Loading...
10. Enterprise FundsENTERPRISE FUNDS Page Fund Dept 1-2 5160 Airport $ 166,798 3-10 5210 Water $ 5,055,853 11-16 5310 454 Sewer Operations & Billing $ 4,211,920 17-21 5310 455 Waste Water Treatment Plant $ 5,477,237 22-26 5349 Storm Sewer $ 1,879,677 27-29 5510 Solid Waste $ 1,426,144 Total $ 18,217,629 AIRPORT ACCOUNT # 5160-430 PURPOSE OF THIS DEPARTMENT: Why does this department exist? The Kalispell City Airport is part of the overall transportation system for the City of Kalispell, serving both recreational and commercial interests with an optional mode of transportation. DEPARTMENT PERSONNEL: GOALS OF THIS DEPARTMENT: What are the departmental goals that support the purpose? The primary goal for the management of the Kalispell Airport is to maintain the airfield in a manner that provides for the ability to effectively accommodate the air traffic using the facility. INTENDED OUTCOMES FROM BUDGET EXPENDITURES In fiscal year 2014, municipal voters rejected a ballot issue to move forward with improvements to the airport as identified in the adopted airport master plan. That action has initiated an effort to update the Urban Renewal Plan from which the improvments were originally identified. The outcome of this plan will likely guide future decisions related to airport maintenance and development efforts. The FY2015 budget represented a change in the management of the airport as we have engaged the services of Red Eagle Aviation as the airport manager. Red Eagle Aviation will continue to manage the airport in fiscal year 2016. This is projected to generate savings within the airport fund. AIRPORT ENTERPRISE FUND -operations FUND: 5160-430-430310 PROJECTED REVENUE AND FUND SUMMARY BEGINNING CASH 10100 Cash - Operations 10120 Cash: Reserve - Capital Improvements REVENUES 343062 Commercial Fees 343063 Tie down fees 343069 Hangar Leases 343071 Hangar Site Leases (3%) 343101 FBO Lease - Red Eagle Aviation (201) 343102 Ground Leases (Hilton) (3%) 343620 Fuel Tax 365010 Misc. 371010 Investment Earnings Total Revenue Total Available EXPENDITURES Airport Operations Capital Improvements Depreciation Total Expenses add back unfunded depreciation ENDING CASH 10100 Cash: Operating ACTUAL BUDGET ACTUAL BUDGET FY13/14 FY14/15 FY14/15 FY15/16 $931088 $101,257 $101,257 $125,104 $18,262 $0 $0 $0 $111.350 $101,257 $101,257 $125,104 $ 13,265 $ 10,000 $ 13,126 $ 10,000 $ 770 $ - $ - - $ 11,565 $ 11,000 $ 12,000 $ 11,000 $ 17,509 $ 17,510 $ 18,034 $ 17,510 $ 17,192 $ 17,734 $ 17,821 $ 17,734 $ 12,078 $ 12,078 $ 12,441 $ 12,814 $ 5,615 $ 5,000 $ 5,669 $ 5,000 $ - $ - $ 2,101 $ - $ 646 $ 500 $ 902 $ 850 $ 78,640 $ 73,822 $ 82,094 $ 74,908 $189,990 $175,079 $183,351 $200,012 $88,733 $681078 $58,247 $68,880 $0 $0 $0 $0 $100,832 $97,918 $97,918 $97,918 $189,565 $165,996 $156,165 $166,798 $100,832 $971918 $97,918 $97,918 $101,257 $107,001 $125,104 $131,132 AIRPORT ENTERPRISE FUND -operations FUND: 5160-430-430310 Personal Services: FrE's 110 Salaries 121 Seasonal salary 153 Health Insurance 155 Retirement Subtotal Maintenance & Operations: 210 Supplies, postage, small equip 341 Electricity 345 Telephone/ cell 354 Contract Services - Airport Management 356 Contract Services - Other 362 Repair & Maintenance - Equip/Lights, etc 373 Dues & Training 390 Equipment Rental 510 Property & Liability Ins. 522 Administrative Transfer 528 Information Tech Transfer Subtotal Improvements from Capital Imp. $: 357 Contract Services - Legal 950 Construction Projects 820 Depreciation (unfunded) Total EXPENSE DETAIL ACTUAL FY13/14 BUDGET FY14/15 ACTUAL FY14/15 BUDGET FY15/16 0.50 0.00 0.00 0.00 $ 29,331 $0 $0 $0 $ 1,066 $0 $0 $0 $ 3,648 $0 $0 $0 $ 1,669 $0 $0 $0 $ 35,714 $0 $0 $0 $ 277 $ 1,000 $ - $ 1,000 $ 1,836 $ 1,500 $ 1,605 $ 1,500 $ 622 $ 180 $ - $ - $ 19,024 $ 36,000 $ 36,000 $ 36,000 $ 8,504 $ 5,000 $ 5,395 $ 7,500 $ 281 $ 2,000 $ 1,096 $ 10,000 $ 488 $0 $0 $0 $ 1,488 $ 2,500 $ 835 $ 1,000 $ 12,523 $ 13,000 $ 6.418 $ 6,500 $ 4,326 $ 5,469 $ 5,469 $ 3,320 $ 3,650 $ 1,429 $ 1,429 $ 2,060 $ 53,019 $ 68,078 $ 58,247 $ 68,880 $0 $0 $0 $0 $0 $0 $0 $0 $ - $0 $0 $0 $ 100,832 $ 97,918 $ 97,918 $ 97,918 $ 189,565 $ 165,996 $ 156,165 $ 166,798 2 WATER ACCOUNT # 5210-447 PURPOSE OF THIS DEPARTMENT: Why does this department exist? To provide safe, potable and palatable water for the needs of the domestic, commercial and industrial consumers. DEPARTMENT PERSONNEL: (15.30 FTE) .20 Public Works Director .25 Senior Civil Engineer (City Engineer) .15 Budget Resource Manager .25 Construction Manager .20 Administrative Coordinator .20 Project Manager (Engineer II) .05 Road and Fleet Superintendent .20 Administrative Assistant .10 General Laborer .60 Utility Management Superintendent .40 Assistant Civil Engineer (Engineer 11) .25 Engineering Tech/GIS/IT Support 1 Water Meter Maintenance Supervisor 1 Water Meter Maintenance Technician 1 Water Maintenance Supervisor 4 Water Maintenance Operators 1 Water Production Supervisor 2 Water Production Operators .50 Meter Reader 1.5 Utility Billing Clerk .15 Finance Director .25 City Accountant .05 Assessment Coordinator GOALS OF THIS DEPARTMENT: What are the departmental goals that support the purpose? 1. To operate the distribution and production facilities to meet Public Drinking Water Standards. 2. Provide drinking water that is safe to drink and palatable. 3. Maintain the system to achieve adequate pressure, minimize leaks, and flows for fire emergencies. INTENDED OUTCOMES FROM BUDGET EXPENDITURES: This years budget continues the replacement of aging, leaking, undersized mains throughout the water system to improve delivery of domestic water and fire flow. An existing well's sand separator will be improved to remove sand from the system in the lower zone and a frequency drive installed to improve start up operation in the upper zone. WATER FUND (Operations & Billing) FUND: 5 210-447 -4305 5 0 PROJECTED REVENUE AND FUND SUMMARY BEGINNING CASH 10100 Operating Cash 10120 Impact Fee Cash 10125 Meter Replacement Cash 10127 Capital & Emergency Reserve -Target $400,000 10130 Bond Reserves (restricted cash) REVENUES 343210 Metered Water Sales (billed) (10100) 343230 Meter Replacement Fee (10125) 343225 Impact Fees (10120) (adj for receivable- $4,094) 343365 Impact Fee Admn (10100) 343260 Misc.-Installation/Reconnect/Tag fees (I0100) 371010 InterestEamings (10100) Interest Earnings -Impact Fee Cash (10120) Total Revenue Total Available EXPENSES EXPENSES FROM RATES Expenses from Meter Cash (10125) Capital Outlay - from Impact Fees (10120) Debt Service -from Impact Fees (10120) Depreciation Total All Departments add back depreciation ENDING CASH 10100 Operating Cash 10120 Impact Fee Cash 10125 Meter Replacement Cash 10127 Capital & Emergency Reserve -Target $400,000 10130 Bond Reserves (restricted cash) Total cash ACTUAL BUDGET ACTUAL BUDGET FY13/14 FY14/15 FY14/15 FY15/16 $2,837,396 $3,328,859 $3,328,859 $3,659,909 $584,601 $887,470 $887,470 $910,706 $227,709 $205,975 $205,975 $298,802 $400,000 $400,000 $400,000 $400,000 $411,258 $411,258 $411,258 $358,400 $4,460,965 $5,233,562 $5,233,562 $5,627,817 $2,839,296 $2,800,000 $2,849,174 $2,810,000 $98,134 $95,000 $99,587 $98,000 $437,219 $266,000 $233,813 $285,000 $23,011 $14,000 $12,306 $15,000 $66,498 $40,000 $73,543 $50,000 $23,669 $22,500 $33,049 $32,400 $4,000 $2,500 $6,000 $3,600 $3,491,827 $3,240,000 $3,307,472 $3,294,000 $7,952,792 $8,473,562 $8,541,034 $8,921,817 $2,466,512 $3,563,377 $2,689,880 $2,951,990 $119,868 $120,000 $6,760 $223,240 $32,850 $110,600 $16,577 $840,623 $100,000 $200,000 $200,000 $200,000 $840,000 $840,000 $840,000 $840,000 $3,559,230 $4,833,976 $3,753,217 $5,055,853 $840,000 $840,000 $840,000 $840,000 $3,328,859 $2,641,982 $3,659,909 $3,615,319 $887,470 $845,370 $910,706 $158,683 $205,975 $180,975 $298,802 $173,562 $400,000 $400,000 $400,000 $400,000 $411,258 $411,258 $358,400 $358,400 $5,233,562 $4,479,585 $5,627,817 $4,705,964 WATER FUND SUMMARY FUND: 5310-454-430620-630/455-430640 EXPENDITURE SUMMARY Personal Services Water Billing Water Operations Subtotal Maintenance & Operations Water Billing Services Water Operations Subtotal Capital Outlay from Rates: Water Operations Subtotal Debt Service from Rates: Water Subtotal Total Capital Outlay - Meter Replacement funds:(10125) Capital Outlay - from Impact Fee Funds: (10120) Debt Service -from Impact Fees: (10120) Depreciation (non -cash item) Total ACTUAL BUDGET ACTUAL BUDGET FY13/14 FY14/15 FY14/15 FY15/16 $106,400 $119,675 $107,261 $150,144 $875,204 $922,085 $798,662 $912,435 $981,604 $1,041,760 $905,923 $1,062,579 $84,076 $80,233 $72,370 $132,173 $596,139 $730,473 $589,071 $742,804 $680,215 $810,706 $661,441 $874,977 $470,748 $1,478,361 $889,916 $960,153 $470,748 $1,478,361 $889,916 $960,153 $333,945 $232,550 $232,600 $54,281 $333,945 $232,550 $232,600 $54,281 $2,466,512 $3,563,377 $2,689,880 $2,951,990 $119,868 $120,000 $6,760 $223,240 $32,850 $110,600 $16,577 $840,623 $100,000 $200,000 $200,000 $200,000 $840,000 $840,000 $840,000 $840,000 $3,559,230 $4,833,976 $3,753,217 $5,055,853 WATER OPERATIONS FUND: 5210-447-430550 EXPENSE DETAIL ACTUAL BUDGET ACTUAL BUDGET FY13/14 FY14/15 FY14/15 FY15/16 Personal Services: FTE's 12.80 12.80 12.80 12.80 110 Salaries & Wages III Seasonal Salaries 112 Severance 121 Overtime/Call Outs 153 Health Insurance 155 Retirement - PERD Subtotal Maintenance & Operations: 210 Office Supplies/Equip/Computers/ GIS 218 Equip. (non-capital)/Safety Equip & Supplies 226 Chlorine & Chemical 229 Other Supplies/Janitorial/Consumable Tools 231 Gas & Oil 312 Postage & Printing 336 Licenses / Public Water Supply Fee 341 Electricity 344 Natural Gas 345 Communications 349 Lab Services 353 Auditing 354 Contract Services 356 Consultants-Wtr Rights Acquisition/Wtr Modeling 362 Repair & Maint./Equip Maint/Radios/Equip Rental 366 Building & Grounds Maintenance 373 Dues & Training 388 Medical/Drug Testing 410 Construction Materials 422 Hydrants 423 Materials - Mains 424 Materials - Service lines 425 Materials - Wells/Pumps $646,176 $704,454 $625,620 $690,169 $2,996 $5,000 $687 $5,000 $28,016 $0 $0 $1,500 $18,301 $20,000 $15,474 $20,000 $132,153 $143,485 $110,945 $146,271 $47,560 $49,146 $45,936 $49,495 $875,203 $922,085 $798,662 $912,435 $8,093 $11,000 $10,507 $11,000 $8,184 $8,500 $6,008 $8,500 $27,668 $38,000 $36,287 $38,000 $3,356 $4,500 $3,645 $4,500 $33,532 $36,000 $27,347 $38,000 $3,622 $4,000 $528 $4,000 $17,169 $18,000 $16,621 $18,000 $129,235 $139,000 $137,007 $139,000 $13,102 $13,000 $10,813 $15,500 $9,477 $9,000 $8,535 $9,000 $16,293 $22,000 $11,473 $22,000 $5,D00 $5,000 $5,000 $5,000 $33,504 $55,000 $42,800 $55,000 $683 $25,000 $11,200 $25,000 $13,434 $15,000 $7,787 $15,000 $1,430 $12,000 $1,303 $12,000 $7,008 $9,000 $8,141 $9,000 $1,199 $800 $435 $800 $36,651 $35,000 $29,553 $35,000 $4,038 $6,000 $12,243 $8,000 $10,597 $10,000 $7,690 $12,000 $13,274 $14,000 $13,572 $16,000 $13,541 $45,000 $6,469 $45,000 Jr iWATER OPERATIONS 5210-447-430550 EXPENSE DETAIL ACTUAL BUDGET ACTUAL BUDGET FY13/14 FY14/15 FY14/15 FY15/16 Maintenance & Operations Continued: 510 Property & Liability Ins. $38,234 $30,000 $23,144 $25,000 512 Uninsured Loss -Deductible & Goodwill Expendi $6,382 $15,000 $145 $15,000 521 Central Garage Transfer $12,398 $14,248 $14,248 $18,130 522 Administrative Transfer $90,775 $104,561 $104,561 $98,426 528 Information Tech. Transfer $29,798 $22,864 $22,864 $32,964 532 Office Rent/Lease Pymnt (Silverbrook Well) $8,462 $9,000 $9,145 $7,984 Subtotal $596,139 $730,473 $589,071 $742,804 4902xx-6xx Principal, Interest, Fiscal Fees $433,945 $432,550 $432,600 $254,281 Capital Outlay: Capital Outlay: Operating funds (RATES) 921 Sand/Cold Mix Storage Shed $0 $0 $0 $25,771 935 Artnory Generator FY 13; Sheepherders Tank Mixer $0 $20,000 $10,509 $0 936 Noffsinger Spring Generator CARRYOVER $0 $90,000 $0 $90,000 937 Sheepherder Backup Power CARRYOVER $149 $15,851 $10,694 $5,157 938 Lower Zone Reservoir Imprvmnts $68,303 $51,697 $0 $0 940 Machinery & Equipment $13,393 $0 $0 $0 944 Water Maintenance Vehicle $26,511 $0 $0 $0 947 US 93 N. Utility Relocate CARRYOVER $49,657 $27,343 $15,709 $11,634 950 4th Ave EN Wtr Main Reple $5,530 $794,470 $651,990 $0 951 SCADA Upgrades $7,954 $15,000 $5,283 $15,000 958 Loop ProjectsFY13; 2nd Ave. E. Main CARRYOVE $0 $174,000 $0 $174,000 962 S. Woodland Dr. System Imprvmnts $290,286 $0 $0 $0 963 Abandon 2" wtr line $4,986 $0 $0 $0 964 2nd Ave WN Waterline Replacement $3,979 $0 $0 $0 967 2nd Ave WN Main -MT to WA CARRYOVER $0 $275,000 $190,409 $84,591 968 Depot Well Revitalization $0 $15,000 $5,322 $0 969 4th Ave E. Main Replc Phase 1 $0 $0 $0 $494,000 970 Old School Well Sand Separator $0 $0 $0 $20,000 971 Westview Well VFD Upgrade $0 $0 $0 $40,000 Subtotal $470,748 $1,478,361 $889,916 $960,153 I WATER OPERATIONS 5210-447-430550 EXPENSE DETAIL ACTUAL BUDGET ACTUAL BUDGET FY13/14 FY14/15 FY14/15 FY15/16 430555 Capital Outlay -Impact Fee Funds (010120) 941 Meters 930 Contract Main Upsize (Impact fee Acct) 953 Develop Wtr Supply Section 36 Well Subtotal capital from Impact Investment f 430550 Capital Outlay -Meter Funds (010125) 948 Meters -Replacement $ subtotal Subtotal 510400-831 Depreciation Expense Total Water Facilities 430560 Water Billing: Personal Services: FTE's 110 Salaries & Wages 112 Severance 153 Health Insurance 155 PERD Subtotal Maintenance & Operations: 210 Office Supplies/Computers 353 Auditing 354 Contract Services 355 Postage/Other Billing Costs 373 Dues & Training 522 Administrative Transfer 528 Information Tech. Transfer 532 Office Rent Subtotal Total Billing Grand Total Water Fund $31,856 $35,600 $0 $75,000 $994 $0 $32,850 $110,600 $119,868 $120,000 $16,577 $64,623 $0 $150,000 $0 $626,000 $16,577 $840,623 $6,760 $223,240 $119,868 $120,000 $6,760 $223,240 $840,000 $840,000 $840,000 $940,000 $3,368,753 $4,634,069 $3,573,586 $4,773,536 2 2 2 2.5 $83,117 $88,558 $85,114 $107,610 $0 $0 $0 $1,500 $17,159 $24,590 $15,817 $33,020 $6,123 $6,527 $6,330 $8,014 $106,400 $119,675 $107,261 $150,144 $1,052 $2,000 $1,839 $5,000 $2,020 $2,020 $2,020 $2,020 $430 $1,500 $0 $1,500 $34,231 $35,000 $29,813 $70,000 $1,371 $1,500 $485 $2,500 $7,336 $7,511 $7,511 $7,731 $29,798 $22,864 $22,864 $37,000 $7,838 $7,838 $7,838 $6,422 $84,076 $80,233 $72,370 $132,173 $190,476 $199,908 $179,631 $282,317 $3,559,229 $4,833,976 $3,753,217 $5,055,853 WATER OPERATIONS FUND: 5210447-430550/560 FY 2016 BUDGET HIGHLIGHTS Line Item Detail: Water Fund 354 Contract Services - $55,000 This line item covers the cost of annual contracts, i.e., U-dig fees, generator testing and maintenance, coveralls, and estimated electrical and system repairs. 422 Hydrants - $8,000 This line item was decreased significantly in previous budget years. Due to increased material costs, in-house inventory, and maintenance needs, this line item is being increased $2,000 in FY 15/16. 423 Materials - Mains - $12,000 The inventory cost for materials has increased within the past year. Another price increase is expected in January 2016. To avoid a deficit in FY 15-16 this line item is being increased $2,000.00. 424 Materials - Service Lines - $16,000 In January 2014, EPA implemented the low lead rule requiring staff to update inventory to meet current standards. Throughout the implementation, projections for price increases were estimated at 19%. Actual price increases for all low lead brass were as high as 39%. Along with, projected service line work flows to increase in the next fiscal year, this line item is being increased $2,000.00. Capital Outlay: Operating Funds (Rates) 921 Sand/Cold Mix Storage Shed - $25,771 This project replaces the current shed that is showing signs of structural failure, rot and decay. The concrete base is also cracked and has been repaired in the past. The new sand shed will be designed to cover the gravel stockpile, cold mix„ and sanding materials Cost shared between/Street, Water, Sewer, & Storm - Total Project Cost $103,084 936 Noffsinger Spring Emergency Generator Replacement - CARRYOVER S90,000 Replace the old emergency generator which is currently inside the shop area, with a new emergency generator located outside and above flood stage elevation. During our 2010 safety/building/fire audit many deficiencies were pointed out about the generator being at its current location, with no containment area for either the generator or the fuel system, proper venting is a large problem, no seismic bracing to prevent roll over, fire protection and accessibility. The age of the generator makes it more and more difficult to find replacement parts. By replacing this generator it reduces chances of fire and safety of workers from inside the shop area and meets the Fire Department safety audit requirements. A new generator also increases efficiency and reliability. A Grant application has been submitted to supplement the funding of the replacement generator. The Emergency Backup Grant, if received, will contribute 75% of the replacement cost (W-EX-I 60). i FUND: 5210-447-43 05 50/5 60 FY 2016 BUDGET HIGHLIGHTS - con't. Line Item Detail: continued Capital Outlay: Operating Funds (Rates) Cont. 937 Sheepherder Tank Backup Power - CARRYOVER $5,157 Provide backup power for the SCADA system at Sheepherder Reservoir. Currently there is no backup power at Sheepherder Reservoir. Power frequently goes out at this location, when the power is out the water level in the tank is unknown and signals are not being sent to activate pumps. A Grant application has been submitted to supplement the funding of the replacement generator. The Emergency Backup Grant, if received, will contribute 75% of the replacement cost (W-EX-161). 