Open Bids for Golf Course Project Fine Grading
Open Bids for Golf Course Project Irrigation System
We, the undersigned, being all of e
notice of the date and purpose o the
held Wednes y, July 9, 1975, noon
to the t n cti0 of the ab and a;
before he ity Council.
,
hn C. Schwar
t
Robert Allen
.a
'Robert son
bers of the City Council, do hereby waive
cial Meeting of the City Council to be
the Golf 'Course Club House, and consent
other business that may properly come
Norma E. Happ, Acting May
O
O`
Dale
Forrest W. Daley
Nort'ert F. Donahue, City Attorney
OPEN BIDS - GOLF COURSE FINE GRADING
865
Item
1.
3.
4.
5.
I
Quantity
BID FORM
Description Unit Price Total
Lump Sum Construction of Tees,
Bunkers, Fairways,Greens L.S.
and all other related
work as specified under
Golf Course Construction.
1 each Tee, as specified L.S.
1 each Bunker,.as specified. L.S.
1 each Fairway,as specified. L.S.
1 each Green, as specified. L.S.
100.,845.00 $
700_on $
1,300.00 $
2,900.00 $
The foregoing unit prices, (other than L.S. for all Golf Course
Construction work), are to be used solely to determine the value
of work completed for progress payments. Any contract entered
into, however will be lump sum for all Golf Course Construction
work.
The following breakdown will be required as part of bids submitted,
as well as being part -of any contract which may be entered into:
Required working days to complete all
Operation operations exclusive of inclement weather.
1. All work specified under
Golf Course Construction.
General Conditions
52
This proposal is valid only if the signature of the bidder is
affixed hereon and the date completed in the space provided.
days.
The: .lintod item:; roprc::;c:r:t. pay il_em:.. All uCli(!r wo)X .indic:,lud
in tba p.;ins ;uu] :;prci.f.ic;aL.i.ons .:hu.11 Ix: incl.udod .in thu ),icl
item;; :stated herein. NO other item: will. he paid.
L•xtcnsi.on of these unit prices is on the basis of esti.u:a;t.d
quantities (said estimated quantities are not warrantecl or
guaranteed) and the totaling of these extensions is for the
purpose of comparing bids only.
All applicable sales tares, State and/or Federal., and any Gt.hcr
special taxes, patent rights or royalties arc included in t!;e
prices quoted in this Proposal.
t, Any furnished quantities are approximate only, being given as a
basis for the comparison of bids, and the City and GO!
Course Architect do not, expressly or by implicatie:n, a,rer_
that the actual amount of work will correspond therewith, but
reserves the right to increase or decrease the amount of any
class or portion of the work or to omit portions of the wort:
as may be deemed necessary or advisable by the City and
Golf Course Architect. .
366
Licensed in accordance with an Act providing for the registration
Item
of Contractor's License Number 3226 , Class A
(If an individual, so state. If. a firm is a'copartnership, si:ate
the firm name and give the names of all individuals or copartners
composing the firm. If a corporation, state legal names of
corporation, and also names of President, Secretary, Treasurer,
and Manager thereof.)
July 9, 1975
Quantity
ARTHUR H. SHOOTER,,INC.
President
ARTHUR H. SHOOTER, PRESIDENT
LORENE M. STAGE, SECRETARY/TREASURER
3605 Haven Avenue
Menlo Park, California 94025
Business Address
BID FORM
Description
Unit Price
1. Lump Sum Construction of Tees,
Bunkers, Fairways,Greens L.S.
and all other related
work as specified under
Golf Course Construction.
2. 1 each Tee, as specified L.S.
3. ,. 1 each
4. l each
5. 1 each
Bunker, as specified.
Fairway,as specified.
Green, as specified.
Total I
/, CSC-() $
L. S. $
L.S. -4, o,:, $
L.S. -q, CC0 $
The foregoing unit prices, (other than L.S. for all Golf Course
Construction work), are to be used solely to determine the value
of work completed for progress payments. Any contract entered
into, however will be lump sum for all Golf Course Construction
work.
The following breakdovm will be required as part of bids submitted,
as well as being part of any contract which may be entered into:
Required working days to complete all
Operation operations exclusive of inclement weather.
1. All work specified under
Golf Course Construction. =;C days.
NM
General Conditions
This proposal is valid only if the signature of the bidder is
affixed hereon and the date completed in the space provided.
Proposal (cone.)
The listed it-oms represent pay items. All otllci- work ind:.catl_d
in the plans and specifications shall be included in the hid
items stated herein. No other items will be paid.
Extension of these unit prices is on the basis of estimated
quantities (said estimated quantities are not warrant:ca or
guaranteed) and the totaling of these extensions is for the
purpose of comparing bids only.
