 'Treatment Plant ,119,05 21-25 5349 Storm Sewer 2X2,303 26-28 5510 Solid Waste 1,246,620 Total 20,422,53 �� AIRPORT ACCOUNT # 5160-430 The Kalispell City Airport is part of the overall transportation system for the City of Kalispell, serving both recreational and commercial interests with an optional mode of transportation. GOALS OF THIS DEPARTMENT: What are the departmental goals that support the purposei In fiscal year 2014, municipal voters rejected a ballot issue to move forward with improvements to the airport as identified in the adopted airport master plan. That action has initiated an effort to update the Urban Renewal Plan from which the improvments were originally identified. The outcome of this plan will likely guide future decisions related to airport maintenance and development efforts. AIRPORT ENTERPRISE FUND -operations FUND: 5160-430-430310 PROJECTED REVENUE AND FUND SUMMARY I I I I ACTUAL BUDGET ACTUAL BUDGET FY14/15 FY15/16 FY15/16 FY16/17 BEGINNING CASH 10100 Cash - Operations $101,257 $125,851 $125,851 $147,071 $101,257 $125,851 $125,851 $147,071 REVENUES 343062 Commercial Fees 343069 Hangar Leases 343071 Hangar Site Leases (3%) 343101 FBO Lease - Red Eagle Aviation (2%) 343102 Ground Leases (Hilton) (3%) 343620 Fuel Tax 365010 Misc. 371010 Investment Earnings Total Revenue Total Available EXPENDITURES Airport Operations Depreciation Total Expenses add back unfunded depreciation ENDING CASH 10100 Cash: Operating $13,126 $10,000 $11,032 $10,000 $12,000 $11,000 $12,000 $11,000 $18,034 $17,510 $18,627 $17,510 $17,821 $17,734 $18,150 $19,145 $12,441 $12,814 $12,814 $13,198 $6,416 $5,000 $5,226 $5,000 $2,101 $0 $0 $0 $902 $850 $1,084 $1,000 $82,841 $74,908 $78,933 $76,853 $184,098 $200,759 $204,784 $223,924 $58,247 $68,880 $57,713 $68,147 $97,918 $97,918 $97,918 $97,918 $156,165 $166,798 $155,631 $166,065 $97,918 $97,918 $97,918 $97,918 $125,851 $131,879 $147,071 $155,777 11 AIRPORT ENTERPRISE FUND -operations FUND: 5160-430-430310 .............. ACTUAL BUDGET ACTUAL BUDGET FY14/15 FY15/16 FY15/16 FY16/17 Maintenance & Operations: 210 Supplies, postage, small equip $0 $1,000 $0 $1,000 341 Electricity $1,605 $1,500 $1,505 $1,500 345 Telephone/ cell $0 $0 $0 $0 354 Contract Services - Airport Management $36,000 $36,000 $36,000 $36,000 356 Contract Services - Other $5,395 $7,500 $4,700 $7,500 362 Repair & Maintenance - Equip/Lights, etc $1,096 $10,000 $2,836 $10,000 373 Dues & Training $0 $0 $0 $0 390 Equipment Rental $835 $1,000 $840 $1,000 510 Property & Liability Ins. $6,418 $6,500 $6,418 $6,500 522 Administrative Transfer $5,469 $3,320 $3,320 $2,562 528 Information Tech Transfer $1,429 $2,060 $2,094 $2,085 Subtotal $58,247 $68,880 $57,713 $68,147 820 Depreciation (unfunded) $97,918 $97,918 $97,918 $97,918 Total $156,165 $166,798 $155,631 $166,065 7 W., ATER ACCOUNT # 5210-447 PURPOSE OF THIS DEPARTMENT: Why does this department exist? To provide safe, potable and palatable water forte needs of the domestic, commercial and industrial consumers. .25 City Engineer .15 Budget Resource Manager .25 Construction Manager .20 Administrative Coordinator .20 Engineer 11 .05 Road and Fleet Superintendent .20 Administrative Assistant 111YOM1111 =--f W101 .60 Utility Management Superintendent .40 Engineer 11 .25 Engineering Tech/GIS/IT Support I Water Meter Maintenance Supervisor I Water Meter Maintenance Technician I Water Maintenance Supervisor 4 Water Maintenance Operators I Water Production Supervisor 2 Water Production Operators .50 Meter Reader 1.25 Utility Billing Clerk .25 Finance Director .15 City Accountant .05 Assessment Coordinator .25 Accounts Payable Clerk GOALS OF THIS DEPARTMENT: What are the departmental goals that support the purpose? 1. To operate the distribution and production facilities to meet Public Drinking Water Standards. 2. Provide drinking water that is safe to drink and palatable. 3. Maintain the system to achieve adequate pressure, minimize leaks, and provide flows for fire emergencies. 4. Replace old, deteriorated, water mains to promote safe drinking water and fiscal efficiencies for the water system customers. INTENDED OUTCOMES FROM BUDGET EXPENDITURES: This year's budget continues the replacement of aging and leaking mains throughout the water system to improve delivery of domestic water and fire flows. 4th Ave E's water main replacement project will be in coordination with a street reconstruct and drainage improvements enabling cost savings for • major infrastructure project. • and water demands will continue to be assessed for the optimum location and scheduling of a new water source to meet the needs of new development demands. "I,v, ATER 1Opi & Billing) FUND: 5210-447-430550 BEGINNING CASH 10100 Operating Cash 10120 Impact Fee Cash 10125 Meter Replacement Cash 10127 Capital & Emergency Reserve -Target $400,000 10130 Bond Reserves (restricted cash) REVENUES 343210 Metered Water Sales (billed) (10100) 343230 Meter Replacement Fee (10125) 343225 Impact Fees (10120) (adj for receivable- $4,094) 343365 Impact Fee Admin (10100) 343260 Misc. -In stallation/Reconnect/Tag fees (10100) 371010 Interest Earnings (10100) Interest Earnings -Impact Fee Cash (10120) Bonded Debt Total Revenue Total Available 0-:4-1101-ON" EXPENSES FROM RATES Expenses from Meter Cash (10125) Capital Outlay - from Impact Fees (10120) Capital Outlay / Bonded Debt Debt Service -from Impact Fees (10120) Depreciation Total All Departments add back depreciation/other noncash exp (rent fyl 7) ACTUAL BUDGET ACTUAL BUDGET FY14/15 FY15/16 FY15/16 FY16/17 $3,328,859 $3,659,909 $3,659,909 $5,158,898 $887,470 $910,706 $910,706 $1,063,170 $205,975 $298,802 $298,802 $362,329 $400,000 $400,000 $400,000 $400,000 $411,258 $358,400 $358,400 $358,400 $5,233,562 $5,627,817 $5,627,817 $7,342,797 $2,849,174 $2,810,000 $3,249,861 $2,850,000 $99,587 $98,000 $105,950 $98,000 $233,813 $285,000 $396,998 $285,000 $12,306 $15,000 $20,895 $15,000 $73,543 $50,000 $137,229 $74,000 $33,049 $32,400 $41,500 $41,500 $6,000 $3,600 $7,468 $4,500 $0 $0 $0 $2,435,627 $3,307,472 $3,294,000 $3,959,901 $5,803,627 $8,541,034 $8,921,817 $9,587,718 $13,146,424_ $2,689,880 $2,457,990 $1,950,496 $2,305,466 $6,760 $223,240 $42,423 $110,000 $16,577 $840,623 $52,002 $835,346 $0 $494,000 $0 $2,435,627 $200,000 $200,000 $200,000 $200,000 $840,000 $840,000 $840,000 $852,844_ $3,753,217 $5,055,853 $3,084,921 $6,739,283 $840,000 $840,000 $840,000 $852,844 10100 Operating Cash $3,659,909 $3,615,319 $5,158,898 $5,833,932 10120 Impact Fee Cash $910,706 $158,683 $1,063,170 $317,324 10125 Meter Replacement Cash $298,802 $173,562 $362,329 $350,329 10127 Capital & Emergency Reserve -Target $400,000 $400,000 $400,000 $400,000 $400,000 10130 Bond Reserves (restricted cash) $358,400 $358,400 $358,400 $358,400 Total cash $5,627,817 $4,705,964 $7,342,797 $7,259,985 I WATER FUND SUMMARY EXPENDITURE SUMMARY ACTUAL BUDGET ACTUAL BUDGET FY14/15 FY15/16 FY15/16 FY 16/17 Personal Services: Water Billing $107,260 $150,144 $133,218 $153,887 Water Operations $798,662 $9129435 $862,654 $946,521 Subtotal $905,922 $1,062,579 $995,872 $1,100,408 Maintenance & Operations: Water Billing Services Water Operations Subtotal Capital Outlay from Rates: Water Operations Subtotal Debt Service from Rates: Water Subtotal Total Capital Outlay - one Project Capital Outlay - Meter Replacement funds:(10125) Capital Outlay - from Impact Fee Funds: (10120) Debt Service -from Impact Fees: (10120) Depreciation (non -cash item) Total $72,370 $1321)173 $107,014 $127,372 $589,071 $742,804 $536,041 $769,096 $661,441 $874,977 $643,055 $896,468 $889,916 $466,153 $256,939 $269,448 $889,916 $466,153 $256,939 $269,448 $232,600 $54,281 $254,630 $51,986 $232,600 $54,281 $254,630 $51,986 $2,689,879 $2,457,990 $2,150,496 $2,318,310 $0 $494,000 $0 $2,435,627 $6,760 $223,240 $42,423 $110,000 $16,577 $840,623 $52,002 $835,346 $200,000 $200,000 $200,000 $200,000 $840,000 $840,000 $840,000 $840,000 $3,753,216 $5,055,853 $3,284,921 $6,739,283 WATER OPERATIONS FUND: 5210-447-430550 ACTUAL I BUDGET ACTUALTBUDGET -- FY14/15 FY15/16 FY15/16 FY16/17 Personal Services: F-fE's 12.80 12.80 12.80 12.80 110 Salaries & Wages $625,620 $690,169 $673,814 $702,293 III Seasonal Salaries $687 $5,000 $0 $5,000 112 Severance $0 $1,500 $0 $0 121 Overtime/Call Outs $15,474 $20,000 $7,161 $20,000 153 Health Insurance $110,945 $146,271 $132,362 $168,225 155 Retirement - PERD $45,936 $49,495 $49,317 $51,002 Subtotal $798,662 $912,435 $862,654 $946,521 Maintenance & Operations: 210 Office Supplies/Equip/Computers/ GIS 218 Equip. (non-capital)/Safety Equip & Supplies 226 Chlorine & Chemical 229 Other Supplies/Janitorial/Consumable Tools 231 Gas & Oil 312 Postage & Printing 336 Licenses / Public Water Supply Fee 341 Electricity 344 Natural Gas 345 Communications 349 Lab Services 353 Auditing 354 Contract Services 356 Consultants-Wtr Rights Acquisition/Wtr Modeling 362 Repair & Maint./Equip Maint/Radios/Equip Rental 366 Building & Grounds Maintenance 373 Dues & Training 388 Medical/Drug Testing 410 Construction Materials 422 Hydrants 423 Materials - Mains 424 Materials - Service lines $10,507 $11,000 $7,466 $11,000 $6,008 $8,500 $5,698 $8,500 $36,287 $38,000 $27,180 $38,000 $3,645 $4,500 $2,709 $4,500 $27,347 $38,000 $19,437 $38,000 $528 $4,000 $315 $4,000 $16,621 $18,000 $15,680 $18,500 $137,007 $139,000 $144,055 $150,000 $10,813 $15,500 $8,254 $15,500 $8,535 $9,000 $10,164 $9,000 $11,473 $22,000 $8,337 $26,000 $5,000 $5,000 $5,000 $5,000 $42,800 $55,000 $25,715 $65,000 $11,200 $25,000 $14,934 $25,000 $7,787 $15,000 $3,575 $15,000 $1,303 $12,000 $2,600 $12,000 $8,141 $9,000 $7,152 $9,000 $435 $800 $255 $800 $29,553 $35,000 $16,332 $35,000 $12,243 $8,000 $7,049 $8,000 $7,690 $12,000 $8,686 $14,000 $13,572 $16,000 $4,389 $14,000 0 WATER OPERATIONS 5210-447-430550 AN i "�G! 11i 1 11§3 W DNA% ACTUAL BUDGET ACTUAL BUDGET FY14/15 FY15/16 FY15/16 FY16/17 Maintenance & Operations Continued: 510 Property & Liability Ins. $23,144 $25,000 $22,452 $15,468 512 Uninsured Loss -Deductible & Goodwill Expendil $145 $15,000 $8,354 $10,000 521 Central Garage Transfer $14,248 $18,130 $18,130 $23,855 522 Administrative Transfer $104,561 $98,426 $98,426 $103,473 528 Information Tech. Transfer $22,864 $32,964 $33,500 $36,000 532 Office Rent/Lease Pymnt (Silverbrook Well) $9,145 $7,984 $7,076 $9,500 Subtotal $589,071 $742,804 $536,041 $769,096 490200 610/620 Principal, Interest, Fiscal Fees $432,600 $254,281 $254,630 $251,986 Capital Outlay - Operating funds (rates): 921 Sand/Cold Mix Storage Shed $0 $25,771 $0 $25,771 922 USFS Bldg & Property Aquisiton/Repair $0 $0 $0 $32,978 935 Sheepherders Tank Mixer $10,509 $0 $0 $0 936 Noffsinger Spring Generator - Carryover $0 $90,000 $0 $90,000 937 Sheepherder Backup Power $10,694 $5,157 $179 $0 938 Lower Zone Reservoir Imprvi-nnts $0 $0 $0 $0 940 Machinery & Equipment $0 $0 $0 $0 944 Water Maintenance Vehicle $0 $0 $0 $0 947 US 93 N. Utility Relocate $15,709 $11,634 $2,175 $0 950 4th Ave EN Wtr Main Replc $651,990 $0 $0 $0 951 SCADA Upgrades $5,283 $15,000 $10,307 $15,000 953 Shop Complex Pavement Restoration $0 $0 $0 $30,552 958 2nd Ave. E. Main - Carryover $0 $216,976 $171,829 $45,147 959 Parks Metering Phase 1 $0 $0 $0 $30,000 962 S. Woodland Dr. System Imprvmnts $0 $0 $0 $0 963 Abandon 2" wtr line $0 $0 $0 $0 964 2nd Ave VvN Waterline Replacement $0 $0 $0 $0 967 2nd Ave WN Main -MT to WA $190,409 $41 fi15 $26,688 $0 968 Depot Well Revitalization $5,322 $0 $0 $0 970 Old School Well Sand Separator $0 $20,000 $15,392 $0 971 Westview Well VFD Upgrade $0 $40,000 $30,369 $0 Subtotal $889,916 $466,153 $256,939 $269,448 0 WATER OPERATIONS 5210-447-430550 EXPENSE DETAIL ACTUAL BUDGET ACTUAL BUDGET FY14/15 FY15/16 FY15/16 FY16/17 Capital Outlay -Bonded: 969 4th Ave E. Main Replc Phase 1-4 $0 $494,000 $0 $2)435fi27 430555 Capital Outlay -Impact Fee Funds (010120): 941 Meters $16:577 $64,623 $42,223 $45,600 930 Contract Main Upsize (Impact fee Acct) $0 $150,000 $9,779 $150,000 953 Develop Wtr Supply Section 36 Well-CarryoN $0 $626,000 $0 $639,746 Subtotal $16,577 $840,623 $52,002 $835,346 430550 Capital Outlay -Meter Funds (010125)- 948 Meters -Replacement $ subtotal Subtotal 510400-831 Depreciation Expense Total Water Facilities 430560 Water Billing: Personal Services* 110 Salaries & Wages 112 Severance 153 Health Insurance 155 PERD Subtotal Maintenance & Operations: 210 Office Supplies/Computers 353 Auditing 354 Contract Services 355 Postage/Other Billing Costs 373 Dues & Training 522 Administrative Transfer 528 Information Tech. Transfer 532 Office Rent Subtotal Total Billing Grand Total Water Fund $6,760 $223,240 $42,423 $110,000 $6,760 $223,240 $42,423 $110,000 $840,000 $8405000 $840,000 $840,000 $3:573,586 $4,773,536 $2,844,689 $6,458,024 FTE's $85,114 $107,610 $98,092 $108,823 $0 $1,500 $0 $0 $15,817 $33,020 $27,754 $36,839 $6,330 $8,014 $7,372 $8,225 $107,261 $150,144 $133,218 $153,887 $1,839 $5,000 $6,112 $2,500 $2,020 $2,020 $2,000 $2,000 $0 $1,500 $0 $3,000 $29,813 $70,000 $49,003 $70,000 $485 $2,500 $2,246 $2,500 $7,511 $7,731 $7,731 $7,950 $22:1864 $37,000 $33,500 $33,000 $7,838 $6,422 $6,422 $6,422 $72,370 $132,173 $107,014 $127,372 $179,631 $282,317 $240,232 $281,259 $3,753,217 $5,055,853 $3,084,921 $6,739,283 h FUND: 5210-447-430550/560 Line Item Detail: Water Fund 349 Lab Services & Sampling Supplies - $26,000 Line item includes $ 10,000 to purchase nine sampling stations for bac-T and chlorine residual testing which will assist with compliance of the new requirements of Federal Clean Water Act's Total Coliform Rule. 354 Contract Services - $65,000 This line item covers the cost of annual contracts, i.e., U-dig fees, generator testing and maintenance, coveralls, and estimated electrical and system repairs. Increased $ 10,000 to complete a water storage tank inspection and cleaning. The inspection will be completed by a fully disinfected dive team in accordance with AWWA standards. Inspections are recommended every five years and include an interior and exterior structural, sanitary, safety, security and coating condition review. Capital Outlay: Operating Funds (Rates) 921 Sand/Cold Mix Storage Shed - FY16 Carryover $25,771 This project replaces the current shed that is showing signs of structural failure, rot and decay. The concrete base is also cracked and has been repaired in the past. The new sand shed will be designed to cover the gravel stockpile, cold mix, and sanding materials Cost shared between/Street, Water, Sewer, & Storm - Total Project Cost $103,084 936 Noffsinger Spring Emergency Generator Replacement - FY 16 Carryover $90,000 Replace the old emergency generator which is currently inside the shop area, with a new emergency generator located outside and above flood stage elevation. During our 2010 safety/building/fire audit many deficiencies were pointed out about the generator being at its current location, with no containment area for either the generator or the fuel system, proper venting is a large problem, no seismic bracing to prevent roll over, fire protection and accessibility. The age of the generator makes it more and more difficult to find replacement parts. By replacing this generator it reduces chances of fire and safety of workers from inside the shop area and meets the Fire Department safety audit requirements. A new generator also increases efficiency and reliability. A Grant application has been submitted to supplement the funding of the replacement generator. The Emergency Backup Grant, will contribute 75% of the replacement cost (W-EX-160). 951 SCADA System Upgrade/Improvements - $15,000 The SCADA system utilizes complex software to operate, control, and monitor water system facilities. This continued allocation ensures funding for all unforeseen upgrades and maintenance to the SCADA system and supporting equipment (W-EX- 155). 953 Shop Complex Pavement Restoration - $30,552 The project involves replacement of the degraded asphalt surface inside the fenced area of the City Shop Complex and the installation of a new storm water quality treatment device. The asphalt at the City Shop Complex is deteriorated beyond simple patch work and necessitates replacement. The asphalt replacement triggers storm water treatment requirements stipulated by the MS4 permit and promotes good stewardship for clean water discharges to Ashley Creek. Cost shared between Water, Sewer, Storm, Streets, & Solid Waste - Total Project Cost $152,760 WATER OPERATIONS FUND: 5210-447-430550/560 Line Item Detail: continued Capital Outlay: Operating Funds (Rates) Cont. 958 2nd Ave East Main Replacement & Upsize -Carryover $45,147 This project replaces an undersized 2" dead end water main with approximately 800' of 8" PVC water main. The proposed water main will continue from the dead-end and loop to 3rd Ave E. providing added fire hydrants and increase fire flows to the area (W-EX-40). 