Engineers Opinion of Probable Construction CostEngineers Opinion of Probable Construction Cost Kalispell City Airport Option 1 - Improvements April 7, 2010 ITEM # DESCRIPTION [UNITS QTY UNIT PRICE TOTAL Overlay 2" on Runway 13-31 Mobilization LS 1 $15,200.00 $15,200,00 Mill Existing Asphalt Pavement - 2" Depth CY 1,333 $40.00 $53,320,00 Crack Sealing LF 10,000 $1.50 $15,000.00 Bituminous Tack Coat GAL 1,440 $2.50 $3,600.00 Bituminous Surface Course @ 2" TON 2,700 $40.00 $108,000.00 Bituminous Material (PG 58-28) @ 6.5% TON 176 $700.00 $123,200.00 18% Engineering LS 1 $54,600.00 $54,600.00 10% Contingency LS 1 $30,300.00 $30,300.00 Total 2" Overlay on Runwa 13-31 $403,200.00 Remark Runway 13-31 Mobilization LS 1 $600.00 $600.00 Runway, 1st Application @'/2-Rate w/o Glass Beads SF 3,600 $1.75 $6,300.00 Runway, Final Application P. Full -Rate w/ Type I Glass Beads SF 3,600 $1.75 $6,300.00 18% Engineering LS 1 $2,300.00 $2,300.00 10% Contingency LS 1 $1,300.00 $1,300.00 Total Remarking on Runway 13-311 1 $16,800.00 Repair Drainage Culverts on Runway 13-31 Mobilization LS 1 $1,500.00 $1,500.05 Replace Drainage Culvert Beneath Runway LF 400 $75.00 $30,000.00 18% Engineering LS 1 $5,400.00 $5,400.00 10% Contingency LS 1 $3,000.00 $3,000.00 Total Culvert Replacement on Runway 13-31 $39,900.00 Install New Lighting System on Runway 13-31 Mobilization LS 1 $11,300.00 $11,300.00 New Runway Lighting System LS 1 $225,000.00 $225,000.00 18% Engineering LS 1 $40,500.00 $40,500.00 10% Contingency LS 1 $22,500.00 $22,500.00 Total Culvert Replacement on Runway 13-31 $299,300.00 TOTAL RUNWAY IMPROVEMENTS $759,200.00 ITEM # DESCRIPTION UNITS QTY UNIT PRICE TOTAL Widen Existing Taxiways to 25' and Overlay Existing Taxiways 2" Mobilization (Cannot Exceed 5% of Bid Schedule) LS 1 $14,200.00 $14,200.00 Mill Existing Asphalt Pavement - 2" Depth CY 860 $40.00 $34,400.00 Earthwork CY 1,100 $15.00 $16,500.00 Crushed Aggregate Base Course (8" Depth) CY 730 $36.00 $26,280.00 Crack Sealing LF 7,500 $1.50 $11,250,00 Bituminous Surface Course @ 2" TON 2,200 $40.00 $88,000.00 Bituminous Material (PG 58-28) @ 6.5% TON 143 $700.00 $100,100.00 Bituminous Prime Coat GAL 1,144 $2.50 $2,860.00 Bituminous Tack Coat GAL 950 $2.50 $2,375.00 Seeding and Fertilizing LS 1.0 $1,500.00 $1,500.00 18% Engineering LS 1 $51,000.00 $51,000.00 10% Contingency LS 1 $28,300.00 $28,300.00 Total Widening and Overlay of Taxiways $376,800.00 CADocuments and SettingsAeistikoTocal Settings\Temporary Internet Piles\Content.0 8W\OFAOJW\Option 1 Estimate 04-7-10 (2) Engineers Opinion of Probable Construction Cost Kalispell City Airport Option 1 - Improvements April 7, 2010 ITEM # DESCRIPTION UNITS QTY UNIT PRICE TOTAL Remark Taxiways Mobilization LS 1 $400.00 $400.00 Taxiways, Ist Application @ %2-Rate w/o Glass Beads SF 2,280 $1.75 $3,990.00 Taxiways, Final Application @ Full -Rate w/ Type I Glass Beads SF 2,280 $1.75 $3,990.00 18% Engineering LS 1 $1,400.00 $1,400.00 10% Contingency LS 1 $800.00 $800.00 Total Remarking on Runway 13-31 $10,600.00 TOTAL TAXIWAY IMPROVEMENTS $387,400.00 ITEM # DESCRIPTION UNITS QTY UNIT PRICE TOTAL Crack Seal and Fog Seal Taxilanes and Apron Mobilization (Cannot Exceed 5% of Bid Schedule) LS 1 $1,800.00 $1,800.00 Crack Sealing LF 10,000 $1.50 $15,000.00 Bituminous Fog Seal TON 25 $800.00 $20,000.00 18% Engineering LS 1 $6,300.00 $6,300.00 10% Contingency LS 1 $3,500.00 $3,500.00 Total Crack Sealing and Fog Sealing for Taxilanes and ApronApronj $46,600.00 Remark Taxilanes and Apron Mobilization (Cannot Exceed 5% of Bid Schedule) LS 1 $500.00 $500.00 Taxiway & Apron Painting, 1st Application @'/,Rate w/o Glass Beads SF 3,000 $1.50 $4,500.00 Taxiway & Apron Painting, Final Application @ Full -Rate w/ Type I Glass Beads SF 3,000 $1.50 $4,500.00 Coal Tar Pitch Emulsion Seal Coat, w/o Aggregate GAL 200 $35.00 $7,000.00 18% Engineering LS 1 $2,100.00 $2,100.00 10% Contingency LS 1 $1,200.00 $1,200.00 Total Crack Sealing and Fog Sealing for Taxilanes and Apron $19,300.00 TOTAL TAXILANE & APRON MAINTENANCE $65,900.00 ITEM # DESCRIPTION UNITS QTY UNIT PRICE TOTAL Fencing Improvements Mobilization LS 1 $2,300.00 $2,300.00 Install 8' High Security Fencing LF 2,100 `i $20.00 $42,000.00 Install Man Gate EA 2 $700.00 $1,400.00 Install Vehicle Gate EA 1 $1,800.00 $1,800.00 18% Engineering LS 1 $8,100.00 $8,100.00 10% Contingency LS 1 $4,500.001 $4,500.00 Total Fencing Improvements $60,100.00 TOTAL OF ALL IMPROVEMENTS $1,272,600.00 CADocuments and SeuingsTeistiko\Local Settings\Temporary Internet FileslContent.O"Ra@*\(iFgt2JVNOpGon 1 Estimate 04-7-10 (2)