All applicable sales taxes, State and/or Federal, and any other
special taxes, patent rights or royalties are included in the
prices quoted in this Proposal.
Any furnished quantities are approximate only, being, given as a
basis for the comparison of bids, and the City and Col;
Course Architect do not, expressly or by implication, _-rer
that the actual amount of work will correspond therewith, but
reserves the right to increase or decrease the amount of any
class or portion of the work or to omit portions of the wor
as may be deemed necessary or advisable by the City and
Golf Course Architect.
' Licensed in accordance with an Act providing for the regisir:Ion
of Contractor's License Number
(If an individual, so state. If a firm is W copartnorship, scatc
the firm .name and give the names of all individuals or copartners
composing the firm. If a corporation, state legal names of
corporation, and also names of President, Secretary, Treasurer,
and Manager thereof.)
R06CRT MUIR GRAVES
60W CO0I16C •RCMIICG7
Ronnln B, =ack s eidert ;: Gen ': r
ar -aret A Pack Sec—`Prea.s
Pact A Company Inc
P05 222
Kalispell$ Yontana 59901
7 - X�
BUFFALO HILL GOLF COURSE P-3
BID FORM
368
Item Quantity Description Unit- Price
Total
1.
Lump Sum
Construction of Tees,
Bunkers, Fairways,Greens
L.S.
and all other related
work as specified under
Golf Course Construction.
2,
1
each
Tee, as specified
L.S.
3.
1
each
Bunker, as specified.
L.S.
4.
1
each
Fairway,as specified.
L.S.
5.
1
each
Green, as specified.
L.S.
r,
45,130.00
$
a
588.00
$ "
94.00
$
204.00
$
2,602.00
$
These prices include Montana Contractors Tax.
The foregoing unit prices, (other than L.S. for all Golf Course
Construction work), are to be used solely to determine the value
of work completed for progress payments. Any contract entered
into, however will be lump sum for all Golf Course Construction
work.
The following breakdown will be required as part of bids submitted,
as well as being part of any contract which may be entered into:
Required working days to complete all
Operation operations exclusive of inclement weather.
1. All work specified under
Golf Course Construction. 30
General,Conditions
This proposal is valid only if the signature of the bidder is
affixed hereon and the date completed in the space provided.
We will not accept Finish Grading Contract without Irrigation Contract.
ROBERT MUIR GRAVES
GOV COURSE ARCNI,CCT
LOFTUS LANDSCAPING, INC.
Patrick D. Loftus
P-2
S.
BUFFALO HILL GOLF COURSE
L0177U5 LAIVDSCAPLVG, INC.
P. e. BOX 602E
..,VNEWICKK AM> MNCITgN ?4
in the plans and spccificati_ons shall he included in C.hc l,,ici
ein. Igo other it -era,; will be
items stated herpaid.
1
Extension of these unit prices is on the,basis of est.i.mritc
quantities (said estimated quzrnt.ities are not warranted or.
guaranteed) and the totaling of these extensions is for the
+ urpose of comparing bids only.
P
and/or
Federal All applicable sles taxes, sStateor aarcinclud<�dl°r
in the
special taxes, pa
prices quoted in this Proposal.
Any furnished quantities axe approximate only, being q.iven as a
and Golf
basis for the comparison of bids, and the —City__ f
Course Architect do not, expressly or by implication• ,,.ores
that the actual amount- of work wi].1 correspoi d therewi::.:,, but
the
reserves the right to increase or dccreas°ortionsl„ot.l o %',ork
class or portion of the work or to omit p
a:. I.),! the.'''::.`.r'
may be deemed neces_r}
r,}
;a ... '..�..
Licensed in accordance with an Act providing for the rc: i.str.at�i/aryy
c
of Contractor's License Number 1721 , Class A
2.
3.
4.
5.
(If an individual, so state.
If a firm is a'copart.nors'lip, state
the firm name and give the names of all indivi.du.,lc or cohartncrs
composing the firm. If a corporation, state legal nan:c!s of
corporation, and also names of President, Secretary, Treasurer,
and Manager thereof.)
Quantity
BID FORJd
Description
LOFTUS LANDSCAPING, INC.
President: Pat 11. Loftus
Vice President: B. J. Loftus
Vice President: Patrick D. Loftus
Secretary: Elaine K. Loftus
Treasurer: Elaine K. Loftus .
P.O. Box 6028, Kennewick, Washington 99336
Business Address;
y
Unit Price
Lump Sum Construction of Tees,
Bunkers, Fairways,Greens L.S.
and all other related
work as specified under
Golf Course Construction.