959 Parks Metering - Phase I - $30,000 Installation of water meters, meter pits, and backflow prevention in the City's parks. Metering City parks irrigation will allow for analysis of production and demand of water production system. The data will enhance our cost of service analysis and the need for implementation of new water production wells. The project will be completed over two phases. (W-EX-176). Capital Outlay: BONDED PROJECT 969 4th Avenue East Main Replacement -Appropriation $1,941,627, FY16 Carryover $494,000 This bonded project constitutes replacement of 14 blocks of water main from Center St to 14 1h St E. The existing 8"/6" cast iron water main was installed between 1925 and 1930, and is at the end of its design service life. The 85 plus year old pipe is corroding, creating multiple main breaks throughout this section of pipe in the past several years. The water project will be coordinated with the street and storm CIPs for road and drainage improvements (W-EX-21). Capital Outlay - Impact Fee funds (10120) 930 Contract Main Upsize - $150,000 $150,000 - Funds required for small city requested upsizing of private development infrastructure (W-EX-1 19). 941 Meters - $45,600 New Services 953 Construct Grossweiler Well -Carryover $626,000; New Appropriation $13,746 -"Total Cost $639,746 As growth and water demand increase, new wells are required to meet the firm and peak demands of the City. The development of Grossweiler well, would be sufficient to meet the projected growth demand and Public Water Supply requirements stipulated by MDEQ. The Grossweiler well is located adjacent to the DNRC/DEQ/911 Center complex on Stillwater Road. This project is funded 100% with impact fees. Capital Outlay - Meter funds (010125) 948 Meters -S110,000 Meter replacement 0 SEWER DEPARTMENT ACCOUNT # 53 10 PURPOSE OF THIS DEPARTMENT: Why does this department exist? Maintain and operate the wastewater collection and treatment facility to have a minimum impact on the environment and enhance the quality of life for the community. WWTP DEPARTMENT PERSONNEL.- (8.55 FTE) .20 Public Works Director I WWTP Manager .1 it Engineer I Assistant WWTP Manager .15 Budget Resource Manager 4 WWTP Operators .10 Administrative Coordinator 2 WWTP Chemists SEWER DEPARTMENT PERSONNEL: (6.55 FTE & I Unfunded FTE) .15 Public Works Director .25 Engineering Tech/GIS/IT Support .15 City Engineer 2.5 Sewer Maintenance Technician .15 Budget Resource Manager I Vacant/Unfunded Swr Maint. Technicial .25 Construction Manager .20 Administrative Coordinator .20 Engineer 11 .20 Administrative Assistant .05 Road and Fleet Superintendent .25 Accounts Payable Clerk .50 Storm/Sewer Maintenance Supervisor .05 Assessment Coordinator .50 Meter Reader .75 Utility Billing Clerk .25 Finance Director .15 City Accountant WWTP 1. To protect the health of the community by discharging wastewater that meets state and federal regulations. 2. Economically maintain facilities to ensure maximum operational functions and equipment longevity. 3. Maximize secondary use of treatment biosolids. -1 MAN 11 HUNG 1. To ensure conveyance of wastewater in the community to the WWTP 2. Economically maintain facilities for maximum operational functions and equipment longevity. 3. Perform preventative maintenance on sewer conveyance and facilities to ensure optimum system operations. The wastewater budget provides for routine maintenance and replacement of equipment and piping within the collection system and wastewater treatment plant (Y�WTP). This year's bud • get continues the collection system improvements necessary to improve conveyance, lift station communication, collection system reliability, and new equipment to perform cost saving in-house pipe repairs. The VVWTP allows for the execution of building maintenance projects, inspections and replacement or repair projects for the secondary digesters, permit compliance for Temperature TMDL and WQ Standards, and alternative review for future bio-solids disposal. SEWER- SANITARY OPERATIONS, BILLING, WASTEWATER TREATMENT FUND: 5 3 10 BEGINNING CASH 10100 Operating 10123 SANITARY Sewer Impact Fee Inv. Account 10124 WWTP Impact Fee Inv. Account 10125 WWTP Equipment Repl/Evergreen 1013x Bond Reserves/ Operating reserve REVENUES 343310 SEWER SERVICE -billed (10100) 343360 Misc. ; (10100) 343330 Impact Fee/Hookup-Sanitary (10 12 3) 343330 Admin Impact Fees Sanitary (10 100) 343335 Impact Fee/Hookup-WWTP (10 124) 343335 Admin Impact Fees WWTP (10 100) 371010 Interest -operations (10100) Interest-WWTP/Evergreen (10 125) Interest-WWTP Impact Fee Acct. (10 124) Interest -Sanitary Impact Fee Invest. Acct. (10 123) Total Revenue Total Available EXPENSES FROM RATES Capital Outlay City/Evergreen Funds (10125) Capital Outlay / Bonded Debt Capital Outlay - from Sanitary Impact Fee funds (10123): Debt Service From Sanitary Impact fees (10123): Debt Service From Treatment Impact fees (10124): Depreciation (non cash expense)/Rent FYI 7 Total Expenses Add depreciation/other non cash exp to cash Add cash distribution to Evergreen/City 10 125 from 10 100 Ir, XT"TIkTd" 1" A C111 10100 Operating 10123 SANITARY Impact Fee Inv. Account 10124 WWTP Impact Fee Inv. Account 10125 WWTP Equipment Rep lacement/Evergreen 1013x Bond Reserves (restricted funds) ACTUAL BUDGET ACTUAL BUDGET FY14/15 FY15/16 FY15/16 FY16/17 $1,597,444 $2,102fi14 $2,102,614 $3,101,221 $2,184,570 $1,646:1778 $1,646,778 $1,867,844 $409,413 $463,469 $463,469 $471,378 $1,531,873 $1,221,608 $1,221,608 $1,448,800 $1,299,313 $1,299,313 $1,299,313 $1,299,313 $790229612 $697339782 $697339782 $891889556 $4,272,036 $4,300,000 $4,642,075 $4,400,000 $28,967 $5,000 $20,308 $15,000 $206,370 $209,000 $695,702 $209,000 $10,862 $11,000 $36,616 $11,000 $276,556 $285,000 $370,362 $285,000 $14,556 $15,000 $19,493 $15,000 $25,870 $19,000 $28;1000 $30,000 $7,500 $7,000 $10,500 $7,500 $2,500 $1,000 $4,388 $2,500 $15,000 $19,000 $14,000 $10,000 $4,860,217 $4,871,000 $5,841,444 $4,985,000 $11,8829829 $119604j82 $129575,226 $1391739556 $3,839,295 $4,670,369 $3,747,885 $4,759,515 $729,364 $801,733 $209,810 $1,452,678 $7,823 $0 $0 $0 $664,162 $1,652,054 $535,477 $1,168,232 $95,000 $95,000 $95,000 $95,000 $225,000 $225,000 $225,000 $225,000 $2,245,000 $2,245,000 $2,245,000 $2,257,844 $798055647 $9,6899156 $7,058,172 $95958,269 $2,245,000 $2,245,000 $2,245,000 $2,257,844 $411,599 $411,599 $426,502 $450,000 $2,102,614 $1,782:245 $3,101,221 $2,812,706 $1,646,778 $127,724 $1,867,844 $823,612 $463,469 $524,469 $471,378 $533,878 $1)221,608 $838,474 $1,448,800 $453,622 $1,299,313 $1,299,313 $1:)299,313 $1,299,313 $6,733,782 $4,572,225 $8,188,556 $5,9239131 In SEWER - WWTP - BILLING FUND SUMMARY FUND: 5310-454-430620-630/455-430640 EXPENSE SUMMARY ACTUAL BUDGET ACTUAL BUDGET FY14/15 FY15/16 FY15/16 FY16/17 Personal Services: Sewer billing $87,913 $125,186 $113,518 $128,760 Sanitary Sewer $309,008 $340,170 $324,710 $341,569 WWTP & LAB $611,199 $761,501 $649,989 $732,667 Subtotal $1,008,120 $1,226,857 $1,088,217 $1,202,998 Maintenance & Operations: Sewer Billing services $72,476 $130,779 $106,606 $123,477 Sanitary Sewer $352,051 $441,998 $307,937 $372,304 WWTP & Lab $742,073 $992,433 $781,324 $933,684 Subtotal $1,166,600 $1,565,210 $1,195,867 $1,429,465 Capital Outlay from rates: Sanitary Sewer Operation $312,534 $605,299 $176,196 $788,195 WWTP & Lab $72,288 $0 $0 $40,000 Subtotal $384,822 $605,299 $176,196 $828,195 Debt Service from rates: Sanitary Sewer $1,889 $1,434 $1,134 $1,646 WWTP $866,265 $859,967 $859,967 $860,055 Subtotal $868,154 $861,401 $861,101 $861,701 City/Evergreen Replacement funded from rates: $411,599 $411,599 $426,502 $450,000 Total $3,839,295 $4,670,367 $3,747,885 $4,772,359 Capital Outlay - Other funds: WWTP Bonded Debt $7,823 $0 $0 $0 WWTP (10 125) City/Evergreen account $729,364 $801,733 $209,810 $1,452,678 Capital Outlay -from Impact Fee funds: Sanitary Sewer(101.