Resolution 3275 - Contract Amendment - American Asphalti&�t�uLuTIOX No. 3275 A v0q()TW.TON TO ALM AND AMMD THE PUNS AM SPECIFICATIONS OF CONTRACT WITH American Asphalt, Inc. ON Street Reconstruction on Contractor Project Second Avenue West--2nd -be 4th Street West VIREIMO, the City did, on Sept. 14, 1979 enter into a contract with Date American Asphalt, Inc. of 208� Hwy. #2 East, Kalispell, MT Contractor Address for street reconstruction Description of Work on the Street Reconstruction on -Second Avenue West and Project WHEFE&S, upon the advice and recommendation of John Kain, Director of Public Works who is the City's consultant and Magineer or Architect engineer on said project, certain changes and alterations of design and specifica- tions have been found necessary and adviseable and in the best interests of the, City,, and said changes and alterations could not have been necessarily foreseeable when the original design and specifications were prepared on this phase.of the Street Reconstruction on Second Ave. W. , and said changes are contained in Project Fbd,ibit "All attached hereto and axe by this reference made a part hereof; and it appears in the best interests of the City to approve said changes and L-�t �,,,rations, I T TBERITORE, pursuant to -the provisions of Section 7 - 5 - 4308(l) YICA- be it )-��-reby resolved: 1. The alterations and modifications of the specifications and plano.of the contracIt, between the City of Kalispell and American Asphalt, Im. Contraotor dated Sept. 14, 1979 _,.as set out in Exhibit "All attached hereto, axe heTeby appmved; and 2. As soon as the price to be paid,for said alterations and modifications are agreed to in writing, signed by the eontxactor2 as hereby approved. by the Council, this approval thereof shall be in effect. PASSED BY THE CITY COUCIL AND APPROM BY M IG-YOR OP THE CITY OF K&LISPELL THIS 21 DAY OF _ January —2 :Lq-80 . ATTOST - Mayor City Clerk CHANGE ORDER NO. 1 PROJECT, Street Reconstruction on 2nd Avenue West Olvh\52 City of Kalispell COITTRACTOR American Asphalt, Inc is The following change(s) VM hereby made to the contract dated 9-14-80 :L. Deeper excavation and extend paving behond intersection Amount of Change $ 6�994-10 2. .Amo=' . of Change S The total amount (added) d9%Q*@M) hereby is 6,994-10 The amended contract price including this change order now is $ 45,765-90 The contract time is changed by (adding) (deletin.- 0 calendar days thereto.' The amWaled date for completion of all work now is Oct. 17, 1979 JUSTIFICATION Due to typical subsurface soils found within this project location, it was necessary to overexcavate in several areas to obtain -acceptable soil conditions. The overage in AV, MIX is attributed to the paving extending beyond the intersections. ACCEPTaNTCE The City of Kalispell, owner, and American Asphalt, Inc. contractor, in the above referenced contract, do hereby agree to the terms and conditions of the i-astant change order number I and same is effective this date in accordance with Resolution No. 3275 and said contract is nn nded accordingly. ACCEPTED American Asphalt, Inc. Conlrac"or's Name Con'Ei4a�tor I dSigdature Date ACCEPTED BY THE CITY OFK&LISPELL Hapyor "t Date ATTEST: ity Clerk PROPOSED CHANGE ORDER 140. DATE 1-21-80 PROJECT Street Reconstruction on 2nd Avenue West OWNER CitX of Kalispell CONTRACTOR American Asphalt, Inc. 3's The following change mm hereby proposed to the Contract dated —2=14-79 1. Deeper excavation and extend paving beyond intersection Amount of Change S 69994-10 The contract price including this change order will be: Ic'.5,765-90 The contract time is changed by (add-ing) (deleting) 0 calendar days thereto. 7he date for completion of all work will be Oct. 17, 1979 JUSTIFICATION Due to typical subsurface soils found within this project location, it was necessary to over excavate in several areas to obtain acceptable soil conditions. The overage in AC MIX is attributed to the paving extending beyond intersections so as to'create a sinooth transition between old and new finisbed s wrf aces. Contractor APPROVED: John Kain �� -4 ---- MEMO TO; JOHN KAIN, DIRECTOR OF PUBLIC WORKS FROM: FRED ZAVODNY, CITY SURVEYOR DATE: DECEMBER 3, 1979 RE; EXCAVATION, -BASE COARSE, CRUSHED GRAVEL AND' A.C. MIX QUANTITIES, SECOND AVE. W., SECOND ST. 11. TO FOURTH ST. W. DUE TO THE TYPICAL SUBSURFACE SOILS FOUND WITHIN THIS PROJECT LOCATION IT WAS NECESSARY - TO OVER EXCAVATE - IN SEVERAL ARE, AS TO OBTAIN ACCEPTABLE SOIL CONDITIONS. THIS SITUATION ACCOUNTS FO'R TIIE'OVBRAGT,;S IN EXCAVATION A14D BASE COARSE QUANTITIES. THE SMALL OVERAGE IN CRUSHED LEVELING GRAVEL 15 OF NO SIGNIFICANCE - THE OVERAGE.IN A.C- MIX CAN BE ATTRI13UTED-TO THE PAVING EXTENDING BrYOND 'INTERSECTIONS SO AS TO CREATE A'SMOOTD TRANSITION BETWEEN OLD AND NEW FINISHED SURFACES - ESTIMATE QUANTITY 2,709.00 CU. YD. �J�RSE 2,032.00 CU. YD. i GRAVEL 339.00 CU. YD. �,x 70MO TONS �)N 2,709.00 x 2.50 = �6E . - 2,032.00 x 4.40 = 339.00 x 16,50 = 700.00 x 25.00 = -7 13, df 0 6 o —7 PRICE FINISHED QUANTITY PRICE 3,593.63 CU. YD. 2,860.93 CU. YD. 341.97 CU. YD. 745.50 TONS 6,772.50 3,593.63 x 2.50 = 8,984.08 8,940.80 2,860.93 x 4.40 = 12,588.09 5,593.50 341.97 x I.G.50 = 5,642.51- 17,500.00 745.50 x 25X0 = L8_,�37-50 38,806.80 45,852.18 3 ff,77/. go 7 �,he undersigned, City Clerk of the City of Kalispell certify that the forego g i a t in 3 rue y- of the Resolution passed the City Council of the City of Kalispell, Montana at a ,ialar meeting held = � .1, / I �,�o City `Ci�# of the City of Kalispell