1 each Tee, as specified L.S.
Total
1 each Bunker, as specified. L.S. q " =---_ $
1 each Fairway,as specified. L.S. S ^:- $
1 each Green, as specified. L.S. 3_„i $
The foregoing unit prices, (other than L.S. for all Golf Course
Construction work), are to be used solely to determine the value
of work completed for progress payments. Any contract entered
into, however will be lump sum for all Golf Course Construction
work.
The following breakdown will be required as part of bids submitted,
as well as being part of any contract which may be entered into:
Required working days to complete all
Operation operations exclusive of inclement weather
1. All work specified under
Golf Course Construction
c,7 0{J.?e i'.;,: days.
j
General Conditions
This proposal
is valid
only
if the
signature
of the
bidder is
affixed hereon
and the
(Lite
. <, � �:'a.�.;co�
in the
.370
Proposal. (cone.)
The listed items represent pay items. All other wort: .i.ncli catecl'
in the plans and specifications shall be included ill t:ho bid
items stated herein. No other items will be paid.
Iixtension of these unit prices is on the ,basis of: e :t:inu tec7
quantities (said estimated quantities are not warranted ox
guaranteed) and the totaling of these extensions is for the
purpose of comparing bids only.
All applicable sales taxes, State and/or Federal, and any othe..r
special taxes,patent rights or royalties are included in the
prices quoted in this Proposal.
Any furnished quantities are approximate only, being given as a
basis for the comparison of bids, and the City arld GOlf
Course Architect do not, expressly or by impl.icai_ion, roe
that the actual amount of work will correspond therewith, but
reserves the right to increase or decrease the amount of any
class or portion of the worl: or to omit portions of the work
as may be deemed necessary or advisable by the City _ and
Golf Course Architect.
Licensed in accordance with an Act providing for the registration
of Contractor's License Number class
Class
(If an individual, so state. Ii, a firm is a'copartnership, scate
the firm name and give the names of all individuals or copartners
composing the firm. If a corporation, state legal names of
corporation, and also names of President, Secretary, Treasurer,
and Manager thereof.)
ROGCRT MUIR GRAVCS
Business Address;.
BID FORM
Item Quantity Description" Unit Price
1. Lump Sum Construction of Tees,
Bunkers, Fairways,Greens L.S.
and all other related
work as specified under
Golf Course Construction.
Total
1
2.
1 each
Tee, / 1$ 1,
as specified L.S. /.SG,
3.
1 each
Bunker, as''specified. L.S. 7G,oc $
4.
l.each
Fairway,as specified. L.S. 3 YIre .'0 $
5.
1 each
Green, as specified. L.S. !y ?-77 VD $
i
The foregoing
unit prices, (other than L.S. for all Golf Course
Construction
work), are to be used solely to determine the value
of work completed
for progress payments. Anv contract entered
into, however
will be lump sum for all Golf Course Construction
'
work.
The following
breakdown will be required as part of bids submitted,
as well as being
part of any contract which may be entered into:
Required working days to complete all
Operation
operations exclusive of inclement weather.
1. All work specified under
Golf Course Construction.
General Conditions
.30 - days.
This proposal is valid only if the signature of the bidder is
affixed hereon and the date completed in the space provided.
IProposal (cont.)
The listed items represent pay items. All other work indicaLud
in the plans and specifications shall be included in the bid
items stated herein. No, other items will be paid.
Extension of these unit prices is on the basis of estimated
quantities (said estimated quantities are not warranted oi,.
guaranteed) and the totaling of these extensions is for the
purpose of comparing bids only.
All applicable sales taxes, State and/or Federal, and any of -her
special taxes, patent rights or royalties are included in the
prices quoted in this Proposal.
Any furnished quantities are approximate only, being given as a
basis for the comparison of bids, and the City and GOIi
Course Architect do not, expressly or by implication, ac�.rce
that the actual amount of work will correspond therewith, but
reserves the right to increase or decrease the amount o: wn�Y
class or portion of the work or to omit portions of the :or
as may be deemed necessary or advisable by the City � and
'
Golf Course Architect.
Licensed in accordance with an Act providing for the re;istr.ation
I / i
of Contractor's License Number � ,2-24 , Class //
(If an individual, so state. If, a firm is a'copart.nership, sLLte
the firm name and give the names of all individuals or copartners
composing the firm. If a corporation, state legal names of
corporation, and also names of President, Secretary, Treasurer,
and Manager thereof.)
372
Business Address
ROBERT MUIR GRAVES
OOV COURSE ARCRI1CCT
OPEN BIDS . GOLF COURSE IRRIGATION SYSTEM.
t� :
G r
'7 /
BUFFALO HILL GOLF COURSE P-3
BID FORM
'
Item
Quantity
Description Unit Price
Total
1.