^ $664,162 $1,652,054 $535,477 $1,168,232 Debt Service -from Impact Fees Sanitary Sewer (10123) $95,000 $95,000 $95,000 $95,000 WWTP (10124) $225,000 $225,000 $225,000 $225,000 Depreciation (non -cash item) Sanitary $820,000 $820,000 $820,000 $820,000 Depreciation (non -cash item) WWTP $1,425,000 $1,425,000 $1,425,000 $1,425,000 Total $79805,645 $9,689,156 $790589172 $999589269 11 SEWER - OPERATIONS FUND: 5310-454-430630 Personal Services: FTE's 110 Salaries & Wages 112 Severance 121 Overtime 153 Health Insurance 155 Retirement - PERD Subtotal Maintenance & Operations: 210 Office Supplies/Equip/ Computer Supplies/GIS 218 Equipment (Non Capital)/Safety Equip & Supplies 229 Other Supplies/Janitorial/Consumable Tools 231 Gas & Oil 312 $0 341 Electricity 344 Natural Gas 345 Telephone & Comm., Alarms 353 Auditing 354 Contract Services 356 Consultants 357 Impact Fee Study/Review Impact Fees 362 Equipment Maintenance/Buildings & Radios 373 Dues & Training, Licenses 388 Medical Services 410 Construction Materials 425 Materials - Pumps/Lift Stations 510 Property & Liability Ins 512 $10,,000 Uninsured Loss/$15,000 Goodwill Expenditures 521 Central Garage Transfer 522 Administrative Transfer 528 Information Tech. Transfer 532 Office Rent 535 Usage Charge for 100,000 Gallons -Trumble Creek Subtotal Capital Outlay: from Rates (10100) 920 Install Lift Station Enclosure 921 Sand/Cold Mix Storage Shed - Carryover 922 USFS Bldg & Property Aquisiton/Repair 940 Machinery & Equipment 947 Hwy 93 N Bypass Utility Relocate ACTUAL BUDGET ACTUAL BUDGET FY14/15 FY15/16 FY15/16 FY16/17 5.55 5.55 5.55 5.55 $239,427 $25 1 ,563 $245,205 $251,377 $0 $1 1500 $0 $0 $1,068 $5,500 $587 $5,500 $51,223 $63,447 $58,803 $66,327 $17,290 $18,160 $20, 115 $18,365_ $309,008 $340,170 $324,710 $341,569 $8,290 $9,200 $6,571 $9,200 $6,841 $8,350 $8,375 $8,350 $2)084 $2,000 $2,308 $2,000 $10,831 $13,500 $7,183 $13,500 $50 $400 $489 $400 $49,299 $54,500 $49,198 $54,500 $13,942 $16,500 $14,010 $16,500 $20,793 $23,000 $22,536 $23,000 $3,000 $3,000 $3,500 $3,000 $7,210 $24,000 $6,873 $24,000 $0 $8,000 $7,500 $8,000 $0 $0 $0 $0 $4,613 $5,000 $2,042 $5,000 $1,301 $3,500 $3,739 $5,500 $308 $500 $547 $500 $6,506 $9,000 $18,458 $9,000 $22,186 $50,000 $9,322 $50,000 $58,359 $62,000 $50,032 $15,791 $18,308 $25:1000 $2,438 $25)000 $7,287 $7,911 $7,911 $9,180 $59,205 $61,733 $61,733 $64,461 $11,432 $16,482 $16,750 $19,000 $7,838 $6,422 $6,422 $6,422 $32,368 $32,000 $0 $0 $352)051 $441,998 $307,937 $372,304 $10,688 $10,000 $3,309 $0 $0 $25:371 $0 $25,771 $0 $0 $0 $32,978 $0 $0 $0 $0 $1:)997 $2,000 $0 $0 IN SEWER - OPERATIONS & Billing FUND: 5310-454-430630 ACTUAL BUDGET ACTUAL BUDGET Capital Outlay: from Rates (10100) FY14/15 FY15/16 FY15/16 FY16/17 950 Back Up Generator for L. S. 11 $5,765 $0 $0 $0 951 1 st Alley EN Pipe Upsize (34% rate 66% impact fees): carryover $87:)192 $20,528 $0 $20,528 952 Peterson School Alley Replacement $0 $0 $0 $284,000 953 Shop Complex Pavement Restoration $0 $0 $0 $30,552 956 Lift Station Communication Upgrade $16,315 $20,000 $15,911 $20,000 959 2nd Alley E Replacement $177,694 $11,650 $6,253 $0 960 Manhole Rehabilitation /Sewer Main Repairs $12,883 $50,000 $9,740 $50,000 961 2nd Alley 'AN -Mont to Calf (66% rates 34% impact fee) Carryover $0 $465,350 $140,983 $324,366 Total Capital Outlay $312,534 $605,299 $176,196 $788,195 430635 Capital Outlay -Impact Fee funds (10123) 951 1st Alley EN Pipe Upsize (34% rate 66% impact fees)CARRY $173,965 $34,035 $0 $34,035 955 Main & Lift Station Upsize $21,777 $48,345 $0 $100,000 957 West Side Interceptor Phase I - Carryover $468,420 $1,329,948 $462,861 $867,087 961 2nd Alley WN -Mont to Calf (66% rates 34% impact fee) Carryover $0 $239,726 $72,616 $167,110 Total Capital from Impact Fee Funds $664,162 $1,652,054 $535,477 $1,168,232 490204-6xx Debt Service -Principal, Interest, Fiscal Agent Fees $96,889 $96,434 $96,134 $96,646 510400-831 Depreciation Expense $820,000 $820)000 $820,000 $820,000 Total Sanitary Sewer Operating Budget $2,554,644 $3:955,955 $2,260,454 $3,586,946 430620 Sewer Billing FTE's 110 Salaries & Wages $70,175 $89,425 $83,974 $91,956 112 Severance $0 $1,500 $0 $0 153 Health Insurance $12,524 $27,608 $23,247 $29,868 155 Retirement - PERD $5,214 $6,653 $6:-297 $6,936 Subtotal $87,913 $125,186 $113,518 $128,760 Materials and Services: 215 Office Supplies/Computers $1,842 $5,000 $6,112 $2,500 353 Auditing and other Contract Services $2,920 $3,000 $2,000 $2)000 355 Billing Costs/Postage $29,850 $70,000 $49,593 $70,000 373 Dues & Training $485 $2,500 $2,122 $2,500 522 Administrative Transfer $6,677 $6,857 $6,857 $7,055 528 Information Tech. Transfer $22,864 $37,000 $33,500 $33,000 532 Office Rent $7,838 $6,422 $6,422 $6,422 Subtotal $72:476 $130,779 $106,606 $123,477 Total Sanitary Sewer Billing Budget $160,389 $255,965 $220:1124 $252,237 IN .. ............ I FUND: 5310-454-430630 J 1 1 Line Item Detail: SANITARY SEWER 218 Equipment -lion Capital - $4,800 / Safety Equipment & Supplies -$3,550 $3,300 - Magnetic Lifters & Dollies $1,500 - Four Gas Analyzer 354 Contract Services -$24,000: Cost of annual contracts; U-dig fees, generator testing/maintenance, coveralls, estimated system repairs. 373 Dues & Training - $5,500 An increase of $2,000 is requested in this budget cycle to promote more advanced training of staff. Proposed technical trainings include, FVCC electrical courses, methods and techniques for grout application in manholes, and sewer camera transporter fundamentals and rebuild course. 425 Materials - Pumps/Lift Stations - $50,000 The City maintains 40 sewer lift stations which contain 80 pumps and motors, numerous drives, check valves and controls. Many of our pumps have reached the end of their service life cycle. In addition to routine maintenance, repairs were mostly associated with pump and motor failures, or level transmission and control malfunctions. This budget accommodates 5-6 major pump replacements a year. Capital Outlay: from Rates (10100) 921 Sand/Cold Mix Storage Shed - Carryover $25,771 This project replaces the current shed that is showing signs of structural failure, rot and decay. The concrete base is also cracked and has been repaired in the past. The new sand shed will be designed to cover the gravel stockpile, cold mix, and sanding materials. Cost shared between/Street, Water, Sewer, & Storm - Total Project Cost $103,084 952 Peterson School - $284,000 This project replaces approximately 600 feet of 4", 6" and 8" concrete sewer pipe with 8" PVC gravity sewer main. Root intrusion in the existing sewer main requires maintenance to reduce sewer back up incidents. This project improves service to approximately 20 different properties (SEW- 15). 953 Shop Complex Pavement Restoration - $30,552 The project involves replacement of the degraded asphalt surface inside the fenced area of the City Shop Complex and the installation of a new storm water quality treatment device. The asphalt at the City Shop Complex is deteriorated beyond simple patch work and necessitates replacement. The asphalt replacement triggers storm water treatment requirements stipulated by the MS4 permit and promotes good stewardship for clean water discharges to Ashley Creek. Cost shared between/Water, Sewer, Storm, Streets, & Solid Waste - Total Project Cost $152,760 956 Lift Station Communication Upgrade - $20,000 This multi -year project replaces up to five lift station landline based alarm systems with cell phone web based alarm and data collection. Currently, operators are alerted of lift station failures through landline phones. The proposed Mission Communication System collects necessary facility data that is published through a web based program reviewed daily by operators. 14 mission units are currently installed and additional units will be purchased and phased into the operational system over the next 7 years (SEW-72). IE FUND: 5310-454-430630 Line Item Detail: SANITARY SEWER 1 M 111,11, W I go= 960 Manhole & Sewer Main Rehabilitation & Replacement - $50,000 This project would allow for the reconstruction or replacement of sanitary sewer manholes and mains that have deteriorated and are approaching a potential failure. The sewer crews review and record the function of manholes and mains. During this review, crews prioritize the potential projects according to the severity of the deterioration. This project also includes $14,700 to purchase a sectional point repair system to slip line short sections of failing sewer mains. This system utilizes trenchless technology to reline collapsed sections of sewer main under 7 feet in length. The proposed system will reduce contractor costs by performing small repairs in-house with no subsurface excavation (SEW-33). Capital Outlay - Impact Fee Funds (10123) 955 Main & Lift Station Upsize -$100,000 $ 100,000 - Misc. sewer contract main upsize, facility enlargements, or regional lift station (SEW-52). 