Loading...
07/09/75 SP City Council Minutes364 SPECIAL MEETING "IN THE HEART OF THE NATION'S PLAYGROUND" KALISPELL$ MONTANA 59901 TO THE HONORABLE BOARD OF COUNCILMEN CITY OF KALISPELL, MONTANA Gentlemen: There will be a Special Meeting of the City Council, Wednesday, July 9th, 1975, at noon at the Golf Course Club House for the following Purpose: Open Bids for Golf Course Project Fine Grading Open Bids for Golf Course Project Irrigation System We, the undersigned, being all of e notice of the date and purpose o the held Wednes y, July 9, 1975, noon to the t n cti0 of the ab and a; before he ity Council. , hn C. Schwar t Robert Allen .a 'Robert son bers of the City Council, do hereby waive cial Meeting of the City Council to be the Golf 'Course Club House, and consent other business that may properly come Norma E. Happ, Acting May O O` Dale Forrest W. Daley Nort'ert F. Donahue, City Attorney OPEN BIDS - GOLF COURSE FINE GRADING 865 Item 1. 3. 4. 5. I Quantity BID FORM Description Unit Price Total Lump Sum Construction of Tees, Bunkers, Fairways,Greens L.S. and all other related work as specified under Golf Course Construction. 1 each Tee, as specified L.S. 1 each Bunker,.as specified. L.S. 1 each Fairway,as specified. L.S. 1 each Green, as specified. L.S. 100.,845.00 $ 700_on $ 1,300.00 $ 2,900.00 $ The foregoing unit prices, (other than L.S. for all Golf Course Construction work), are to be used solely to determine the value of work completed for progress payments. Any contract entered into, however will be lump sum for all Golf Course Construction work. The following breakdown will be required as part of bids submitted, as well as being part -of any contract which may be entered into: Required working days to complete all Operation operations exclusive of inclement weather. 1. All work specified under Golf Course Construction. General Conditions 52 This proposal is valid only if the signature of the bidder is affixed hereon and the date completed in the space provided. days. The: .lintod item:; roprc::;c:r:t. pay il_em:.. All uCli(!r wo)X .indic:,lud in tba p.;ins ;uu] :;prci.f.ic;aL.i.ons .:hu.11 Ix: incl.udod .in thu ),icl item;; :stated herein. NO other item: will. he paid. L•xtcnsi.on of these unit prices is on the basis of esti.u:a;t.d quantities (said estimated quantities are not warrantecl or guaranteed) and the totaling of these extensions is for the purpose of comparing bids only. All applicable sales tares, State and/or Federal., and any Gt.hcr special taxes, patent rights or royalties arc included in t!;e prices quoted in this Proposal. t, Any furnished quantities are approximate only, being given as a basis for the comparison of bids, and the City and GO! Course Architect do not, expressly or by implicatie:n, a,rer_ that the actual amount of work will correspond therewith, but reserves the right to increase or decrease the amount of any class or portion of the work or to omit portions of the wort: as may be deemed necessary or advisable by the City and Golf Course Architect. . 366 Licensed in accordance with an Act providing for the registration Item of Contractor's License Number 3226 , Class A (If an individual, so state. If. a firm is a'copartnership, si:ate the firm name and give the names of all individuals or copartners composing the firm. If a corporation, state legal names of corporation, and also names of President, Secretary, Treasurer, and Manager thereof.) July 9, 1975 Quantity ARTHUR H. SHOOTER,,INC. President ARTHUR H. SHOOTER, PRESIDENT LORENE M. STAGE, SECRETARY/TREASURER 3605 Haven Avenue Menlo Park, California 94025 Business Address BID FORM Description Unit Price 1. Lump Sum Construction of Tees, Bunkers, Fairways,Greens L.S. and all other related work as specified under Golf Course Construction. 2. 1 each Tee, as specified L.S. 3. ,. 1 each 4. l each 5. 1 each Bunker, as specified. Fairway,as specified. Green, as specified. Total I /, CSC-() $ L. S. $ L.S. -4, o,:, $ L.S. -q, CC0 $ The foregoing unit prices, (other than L.S. for all Golf Course Construction work), are to be used solely to determine the value of work completed for progress payments. Any contract entered into, however will be lump sum for all Golf Course Construction work. The following breakdovm will be required as part of bids submitted, as well as being part of any contract which may be entered into: Required working days to complete all Operation operations exclusive of inclement weather. 