Lump Sum
Plans and Specifications, L.S.
129,007.00
$
and installation of a com-
pletely functional fully
automatic irrigation sys-
tem for new holes 5-16,
and parts of new holes ]
and 2 for Buffalo Hill
Golf Course.
2.
Lump Sum
Staking of all supply and L.S.
2,498.00
$
main lines, irrigation
heads, and other features
as required for approval
and construction.
3.
Lump Sum
Plans and specifications L.S.
24,914.00
$
and installation ofcom-
.a
pletely functional pres-
surized pump supply system.
TOTAL LUMP SUM BID - Items 1,2 and 3, inclusive....,
156,419.00
$
These
prices include
Montana Contractors Tax.
Catalogue
Item
Quantity
Description Description
Unit Price
4.
1 each
Rotary pop-up irriga-
tion sprinkler head ki i0 [j �ltne;-
and complete riser
unit, installed 1 rnn ,.c� % X �6
$
5.
1 each
Rotary pop-up,part-
circle irrigation
sprinkler head and Iii
rrte r seer
6. 1 lin. ft.
8" Class 160 Ring-
378 1
tite P.V.C. pipe,�-
installed as
specified.
-� $
7• 1 lin, ft.
6" Class 160 Ring-
�
tite P.V.C. pipe,
installed as specified.
p C i �s i 6c� 1�',�
J
8• 1 lin. ft.
4" Class 160 Ring-n[� o'+- fe_
J.�I- I�inc
tite P.V.C, pipe,
installed as specified.
ROBERT MUIR GRAVES
GOLF COURSE AIICMITCCT BUFFALO HILL GOLF
COURSE P-2
BID FORM(cont.)
Catalogue
#
f em Quantity
Description Description
Unit Price
j 9. 1 lin. ft.
3" Class 160, Ring-
tite P.V.C. pipe
installed as specified. C".las. 1F`C, nlwst
L S
11. 1 lin. ft.
2Y" Class 160,Ring-
tite, P.V.C. pipe
J
installed as spec ified.R'Z+ +n .,eS:iR
S
} 1.. 1 lin. ft.
2" Class 160, Ring-
tite P.V.C. pipe _
installed as .specified i\b� lay d�SsSh
$
3 Ciasi ZCQ ,l�
�.. 1 lin. ft.
14ru-C1-a�s-s-1f4-,-Ring-
•mite• P.V.C. pipe
installed as specified or
2-
13. 1 lin. ft.
2k Class 200,Solvent- T ;"l• 5'"'fS`"`
-
weld,P.V.C. pipe, in-
cc,
Z
stalled as specified. Cr Pk6tc
S
14. 1 lin. ft.
2" Class 200, Solvent- S. M , 5 I rra
weld,P.V.C. pipg,in-
stalled as Specified. or (� SC +l�vslic
S _
I S
1 lin. ft.
lit"Class 200,Solvent- T h SImpscil
weld,P.V.C. pipe in-
stalled as specified. (�:r (CSC 0<i�k'Ic
?'S
{ S
1 lin. ft.
14"Class 200 Solvent-
weld,P.V.C. pipe in-
R SC
15
S
stalled as specified. � ,- ��isstic
7. 1 lin.-ft.
1" Class 200 Solvent- S. Nl • 5 `
.^+(�
weld,P.V.C. pipe in-
c
stalled as specified. C.'-
1 lin. ft.
1" Schedule 40 P.V.C. T. M. 5
15
pipe. r. r 3�C
I I9: 1 each
Quick Coupling Valve
installed as specified R,�Tin,� +n
21 G
C S� Z rC"-10
i 1 each
Controller with re-
r
quired wiring, in- tP [3uc�„e, C`��I`(�`� 5 �'
stalled as specified
1 each
lk" Remote Control
Valve,with required
wiring,installed as 4
jvur�� i\c
specified. jv Irr�\
$
ROBERT MUIR GRAVES
GOLF COURSE AOCNITCCT BUFFALO HILL GOLF COURSE P-3
BID FORM, (cone)
Item Quantity
Cai:alogue
Description Description
22. 1 each 3" Remote Control Valve
with required wiring, installed as specified 11Otjz i eQuirc(t
23. 1 each
24. 1 each
25. 1 each
26. 1 each.