957 West Side Interceptor Phase I -Three Mile Drive and Spring Creek Project - Carryover $867,087 This project is for the design engineering and construction to install approximately 20,000 lineal feet of sanitary gravity sewer main, a rail road crossing, a highway crossing and other related items. This is the proposed first phase of the West Side Interceptor, extending new main from a connection at 10th Street West and 5th Ave West, west and then north across Three Mile Drive to an area south of Section 35. The design for the project will include growth forecasts, sanitary sewer modeling; topographic, property, and utility surveys; development and negotiations for easements and land acquisition- development of project design plans and specifications- and bidding and negotiation services (SEW-55). Capital Outlay - Carryover $20,528 from Rates (10100) and $34,035 from Impact Fee Funds (10123) 951 1st Alley EN Pipe Upsize - Carryover $54,563 This project replaces 1,110 ft of 8" gravity sewer main with a 12" sewer main from E Nevada St to E Washington. The pipe increase will eliminate the current surcharging and main backage created from upstream development's increase flow to the down gradient sewer conveyance system. The existing 8" gravity sewer main is downstream of the large sewage flow basin associated with the Buffalo Hill Lift Station (LS 9). The force main from LS 9 was upsized from an 8" to a 10" diameter pipe in 2007. The force main upsize allows more wastewater flow when the pumps are running. The force main outlets into the gravity conveyance system approximately 4 blocks north of the beginning of 1st Ave E Alley Sewer Replacement project. The project cost will be paid for by sewer rates and impact fees. The new 12" pipe enables 66% more wastewater flow through the upsized conveyance section (SEW-47). Capital Outlay - $324,366 from rates (10100) and $167,110 from impact fee funds (10123) 961 2nd Alley WN from Montana to California Upsize - Carryover $491,476 2 nd Alley WN from MT to CA: This project replaces 1,350'of 8'.'clay sewer main with a 10"' sewer main from Montana to California. The pipe increase and replacement will eliminate the current surcharging created from root intrusion, aging deteriorated pipe and new development increase flow. This section of sewer is downstream of a large sewage flow basin associated with the hospital and 'AN area of the city. The project cost will be paid for by sewer rates and impact fees (SEW-67). IR AVVY ASTEWATER TREATMENT PLANT FUND: 5310-455-430640 Personal Services: 110 Salaries & Wages III Seasonal Salaries 112 Severance 121 Overtime 153 Health Insurance 155 Retirement - PERD Subtotal ACTUAL BUDGET ACTUAL BUDGET FY14/15 FY15/16 FY15/16 FY16/17 FTE's 5.55 6.55 6.55 6.55 $346,238 $448,294 $403!1296 $4485865 $687 $51000 $2,024 $5!)000 $0 $1,500 $0 $0 $21)115 $22,500 $225961 $22)500 $59)423 $84419 $74,318 $88,992 $26,608 $32,035 $3 1!1233 $32463 $454)071 $593,747 $533,832 $597,820 Maintenance & Operations: 210 Office Supplies/Equip/Computers 218 Safety Equipment & Supply 225 Alum 226 Chemicals 229 Other Supplies/Janitorial/Consumable Tools/Equip Rental 231 Gas & Oil 312 Postage & Shipping 336 Licenses and Fees 341 Electricity 342 Water 344 Natural Gas 345 Telephone & Alarms 353 Auditing 354 Contract Services -Glacier Gold 355 Other Contract Services 356 Consult-Elec Eng/Permit Asst /Optimization & Bio Solid StudieE 358 Consultant - TMDL 360 Maintenance Service -Misc. 366 Building Maintenance 373 Dues,, Training & Training Materials 388 Medical Services 510 Property & Liability Insurance 521 Central Garage Transfer 522 Administrative Transfer 528 Information Tech. Transfer Subtotal $6,413 $1000 $7,603 $101000 $1,362 $2!300 $839 $2,700 $11,324 $20,000 $1 l!384 $20!)000 $15,964 $19,000 $17,739 $19,000 $3,570 $7,000 $4!259 $7!)000 $11,807 $18,500 $8,289 $18,500 $259 $350 $197 $350 $6,457 $11)000 $7,193 $1000 $1695944 $178,500 $166,497 $178,500 $7)549 $6)500 $61330 $7,500 $471458 $65,000 $39,931 $65,000 $51219 $51000 $6, 171 $51500 $41000 $45000 $2,750 $4,000 $123,822 $124,000 $112, 116 $1245000 $29,678 $30,000 $29,473 $3000 $21)575 $145)000 $57!1999 $100,000 $61687 $1500 $1,366 $15,000 $19,624 $30:P000 $15,371 $30,000 $245590 $6000 $48,905 $365000 $3,841 $7)500 $5)550 $7,500 $220 $500 $402 $500 $37,695 $40)000 $40,699 $34,985 $17,519 $125822 $12:)822 $13)212 $116fi3 8 $1041138 $104)138 $112,237 $17)148 $245723 $25, 125 $27,500 $710)363 $941)233 $7335548 $878,984 UN WASTEWATER TREATMENT PLANT FUND: 5310-455-430640 EXPENSE DETAIL ACTUAL BUDGET ACTUAL BUDGET FY14/15 FY15/16 FY15/16 FY16/17 430640 Capital Outlay: Operating Funds 920 Main/Digester roof FY 14; Roof & Lighting FYI 5 $55,783 $0 $0 $0 921 Evergreen Sewer Sampling Equipment & Bid $0 $0 $0 $4000 940 Coat Equalization Basin - Carryover $16,1505 $0 $0 $0 Subtotal 430644 Capital Outlay: Bonded 935 Construction Digester Lid 430645 WWTP Replacement Funds:Evg (10 125) 362 Equipment Maintenance 920 RAS Bid & Storage Warehouse Roof Replcmnt 933 Solid Dewatering Carryover 934 Secondary Digester Lid FY16 Inspection;FY17 Design 936 Digested Sludge Line Replacement Carryover 937 Sand Filter Maintenance & Replacement 940 Machinery & Equipment Subtotal 4902xx-6x Debt Service 831 Replacement Reserve -Evergreen Depreciation Expense (non cash) Subtotal WWTP 430646 Laboratory Operations - Personal Services: 110 Salaries & Wages 153 Health Insurance 155 Retirement - PERD Subtotal Maintenance & Operations: 210 Office Supplies/Computers/other Supplies/Shipping 218 Equipment 222 Lab Supplies 349 Lab services /Permit & Pretreatment Testing 362 Equipment Maintenance 373 Dues & Training, Licenses Subtotal Subtotal Laboratory Total Treatment Plant $72,288 $0 $0 $40)000 $7)823 $0 $0 $0 $581454 $100,000 $74)328 $100,000 $0 $0 $0 $40.1000 $508,383 $2951233 $82,426 $100,000 $0 $31,500 $0 $531,500 $0 $3001000 $1,322 $298)678 $0 $0 $0 $200,000 $162,527 $75,000 $51,734 $182,500 $729,364 $801!1733 $209,810 $1)452fi78 $11091,265 $ 1 i,0841967 $1,084,967 $1,085)055 $411 ,599 $411 ,599 $4261502 $450,000 $114257000 $1,425,000 $1)425,000 $1,42500 $4,901,773 $5:258,279 $4)413)659 $5:1929)537 FTEI� 2.0 2.0 2.0 2.0 $1211616 $129,261 $92:1285 $106,284 $26,744 $29,319 $17,375 $20,932 $8)769 $9)177 $61497 $7)630 $157, 129 $167,756 $116, 157 $134)847 $1,724 $4,500 $2,115 $4,500 $1:1769 $2,500 $688 $2)500 $8,058 $8,500 $14,346 $9:1500 $16,382 $29,000 $24)429 $29,000 $25141 $4)000 $4,480 $51500 $IfiM $2)700 $1)718 $3,700 $31,710 $51,200 $47,376 $541700 $188,839 $218)956 $163:933 $189,547 $51090fi12 $5,47711237 $4:577,592 $6, 11905 IN FUN1: 5310-455-430640 •CUT I d'R1I 111111 Ili 11 i 1111 11111111111 Increased $ 1 ,000 to reflect actual costs. Rag /grit and landfill biosolids disposal fees and other contract services. 356 Consultant - Electrical Engineer, Permit Compliance & Bio Solids Study - $100,000 $20,000 Electrical Engineer - Continue to update the 1992 antiquated computer control programming for operations of the modernized equipment in the current plant. Ongoing trouble shooting when failures occur in communications and the computer control program. $40,000 - Permit Compliance : Optimization Study Temperature Mon itoring/Evalu ation - The future implementation of numeric water quality standards and Flathead Lake TMDL by MDEQ will limit the amount of nutrients discharged from the WWTP. Kalispell is unable to meet the required nutrient limits,, and was issued a general nutrient standard variance as outlined in SB 367. The new permit requires dischargers receiving a variance to perform an optimizing study. The optimization study requires evaluation of the current facility operation to optimize nutrient reduction with existing infrastructure and analyzes cost-effective methods of reducing nutrient loading, including but not limited to nutrient trading without substantial investment in new infrastructure. The analysis is to include cost-effective methods of reducing nutrient loading without substantial investment in new infrastructure,, there should not be structural changes, and there should not be an increase in rates. MDEQ's expectation is the study be performed by a third party professional engineer specializing in wastewater nutrient removal processes, and includes modeling of alternative plant configuration and operation scenarios to determine if operational modification could be made to achieve better nutrient removal performance. The study must also explore the feasibly of nutrient trading within the watershed. Temperature Monitoring: The city of Kalispell has been issued a new waste water discharge permit from MT. D.E.Q. in Aug. 2015. The permit mandates the development of a temperature and flow monitoring plan for instream and effluent discharge. The monitoring plan has been submitted, approved, and implementation of the plan will begin on July 1, 2016. This new mandate is in response to the state adopted Temperature TMDL for Ashley Creek. $40,000 - Bio Solids Disposal Study - As the City approaches the capacity of the Glacier Gold Composting facility of 600 dry/tons per year we need to explore alternative means of sludge disposal. These funds would be used to research alternative disposal options. 