947 US 93 North Utility Relocate Design & Construction - CARRYOVER $11,634 This project replaces approximately 1,600 feet of 12" PVC water main with a combination of 12" PVC and 16" HDPE water main. Currently, this main is the only major water transmission main connecting the areas west of the proposed bypass to the rest of the city water distribution system. This project was necessitated by the revision of Three Mile Drive as it relates to the proposed Highway 93 Bypass. MDT placed this new intersection as a top priority and plans on constructing it with their next round of available funding, requiring design to be completed and ready for 2013 construction. All water main relocated under the proposed bypass will be replaced with 16" HDPE. 16" HDPE has the same inside diameter as 12" PVC, so it will function the same as the existing main. The overall project also includes the replacement of a sanitary sewer force main. Costs associated with the sewer main are not included in this line item. Project is complete, waiting on final billing from MDOT (W-EX-162). 951 SCADA System Upgrade/Improvements - $15,000 System improvements to include installing programmable logic controllers which monitor and control individual well sites in conjunction with the SCADA system. City operators will be able to review the recorded well activities and corresponding daily water level data, and perform long term trend analysis essential to the City's water operations. Project also includes replacement of the windows, XP computer and the wonderware operating system (W-EX-155). 958 2nd Ave East Main Replacement & Upsize - CARRYOVER $174,000 This project replaces an undersized 2" dead end water main with approximately 800' of 8" PVC water main. The proposed water main will continue from the dead-end and Ioop to 3rd Ave E. providing added fire hydrants and increase fire flows to the area (W-EX40). 967 2nd Ave WN Water Main Replacement Montana to Washington - CARRYOVER $84,591 This project replaces approximately 750 feet of 8" CIP water main with 8" PVC water main. The new water main will provide reliability for system stresses associated with fire flows, and limit liability associated with claims from private properties and transportation system right-of-way arising from main breaks. The existing 8" cast iron water main within the limits of this project was installed in 1926 and has had 4 recorded water main ruptures in 4 years. The project includes installation of 10" HDPE under Highway 2 (Idaho Street) (W-EX-164). 969 4th Avenue East Main Replacement Phase 1-Center to 14th Si. E. - $494,000 This is the first out of four phases of a 14 block water main replacement project from Center St to 14`s St E. The existing 8" /6" cast iron water main was installed between 1925 and 1930, and is at the end of its design service life. The 85 plus year old pipe is corroding creating multiple main breaks throughout this section of pipe in the past several years. This phase replaces three blocks of 8" water main from Center St to 3rd St E, and will be coordinated with street C1Ps for future road and drainage improvements (W-EX-21). W WATER OPERATIONS FUND: 5210-447-430550/560 FY 2016 BUDGET HIGHLIGHTS - con't. Line Item Detail: continued Capital Outlay: Operating Funds (Rates) Cont. 970 Old School Well Sand Separator - $20,000 This project removes, replaces and reconfigures the pump house piping at Old School Well. The current sand separator developed a minor leak due to abrasion in 2014. A temporary repair has been made but replacement is necessary. The proposed unit will be upgraded from current design to capture smaller micron sand particles (W-EX-173). 971 Westview Well VFD Upgrade - $40,000 This project involves upgrade of the existing soft start to a variable frequency drive (VFD) at Westview Well. A VFD provides more setting control when operating a submersible pump. High capacity submersible pumps often require a slow starting speed to alleviate any water hammering in downstream piping. Westview well currently experiences a water hammer of 150 psi upon startup. This modification would include similar equipment currently installed at Grandview Well where water hammer is recorded at 7 psi differential (W-EX-174). Capital Outlay - Impact Fee funds (10120) 930 Contract Main Upsize - $150,000 $150,000 - Funds required for small city requested upsizing of private development infrastructure (W-EX-119). 941 Meters - $64,623, FY16 Appropriation $45,600, FY15 Carryover $19,023 New Services 953 Construct Grossweiler Well - $626,000 As growth and water demand increase, new wells are required to meet the firm and peak demands of the City. The development of Grossweiler well, would be sufficient to meet the projected growth demand and Public Water Supply requirements stipulated by MDEQ. The Grossweiler well is located adjacent to theDNRC/DEQ/911 Center complex on Stillwater Road. This project is funded 100% with impact fees. Capital Outlay - Meter funds (010125) 948 Meters - $223,240: FY16 Appropriation $110,000, FY15 Carryover $113,240 Replacement Meters 10 SEWER DEPARTMENT ACCOUNT # 5310 PURPOSE OF THIS DEPARTMENT: Why does this department exist? To maintain and operate the wastewater collection and treatment facility to have a minimum impact on the environment and enhance the quality of life for the community. WWTP DEPARTMENT PERSONNEL: (8.55 FTE) .20 Public Works Director 1 WWTP Manager .10 Senior Civil Engineer (City Engineer) 1 Asst WWTP Manager (Proposed) .15 Budget Resource Manager 4 WWTP Operators .10 Administrative Coordinator 2 WWTP Chemists SEWER DEPARTMENT PERSONNEL: (6.55 FTE & 1 Unfunded FTE) .15 Public Works Director .25 Engineering Tech/GISAT Support .15 Senior Civil Engineer (City Engineer) 2.5 Sewer Maintenance Technician .15 Budget Resource Manager .25 Construction Manager .20 Administrative Coordinator .20 Project Manager (Engineer 111) .20 Administrative Assistant .05 Road and Fleet Superintendent 1 Vacant/Unfunded Swr Maint. Technician .50 Storm/Sewer Maintenance Supervisor .05 Assessment Coordinator .50 Meter Reader 1 Utility Billing Clerk .15 Finance Director .25 City Accountant GOALS OF THIS DEPARTMENT: What are the departmental goals that support the purpose? WWTP 1. To protect the health of the community by discharging wastewater that meets state and federal regulations. 2. Economically maintain facilities to ensure maximum operational functions and equipment longevity. 3. Maximize secondary use of treatment biosolids. SEWER COLLECTION 1. To ensure conveyance of wastewater in the community to the WWTP 2. Economically maintain facilities for maximum operational functions and equipment longevity. 3. Preform preventative maintenance on sewer conveyance and facilities to ensure optimum system INTENDED OUTCOMES FROM BUDGET EXPENDITURES The FY 16 wastewater budget provides for routine maintenance and replacement of equipment and piping within the collection system and wastewater treatment plant (WWTP). This year's budget continues the collection system improvements necessary to improve lift station communication and data logging, collection system reliability, and increase capacity to meet future growth demands. The WWTP will utilize additional personnel to assist in the development and implementation of the discharge permit's mandated temperature and nutrient variance programs, and its increased directives for the pre-treatment program. SEWER- SANITARY OPERATIONS, BILLING, WASTEWATER TREATMENT FUND: 5310 PROJECTED REVENUE AND FUND SUMMARY BEGINNING CASH 10100 Operating 10123 SANITARY Sewer Impact Fee Inv. Account 10124 WWTP Impact Fee Inv. Account 10125 WWTP Equipment Repl/Evergreen 1013x Bond Reserves/ Operating reserve REVENUES 343310 SEWER SERVICE -billed (10100) 343360 Misc. ; (10100) 343330 Impact Fee/Hookup-Sanitary (10123) 343330 Admin Impact Fees Sanitary (10100) 343335 Impact Fee/Hookup-WWTP (10124) 343335 Admin Impact Fees WWTP (10100) Bonded Debt 371010 Interest -operations (10100) Interest-WWTP/Evergreen (10125) Interest-WWTP Impact Fee Acct. (10124) Interest -Sanitary Impact Fee Invest. Acct. (10123) Total Revenue Total Available EXPENSES EXPENSES FROM RATES Capital Outlay City/Evergreen Funds (10125) Capital Outlay / Bonded Debt Capital Outlay - from Sanitary Impact Fee funds (10123): Debt Service From Sanitary Impact fees (10123): Debt Service From Treatment Impact fees (10124): Depreciation (non cash expense) Total Expenses Add depreciation to cash Add cash distribution to Evergreen/City 10125 from 10100 