1. All work specified under Golf Course Construction. =;C days. NM General Conditions This proposal is valid only if the signature of the bidder is affixed hereon and the date completed in the space provided. Proposal (cone.) The listed it-oms represent pay items. All otllci- work ind:.catl_d in the plans and specifications shall be included in the hid items stated herein. No other items will be paid. Extension of these unit prices is on the basis of estimated quantities (said estimated quantities are not warrant:ca or guaranteed) and the totaling of these extensions is for the purpose of comparing bids only. All applicable sales taxes, State and/or Federal, and any other special taxes, patent rights or royalties are included in the prices quoted in this Proposal. Any furnished quantities are approximate only, being, given as a basis for the comparison of bids, and the City and Col; Course Architect do not, expressly or by implication, _-rer that the actual amount of work will correspond therewith, but reserves the right to increase or decrease the amount of any class or portion of the work or to omit portions of the wor as may be deemed necessary or advisable by the City and Golf Course Architect. ' Licensed in accordance with an Act providing for the regisir:Ion of Contractor's License Number (If an individual, so state. If a firm is W copartnorship, scatc the firm .name and give the names of all individuals or copartners composing the firm. If a corporation, state legal names of corporation, and also names of President, Secretary, Treasurer, and Manager thereof.) R06CRT MUIR GRAVES 60W CO0I16C •RCMIICG7 Ronnln B, =ack s eidert ;: Gen ': r ar -aret A Pack Sec—`Prea.s Pact A Company Inc P05 222 Kalispell$ Yontana 59901 7 - X� BUFFALO HILL GOLF COURSE P-3 BID FORM 368 Item Quantity Description Unit- Price Total 1. Lump Sum Construction of Tees, Bunkers, Fairways,Greens L.S. and all other related work as specified under Golf Course Construction. 2, 1 each Tee, as specified L.S. 3. 1 each Bunker, as specified. L.S. 4. 1 each Fairway,as specified. L.S. 5. 1 each Green, as specified. L.S. r, 45,130.00 $ a 588.00 $ " 94.00 $ 204.00 $ 2,602.00 $ These prices include Montana Contractors Tax. The foregoing unit prices, (other than L.S. for all Golf Course Construction work), are to be used solely to determine the value of work completed for progress payments. Any contract entered into, however will be lump sum for all Golf Course Construction work. The following breakdown will be required as part of bids submitted, as well as being part of any contract which may be entered into: Required working days to complete all Operation operations exclusive of inclement weather. 1. All work specified under Golf Course Construction. 30 General,Conditions This proposal is valid only if the signature of the bidder is affixed hereon and the date completed in the space provided. We will not accept Finish Grading Contract without Irrigation Contract. ROBERT MUIR GRAVES GOV COURSE ARCNI,CCT LOFTUS LANDSCAPING, INC. Patrick D. Loftus P-2 S. BUFFALO HILL GOLF COURSE L0177U5 LAIVDSCAPLVG, INC. P. e. BOX 602E ..,VNEWICKK AM> MNCITgN ?4 in the plans and spccificati_ons shall he included in C.hc l,,ici ein. Igo other it -era,; will be items stated herpaid. 1 Extension of these unit prices is on the,basis of est.i.mritc quantities (said estimated quzrnt.ities are not warranted or. guaranteed) and the totaling of these extensions is for the + urpose of comparing bids only. P and/or Federal All applicable sles taxes, sStateor aarcinclud<�dl°r in the special taxes, pa prices quoted in this Proposal. Any furnished quantities axe approximate only, being q.iven as a and Golf basis for the comparison of bids, and the —City__ f Course Architect do not, expressly or by implication• ,,.ores that the actual amount- of work wi].1 correspoi d therewi::.:,, but the reserves the right to increase or dccreas°ortionsl„ot.l o %',ork class or portion of the work or to omit p a:. I.),! the.'''::.`.r' may be deemed neces_r} r,} ;a ... '..�.. Licensed in accordance with an Act providing for the rc: i.str.at�i/aryy c of Contractor's License Number 1721 , Class A 2. 3. 4. 