358 Consultants -'Total Maximum Daily Load (TMDL) / Permit - $15,000 The State of Montana is under Federal Court order to develop a TMDL for pollutants flowing from the Flathead basin into Flathead lake. TMDL restrictions will have some consequences for the City's historical ability to drain storm waters to Flathead tributaries and its community wastewater to Ashley creek. A TMDL that is restrictive could impair the City's ability to grow and would raise the cost of treating community wastewater and storm water discharges. We have engaged an experienced consultant to provide assistance to the City for working with MDEQ to develop a satisfactory TMDL. This budget item also includes funds for potential legal costs related to the TMDL issue. 00 FUND: 5310-455-430640 366 Building Maintenance - $36,000 $10,000 - Headwork's Interior Painting The interior of the headwork building was originally painted in 1992. Corrosion is causing interior rusting problems creating coating needs. $16,000 - Exterior Building Painting The headwork lift station, and small storage building are in need of repainting due to age, original flat base paint, and the caustic environment created by wastewater. $10,000 - Mise building repairs and maintenance to multiple WWT buildings. 430640 Capital Outlay - Operating Funds 921 Evergreen Sewer Sampling Equipment & Shack - $40,000 Per the Interlocal agreement with Evergreen Sewer & Water the WWTP tests the strength of Evergreen's discharge to the WWTP. Sampling equipment in the Evergreen sewer discharge shack and the headwork building was installed in 2008. The equipment is in poor condition and needs updating to meet current sampling protocol. The current sampling shack is too small to fit the updated sampler. The project includes installation of a monolithically slab, a larger sampling shack, odor control for safe entry, and the purchase of (2) composite samplers. 430645 Capital Outlay - Replacement Funds 362 Equipment Maintenance - $100,000 -The WWT plant maintains along list of equipment some of which includes 76 pumps, 210 valves, air compressors, gas boilers, sand filters, air blowers, fans, motors etc. The original 1992 plant is reaching the expected life span of 25 years and therefore increases in equipment replacement, rehabilitation, and maintenance is expected. Most of the smaller pump replacement costs range in $12,000 - $15,000 range. The larger digester mixer pumps cost $50,000 and an air blower replacement costs would exceed the $125,000 range. The U.V. disinfection system consists of 2 banks of U.V. bulbs (200 bulbs). Bulbs are designed to run for 12,000 hours. Current bulb run time is over 36,,000 hours. $11,000 will be utilized to replace one bank (100 bulbs) of bulbs per year. (WWTP-1604). 920 R.A.S. Building & Storage Warehouse Roofing Replacement - $40,000 Under heavy rain conditions the R.A.S. building roof leaks. In the past, major rain events have resulted in equipment damage. The storage warehouse was built in the 1970's and has never had the roofing replaced. Replacements of these roofs will protect valuable electrical equipment from water damage. 933 Solids ewatering Design & Construction - Carryover $100,000 The 2008 Facility Plan Update included $1.9 million to update the Solids Dewatering in Phase 3 of the AWWTP Expansion. The installation of I new screw press is a portion of the suggested improvements to replace I of 2 belt filter press (WWTP-1715). 934 Secondary Digester Lids Replacement - FY16 Carryover 31,500; New Appropriation $500,000 The Secondary Digester Lids were originally installed in 1992. The steel floating lids were protective coated in 1997 due to the corrosive environment. The coatings were designed to last 10 + years, and the coating/metal are now showing signs of rusting. An inspection by a qualified coating and structural expert will help to assess the necessity of further action with coatings or lid replacements. Budget for this project includes inspection, design and coating of the TWAS and secondary digesters. Specific cost for coating will be adjusted following inspection results (WWTP- 1711). Re LIATNIEV, M- FUND: 5310-455-430640 430645 Capital Outlay - Replacement Funds Continued 936 Digested Sludge Line Replacement -Carryover $298,678 This project replaces the digester sludge line which runs from the digesters (3) to the solids dewatering building. Sludge having gone through the digestion process for solids reduction is then pumped from the digester building to the solids dewatering building where it is dewatered and hauled to Glacier Gold. The digester sludge line is experiencing failure due to corrosion and has developed three holes/breaks in the past four years (WWTP- 1725). 937 Sand Filters Maintenance and Replacement - $200,000 This project involves replacement of eroded away and displaced sand, and the replacement and rehabilitation of the filter units in order to improve functionality. After 24 years of service the sand filters are worn, cracked, and no longer operate at optimum capacities. Engineering support will be required for rehabilitation which will be determined once the filters are inspected (WWTP-1608). 940 Machinery & Equipment Replacement Fund - $182,500 $21,000 Backup Plant Air Compressor - This would replace two 1984 air compressors we can no longer get parts for with one air compressor. $8:500 - Lawn Tractor - Replacement of a 2003 Lawn Tractor. The mower is used to maintain 23 acres at the WWT plant. $11 NO - Lift Station Make Up Air Replacement - Current unit is 24 yrs old and is rusted out allowing water to leak in causing electrical issues. $ 10)000 - Lab Flask Scrubber Dishwasher - Current lab sanitizer is 9 years old and in need of replacement. $32:1000 - Replace Fermenter Recirculation Pump (WWTP-3 10). $100,000 - Secondary Clarifier Covers - North & South to eliminate algae growth (WWTP-1607). Laboratory Operations: 349 Lab Services/Permit & Pretreatment Testing - S29,00C Pretreatment Program: The City of Kalispell was issued a new wastewater discharge permit from the Department of Environmental Quality in 2015. The permit mandates increased sampling parameters and analysis from the treatment facility influent and effluent for the presence of toxic pollutants as a part of the pretreatment program. 362 Equipment Maintenance - $5,500 Increasing this line item by $1,500.00 due to the age of the lab equipment, i.e., BOD incubator, water purification unit, and refrigerator, and increasing replacement costs. 373 Dues & Training - $3,700 The Lab recently hired a new Chemist and a new Lab Tech. Both will need extra training to help them obtain Wastewater licenses from MDEQ. K11 STORM SEWER ACCOUNT # 5349-453 .... .. ... .. ... The purpose of this department is to provide for a means of storm water conveyance to designated storm water management areas and outfalls, thus reducing the localized and undesirable occurrence of storm water ponding. Responsibilities also include implementation of the Storm Water Management Program to minimize pollutant run off to waterbodies in accordance with State and Federal Regulations. DEPARTMENT PERSONNEL: (6.20 FTE) .10 Public Works Director .25 Senior Civil Engineer (City Engineer) .15 Budget Resource Manager .25 Construction Manager .10 Administrative Coordinator .20 Project Manager (Engineer 11) .05 Road and Fleet Superintendent .20 Assessment Coordinator .60 Assistant Civil Engineer (Engineer 11) .25 Engineering Tech/GIS/IT Support .20 Administrative Assistant .50 Storm/Sewer Maintenance Supervisor 2.5 Storm Maintenance .25 Special Street Maintenance Operator .20 General Laborer .40 Utility Management Superintendent GOALS OF THIS DEPARTMENT: What are the departmental goals that support the purpose? 