ENDING CASH 10100 Operating 10123 SANITARY Impact Fee Inv. Account 10124 WWTP Impact Fee Inv. Account 10125 WWTP Equipment Replacement/Evergreen 1013x Bond Reserves (restricted funds) ACTUAL BUDGET ACTUAL BUDGET FY13/14 FY14/15 FY14/15 FY15/16 $751,629 $1,597,444 $1,597,444 $2,102,616 $2,011,722 $2,184,570 $2,184,570 $1,646,778 $358,460 $409,413 $409,413 $463,469 $1,252,082 $1,531,873 $1,531,873 $1,221,608 $1,299,313 $1,299,313 $1,299,313 $1,299,313 $5,673,206 $7,022,612 $7,022,612 $6,733,784 $4,127,594 $4,200,000 $4,272,036 $4,300,000 $11,690 $5,000 $29,967 $5,000 $197,819 $152,000 $206,370 $209,000 $10,412 $8,000 $10,862 $11,000 $274,453 $209,000 $276,556 $285,000 $14,138 $11,000 $14,556 $15,000 $1,087,682 $0 $0 $0 $12,925 $14,000 $25,870 $19,000 $8,760 $5,000 $7,500 $7,000 $1,500 $500 $2,500 $1,000 $14,000 $14,000 $15,000 $19,000 $5,760,973 $4,618,500 $4,860,217 $4,871,000 $11,434,179 $11,641,112 $11,882,829 $11,604,784 $3,648,466 $4,412,403 $3,839,296 $4,670,369 $140,568 $978,664 $729,364 $801,733 $770,160 $45,000 $7,823 $0 $13,971 $1,005,640 $664,162 $1,652,054 $25,000 $95,000 $95,000 $95,000 $225,000 $225,000 $225,000 $225,000 $2,245,000 $2,245,000 $2,245,000 $2,245,000 $7,068,167 $9,006,707 $7,805,645 $9,689,156 $2,245,000 $2,245,000 $2,245,000 $2,245,000 $411,599 $411,599 $411,599 $411,599 $1,597,444 $1,292,750 $2,102,616 $1,782,247 $2,184,570 $1,249,930 $1,646,778 $127,724 $409,413 $393,913 $463.469 $524,469 $1,531,873 $969,908 $1,221,608 $838,474 $1,299,313 $1,384,603 $1,299,313 $1,299,313 $7,022,612 $5,291,004 $6,733,784 $4,572,227 11 ACTUAL BUDGET ACTUAL BUDGET FY13/14 FY14/15 FY14/15 FY15/16 $85,304 $96,642 $87,913 $125,186 $300,511 $329,883 $309,008 $340,170 $589,545 $648,549 $611,200 $761,504 $975,360 $1,075,075 $1,008,121 $1,226,860 $82,930 $80,729 $72,476 $130,779 $384,931 $398,053 $352,051 $441,998 $735,197 $890,625 $742,073 $992,433 $1,203,058 $1,369,408 $1,166,600 $1,565,210 $81,661 $563,567 $312,534 $605,299 $46,626 $119,000 $72,288 $0 $128,287 $682,567 $384,822 $605,299 $71,610 $2,189 $1,889 $1,434 $858,553 $871,565 $866,265 $859,967 $930,163 $873.754 $868,154 $861,401 $411,599 $411,599 $411,599 $411,599 $3,648,467 $4,412,403 $3,839,296 $4,670,369 $770,160 $45,000 $7,823 $0 $140.568 $978.664 $729,364 $801,733 $13,971 $1,005,640 $664,162 $1,652,054 $25,000 $95,000 $95,000 $95,000 $225,000 $225,000 $225,000 $225,000 $820,000 $820.000 $820.000 $820,000 $1,425,000 $1,4251000 $1,425,000 $1.425,000 SEWER - WWTP - BILLING FUND SUMMARY FUND: 5310-454-430620-630/455-430640 EXPENSE SUMMARY Personal Services: Sewer billing Sanitary Sewer WWTP & LAB Subtotal Maintenance & Operations: Sewer Billing services Sanitary Sewer WWTP & Lab Subtotal Capital Outlay from rates: Sanitary Sewer Operation WWTP & Lab Subtotal Debt Service from rates: Sanitary Sewer WWTP Subtotal City/Evergreen Replacement funded from rates: Total Capital Outlay - Other funds: WWTP Bonded Debt WWTP (10125) City/Evergreen account Capital Outlay -from Impact Fee funds: Sanitary Sewer(1012 Debt Service -from Impact Fees SanitarySewer (10123) WWTP (10124) Depreciation (non -cash item) Sanitary Depreciation (non -cash item) WWTP Total $7,068,166 $9,006,707 $7,805,645 $9,689,156 12 SEWER - OPERATIONS FUND: 5310-454-430630 EXPENDITURE DETAIL ACTUAL BUDGET ACTUAL BUDGET FY13/14 FY14/15 FY14115 FY15/16 Personal Services: FTE's 5.55 5.55 5.55 5.55 110 Salaries & Wages $230,040 $249,754 $239,427 $251,563 112 Severance $0 $0 $0 $1,500 121 Overtime $1,802 $5,500 $1,068 $5,500 153 Health Insurance $52,080 $56,777 $51,223 $63,447 155 Retirement -PERD $16,588 $17,852 $17,290 $18,160 Subtotal $300,511 $329,883 $309,008 $340,170 Maintenance & Operations: 210 Office Supplies/Equip/ Computer Supplies/GIS $5,248 $9,200 $8,290 $9,200 218 Equipment (Non Capital)/Safety Equip & Supplies $3,789 $6,500 $6,841 $8,350 229 Other Supplies/lanitorial/Consumable Tools $1,380 $2,000 $2,084 $2,000 231 Gas & Oil $10,650 $11,500 $10,831 $13,500 312 Postage & Shipping / Printing $593 $400 $50 $400 341 Electricity $48,604 $54,500 $49,299 $54,500 344 Natural Gas $13,847 $14,500 $13,942 $16,500 345 Telephone & Comm., Alarms $26,520 $23,000 $20,793 $23,000 353 Auditing $3,000 $3,000 $3,000 $3,000 354 Contract Services $41,955 $24,000 $7,210 $24,000 356 Consultants $10,807 $8,000 $0 $8,000 357 Impact Fee Study/Review Impact Fees $2,155 $0 $0 $0 362 Equipment Maintenance/Buildings & Radios $2,230 $5,000 $4,613 $5,000 373 Dues & Training, Licenses $2,725 $3,000 $1,301 $3,500 388 Medical Services $991 $800 $308 $500 410 Construction Materials $7,670 $9,000 $6,506 $9,000 425 Materials - Pumps/Lift Stations $36,933 $50,000 $22,186 $50,000 510 Property & Liability Ins $37,848 $67,891 $58,359 $62,000 512 $10,000 Uninsured Loss/$15,000 Goodwill Expenditures $9,874 $20,000 $18,308 $25,000 521 Central Garage Transfer $6,259 $7,288 $7,287 $7,911 522 Administrative Transfer $53,670 $29,205 $59,205 $61,733 528 Information Tech. Transfer $20,486 $11,432 $11,432 $16,482 532 Office. Rent $7,838 $7,838 $7,838 $6,422 535 Usage Charge for 100,000 Gallons-Trumble Creek $29,858 $30,000 $32,368 $32,000 Subtotal $384,931 $398,054 $352,051 $441,998 Capital Outlay: from Rates (10100) 920 Install Lift Station Enclosure $4,920 $23,000 $10,688 $10,000 921 Sand/Cold Mix Storage Shed $0 $0 $0 $25,771 940 Machinery & Equipment $16,714 $0 $0 $0 947 Hwy 93 N Bypass Utility Relocate CARRYOVER $18,986 $2,067 $1,997 $2,000 13 SEWER - OPERATIONS & Billing FUND: 5 310-454-430630 EXPENDITURE DETAIL Capital Outlay: from Rates (10100) 950 Back Up Generator for L.S. 11 951 lst Alley EN Pipe Upsize (34% rate 66% impact fees): carryover 952 Peterson School Alley Replacement 953 By -Pass Pump Grandview Lift Station 954 Sanitary Liquid Disposal Site FY 13 956 Lift Station Communication Upgrade 959 2nd Alley E Replacement: carryover 960 Manhole Rehabilitation /Sewer Main Repairs 961 2nd Alley WN -Mont to Calf (66% rates 34% impact fee) Total Capital Outlay 430635 Capital Outlay -Impact Fee funds (10123) 951 1 st Alley EN Pipe Upsize (34% rate 66% impact fees)CARRY 955 Main & Lift Station Upsize 957 Three Mile Drive Interceptor 958 Spring Creek Interceptor 961 2nd Alley WN -Mont to Calf (66% rates 34% impact fee) Total Capital from Impact Fee Funds 490204-6xx Debt Service -Principal, Interest, Fiscal Agent Fees 510400-831 Depreciation Expense Total Sanitary Sewer Operating Budget 430620 Sewer Billing FTE's 110 Salaries & Wages 112 Severance 153 Health Insurance 155 Retirement - PERD Subtotal Materials and Services: 215 Office Supplies/Computers 353 Auditing and other Contract Services 355 Billing Costs/Postage 373 Dues & Training 522 Administrative Transfer 528 Information Tech, Transfer 532 Office Rent Subtotal Total Sanitary Sewer Billing Budget ACTUAL BUDGET ACTUAL BUDGET FY13/14 FY14/15 FY14/15 FY15/16 $17,741 $22,259 $5,765 $0 $0 $107,000 $87,192 $20,528 $0 $119,000 $0 $0 $0 $62,500 $0 $0 $0 $0 $0 $0 $0 $20,000 $16,315 $20,000 $0 $140,000 $177,694 $110,000 $23,300 $50,000 $12,883 $50,000 $0 $0 $0 $367,000 $81,661 $545,826 $312,534 $605,299 $0 $208,000 $173,965 $34,035 $13,971 $247,640 $21,777 $101,071 $0 $145,000 $133,038 $586,967 $0 $405,000 $335,382 $742,981 $0 $0 $0 $187,000 $13,971 $1,005,640 $664,162 $1,652,054 $96,610 $97,189 $96,889 $96,434 $820,000 $820,000 $820,000 $820,000 $1,697,684 $3,214,333 $2,554,644 $3,955,955 1.5 1.5 1.5 2.0 $68,421 $72,402 $70,175 $99,425 $0 $0 $0 $1,500 $11,852 $18,916 $12,524 $27,608 $5,030 $5,324 $5,214 $6,653 $85,304 $96,642 $87,913 $125,186 $1,005 $2,000 $1,842 $5,000 $2,450 $4,850 $2,920 $3,000 $34,048 $35,000 $29,850 $70,000 $1,377 $1,500 $485 $2,500 $6,414 $6,677 $6,677 $6,857 $29,798 $22,864 $22,864 $37,000 $7,838 $7,838 $7,838 $6,422 $82,930 $80,729 $72,476 $130,779 $168,234 $177,371 $160,389 $255,965 14 SEWER - OPERATIONS FUND: 5310454-430630 FY 2016 BUDGET HIGHLIGHTS Line Item Detail: SANITARY SEWER 218 Equipment - Non Capital - $4,600 / Safety Equipment & Supplies-$3,750 $2,300 Portable Flow Meter used to verify pump component wear for scheduling of maintenance (cost shared w/storm-total $4,600). $750 Fire Cabinet. Cost shared w/Storm - Total Cost $1,500 354 Contract Services-$24,000: Cost of annual contracts; U-dig fees, generator testing/maintenance, coveralls, estimated system repairs. 425 Materials - Pumps/Lift Stations - $50,000 The City maintains 40 sewer lift stations which contain 80 pumps and motors, numerous drives, check valves and controls. Many of our pumps have reached the end of their service life cycle. In addition to routine maintenance, repairs were mostly associated with pump and motor failures, or level transmission and control malfunctions. This budget accommodates 5-6 major pump replacements a year. Capital Outlay: from Rates (10100) 920 Sanitary Lift Station Enclosure - $10,000 One lift station building structure to protect lift station equipment. Enclosures provide weather protection and covering during winter maintenance activities, as well as reduces heating costs. Covered lift stations protect the equipment and allows maintenance to be performed efficiently and in a safer environment (SEW-63). 