Loading...
Resolution 3108 - Contract Amendment - Pack & Co - Storm Drain Improvements"S RESOLUTION NO. 3108 A RESOLUTION TO ALTER AND AMEND THE PLANS AND SPECIFIOATIONS OF CONTRACT WITH PACK = COMPANY ON CONSTRUCTION OP STORM DRAIN IMPROVEMENTS, HUD GRANT NO. 11-76-m�-3o-0008. WHEREAS, the City didv on February 9, 1977, enter into a contract with Pack and Company of Kalispell, Montana for otorm drain improvements on 7th Avenue West on the Construction of Storm Drain Improvements Project (HUD Grant No. 1�-76-DN-30-0008); and WTEREAS, upon the advice and recommendation of Stahly Engineering & Associates, who is the City's consultant and engineer on said project, certain changes a -ad alterations of design and.specifications have been found necessary and adviseable and in the best interests of the City; and said changes and alterations could not have been necessarily foreseeable when the original design and specifications were prepared on this phase of the Cons-ttuction of Storm Drain Improvements Project, and said changes are contained in Exhibit "All attached hereto and are by this reference made a paxt hereof; and WHEREAS, it appears in the best interests of the City to approve said changes and alterations, NOW THEREFORE, pursuant to the provisions of Section 11-1204v R.C.M., 1947, be it hereby resolved-. 1. The alterations and modifications of the specifications and plans of the contract between the City of Kalispell and Pack and Company, dated February 9, 1977, as set out in Exhibit "All attached hereto, are hereby approved; and 2. As soon as the price to be paid for said alterations and modif— ications are agreed to in writing, signed by the contractor, as hereby approved by the Council, this approva thereof shall be in effect. PASSED B�7 CI OVCOUNCIL ANDD BT THE OF THE CITY OF KALISPELL d 'I THIS A 9 77 -F`l 6 PW ') (9 Form C-1 2/77 MIBIT "All PROPOSED CHANGE ORDER NO. I DATE April 27, 1977 Construction of Storm Drain Improvements PROJECT H.U.D. Grant No. B-76-DN-30--0008 01MER City of Kalispell, Montana CONTRACTOR Pack and Company is The following change a= hereby proposed to the Contract dated 2/9/77 1. Install Clean -Out Manhole - Force Account (No Bid ftice) 2. of Change_L--40�.2 .Amount of Change_j_ The total amount to be (added) hereby is _$L 403,25.- The contract price including this change order will be: 3 8-1,194, 01 not The contract time is/changed The amended date for completion of a-11 work will be same JUSTIFICATION A 301, access manhole was installed where the existing storm drain ties into the new 4211 R.C.P. storm drain at the re2ueot of the City of YalisDell's storm sewer maintenance personnel to facilitate clean -out of the old,system should there be delays in installation of the remainder of the new southwest storm sewer system. 7-7 ontracto-z `11� J� APPROVED: Engineer Form C-1 2/77 EXHIBIT "All PROPOSED CHANGE ORDER No. 2 WE April 28, 1977 Construction of Storm Drain Improvements PROJECT H.U.D. Grant No. B-76-DN-30-0008 OWNER City of Kalispell, Nontana CONTRACTOR Pack and C222EX The following changes are hereby proposed to the Contract dated— 2/9/77 1. Carry Stub -out at 10th Street to behind curb turns ,Amount of Change-! 499-44 2. Delete bid items not to be used due to street reconstruction by city crews. --- Amount of Change_L- 4,041-00 3. Install Storm Drain to 6th Street Amount of Change $ 6,740-36 The total amount to be (added) Cja&t&Q hereby is $=,Q1,8O The contract price including this change order 'will be: 214,335.81 The contract time is changed by (adding) (aaob±ng) 30 alendar days thereto. The amended date for completion of all work will be September 7, 1977 i(isTIFIcATION 1. The original contract called for the 1811 stub -out from the 421, storm drain to be 61 in length. This should be extended to beyond the curb tunns s-o—that the pavement to be installed this year will not be disturbed when Phase 3 of the SW area storm sewer -is constructed U a I-a7er date. 2. This Bid item was Me-li-xTe-d to provide for temporary asphalt curbs for drainage channelization around the new curb inlets and is no lonret needed as tRe City is re�onsTructln-g TH5 sTreets THIR cons��Mon se son. 3. The original contract called for the installation of the 7th Ave. W. storm drain system Up to 71H St- Me- above cost of $33,141.80 has been added to allow conR tion of the storm drain from 7th Street to 6th Street under this contract. For detailed Mid Items see attaohed sheet. Contr�ictoT APPROVED: Engineer