1. To maintain and operate the storm water collection, detention, and treatment facilities for the conveyance • I 2. Implement requirements of the Municipal Separate Storm Sewer System Discharge Permit (MS4). IM1,11 11111111 i mrsTel 7101,111 The FYI 7 budget for Storm Sewer recommends continuation of capital projects to improve conveyance of a deteriorated system, improve water quality, and improve the function of a regional detention facility. The budget also provides for several improvements for storm water conveyance systems within the community, at the City's Shop Complex and supports the development/implementation of the MS4 Storm Water Management Permit requirements. STORM SEWER FUND: 5349-453-430246 PROJECTED REVENUE AND FUND SUMMARY BEGINNING CASH 10100 CASH: Operating 10120 Cash,, Impact Fees 10122 Cash,, Capital Reserve 10127 Cash, Emergency Reserve 10190 Cash,, Designated for Equipment Replacement 10193 Cash,, Designated Capital Projects Total Cash REVENUES 343370 Storm Assessments -billed (10100) Assessments -designated for equipment (10 190) Assessments -designated for capital projects (10193) Bonded Debt 334040 Petro Tank/Monitory Reimbursement (10100) 343035 Permit fees & other Charges for Service (10100) 362010 Litigation Settlement 363040 Penalty & Interest (10100) 371010 Interest (10 100) 343033 Impact Fees (10 120) Impact Fee 5%Admin (10100) Total Revenue Total Available EXPENSES FROM RATES (10100) Capital Outlay -impact fee (10 120) Capital Equipment - replacement (10 190) Capital Outlay - Bonded Debt Depreciation (non -cash expense) Total Expenses ACTUAL BUDGET ACTUAL BUDGET FYI 4/15 FY15/16 FY15/16 FY16/17 $895,162 $1)107,326 $ 1 107,326 $1,448,231 $1,056,838 $ 1, 1601924 $ 1 160,924 $1,337,938 $140,000 $140,000 $140,000 $14000 $25,000 $25)000 $25,000 $25)000 $54,982 $91)186 $911186 $131,186 $515,844 $65,844 $65,844 $115,844 $207,826 $2,590,280 $2,590,280 $3,198,199_ add back depreciation/other ENDING CASH 10100 Cash, Operating 10120 Cash, Impact Fees 10122 Cash,, Capital Reserve (target $140,000) 10127 Cash,, Emergency Reserve (target $25,000) 10190 Cash,, Designated Equipment Replacement 10193 Cash, Designated Capital Projects $743,321 $756,000 $761,145 $760,000 $40:1000 $40,000 $40)000 $40,000 $50)000 $50!)000 $50,000 $50,000 $0 $0 $0 $38200 $2)765 $2,500 $400 $2)500 $12)714 $1,000 $91425 $1,000 $1351390 $1,895 $2,000 $1,568 $1,000 $17,579 $15:1000 $19,290 WOO $104)086 $1427,500 $254,761 $142,500 $51478 $7:500 $131408 $7,500 $977,838 $1:1016)500 $1,289,787 $1,404,500 $3,665:1664 $306,780 $3,880)067 $4)602,699 $1,071,588 $1,422,413 $599,121 $1,472)303 $0 $1301000 $821747 $130,000 $3,796 $42,264 $0 $43)000 $0 $0 $0 $38200 $285)000 $285,000 $28500 $285,1000 $1:)360)384 $1:18791677 $966:1868 $2,312)303 $285)000 $285:.000 $285)000 $291,422 $1J07)326 $506, 177 $1,448,231 $938)194 $1)160,924 $ 1 , 178424 $1,337,938 $1)350,438 $140)000 $140,000 $14000 $14000 $2500 $25:1000 $25:1000 $251000 $91,186 $46,658 $13 1 , 186 $128)186 $65,844 $115:1844 $115,844 $0 $2,590,280 $2,012, 1013 $3,198,199 $2)581:1817 al STORM SEWER FUND: 5349-453-430246 Personal Services: 110 Salaries & Wages 112 Severance 121 Overtime 153 Health Insurance 155 Retirement Subtotal Maintenance & Operations: 210 Office Supplies/Equip/Computer/GIS 218 Equipment (non capital)/ Safety Equip & Supplies 229 Other Supplies/Consumable Tools 231 Gas & Oil 345 Telephone & Communication 353 Auditing 354 Contract Services 356 Storm Water Reg Compliance Program/Permit 357 Impact Fee Update (FY 17 Carryover) 358 Consultants 359 Consultants/TMDL / Permit 360 Repair & Maint Services 362 Groundwater Monitoring 371 Curb & Gutter 373 Dues & Training 388 Medical Services 410 Construction Materials 510 Liability Ins. ($5,000; $5,000 uninsured loss) 521 Central Garage Transfer 522 Administrative Transfer 528 Information Tech Transfer 530 Lease Payments/BNSF 532 Office Rent Subtotal ACTUAL BUDGET ACTUAL BUDGET FY14/15 FY15/16 FY15/16 FY16/17 ® 6.20 6.20 6.20 $322,178 $354,364 $349:)017 $360:758 $0 $1,500 $0 $0 $946 $4,000 $618 $4)000 $63,729 $84!)814 $71)255 $81,030 $23,408 $25,357 $25,629 $26,448 $410,261 $470)035 $4461519 $472,236 $8,038 $10,100 $4,602 $10,100 $4,151 $6,550 $2,559 $6,550 $550 $21200 $36 $2,200 $10,670 $11 ,500 $6,900 $11,500 $504 $800 $862 $800 $2,340 $2)340 $ 1!)650 $2,340 $2,351 $6,000 $4,107 $6,000 $14,057 $251000 $25,312 $35,000 $0 $50,000 $8,704 $50,000 $0 $7,000 $7,000 $6,687 $159000 $9)603 $15)000 $1)912 $2,500 $1,780 $21500 $2, 181 $7,500 $4:)606 $6)500 $4,316 $7,000 $3,948 $7)000 $896 $3)500 $3,307 $5,500 $0 $100 $196 $100 $3,047 $1000 $1,770 $101000 $4,918 $101000 $5,554 $10,000 $7,287 $71911 $7,911 $91180 $34,352 $351523 $35,523 $39!1752 $8,574 $12,361 $12)562 $1300 $5,541 $5,900 $4,688 $5!1900 $7)838 $6)422 $6)422 $6:1422 $130:1210 $245,207 $152,602 $262)344 NN STORM SEWER FUND: 5349-453-430246 EXPENSE DETAIL-Con't. ACTUAL BUDGET ACTUAL BUDGET FY14/15 FY15/16 FY15/16 FY16/17 430246 Capital Outlay: from rates (10100) 921 Sand/Cold Mix Storage Shed -Carryover 944 Vacuum Jet Truck - 3 8% 951 9th St. E. Stormwater Impry 952 Storm Drain Correction Funds 953 Willows Prj FY14&15; Shop Complex Pavement Restoration 954 S. Meadows Phase I-FyI2; Phase2-FY13,Phase3-FY14 955 Sylvan Dr Repair Phase I -FYI 6 Carryover Subtotal Capital Outlay: Bonded 969 4th Ave E. Replace Phase 1-4 430248 Capital Outlay: Impact Fee $ (10120) 960 Stormwater Facility Upsizing Subtotal 430249 Capital Outlay: from Replacement $ (10190) 840 Machinery & Equipment -MAGI Match (transfer fy 16/17) 944 Vacuum Jet Truck - 62% S ubtotal 510400 831 Depreciation: Total $0 $251771 $0 $25,771 $0 $0 $0 $0 $204,672 $0 $0 $0 $90,352 $1001000 $0 $10000 $5,067 $0 $0 $30,552 $23 1 ,026 $0 $0 $0 $0 $581)400 $0 $581,400 $531JI7 $707) 171 $0 $737,723 $0 $0 $0 $38200 $0 $130)000 $0 $13000 $0 $130,000 $0 $130,000 $3,796 $0 $42)264 $0 $0 $0 WOO $0 $3,796 $285)000 $42,264 $28500 $0 $285,000 WOO $285)000 $1,360,384 $1:)879fi77 $884,121 $2)312)303 PW STORM SEWER FUND: 5349-453-430246 Line to Detail: STORM SEWER FUND 356 for Water Regulatory Compliance Program/Permit Fees - $35,000 The Stormwater MS4 Permit requires the City to implement a Stormwater Management Program (SWMP). The SWMP outlines and defines Best Management Practice (BMPs) and Programs the City will implement and maintain to meet the regulatory requirements. Programs to implement and/or maintain are outlined and require yearly funding, these include: 1) Erosion and sediment control annual training, 2) Public education and participation handouts and advertising, 3) Storm drain ID decals, 4) Car wash equipment, 5) Good housekeeping BMPs, 6) Site inspection and enforcement for post construction structural BMPs, 7) Illicit discharge monitoring and removal. Stormwater permit consultant fee provides technical support with the MS4 update ($8,564 year for two years -total $17,128). City of Kalispell and other MS4 cities are working with MDEQ to develop a new State of Montana MS4 stormwater general permit and a stormwater manual to meet our common needs. Kalispell's portion to develop the MS4 manual is $15,730. 430246 Capital Outlay: from Rates (10100) 921 Sand/Cold Mix Storage Shed -Carryover $25,771 This project replaces the current shed that is showing signs of structural failure, rot and decay. The concrete base is also cracked and has been repaired in the past. The new sand shed will be designed to cover the gravel stockpile, cold mix, and sanding materials. Cost shared between/Street, Water, Sewer, & Storm - Total Project Cost $103,084 952 for Drain Correction - $100,000 The goal of this project is to provide design and construction for areas in the City that are in need of storm drainage systems and storm drainage system upgrades. Projects include: Areas in sections of the City that have extensive ponding at the intersection caused from rain events. Improve curb and gutter flow to eliminate ponding and deterioration of pavement. 953 Shop Complex Pavement Restoration - $30,552 The project involves replacement of the degraded asphalt surface inside the fenced area of the City Shop Complex and the installation of a new storm water quality treatment device. The asphalt at the City Shop Complex is deteriorated beyond simple patch work and necessitates replacement. The asphalt replacement triggers storm water treatment requirements stipulated by the MS4 permit and promotes good stewardship for clean water discharges to Ashley Creek. Cost shared between/Water, Sewer, Storm, Streets, & Solid Waste - Total Project Cost $152,760 E STORM SEWER FUND: 5349-453-430246 430246 Capital Outlay: from Rates (10100) Continued 955 Sylvan Drive Stormwater Repair Phase I -Carryover 581,400 The Sylvan Drive stormwater system services a large drainage basin in the west and northwest areas of Kalispell. The system consists of large stormwater pipes, manholes and a detention facility that discharges to the natural drainage backwater channel of the Stillwater River. This project is necessitated due to the severe corrosion of the invert section of the 750' corrugated metal pipe and manholes. The project will be performed in two phases. The first phase, being the removal and replacement of the deteriorated pipe and the installation of a Water Quality treatment device (STX-39). �1,1 11111111111111 Fill! 1!P1 110111 NONNI 969 4th Avenue Stormwater Replacement - $382,000 This is a stormwater drainage improvement project which will be designed in-house and the construction coordinated with the 14 block water main and road reconstruction on 4th Ave E from Center St to 14 St E. 4th Ave E's storm drain and piping infrastructure is deteriorated and the conditions necessitate reconstruction and additional stormwater piping/manhole improvements (STX-54). 