921 Sand/Cold Mix Storage Shed - $25,771 This project replaces the current shed that is showing signs of structural failure, rot and decay. The concrete base is also cracked and has been repaired in the past. The new sand shed will be designed to cover the gravel stockpile, cold mix, and sanding materials. Cost shared between/Street, Water, Sewer, & Storm - Total Project Cost $103,084 947 Hwy 93 N Bypass Utility Relocate (3 Mile Dr) - $2,000 This project replaces approximately900 feet of existing 6" PVC force main with approximately 800 feet of 8" HDPE force main and 100' of 12" PVC gravity main. This project was necessitated by the revision of Three Mile Road as it relates to the proposed Highway 93 Bypass. MDT placed this new intersection as a top priority and plans on constructing it with their next round of available funding, requiring design to be completed and ready for 2013 construction. All of the existing 6" PVC sewer force main relocated under the proposed bypass will be upsiaed to 8" HDPE to allow additional flow capacity and reduced head losses. The overall project also includes the replacement of a water main. Costs associated with the water main are not included in this item. The new 8" HDPE force main enables 44% more flow capacity. This project will be paid for by sewer rates (56%n) and impact fees (44%). Total project cost $60,000 (SEW-66). 956 Lift Station Communication Upgrade - $20,000 This multi -year project replaces lift station landline based alarm systems with cell phone web based alarm and data collection. Currently, operators are alerted of lift station failures through landline phones. The proposed Mission Communication System collects necessary facility data that is published through a web based program reviewed daily by operators. 4 mission units are currently installed and additional units will be purchased and phased into the operational system over the next 7 years (SEW-72). 959 2nd Alley E. Pipe Replacement from 5th St. East to 7th St. East - CARRYOVER $110,000 This project replaces approximately 700 feet of 1930°s era 8" clay sewer with 8" PVC gravity sewer main. The existing sewer main was found to be cracked and could pose a serious problem if pipe conditions continue to deteriorate. This project would improve services to approximately 30 different residences (SEW-14). 15 SEWER - OPERATIONS FUND: 5310-454-43 063 0 FY 2016 BUDGET HIGHLIGHTS Line Item Detail: SANITARY SEWER Capital Outlay: from Rates (10100) Cont. 960 Manhole & Sewer Main Rehabilitation & Replacement - $50,000 This project would allow for the reconstruction or replacement of sanitary sewer manholes and mains that have deteriorated and are approaching a potential failure. The sewer crews review and record the function of manholes and mains. During this review, the crews prioritize the potential projects according to the severity of the deterioration (SEW-33). Capital Outlay - Impact Fee Funds (10123) 955 Main & Lift Station Upsize-$101,071 $100,000 - Misc. sewer contract main upsize, facility enlargements, or regional lift station (SEW-52). $1,071 - CARRYOVER Funds to upsize sewer main for US 93 North Bypass (SEW-66) 957 Three Mile Drive Interceptor - CARRYOVER $86,967 & $500,000 NEW APPROPRIATION This item is for the design engineering for a project to install approximately 5,500' of large sanitary sewer main, continuing construction of the West Side Interceptor from the point where the Spring Creek Interceptor is proposed to connect at Three Mile Drive. The design for the project will include growth forecasts; sanitary sewer modeling; topographic, property, and utility surveys; development and negotiations for easements and land acquisition; development of project design plans and specifications; and bidding and negotiation services (SEW-55). 958 Spring Creek Interceptor - CARRYOVER $242,981 & $500,000 NEW APPROPRIATION This item is for the design engineering for a project to install a large sanitary sewer lift station, approximately 2,000 lineal feet of sanitary force main, approximately 12,500 lineal feet of sanitary gravity main, a railroad crossing, a highway crossing, and other related items. This is the proposed first phase of the West Side Interceptor, extending new main from a connection at 10th Street West and 5th Avenue West, west and then north to Three Mile Drive. The design for the project will include growth forecasts; sanitary sewer modeling; topographic, property, and utility surveys; development and negotiations for easements and land acquisition; development of project design plans and specifications; and bidding and negotiation services (SEW-56). Capital Outlay - CARRYOVER $20,528 from Rates (10100) and $34,035 from Impact Fee Funds (10123) 951 1st Alley EN Pipe Upsize -CARRYOVER $54,564 This project replaces 1,110 ffof 8" gravity sewer main with a 12" sewer main from E Nevada St to E Washington. The pipe increase will eliminate the current surcharging and main backage created from upstream development's increase flow to the down gradient sewer conveyance system. The existing 8" gravity sewer main is downstream of the large sewage flow basin associated with the Buffalo Hill Lift Station (LS 9). The force main from LS 9 was upsized from an 8" to a 10" diameter pipe in 2007. The force main upsize allows more wastewater flow when the pumps are running. The force main outlets into the gravity conveyance system approximately 4 blocks north of the beginning of 1 st Ave E Alley Sewer Replacement project. The project cost will be paid for by sewer rates and impact fees. The new 12" pipe enables 66% more wastewater flow through the upsized conveyance section (SEW-47). Capital Outlay - $367,000 from rates (10100) and $187,000 from impact fee funds (10123) 961 2nd Alley WN from Montana to California Upsize - $554,000 2" d Alley WN from MT to CA: This project replaces 1,350' of 8" clay sewer main with a 10" sewer main from Montana to California. The pipe increase and replacement will eliminate the current surcharging created from root intrusion, aging deteriorated pipe and new development increase flow. This section of sewer is downstream of a large sewage flow basin associated with the hospital and WN area of the city. The project cost will be paid for by sewer rates and impact fees (SEW=67). 16 WASTEWATER TREATMENT PLANT FUND: 5 310-455-430640 I Personal Services: 110 Salaries & Wages III Seasonal Salaries 112 Severance 121 Overtime 153 Health Insurance 155 Retirement - PERD Subtotal EXPENSE DETAIL ACTUAL BUDGET ACTUAL BUDGET FY13/14 FY14115 FY14/15 FY15/16 FTE's 5.55 5.55 5.55 6.55 $337,210 $384,625 $346,238 $448,294 $2,996 $5,000 $687 $5,000 $0 $0 $0 $1,500 $21,554 $21,500 $21,115 $22,500 $60,268 $65,237 $59,423 $84,419 $25,704 $26,065 $26,608 $32,035 $447,732 $502,427 $454,071 $593,747 Maintenance & Operations: 210 Office Supplies/Equip/Computers 218 Safety Equipment & Supply 225 Alum 226 Chemicals 229 Other Supplies/Janitorial/Consumable Tools/Equip Rental 231 Gas & Oil 312 Postage & Shipping 336 Licenses and Fees 341 Electricity 342 Water 344 Natural Gas 345 Telephone & Alarms 353 Auditing 354 Contract Services -Glacier Gold 355 Other Contract Services 356 Consult-Elec Eng/Permit Asst /Optimization & Bio Solid Studies 358 Consultant - TMDL 360 Maintenance Service -Mist. 366 Building Maintenance 373 Dues, Training & Training Materials 398 Medical Services 510 Property & Liability Insurance 521 Central Garage Transfer 522 Administrative Transfer 528 Information Tech. Transfer Subtotal $3,215 $10,000 $6,413 $10,000 $1,961 $2,700 $1,362 $2,700 $18,343 $20,000 $11,324 $20,000 $15,458 $16,000 $15,964 $19,000 $6,482 $7,000 $3,570 $7,000 $14,677 $18,500 $11,807 $18,500 $227 $350 $259 $350 $5„712 $11,000 $6,457 $11,000 $166,524 $172,000 $169,944 $178,500 $5,238 $6,150 $7,549 $6,500 $58,626 $55,000 $47,458 $65,000 $4,566 $5,000 $5,219 $5,000 $4,000 $4,000 $4,000 $4,000 $121,130 $124,000 $123,822 $124,000 $25,103 $30,000 $29,678 $30,000 $18,634 $95,000 $21,575 $145,000 $0 $15,000 $6,687 $15,000 $26,353 $30,000 $19,624 $30,000 $2,192 $30,000 $24,590 $60,000 $5,516 $7,500 $3,841 $7,500 $444 $600 $220 $500 $40,625 $38,320 $37,695 $40,000 $19,161 $17,519 $17,519 $12,822 $117,592 $116,638 $116,638 $104,138 $25,560 $17,148 $17,148 $24,723 $707,339 $849,425 $710,363 $941,233 17 WASTEWATER TREATMENT