27. 1 each
28. 1 each
29. 1 each
30. 1 each
31. 1 each
3 1 each
3 ! . 1 each
34. 1 each
2�"Remote Control Valve
with required wiring,
installed as specified no rL e- (-e
2" Remote Control Valve J 5 q GC- &,Lkner
with required wiring,
installed as specified.1ccTriCycl�uC
1'h"Remote Control Valve 153 GL /)uc&ner
with required wiring,
installed as specified. E ( ectric Lr"Jue
8" Gate Valve,installed J<EA)ticuy RinJ-
as specified. 7-de ue
6" Gate Valve,installed Ki+u.vr-or' t�inJ-
as specified. •Ti•te CIAL 444(ue.
4" Gate Valve,installedi+-
as specified. :lit Ct'J'? vrduc
3" Gate Valve,installed % "" OY Ri��-
as specified. Td-e e ; "'(0e
2'k" Gate valve,installed
Unit Price
i
S
O0 1
$
on
cc $
or.
CIO $
`.
as specified. f16Yte_ eciu�krect $
2" Gate Valve ,installed
as specified. n C"'Ie •i-I? q LL rec� $
6" check valve, installed G F% A I" -S t
as specified.
6" pressure relief valve,
installed as specified. jC� (,_ C.1e, % I C' o $
Float valve and control
valve combination, in-
stalled as specified. CL Q0 t2. i eC) U I f'(,_J $
The foregoing unit prices are to be used solely for determining
possible changes in the contract amount resulting from possible
changes in the plans or work and for determining the value of
work completed for progress payments. Any contract entered into
will, however, be Lump Sum.
The following breakdown will be required as part of bids submitted,
as well as being part of any contract which may be entered into:
Required working days to complete each
Operation operation exclusive of inclement weather.
1. Staking of Supply and Main Lines,
Irrigation Heads, and Other Fea-
tures as required for approval.
2. Supply, 'main line installation and
installation of pump supply, com-
plete, tested and operable.
3. All piping, heads, valves and ap-
purtenances, complete, tested and
operable.
10 days
40 days
40 days
50 days
TOTAL CONSTRUCT''_
375
General Conditions
This proposal is valid only if the signature of the bidder is
affixed hereon and the date completed in the space provided.
Proposal (conL.)
The listed items represent pay items. All other work indicated
in the plans and specifications shall be included in the I,:id
items stated herein. No other ii.ems will be paid.
Extension of these unit prices is an the basis of estimated
quantities (said estimated quantities are not warranted or
guaranteed) and the totaling of these extensions is for t.hc
purpose of comparing bids only.
All applicable sales taxes, State and/or Federal, and any other
special taxes, patent rights or royalties are included in thu
prices quoted in this Proposal.
Any furnished quantities are approximate only, being given as a
basis for the comparison of bids, and*the City and Golf
Course Architect do not, expressly or by implication, agr.ec.
that the actual amount of work will correspond ther^with, but
reserves the right to increase or decrease the amount of any
class or portion of the work or to omit portions of the work
as may be deemed necessary or advisable ley the City and
Golf Course Architect.
Licensed in accordance with an Act providing for the registration
of Contractor's License Number 1721 , Class A
(If an individual, so state. If a firm is a copartnership, state
the firm name and give the names of all individuals or copartners
composing the firm. -'If a corporation, state legal names of
corporation, and also names of President., Secretary, Treasurer,
and Manager thereof.)
LOFTUS LANDSCAPING, INC.
President: Pat W. Loftus
Vice -President: B. J. Loftus
Vice -President: Patrick D. Loftus
Secretary: Elaine K. Loftus
Treasurer: Elaine K. Loftus
P.O. Box 6028, Kenne%,Ack, 4lashineton 90336
Address
business
ROUCRT MUIR GRAVES
sou COURSE •RCMITCCT BUFFALO HILL GOLF COURSE P-6
376
BID FORM
Item
1.
Quantity Description
Lump Sum Plans and Specifications,
and installation of a com-
pletely functional fully
automatic irrigation sys-
tem for new holes 5-16,
and parts of new holes 3.
and 2 for Buffalo Hill
Golf Course.
Unit Price Total
L. S. /3,E 31— $
2.
Lump Sum
Staking of all supply and L.S.
$
main lines, irrigation
heads, and other features
as required for approval
and construction.
1
3.
Lump Sum
Plans and specifications L.S.
SZ D D a $
and installation of a com-
pletely functional pres- a-4veQy 15'a ,,5
surized pump supply system.
I
TOTAL LUMP
SUM BID - Items 1,2 and 3, inclusive.....
4? y ZA/ $
Catalogue
Item
Quantity
Description Description
Unit Price
4.
1 each
Rotary pop-up irriga-
tion sprinkler head R(Icenf.P
and complete riser
k
unit, installed _33SD 5A161)( 4b
oo
5.
