Resolution 3208 - Contract Amendment - Liberty Drilling - Water Supply WellRESOLUTION NO,32M
A RESOLUTION TO ALTER AND AMD THE PLANS AND SPECIFICATIONS Or CONTRACT WITH
Ltberty Drilling Company ON Water Supply Well Improvements
Contractor Project
VMREAS, the City did, on Dec. 9, 1977 enter into a contract -iiith
Date
Liberty Drilling of 3850 Hig�way #92 So. Kalispell
Contractor Address
for drilling water well
Description of Work
on the Kalispell Water Well Supply an d
Project
WHEREAS, upon the advice and recommendation of Thomas, Dean & Hoskins, Inc.
Engineer who is the City's consultant and
Engineer or Architect
engineer on said project, certain changes and alterations of design and specifica-
tions have been found necessaxy and adviseable and in the best interests of the
City; and said changes and alterations could not have been necessarily foreseeable
'when the original design and specifications were prepared on this phase of the
Kalispell Water Well Supply and said changes are contained in
Project
Exhibit "A" attached hereto and axe by this reference made a part hereof; and
WBEREAS, it appears in the beat interests of the City to approve said changes
and alterations,
r
NOW THEMORE, pursuant to the provisions of Section 11-1204, B.C.M., :L947,
be it hereby resolved;
1. The alterations and modifications of the specifications and plans of the
contxact between the City of Kalispell and Liberty Drilling
Contractor
dated Dec. 9t 1977 as set out in Exhibit "A" attached hexeto, are
hereby approved; and
2. As soon as the price to be paid for said alterations and modifications
are agreed to in writing, signed by the contractor, as hereby approved by the
Council, this approval thereof shall be in effect.
PASSED BY THE CITY COUNCIL AND APPROVED BY THE MAYOR OF THE CITY OF KALISPELL THIS
th DAY OF
ATTEST:
City Clerk
4,,,nW � -
Mayor
M
CHANGE ORI)ER NO. 2
PROJECT Water SUPPly Well
OWN[I.TZ C LLX-2L-js��
C01,1TRACTOR Liberty Drillinq Company
Tlio follot-iing changy�(s) are licreby made to the contract dated
1. Revise contract unit bid price for bid item no. 9 "test nulMing
wcl-P' from $4-18.00 per hour to $259.00 per hour for an estimated 24
period. --- Amount of Change $ 5,280.00
2. ,The pump used for thetest pumping will betbe final iDroduction
pump. Payment will be based on actual hours of continuous pumping and
may be as low as 12 hours or less. Amount of Change 3
Tbo total amo-unt (-N�,IdCA) deleted) hereby is $ 5,280.00
Mhe Amended contract price includIng this change order now is $ 94,337.50
The contract time is changed by (ad�) (dean �Ig) 0 calendar days,Ake=xkK
T1,.e, amended date -for completion of all work now is __�4g 31 , 1978
JUSTIFICATION
The revision will allow for a substantial reduction in the cost of the
prolec s cc ETTE—in-77-aTTation, operatIon, and removal of a test pump
will not be necessary. The well will be test pumped using the final
wel=p'ump as �ae�s pump.
ACCIL;PTANCE
The City of Kalispell, owner, and Liberty Drilling Cq22LnX____pontrac1or,
in the above refer�nced contract, do hereby agree to the te=s and conditions of
tho instant change order number 2 and same is effective this date in accordance
with Resolution No. and said cont=ct is amended accordingly.
ACCEPTED Liberty Drilling Company
Contractor's Name
ACCEPTED BY THE CITY OF KALISPELL
ZfTEST:
Qx,M-V%MAb,%r%
ntractor's Signature Date
Myor Date
City Clerk
--'orm C-1
EXHIBIT "A"
PROPOSED CHANGE ORDER NO. DATE December 4, 19
PROJECT— Water SunDIv Well
OWNER City of Y lis]2ell
CONTRACTOR Liberty Drilling Company
The following change(s) are hereby proposed to the Contract dated
1-- See other sheet.
0
Amount of Change$
Amount of change$
The total amount to be OnflUji) (deleted) hereby is: S.2801. 0
The contract price including this change order will be $94,337.50
The contract time is changed by (gogAgg) (jjg*g:kAn.S)
calendar days thereto.
The amended date for completion of all work will be unch�jnqed,
JUSTIFICATION The revision will allow for a.substantial rg,,dgg,�in
the project since the installation, operation, and removal of a---taat
pump wil.l..not be necessary. The well w.ilj. be test pumped usina the
final well pump as a test PuMp!-,-_-
Co
or
Approved: E
Engineer
for: THOMAS, DEAN & HOSKINS, INC.
he undersigned, City Clerk of the City of Kalispell certify that the foregoing is a true
. of the Resolution duly passed by the City Cov=il of the City of Kalispell, Montana at
gular meeting held
CJ�y Clerk of the City of Kalispell