PLANT FUND: 5 310-455-430640 EXPENSE DETAIL ACTUAL BUDGET ACTUAL BUDGET FY13/14 FY14/15 FY14/15 FY15/16 430640 Capital Outlay: Operating Funds 920 MaudDigesterroof FY13&14: Headwork's roof & Main Bld Light 940 Coat Equalization Basin - Carryover Total Outlay Funds 430644 Capital Outlay: BONDED PROJECT 935 Construction Digester Lid 430645 WWTP Replacement Funds:Evg (10125) 362 Equipment Maintenance 933 Solid Dewatering CARRYOVER 934 Secondary Digester Lid Inspection 936 Digested Sludge Line Replacement 940 Machinery & Equipment Total Replacement Funds 4902xx-6x Debt Service (see debt page) 831 Replacement Reserve -Evergreen Depreciation Expense (non cash) Subtotal WWTP $46,626 $59,000 $55,783 $0 $0 $60,000 $16,505 $0 $46,626 $119,000 $72,288 $0 $770,160 $45,000 $7,823 $0 $87,382 $100,000 $58,454 $100,000 $53,186 $615,610 $508,383 $295,233 $0 $0 $0 $31,500 $0 $0 $0 $300,000 $0 $238,000 $162,527 $75,000 $140,569 $953,610 $729,364 $801,733 $1,083,553 $1,096,565 $1,091,265 $1,084,967 $411,599 $411,599 $411,599 $411,599 $1,425,000 $1,425,000 $1,425,000 $1,425,000 $5,032,577 $5,402,626 $4,901,773 $5,258,279 430646 Laboratory Operations FTE's 2.0 2.0 2.0 2.0 Personal Services: 110 Salaries & Wages $113,078 $134,177 $121,616 $129,261 153 Health Insurance $20,676 $28,108 $26,744 $29,319 155 Retirement - PERD $8,059 $8,891 $8,769 $9,177 Subtotal $141,813 $171,177 $157,129 $167,756 430646 Laboratory Maint. & Operations: 210 Office Supplies/Computers/other Supplies/Shipping $2,502 $4,500 $1,724 $4,500 218 Equipment $1,452 $2,500 $1,769 $2,500 222 Lab Supplies $8,292 $7,500 $8,058 $8,500 349 Lab services /Permit & Pretreatment Testing $9,252 $20,000 $16,382 $29,000 362 Equipment Maintenance $5,381 $4,000 $2,141 $4,000 373 Dues & Training, Licenses $979 $2,700 $1,636 $2,700 Subtotal Laboratory $27,858 $41,200 $31,710 $51,200 Grand Totals $5,202,248 $5,615,003 $5,090,612 $5,477,237 18 WASTEWATER TREATMENT PLANT FUND: 5310-45 5-430640 FY 2016 BUDGET HIGHLIGHTS Line Item Detail - Wastewater Treatment Plant 226 Chemicals - $19,000 $3,000 increase needed for the additional usage of polymer attributed to the new screen press. 355 Other Contract Services - $30,000 Rag /grit and landfill biosolids disposal fees and other contract services. 356 Consultant - Electrical Engineer, Permit Assistance & Optimization Study - $145,000 $20,000 Electrical Engineer - Continue to update the 1992 antiquated computer control programming for operations of the modernized equipment in the current plant. Ongoing trouble shooting when failures occur in communications and the computer control program. $15,000 - Permit Assistance - Discharge permit renewal work and negotiation assistance with DEQ. $30,000 - Optimization Study - The future implementation of numeric water quality standards and Flathead Lake TMDL by MDEQ will limit the amount of nutrients discharged from the W WTF. There is a high potential Kalispell will not be able to meet the required nutrient limits, and will have to apply for a general nutrient standard variance as outlined in SB 367. The bill requires dischargers receiving a variance to perform an optimizing study. The optimization study requires evaluation of the current facility operation to optimize nutrient reduction with existing infrastructure and analyzes cost-effective methods of reducing nutrient loading, including but not limited to nutrient trading without substantial investment in new infrastructure. The analysis is to include cost-effective methods of reducing nutrient loading without substantial investment in new infrastructure, there should not be structural changes, and there should not be an increase in rates. MDEQ's expectation is the study be performed by a third party professional engineer specializing in wastewater nutrient removal processes, and includes modeling of alternative plant configuration and operation scenarios to determine if operational modification could be made to achieve better nutrient removal performance. The study must also explore the feasibly of nutrient trading within the watershed. $30,000 - Bio Solids Disposal Study - As the City approaches the capacity of the Glacier Gold Composting facility of 600 dry/tons per year we need to explore alternative means of sludge disposal. These funds would be used to research alternative disposal options. $50,000 - Temperature Control/Temperature Monitoring: The city of Kalispell will be issued a new waste water discharge permit from the Department of Environmental Quality in 2015. The permit will mandate the development of a temperature and flow monitoring plan for instream and effluent discharge. A monitoring plan in required to be submitted to DEQ within six month of the permit effective date, and implementation of the plan is required to begin on July 1, 2016. This new mandate is in response to the state adopted Temperature TMDL. 358 Consultants - Total Maximum Daily Load (TMDL) / Permit - $15,000 The State of Montana is under Federal Court order to develop a TMDL for pollutants flowing from the Flathead basin into Flathead lake. TMDL restrictions will have some consequences for the City's historical ability to drain storm waters to Flathead tributaries and its community wastewater to Ashley creek. A TMDL that is restrictive could impair the City's ability to grow and would raise the cost of treating community wastewater and storm water discharges. We have engaged an experienced consultant to provide assistance to the City for working with MDEQ to develop a satisfactory TMDL. This budget item also includes funds for potential legal costs related to the TMDL issue. 19 FUND: 5 310-455-43 0640 FY 2016 BUDGET HIGHLIGHTS Line Item Detail - Wastewater Treatment Plant 366 Building Maintenance - $60,000 $37,500 - Digester Building Heating System - The digester building heat is operating under the original system which was installed in 1984. The system operates with compressed air which in turn operates pneumatic thermostats, and pneumatic solenoids. The entire system is worn out, leaking, and needs to be replaced. The installation of a new electronic system would increase heating efficiency and would increase ease of operations, versus replacing it with a similar pneumatic system. $18,500 - Main Office Building Flooring Replacement - The Main Office Building Flooring was originally installed in 1992, and 23 years of cleaning and wear have taken it's tole on the existing flooring. The replacement flooring will be specified for industrial, high use to ensure longevity of the flooring. The main office building and conference room are used extensively by the City and numerous other agency's. $4,000 - Mise Building repairs and maintenance 430645 Capital Outlay - Replacement Funds 362 Equipment Maintenance - $100,000 -The W WT plant maintains along list of equipment some of which includes 76 pumps, 210 valves, air compressors, gas boilers, sand filters, air blowers, fans, motors etc. The original 1992 plant is reaching the expected life span of 25 years and therefore increases in equipment replacement, rehabilitation, and maintenance is expected. Most of the smaller pump replacement costs range in $12,000 - $15,000 range. The larger digester mixer pumps cost $50,000 and an air blower replacement costs would exceed the $125,000 range (WWTP-1604). 933 Solids Dewatering Design & Construction - CARRYOVER $295,233 The 2008 Facility Plan Update included $1.9 million to update the Solids Dewatering in Phase 3 of the AWWTP Expansion. The installation of I new screw press is a portion of the suggested improvements to replace 1 of 2 belt filter press (WWTP-1715). 934 Secondary Digester Lids Replacement Inspection - $31,500 The Secondary Digester Lids were originally installed in 1992. The steel floating lids were protective coated in 1997 due to the corrosive environment. The coatings were designed to last 10 + years, and the coating/metal are now showing signs of rusting. An inspection by a qualified coating and structural expert will help to assess the necessity of further action with coatings or lid replacements (WWTP-1711). 936 Digested Sludge Line Replacement - $300,000 This project replace the digester sludge line which runs from the digester to the solids dewatering building. Sludge that has gone through the digestion or solids reduction process is pumped from the digester building to the solids dewatering building, where it is dewatered and hauled to Glacier Gold_ The digester sludge line is experiencing failure due to corrosion and has developed three holes in the past four years (WWTP-1725). 