09/14/10 Memo/City Shops Area ProjectCITY OF KALISPELL MEMO September 14, 2010 TO: City Manager FM: Facilities Planning SUBJ: City Shops area Project As you are aware, during a recent Safety & Facilities Audit in the City Shops area this year, the team identified a potential problem area that requires your attention and possible action. In the midst of all the buildings in the City Shops Complex there stands an old wooden, two story structure. It was identified as Building 1428 and also as Building #8. Upon close inspection of the structure the team found it to be extremely unstable. The building is currently being used by several departments of the City to store an array of different material. The Police Department stores confiscated bikes in the building as well as some evidence storage. The Vehicle Maintenance Department stores parts from destroyed police cars, in case they might be usable in the future. Unfortunately, a lot of the parts belong to police cars the City no longer uses. Some of the safety violations were corrected on the spot, such as, the storage of tires in that location. The team did not go upstairs because the stairwell appeared to be unsafe to ascend. The structure is sitting on concrete pillars and it leans badly. The safety team asked the building department to look at the structure for stability and they declared it unsafe. The decision as to what to do about the situation rests with your office. I have attached an aerial photo of the Shop Complex to explain my recommendations: 1. Immediately demolish the building know as Building 1428 and clear the spot for development. 2. Construct a metal building on the location that will match the existing Sign & Signal building. The new structure would be a steel structure that would attach to the current Sign & Signal building. It would be approximately 40' deep and 60' long with three overhead bay doors. For planning purposes I have estimated the costs (subject to engineering specifications) as follows: Excavation of the site $10,000 Concrete footings and flooring $37,000 Steel building to match existing building $40,000 Construction of the steel building $21,000 Utilities, Heating, Electrical, etc. $16,000 Estimate $124,000 If you contract the structure out, add P & O $ 24,000 Total estimated Bid $148,000 As far as the usage of the new structure, there is plenty of need in the Shop Complex. Sign & Signal currently uses two bays of their shop for manufacturing of signs and storage. At least half of the new structure could be dedicated to Sign & Signal and free up the two bays for vehicle and equipment storage. There is plenty of need for heated inside storage in this climate. If you have any questions, please don't hesitate to ask.