Loading...
06-25-15 Site Development Review Committee MinutesSITE DEVELOPMENT REVIEW COMMITTEE SUMMARY Thursday, June 25, 2015 Lower Level Conference Room 201 First Avenue East ATTENDING: Mark Crowley, Construction Manager Dave Dedman, Fire Chief Keith Haskins, Senior Civil Engineer Jarod Nygren, Senior Planner Rick Parker, Building Plans Examiner Wade Rademacher, Police Captain P.J. Sorensen, Chairman Kathy Nelson, Recording Secretary GUESTS: James Freyholtz, Montana Department of Transportation HEAR THE PUBLIC: None. PERFORMANCE BOND REMINDERS: None. OLD BUSINESS: Beehive Homes — 242 Stillwater; new assisted living/memory care unit. Public Works received their resubmittal yesterday and will be reviewing these. This will be on the agenda for next week. Calaway Apartments — 1079 N Meridian; new apartment complex. Jentz has sent out a letter requesting them to respond to the Public Works infrastructure design issues or Building Permit issues by July 1st or their CUP will be void and they'll have to start over. There has been no response received yet to this letter. Haskins noted that he spoke with Rob Smith 2-3 weeks ago, asking him if they were going to resubmit, and Smith stated that he was told to hold off. This will be on the agenda for next week. 91/93/97 Financial Drive — new four-plex CUP. Haskins stated that Public Works has not received any submittal from them on the civil. Sorensen noted that they are moving forward. Parker stated that he spoke with an architect from Helena who has an interest in this project but was not sure if the architect is officially employed by them. This will be on the agenda for next week. Captain's Marine — Hwy 93 S; new retail building. Parker stated he is finishing their plan review comments this morning. We will be getting as -built drawings. The bike path is not on the civil drawings, and he noted in his comments that they will need to put it on their drawings. Freyholtz stated they will need to get an encroachment permit from MDT. Haskins noted that Public Works will need to make sure they meet our minimum requirements on the path, referencing the AASHTO Bicycle and Pedestrian Design Guides. This will be on the agenda for next week. Canvas Church — 255 Summit Ridge; expansion of existing church. Resubmittal plans have been received and Wargo is just finishing up with her review. They still need to complete their Geotechnical Soils Report. This will be on the agenda for next week. NEW BUSINESS: Weber Apartments (Bloomstone) — Treeline Road; eight 12-plex apartments. They plan to loop the water line to provide minimum fire flows. ARC tabled this project at their Tuesday meeting, requesting more variety of colors and adding in some evergreen trees. Sorensen suggested to them that they add a play area for children. Haskins asked about the location of their mailboxes. They do have garbage container locations designated. Their trash facilities will need to have an ADA access route to them. Nygren asked about the bike path. PLANNING OFFICE ITEMS: KRMC Parking Lot Expansion and Zone Change —This will be going to the City Council on July 6th with a Resolution of Intent. Nygren stated that KRMC will be removing their temporary parking lot along with all the gravel, and putting down top soil in that location in response to working positively with the neighborhood concerns. Stillwood Farms — Four Town Homes on North Riding — Fraser will be bringing in the Final Plat for this project. Spring Prairie Phase IV — Blumenstein informed Nygren that they have received the letter from the Army Corps of Engineers. In their discussion, she indicated that she is in agreement with it. OTHER REPORTS: Future Projects - Sorensen noted that Popeye's will be submitting their plans by the end of the month. KRMC will be submitting their ER expansion in July or August. Spring Prairie Phase IV will also be coming in soon. 406 Grille — Crowley informed the committee that Kalispell's first Parklet Permit has been issued to 406 Grille. FCEDA — Haskins has been working through the design review for the FCEDA Park and will be sending out his comments today. Their Phase One is only for the water. They will be extending a 12" main all around their site and then all the way down to Fourth and Oregon. It's a big project. The meeting was adjourned at 10:17 a.m. cc: Police City Manager FCAOA MDOT Bldg Fire City Clerk City Airport Planning Parks Comm. Dev. Public Works 2