1 each
.Rotary pop-up,part-
'
circle irrigation
sprinkler head and &C&f-e
complete riser unit,
installed �{,�9K �bx �%;z
_
70 $
6.
1 lin. ft.
8" Class 160 Ring-
tite P.V.C. pipe,
installed as
ew
specified.
4(n — $
7.
1 Tin. ft.
6" Class 160 Ring-
tite P.V.C. pipe,
installed as specified. IQ S C
S 00 $
8.
1 lin. ft.
4" Class 160 Ring-
tite P.V.C. pipe,
installed as specified. \4'5 C
7
RGGERT MUIR GRAVES
BUFFALO HILL GOLF COURSE P-2 �.
004s COURSE ARCHITECT
-
BID FORM(cont.)
Catalogue
'
Item
Quantity
Description Description
Unit Price
9.
1 lin. ft.
3" Class 160, Ring-
tite P.V.C. pipe
installed as specified. , C_
$
10.
1 lin. ft.
2h" Class 160,Ring-
tite, P.V.C. pipe
.installed as specified. q SC
$
11.
1 lin. ft.
2" Class 160, Ring-
tite P.V.C. pipe
installed as specified H$G
S
1 12.
13.
14.
17.
18.
19.
20.
21.
1 lin. it. 1." Class 160,Ring-
tite P.V-C- pipe
installed as - specified
w� CC-
1 lin. ft.
2� Class 200,Solvent-
weld,P.V.C. pipe, in-
stalled as specified.
/S C
1 lin. ft.
2" Class 200,solvent-
weld,P.V.C. pipe,in-
stalled as specified.
BSc
1 lin. ft.
1�"Class 200;Solvent-
weld,P.V.C. pipe in-
A S G
stalled as specified.
1 lin. ft.
1,"Class 200 Solvent-
weld,P.V.C, pipe in-
f}� �-
stalled as specified.
1 lin. ft.
1" Class 200 Solvent-
weld,P.V.C. pipe in-
stalled as specified.
1 lin. ft.
1".Schedule 40 P.V.C.
S G
pipe.
1 each
Quick Coupling Valve
installed as specified
Cknege
1 each
Controller with re-
wiring, in-
�j(�GILh%G2
quired
stalled as specified
1 each
lo" Remote Control
Valve,with required
wiring,installed as
$
'
specified.
BID FORM, (cont)
Catalogue
Item
Quantity
Description Description
Unit Price
22.
1
each
3" Remote Control Valve
with required wiring,
installed as specified
$.
23.
1
each
2h"Remote Control Valve
with required wiring,
installed.as specified
$
24..
1
each
2" Remote Control Valve
with required wiring,
installed as specified. $CACe/M ./5Y
,G
�7S`
$
25.
1
each
lh,"Remote Control Valve
with required wiring,
installed &iCkA16 i53
6C-
o�
as specified.
26.
1
each.
8" Gate Valve,installed
as specified.
27.
1
each
6" Gate Valve,installed
y
as specified,
S
28.
1
each
4" Gate Valve,installed
as specified.
29.
1
each
3" Gate Valve,installed
as specified.
__-
S
��. 1 each 2;" Gate valve,installed
as specified.
S
31.
32.
33.
34.
1 each 2" Gate Valve ,installed
as specified.
1 each 6" check valve,installed
as specified.
F
19
1 each 6" pressure relief valve,
installed as specified. &).AT&mAnl
1 each Float valve and control
valve combination, in-
stalled as specified.
The foregoing unit prices are to be used solely for determining
possible changes in the contract amount resulting from possible
changes in the plans or work and for determining the value of
work completed for progress payments. Any contract entered into
will, however, be Lump Sum.
The following breakdown will be required as part of bids submitted,
as well as being part of any contract which may be entered into:
Required working days to complete each
Operation operation exclusive of inclement weather
1. Staking of Supply and Main Lines,
Irrigation Heads, and Other Fea-
tures as required for approval.
S
days
2. Supply, main line installation and
installation of pump supply, com-
plete, tested and operable.
days '
3. All piping, heads, valves and ap-
purtenances, complete, tested and
operable.,
,?'-U
days
TOTAL CONSTRUCTION TIME
,SD
days
General Conditions
This proposal is valid only if the signature of the bidder is
affixed hereon and the date completed in the space provided.
I'rol)c> _al (cunL. )
Tho listed items represent pay items;. Al.l. other work indicated
in the plans and Spec ifi.cat:ions uliall be includes) in the ),.id
items Stated herein. No other items will be paid.