20 WASTEWATER TREATMENT PLANT FUND: 5310-455-430640 FY 2016 BUDGET HIGHLIGHTS Line Item Detail - Wastewater Treatment Plant 430645 Capital Outlay - Replacement Funds 940 Machinery & Equipment Replacement Fund - CARRYOVER $41,000, New Appropriation $34,000 $41,000 - CARRYOVER Replace Fermenter Recirculation Piping $34,000 - NEW APPROPRIATION - Utility Replacement Vehicle for Pretreatment Program Laboratory Operations: 349 Lab Services/Permit & Pretreatment Testing - $29,000 Pretreatment Program: The City of Kalispell will be issued a new waste water discharge permit from the Department of Environmental Quality in 2015. The permit will mandate increased sampling parameters and analysis from the treatment facility influent and effluent for the presence of toxic pollutants as a part of the pretreatment program. 21 STORM SEWER ACCOUNT # 5349-453 PURPOSE OF THIS DEPARTMENT: Why does this department exist? The purpose of this department is to provide for a means of conveyance of storm water to designated storm water management areas and outfalls, thus reducing the localized and undesirable occurrence of storm water ponding. DEPARTMENT PERSONNEL: (6.20 FTE) .10 Public Works Director .25 Senior Civil Engineer (City Engineer) .15 Budget Resource Manager .25 Construction Manager .10 Administrative Coordinator .20 Project Manager (Engineer II) .05 Road and Fleet Superintendent .20 Assessment Coordinator .60 Assistant Civil Engineer (Engineer 11) .25 Engineering Tech/GIS/fT Support .20 Administrative Assistant .50 Storm/Sewer Maintenance Supervisor 2.5 Storm Maintenance .25 Special Street Maintenance Operator .20 General Laborer .40 Utility Management Superintendent GOALS OF THIS DEPARTMENT: What are the departmental goals that support the purpose? 1. To maintain and operate the storm water collection, detention, and treatment facilities for the conveyance of storm water. 2. Implement requirements of the Municipal Separate Storm Water Discharge Permit. INTENDED OUTCOMES FROM BUDGET EXPENDITURES The FY16 budget for Storm Sewer recommends continuation of capital projects to improve conveyance of a deteriorated system, improve water quality, and maintain and improve the function of a regional detention facility. The budget also provides for several improvements for storm water conveyance systems within the community and supports the development and implementation of the new MS4 Storm Water Management Program. STORM SEWER FUND: 5349-453-43 0246 PROJECTED REVENUE AND FUND SUMMARY BEGINNING CASH 10100 CASH: Operating 10120 Cash, Impact Fees 10122 Cash, Capital Reserve 10127 Cash, Emergency Reserve 10190 Cash, Designated for Equipment Replacement 10193 Cash, Designated Capital Projects Total Cash REVENUES 343370 Storm Assessments -billed (10100) Assessments -designated for equipment (10190) Assessments -designated for capital projects (10193) 334040 Petro Tank/Monitory Reimbursement (10100) 343035 Permit fees & other Charges for Service (10100) 363040 Penalty & Interest (10100) 371010 Interest (10100) 343033 Impact Fees (10120) Impact Fee 5% Admin (10100) S/T Advance to SM 345 Total Revenue Total Available EXPENSES EXPENSES FROM RATES (10100) Capital Outlay -impact fee (10120) Capital Equipment -replacement (10190) Depreciation (non -cash expense) Total Expenses ACTUAL BUDGET ACTUAL BUDGET FY13/14 FY14/15 FY14/15 FY15/16 add back depreciation ENDING CASH 10100 Cash, Operating 10120 Cash, Impact Fees 10122 Cash, Capital Reserve (target $140,000) 10127 Cash, Emergency Reserve (target $25,000) 10190 Cash, Designated Equipment Replacement 10193 Cash, Designated Capital Projects $833,177 $895,162 $895,162 $1,107,326 $871,225 $1,056,838 $1,056,838 $1,160,924 $140,000 $140,000 $140,000 $140,000 $25,000 $25,000 $25,000 $25,000 $238,102 $54,982 $54,982 $91,186 $432,835 $515,844 $515,844 $65,844 $2,540,339 $2,687,826 $2,687,826 $2,590,280 $744,424 $740,000 $743,321 $756,000 $40,000 $40,000 $40,000 $40,000 $50,000 $50,000 $50,000 $50,000 $8,373 $2,500 $2,765 $2,500 $9,750 $1,000 $12,714 $1,000 $2,279 $2,000 $1,895 $2,000 $13,246 $8,000 $17,579 $15,000 $246,695 $142,500 $104,086 $142,500 $12,984 $7,500 $5,478 $7,500 $33,009 $0 $0 $0 $1,160,760 $993,500 $977,838 $1,016,500 $3,701,099 $3,681,326 $3,665,664 $3,606,780 $722,571 $1,558,093 $1,071,588 $1,464,677 $67,582 $130,000 $0 $130,000 $223,120 $5,500 $3,796 $0 $285,000 $285,000 $285,000 $285,000 $1,298,273 $1,978,593 $1,360,384 $1,879,677 $285,000 $285,000 $285,000 $285,000 $895,162 $598,069 $1,107,326 $471,649 $1,056,838 $1,069,338 $1,160,924 $1,178,424 $140,000 $140,000 $140,000 $140,000 $25,000 $25,000 $25,000 $25,000 $54,982 $89,482 $91,186 $131,186 $515,844 $65,844 $65,844 $65,844 $2,687,826 $1,987,733 $2,590,280 $2,012,103 22 STORM SEWER FUND: 5349-453-430246 EXPENSE DETAIL ACTUAL BUDGET ACTUAL BUDGET FY13/14 FY14/15 FY14/15 FY15/16 Personal Services: 6.20 6.20 6.20 6.20 110 Salaries & Wages $323,330 $350,378 $322,178 $354,364 112 Severance $0 $0 $0 $1,500 121 Overtime $1,882 $4,000 $946 $4,000 153 Health Insurance $68,472 $71,561 $63,729 $84,814 155 Retirement $23,311 $25,139 $23,408 $25,357 Subtotal $416,995 $451,079 $410,261 $470,035 Maintenance & Operations: 210 OfficeSupplies/Equip/Computer/GIS $4,652 $10,100 $8,038 $10,100 218 Equipment (non capital)/ Safety Equip & Supplies $3,500 $3,500 $4,151 $6,550 229 Other Supplies/Consumable Tools $2,281 $2,200 $550 $2,200 231 Gas & Oil $9,486 $11,500 $10,670 $11,500 345 Telephone & Communication $528 $800 $504 $800 353 Auditing $2,340 $2,340 $2,340 $2,340 354 Contract Services $1,892 $6,000 $2,351 $6,000 356 Storm Water Reg Compliance Program/Permit $14,185 $25,000 $14,057 $25,000 357 Impact Fee Update $0 $7,500 $0 $50,000 358 Consultants $0 $7,000 $0 $7,000 359 Consultants/TMDL/Permit $0 $15,000 $6,687 $15,000 360 Repair & Maint Services $1,328 $2,500 $1,912 $2,500 362 Groundwater Monitoring $4,436 $10,000 $2,181 $7,500 371 Curb & Gutter $5,032 $7,000 $4,316 $7,000 373 Dues & Training $2,218 $3,500 $896 $3,500 388 Medical Services $0 $100 $0 $100 410 Construction Materials $637 $10,000 $3,047 $10,000 510 Liability Ins. ($5,000; $5,000 uninsured loss) $7,394 $7,982 $4,918 $10,000 521 Central Garage Transfer $6,259 $7,287 $7,287 $7,911 522 Administrative Transfer $28,416 $34,352 $34,352 $35,523 528 Information Tech Transfer $7,301 $8,574 $8,574 $12,361 530 Lease Payments/BNSF $5,263 $5,700 $5,541 $5,900 532 Office Rent $7,838 $7,838 $7,838 $6,422 Subtotal $114,986 $195,773 $130,210 $245,207 23 STORM SEWER FUND: 5349-453-430246 EXPENSE DETAIL-Con't. ACTUAL BUDGET ACTUAL BUDGET FY13/14 FY14/15 FY14/15 FY15/16 430246 Capital Outlay: from rates (10100) 840 MACI Grant Match CARRYOVER $0 $42,264 $0 $42,264 921 Sand/Cold Mix Storage Shed $0 $0 $0 $25,771 941 Utility Asset Management Program $0 $0 $0 $0 944 Vacuum Jet Truck - 38% $124,203 $0 $0 $0 951 9th St. E. Stormwater Impry $0 $200,000 $204,672 $0 952 Storm Drain Correction Funds $0 $100,000 $90,352 $100,000 953 Willows Stormwater Improvement Prj CARRYOVER $66,387 $82,977 $5,067 $0 954 S. Meadows Phase 1-Fy12; Phase2-FY13,Phase3-FY]4 CA] $0 $300,000 $231,026 $0 955 Sylvan Dr. StrmwtrRepair Phase I-FY15; Phse 2-FY16 $0 $186,000 $0 $581,400 Subtotal $190,590 $911,241 $531,117 $749,435 430248 Capital Outlay: Impact Fee $ (10120) 953 Willows Stormwater Improvement Prj $23,929 $0 $0 $0 960 Stormwater Facility Upsizing $43,653 $130,000 $0 $130,000 Subtotal $67,582 $130,000 $0 $130,000 430249 Capital Outlay: from Replacement $ (10190) 940 Machinery & Equipment $20,474 $5,500 $3,796 $0 944 Vacuum Jet Truck - 62% $202,646 $0 $0 $0 Subtotal $223,120 $5,500 $3,796 $0 510400 Depreciation: 831 Depreciation: $285,000 $285,000 $285,000 $285,000 Total $1,298,273 $1,978,593 $1,360,384 $1,879,677 24 STORM SEWER FUND: 5349-453-430246 FY 2016 BUDGET HIGHLIGHTS Line Item Detail: STORM SEWER FUND 218 Equipment - Non Capital - $3,800/ Safety Equipment & Supplies $2,750 $2,300 Portable Flow Meter used to verify pump component wear for scheduling of maintenance (cost shared w/sewer-total $4,600). $750 Fire Cabinet. Cost shared w/Sewer - Total Cost $1,500 356 Storm Water Regulatory Compliance Program/Permit Fees - $25,000 The Stormwater MS4 Permit requires the City to implement a Stormwater Management Program (SVdMP). The SV✓MP outlines and defines Best Management Practice (BMPs) and Programs the City will implement and maintain to meet the regulatory requirements. Programs to implement and/or maintain are outlined and require yearly funding, these include: 1) Erosion and sediment control annual training, 2) Public education and participation handouts and advertising, 3) Storm drain ID decals, 4) Car wash equipment, 5) Good housekeeping BMPs, 6) Site inspection and enforcement for post construction structural BMPs, 7) Illicit discharge monitoring and removal. Stormwater permit consultant fee provides technical support with the MS4 update ($8,564 year for two years -total $17,128). 