Resolution 3106 - Amend Contract - Sandon - Concrete Alley Pavement Improvement6 44 RESOLUTION 3106 A RESOLUTION TO ALTER AND AMEND THE PL=S AND SPECIFICATIONS OF CONTRACT WITH BANDON CONSTRUCTION COMPANY ON S. I. D.'#324 CONCRETE ALLEY PAVMENT T"RovEmENn WHEREAS, the City did, on March 18, 1977 enter into a contract with Bandon Construction Company, of Kalispell, Montana for paving and improving First Alley East from Fifth Street to Center Street on the S.I.D. #324 Concrete Alley Pavqmen Improvement Project; and VHERFASv upon the advice and recommendation of Thomas, Dean & Hoskins, Inc. who is the City's consultant and engineer on said project, certain changes and alterations of design and specifications have been found necessary and adviseable and in the beat interests of the City; and said changes and alterations could not have been necessarily foreseeable when the original design and specifications were prepared on this phase of the Concrete Alley Pavement Improvement Project, and said changes are contained in Exhibit "All attached hereto and are by this reference made a part hereof; and WEEREAS, it appears in the best interests of the City to approve said changes and alterations, NOW THEREFORE, puxsuant to -the provisions of Section 11-1204, R6C,M,, 1947� be it hereby resolved: 1. The alterations and modifications of the specifications and plans of the contract between the City of Kalispell and Bandon Construction Company, dated March 18, 1977, as set out in Exhibit "All attached hereto, axe hereby approved; and 2. As soon as the price to be paid for said alterations and modifications are agreed to in writing, signed by the contractor, as hereby approved by the Council, this approval thereof shall be in effect. PASSED BY TIM CI OUNCIL AM 7P11FT THE MAYOR OF TEE CITY OF KALISPELL THIS APRIL 11, 19 ". ATTEST: ed Cit7 C1,r 8,11,c ert s i ore Is a r e- 8P sf spe_ To 0 t a 'gual y- 'no 0 t� floik-na a lar k f 11 C meeting held the 11th day of vrgiifo, 1977 Yr i tv-"Ql fKrk -0-f 4-- Form 0-1 2/77 PROPOSED CHANCE ORCER NO. I DATE April 12, 1977 PROJECT S.I.D. #324, Concrete alley pavement improvements. 01-MM City of Kalispell CONTRACTOR Sandon Construction Co., Tme. is The following change hereby proposed to the Contract dated NaTch :L8, 1977 1. Fbccavate and replace unsuitable subbase material with gra4wlar pit xun gravel at the unit price of 51-95 per cubic yard, the total quanitity not to exceed 500 cu. yde, withoutfurther consideration by the Amount of Change_L--27.5--OO owner. 2. If nacess2a, -the owner has the option of extending the total IMMLa,�2 at the stated unit 2rice Amount of Change_A The total amount to be (added) (fttzkzd) hereby is 975-00 The con -tract price including this change order will be: 73,090-76 not The contract time is/changed �X� jq (2 3 The amended date for completion of all work- will be same JUSTIFICATION 'Unsuitable material has been encountered during subgrade excavation. Replacement is necessa=y to provide a stable roadway base. APPROVED: I Engineer