430248 Capital Outlay: from Impact Fees (10120) 960 Stormwater Facility Upsizing - $130,000 $130,000 - Misc. Stormwater contract main upsize, and or facility enlargements. Increase due to new development in Section 36 and Highway 93 South. 430249 Capital Outlay: from Replacement (10190) 840 MACI Grant Match - $43,000- operating transfer to MACI grant The State is once again proposing to provide local governments the opportunity to purchase air quality management equipment, like street sweepers, through the Montana Air & Congestion Initiative (MAGI). The City is proposing to purchase a new street sweeper (replacing a 2009 model) in order to continue to support the City's Stormwater Management Program. As a permitted Municipal Separate Storm Sewer System (MS4), the City of Kalispell is required to develop controls in order to reduce or eliminate the discharge of pollutants from streets, roads, highways, municipal parking lots, maintenance and storage yards, vehicle fleet or maintenance shops with outdoor storage areas, salt/sand storage locations, and snow disposal areas operated by the permittee. As part of the Stormwater Management Program, a Street Sweeping Program has been developed to meet permit requirements. By implementing the Street Sweeping Program and performing routine street sweeping, the City is able to meet permit requirements by collecting sediments, metals, organics, and oil and grease wastes that would otherwise be transported by stormwater runoff to surface waters. IN SOLID WASTE ACCOUNT -14 0-460 PURPOSE OF THIS DEPARTMENT: Why does this department exist? The Solid Waste Department collects and disposes of solid waste material from residential and commercial entities to provide a cleaner and healthier condition for the City of Kalispell. DEPARTMENT PERSONNEL: (7.40 FTE) .10 Public Works Director .15 Budget Resource Manager .20 Assessment Coordinator .20 Administrative Coordinator .30 Road and Fleet Superintendent .20 Administrative Assistant .15 Project Manager (Engineer 11) 5 Solid Waste Operators I Solid Waste Supervisor J 0 General Laborer GOALS OF THIS DEPARTMENT: What are the departmental goals that support the purpose? 1. Collect, handle, and transport solid waste in a safe and effective manner. 2. Provide solid waste services to the community of Kalispell in a respectable and reliable manner. The FYI 7 expenditures promotes the continuation of solid waste collection and transport operations to service existing and new residential/commercial customers while maintaining a high level of service. Equipment replacement expenditures include replacement of an older service truck utilized for plowing and sanding alleys, individual requests and service support call outs. SOLID WASTE FUND: 5510-460-430840;430845 PROJECTED REVENUE AND FUND SUMMARY ACTUAL BUDGET ACTUAL BUDGET FY14/15 FY15/16 FY15/16 FY16/17 BEGINNING CASH 10100 Cash.- Operating $754,474 $828,089 $828,089 $849,758 10120 Replacement Account $114,937 $230,839 $230,839 $117,480 Total Cash $869:1411 $1,058,928 $1,058,928 $967,238 343410 Assessments 343420 garbage collections billed (part year) 363040 Penalty & Interest 371010 Interest Earnings 343360 Misc. Total Revenue Total Available Total Expenses from Rates (10 100) Capital Outlay -Replacement (10 120) *Depreciation/Replacement Fund Total Expenses add back transfer to replacement account add back prepaid rent ENDING CASH 10100 Operating 10120 Replacement Account Total Cash $944,910 $954,436 $944,444 $955,000 $25,836 $23,000 $21,837 $21,500 $2,555 $2,500 $2,086 $2,100 $5,564 $5,000 $6,109 $6,000 $46,692 $0 $7,696 $0 $1,025,557 $984,936 $982,172 $984,600 $1,894,968 $2,043,864 $2,041,100 $1,951,838 $755,442 $951,644 $810,503 $1,048,620 $80,598 $324,500 $263,359 $48,000 $150,000 $150,000 $150,000 $150,000 $986,040 $1,426,144 $1,223,862 $1,246,620 $150,000 $150,000 $150,000 $150,000 $6,422 $828,089 $711,381 $849,758 $642,160 $230,839 $56,339 $117,480 $219,480 $1,058,928 $767,720 $967,238 $861,640 we SOLID WASTE FUND: 5510-460-430840;430845 EXPENSE DETAIL ACTUAL BUDGET ACTUAL BUDGET FY14/15 FY15/16 FY15/16 FY16/17 Personal Services* FTE's 7® 7® 7® 7® 110 Salaries & Wages $372,599 $404,181 $392,983 $399,776 112 Severance $0 $61,975 $0 $60,455 121 Overtime/Call Outs $4,863 $5,500 $4,480 $5,500 153 Health Insurance $80,796 $95,330 $90,146 $106,280 155 Retirement - PERD $26,942 $28,610 $28,718 $28,993 Subtotal $485,200 $595,596 $516,327 $601,004 Materials and Services: 213 Office Equip/ Computer Equip & Supplies $5,970 $9,500 $4,510 $9,500 218 Non Capital Equip.- Garbage Containers $28,282 $35,000 $19,480 $35,000 229 Other Supplies/Safety Equip/Consumable Toc $3,035 $5,500 $2,586 $5,500 231 Gas and Oil $47,761 $61,500 $31,223 $60,000 341 Electricity $1,353 $1,950 $1,341 $1,950 344 Natural Gas $3,211 $4,900 $2,632 $4,900 345 Telephone $695 $850 $1,246 $850 354 Contract Services $5,008 $9,000 $11,283 $9,000 362 Equipment Maint. & Supplies/Radios $2,206 $5,700 $1,245 $5,700 366 Building Maintenance $119 $2,500 $1,186 $2,500 373 Dues & Training $722 $3,500 $3,856 $3,500 388 Medical Services $835 $650 $373 $650 510 Property & Liability Ins. $9,218 $10,000 $10,570 $6,799 512 Uninsured Loss - Deductible $700 $3,000 $4,927 $4,000 521 Central Garage Transfer $59,786 $61,388 $61,388 $76,104 522 Administrative Transfer $33,484 $33,186 $33,186 $37,311 528 Information Tech. Transfer $8,574 $12,361 $12,562 $12,513 532 Office Rent $7,838 $6,422 $6,422 $6,422 Subtotal $218,797 $266,907 $210,016 $282,199 430845 Wash Bay/Materials & Services 224 Janitorial Supplies $74 $250 $79 $250 341 Electricity $2,097 $3,500 $2,107 $3,500 342 Water $241 $500 $1,372 $2,000 344 Natural Gas $3,529 $6,500 $3,061 $6,500 360 Repair & Maint Services/Building Maint $501 $3,500 $2,771 $3,500 Subtotal $6,442 $14,250 $9,390 $15,750 w SOLID WASTE FUND: 5510-460-430840;430845 ACTUAL BUDGET ACTUAL BUDGET FY14/15 FY15/16 FY15/16 FY16/17 430840 Capital Outlay: (Financed 5 yr) 944 Garbage Truck $0 $0 $0 $0 430840 Capital Outlay: 820 Alley Paving - transfer to Gas Tax $25,000 $35,000 $35,000 $35,000 922 USFS Bldg & Property Aquisiton/Repai* $0 $0 $0 $43,971 953 Shop Complex Pavement Restoration $0 $0 $0 $30,552 Subtotal $25,000 $35,000 $35,000 $109,523 430840 Capital Outlay: Replacement Funds (10120) 940 Machinery & Equipment $0 $0 $0 $48,000 944 Garbage Truck $80,598 $324,500 $263,359 $0 Subtotal $80,598 $324,500 $263,359 $48,000 600 Debt Service - Garbage Truck $20,003 $39,891 $39,770 $40,144 510400 Depreciation (fund Replacement account $150,000) 831 Depreciation Expense $150,000 $150,000 $150,000 $150,000 Total $986,040 $1,426,144 $1,223,862 $1,246,620 Capital Outlay: 820 Alley Paving - $35,000 Pave approximately five alleys and perform maintenance on existing paved alleys. Paved alleys enable garbage trucks better access to containers, improving operation efficiency, and the alleys are easier to maintain in the winter and summer months. 953 Shop Complex Pavement Restoration - $30,552 The project involves replacement of the degraded asphalt surface inside the fenced area of the City Shop Complex and the installation of a new storm water quality treatment device. The asphalt at the City Shop Complex is deteriorated beyond simple patch work and necessitates replacement. The asphalt replacement triggers storm water treatment requirements stipulated by the MS4 permit and promotes good stewardship for clean water discharges to Ashley Creek. Cost shared between/Water, Sewer, Storm, Streets, & Solid Waste - Total Project Cost $152,760 Capital Outlay: Replacement Funds (10120) 944 Machinery & Equipment - $48,000 $48,000 - Pick Up, 8'Plow, and Tommy Gate. Scheduled replacement of existing pickup. W61IJ