430246 Capital Outlay: from Rates (10100) 840 MACI Grant Match - CARRYOVER $42,264 - operating transfer to MACI grant The State is once again proposing to provide local governments the opportunity to purchase air quality management equipment, like street sweepers, through the Montana Air & Congestion Initiative (MACI). The City is proposing to purchase a new street sweeper (replacing a 1991 model) in order to continue to support the City's Stormwater Management Program. As a permitted Municipal Separate Storm Sewer System (MS4), the City of Kalispell is required to develop controls in order to reduce or eliminate the discharge of pollutants from streets, roads, highways, municipal parking lots, maintenance and storage yards, vehicle fleet or maintenance shops with outdoor storage areas, salt/sand storage locations, and snow disposal areas operated by the permittee. As part of the Stormwater Management Program, a Street Sweeping Program has been developed to meet permit requirements. By implementing the Street Sweeping Program and performing routine street sweeping, the City is able to meet permit requirements by collecting sediments, metals, organics, and oil and grease wastes that would otherwise be transported by stormwater runoff to surface waters. 921 Sand/Cold Mix Storage Shed - $25,771 This project replaces the current shed that is showing signs of structural failure, rot and decay. The concrete base is also cracked and has been repaired in the past. The new sand shed will be designed to cover the gravel stockpile, cold mix, and sanding materials. Cost shared between/Street, Water, Sewer, & Storm - Total Project Cost $103,084 25 STORM SEWER FUND: 5349-45 3 -43 0246 FY 2016 BUDGET HIGHLIGHTS 430246 Capital Outlay: from Rates (10100) Continued 952 Storm Drain Correction - $100,000 The goal of this project is to provide design and construction for areas in the City that are in need of storm drainage systems and storm drainage system upgrades. Projects include: Areas in sections of the City that have extensive ponding at the intersection caused from minor rain events. Improve curb and gutter flow to eliminate ponding and deterioration of pavement. 955 Sylvan Drive Stormwater Repair - CARRYOVER $186,000, New Appropriation-$395,400 The Sylvan Drive Stormwater system services a large drainage basin in the west and northwest areas of Kalispell. The system consists of large stormwater pipes, manholes and a detention facility that discharges to the natural drainage backwater channel of the Stillwater River. This project is necessitated due to the severe corrosion of the invert section of the 750' corrugated metal pipe and manholes. The project will be performed in two phases, the first being the removal and replacement of the deteriorated pipe and the installation of a Water Quality treatment device. The second being the pond clean out and slope/bottom vegetation stabilization and rehabilitation of the pond outfall. 430248 Capital Outlay: from Impact Fees (10120) 960 Stormwater Facility Upsizing - $130,000 $130,000 - Misc. Stormwater contract main upsize, and or facility enlargements. Increase due to new development in Section 36 and Highway 93 South. SOLID WASTE ACCOUNT # 5510-460 PURPOSE OF THIS DEPARTMENT: Why does this department exist? The Solid Waste Department collects and disposes of solid waste material from residential and commercial entities to provide a cleaner and healthier condition for the City of Kalispell. DEPARTMENT PERSONNEL: (7.40 FTE) .10 Public Works Director .15 Budget Resource Manager .20 Assessment Coordinator .20 Administrative Coordinator .30 Road and Fleet Superintendent .20 Administrative Assistant .15 Project Manager (Engineer II) 5 Solid Waste Operators 1 Solid Waste Supervisor .10 General Laborer GOALS OF THIS DEPARTMENT: What are the departmental goals that support the purpose? Collect, handle, and transport solid waste in a safe and effective manner. 2. Provide solid waste services to the community of Kalispell in a respectable and reliable manner. INTENDED OUTCOMES FROM BUDGET EXPENDITURES The FY16 recommends the routine replacement of equipment for the collection, transport, and disposal of refuse accumulated within the City. Replacement side arms are speced with larger receptacles enabling the route to be ran more efficiently. SOLID WASTE FUND: 5510-460-430840;430845 PROJECTED REVENUE AND FUND SUMMARY BEGINNING CASH 10100 Cash: Operating 10120 Replacement Account Total Cash REVENUES 343410 Assessments 343420 garbage collections billed (part year) 363040 Penalty & Interest 371010 Interest Earnings BOI - Inception of Loan 343360 Misc. Total Revenue Total Available EXPENSES Total Expenses from Rates (10100) Capital Outlay -Replacement (10120) *Depreciation/Replacement Fund Total Expenses add back transfer to replacement account ENDING CASH 10100 Operating 10120 Replacement Account Total Cash ACTUAL BUDGET ACTUAL BUDGET FY13/14 FY14/15 FY14/15 FY15/16 $660,849 $754,474 $754,474 $874,589 $245,547 $114,937 $114,937 $184,339 $906,396 $869,411 $869,411 $1,058,928 $923,504 $920,000 $944,910 $954,436 $24,698 $20,000 $25,836 $23,000 $2,745 $2,500 $2,555 $2,500 $4,478 $3,000 $5,564 $5,000 $172,988 $200,000 $0 $0 $1,873 $0 $46,692 $0 $1,130,286 $1,145,500 $1,025,557 $984,936 $2,036,682 $2,014,911 $1,894,968 $2,043,864 $886,661 $874,162 $755,442 $951,644 $280,610 $96,369 $80,598 $324,500 $150,000 $150,000 $150,000 $150,000 $1,317,271 $1,120,531 $986,040 $1,426,144 $150,000 $150,000 $150,000 $150,000 $754,474 $875,812 $874,589 $757,881 $114,937 $168,568 $184,339 $9,839 $869,411 $1,044,380 $1,058,928 $767,720 27 SOLID WASTE FUND: 5510-460-430840;430845 EXPENSE DETAIL ACTUAL BUDGET ACTUAL BUDGET FY13/14 FY14/15 FY14/15 FY15/16 Personal Services: FrE's 7.40 7.40 7.40 7.40 110 Salaries & Wages $369,765 $401,583 $372,599 $404,181 112 Severance $0 $0 $0 $61,975 121 Overtime/Call Outs $4,538 $5,500 $4,863 $5,500 153 Health Insurance $81,713 $85,694 $80,796 $95,330 155 Retirement - PERD $26,503 $28,541 $26,942 $28,610 Subtotal $482,519 $521,318 $485,200 $595,596 Materials and Services: 213 Office Equip/ Computer Equip & Supplies $5,524 $9,500 $5,970 $9,500 218 Non Capital Equip.- Garbage Containers $29,297 $35,000 $28,282 $35,000 229 Other Supplies/Safety Equip/Consumable To $3,646 $5,500 $3,035 $5,500 231 Gas and Oil $57,372 $59,000 $47,761 $61,500 341 Electricity $1,555 $1,900 $1,353 $1,950 344 Natural Gas $4,203 $4,200 $3,211 $4,900 345 Telephone $906 $850 $695 $850 354 Contract Services $9,204 $9,000 $5,008 $9,000 362 Equipment Maint. & Supplies/Radios $1,319 $5,700 $2,206 $5,700 366 Building Maintenance $257 $2,500 $119 $2,500 373 Dues & Training $1,119 $3,500 $722 $3,500 388 Medical Services $623 $650 $835 $650 510 Property & Liability Ins. $15,246 $10,600 $9,218 $10,000 512 Uninsured Loss - Deductible $75 $6,500 $700 $3,000 521 Central Garage Transfer $47,140 $59,786 $59,786 $61,388 522 Administrative Transfer $27,760 $33,484 $33,484 $33,186 528 Information Tech. Transfer $9,312 $8,574 $8,574 $12,361 532 Office Rent $7,838 $7,838 $7,838 $6,422 Subtotal $222,396 $264,082 $218,797 $266,907 430845 Wash Bay/Materials & Services 224 Janitorial Supplies $0 $250 $74 $250 341 Electricity $3,907 $4,000 $2,097 $3,500 342 Water $315 $500 $241 $500 344 Natural Gas $4,323 $6,500 $3,529 $6,500 SOLID WASTE FUND: 5510-460-430840;430845 EXPENSE DETAIL ACTUAL BUDGET ACTUAL BUDGET FY13/14 FY14/15 FY14/15 FY15/16 360 Repair & Maint Services/Building Maii $213 Subtotal $8,758 430840 Capital Outlay: (Financed 5 yr) 944 Garbage Truck $172,988 $172,988 430840 Capital Outlay: 820 Alley Paving - transfer to Gas Tax $0 $0 430840 Capital Outlay: Replacement Funds (10120) 940 Machinery & Equipment $2,679 944 Garbage Truck $277,931 Subtotal $280,610 600 Debt Service BOI 2539-02 Garbage Tru $0 510400 Depreciation (fund Replacement account $150,000) 831 Depreciation Expense $150,000 $3,500 $501 $3,500 $14,750 $27,012 $6,442 $0 $14,250 $0 $27,012 $0 $0 $25,000 $25,000 $35,000 $25,000 $25,000 $35,000 $0 $0 $96,369 $80,598 $324,500 $96,369 $22,000 $80,598 $20,003 $324,500 $39,891 $150,000 $0 $150,000 Total $1,317,271 $1,120,531 $836,040 $1,426,144 FY 2016 BUDGET HIGHLIGHTS Line Item Detail : Solid Waste Fund Capital Outlay: 820 Alley Paving - $35,000 Pave approximately seven alleys. Paved alleys enable garbage trucks better access to containers, the alleys are easier to maintain in the winter months, improving operation efficiency. Capital Outlay: Replacement Funds (10120) 944 Machinery & Equipment - $324,500 27 Yard Sidearm Garbage Truck - Replacing a 2003 Sidearm that is currently in back up status and has reached the end of its life cycle. 29