Extension of these unit prices is on the basis of: estimated
quantities (said estimated cluantitics are not war.rantccl Or
guaranteed) and the totaling of these extensions is for the
purpose of comparing bids only.
All applicable sales taxes, statra and/or Federal, and any other
special taxes, patent rights or royaltics arc: inc.luc:icd in the
prices quoted in this Proposal.
�. Any furnished quantities are approximate only, being givon a-• a
basis for the comparison of bids, and'the Cites ar,ri Golf
Course Architect do not, expressly or by implication, arr.ec
that the actual amount of work will correspond then^rr]t.1,, b:1
reserves the right to increase or decrease the amo-ant of +any
class or portion of the work or to omit portions o the work
as may be deemed necessary or advisable by the City and
Golf Course Arrhi tc ct..
Licensed in accordance with an Act providing for the reri.str.AH
I
Item
of Contractor's License Number _02 5 8 , Class _g___
(If an individual so state. if a firm is a coparta:ers::ip. state
the firm name and give the names of all individuals or copartners
composing the firm. If a corporation, state legal names of
corporation, and also names of President, Secretary, Treasurer,
and Manager thereof.)
ROOERT MUIR GRAVCS
BID FORM
Quantity Description
Lloyd C. Lockre.. , jr.
fbes�de.+t
gmy_ nn. I.,x.k�«. v.« Pics:deV*-
IJ ica.�0. K�1a•a � Sa.e. 'Ges,.
t = Ta"wy
PO. 00v- 30i81
A: ff: r, a s. an4-% ..ems SeJIoZ
Busi.neas ddress
Unit Price Total
1.
Lump Sum
Plans and Specifications,
L.S.
$
and installation of a com-
pletely functional fully
automatic irrigation sys-
tem for new holes 5-16,
and parts of new holes ].
and 2 for Buffalo Bill
Golf Course.
2.
Lump Sum
Staking of all supply and
L.S.
$
main lines, irrigation
heads, and other features'
as required for approval
and construction.
3.
Lump Sum
Plans and specifications
L.S.
yoo O° $
and installation of a com-
pletely functional pres-
surized pump supply system.
TOTAL LUMP
SUM BID - Items 1,2 and 3, inclusive.....
7,S/,?,°d $
Catalogue
Item
Quantity
Description Description
Unit Price
4.
1 each
Rotary pop-up irriga-
tion sprinkler head /;/I,;I
and complete riser
unit, installed // ,�%
`�/�f�i_ .ilti
G!j �� $
5.
1 each
Rotary pop-up,part-
circle irrigation
sprinkler head and
complete riser unit,.
installed CL
/_/,_ $
380
6.
7.
8.
1 lin. ft. 8" Class 160 Ring-
tite P.V.C. pipe, IVA
installed as _
specified. $
1 lin. ft. 6" Class 160 Ring-
tite P.V.C. pipe,
installed as specified. So2 c. 3.0 $
1 lin. ft. 4" Class 160 Ring-
tite P.V.C. pipe,
installed as specified.
-
ROBERTMUIR GRAVES -BUFFALO HILL GOLF COURSE P-2 I
GOLF COURSE ARCHITECT
BID FORM(cont.)
Catalogue
Item Quantity Description Description Unit Price
9. 1 lin, ft. 3" Class 160, Ring-
tite P.V.C. pipe
installed as specified. �2jf $
10. 1 lin. ft. 24" Class 160,Ring-
tite, P.V.C. pipe
installed as specified.
11. 1 lin. ft. 2" Class 160, Ring-
tite P.V.C. pipe
installed as specified AAA — $
12. 1 lin. ft. 1'h" Class 160,Ring-
tite P.V.C. pipe
installed as specified _ jV,f — $
13. 1 lin. ft. 2h Class 200,Solvent-
weld,P.V.C., pipe, in-
stalled as specified.
14. 1 lin. ft. 2" Class 200,Solvent-
weld,P.V.C. pipp,in-
stalled as specified. ��� Sy`.c, /,37 $
is. 1 lin. ft. 1'k"Class 200,Solvent-
weld,P.V.C. pipe in-
stalled as specified.
16. 1 lin. ft. 14"Class 200'Solvent-
weld,P.V.C. pipe in-
stalled as specified.
17. 1 lin. ft. 1" Class 200 Solvent-
weld,P.V.C. pipe in-
stalled as specified. JYA $
18. 1 lin. ft. 1" Schedule 40 P.V.C.
pipe. �IriY Si�/��. /• �G $
19.
20.
21.
1 each Quick Coupling Valve
installed as specified
1 each Controller with re- A,
quired wiring, in-
stalled as specifiedO-
1 each 14" Remote Control
Valve,with required
wiring,installed as
specified.
.S, 7 _j
7,19. uo
ROBERT MUIR GRAVES
40LF COURSE A84WECT
BUFFALO ]TILL GOLF COUIZSF P-3
381
I
I
Item
22.
' 23.
2 Q.
25.
26.
27.
28.
29.
:.., 30.
31.
32.
33.
34.
BID FORM,,(cont)
Catalogue
Quantity
Description Description
Unit. Price
1
each
3" Remote Control Valve
with required wiring,
_
installed as specified
1
each
2Y'Remote Control Valve
with required wiring,
installed as specified
1
each
2" Remote Control Valve
with required wiring,
installed as specified.
SL3 /��cn GF
/3�• $
1
each
1'h"Remote Control Valve
with required wiring,
installed as specified.
" ;0;/.S0 i�=s
/7/•vim $
1
each.
8" Gate Valve,installed
as specified.
/Y/.i $
1
each
6" Gate Valve,installed
as specified.
Ae,r S"&ee"
�d�•�o $
1
each
4" Gate Valve,installed
as specified.
1
each
3" Gate Valve,installed
as specified.
��T S/��.
_�� ov $
1
each
2�" Gate valve,installed
as specified.
1
each
2" Gate Valve ,installed
as specified.
/✓y
— $
1
each
6" check valve,installed
as specified.
_
1
each
-=F-" pressure relief valve,
installed as specified;,
n Lt %/G-v/-A<b
1
each
Float valve and control
valve combination, in-
stalled as specified.
The foregoing unit prices are to be used solely for determining
possible changes in the contract amount resulting from possible
changes in the plans or work and for determining the value of
work completed for progress payments. Any contract entered into
will, however, be Lump Sum.
' The following breakdown will be required as part of bids submitted,
as well as being part of any contract which may be entered into:
Required working days to complete each
Operation operation exclusive of inclement weather.
1. Staking of Supply and Alain Lines,
Irrigation Heads, and Other Fea-
tures as required for approval. days
b 3 2 2. Supply, main line installation and
installation of pump supply, com-
plete, tested and operable. ifs days
3. All piping, heads, valves and ap-
purtenances, complete, tested and
operable. days
TOTAL CONSTRUCTION TIME S O days
General Conditions
This proposal is valid only if the signature of the bidder is '
affixed hereon and the date completed in the space provided.
Proposal. (coat.)
The listed items represent pay items. All other work indicated
in the plans and specifications shall be included in the ),:id
items stated herein. No other items will be paid.
� Extension of these unit prices is on the basi.s of es.timated
quantities (said estimated quantities are not warranted or
guaranteed) and the totaling of these extensions is for t.h(.!
purpose of comparing bids only.
All applicable sales taxes, State and/or. Federal, and any other
special taxes, patent rights or royalties are included in the
prices quoted in this Proposal..
Any furnished quantities are approximate only, being given as a
basis for the comparison of bids, and'the City and Golf
Course Architect do not, expressly or by implication, agree
that the actual amount of work will correspond thercwit.h, but.
reserves the right to increase or decrease the amount of any '
class or portion of.the work or to omit portions of the work
as may be deemed necessary or advisable by the City and
Golf Course Architect,
Licensed in accordance with an Act providing for the registration
of Contractor's License Number Class z
(If an individual, so state. If a firm is a copartnersiiiY, state
the firm name and give the names of all individuals or copartners
composing the firm. If a corporation, state legal names of
corporation, and also names of President, Secretary, Treasurer,
and Manager thereof.)
1 ELL c' y Fig TILL /-',�
)
Business Address
ROOCRT MUM GRAYCS
GOLF COURSE •NCM,Tccl BUFFALO HILL GOLF COURSE P-6
M';,]
Councilman Daley moved all bids be referred to the Park Committee and Golf Course
Expansion Committee with power to act. Seconded by Councilman Olson. Carried.
Mel Wollan, County Commissioner, reported that the county is ready to advertise for
bids for the construction of the Northwest Drainage System which is being participated
50/50 with the City of Kalispell. He submitted a preliminary contract and a few
changes were made by City Attorney Donahue.
Councilman Sliter moved Acting Mayor Happ be authorised to sign the Northwest
' Drainage System agreement as revised. Seconded by Councilman Olson. Carried.
Councilman Sliter moved that a title research on the land exchange between the
Thompson and City of Kalispell in Lawrence Park be made at city expense. Seconded
by Councilman Allen. Carried.
There being no further business, the meeting was adjourned.
Minutes approved as read, July 21, 1975.
ATTEST:
Marjo ie Giermann, Deputy City Clerk
L7
Norma E. Happ, Acting Mayor