5. (If an individual, so state. If a firm is a'copart.nors'lip, state the firm name and give the names of all indivi.du.,lc or cohartncrs composing the firm. If a corporation, state legal nan:c!s of corporation, and also names of President, Secretary, Treasurer, and Manager thereof.) Quantity BID FORJd Description LOFTUS LANDSCAPING, INC. President: Pat 11. Loftus Vice President: B. J. Loftus Vice President: Patrick D. Loftus Secretary: Elaine K. Loftus Treasurer: Elaine K. Loftus . P.O. Box 6028, Kennewick, Washington 99336 Business Address; y Unit Price Lump Sum Construction of Tees, Bunkers, Fairways,Greens L.S. and all other related work as specified under Golf Course Construction. 1 each Tee, as specified L.S. Total 1 each Bunker, as specified. L.S. q " =---_ $ 1 each Fairway,as specified. L.S. S ^:- $ 1 each Green, as specified. L.S. 3_„i $ The foregoing unit prices, (other than L.S. for all Golf Course Construction work), are to be used solely to determine the value of work completed for progress payments. Any contract entered into, however will be lump sum for all Golf Course Construction work. The following breakdown will be required as part of bids submitted, as well as being part of any contract which may be entered into: Required working days to complete all Operation operations exclusive of inclement weather 1. All work specified under Golf Course Construction c,7 0{J.?e i'.;,: days. j General Conditions This proposal is valid only if the signature of the bidder is affixed hereon and the (Lite . <, � �:'a.�.;co� in the .370 Proposal. (cone.) The listed items represent pay items. All other wort: .i.ncli catecl' in the plans and specifications shall be included ill t:ho bid items stated herein. No other items will be paid. Iixtension of these unit prices is on the ,basis of: e :t:inu tec7 quantities (said estimated quantities are not warranted ox guaranteed) and the totaling of these extensions is for the purpose of comparing bids only. All applicable sales taxes, State and/or Federal, and any othe..r special taxes,patent rights or royalties are included in the prices quoted in this Proposal. Any furnished quantities are approximate only, being given as a basis for the comparison of bids, and the City arld GOlf Course Architect do not, expressly or by impl.icai_ion, roe that the actual amount of work will correspond therewith, but reserves the right to increase or decrease the amount of any class or portion of the worl: or to omit portions of the work as may be deemed necessary or advisable by the City _ and Golf Course Architect. Licensed in accordance with an Act providing for the registration of Contractor's License Number class Class (If an individual, so state. Ii, a firm is a'copartnership, scate the firm name and give the names of all individuals or copartners composing the firm. If a corporation, state legal names of corporation, and also names of President, Secretary, Treasurer, and Manager thereof.) ROGCRT MUIR GRAVCS Business Address;. BID FORM Item Quantity Description" Unit Price 1. Lump Sum Construction of Tees, Bunkers, Fairways,Greens L.S. and all other related work as specified under Golf Course Construction. Total 1 2. 1 each Tee, / 1$ 1, as specified L.S. /.SG, 3. 1 each Bunker, as''specified. L.S. 7G,oc $ 4. l.each Fairway,as specified. L.S. 3 YIre .'0 $ 5. 1 each Green, as specified. L.S. !y ?-77 VD $ i The foregoing unit prices, (other than L.S. for all Golf Course Construction work), are to be used solely to determine the value of work completed for progress payments. Anv contract entered into, however will be lump sum for all Golf Course Construction ' work. The following breakdown will be required as part of bids submitted, as well as being part of any contract which may be entered into: Required working days to complete all Operation operations exclusive of inclement weather. 1. All work specified under Golf Course Construction. General Conditions .30 - days. This proposal is valid only if the signature of the bidder is affixed hereon and the date completed in the space provided. IProposal (cont.) The listed items represent pay items. All other work indicaLud in the plans and specifications shall be included in the bid items stated herein. No, other items will be paid. Extension of these unit prices is on the basis of estimated quantities (said estimated quantities are not warranted oi,. guaranteed) and the totaling of these extensions is for the purpose of comparing bids only. All applicable sales taxes, State and/or Federal, and any of -her special taxes, patent rights or royalties are included in the prices quoted in this Proposal. Any furnished quantities are approximate only, being given as a basis for the comparison of bids, and the City and GOIi Course Architect do not, expressly or by implication, ac�.rce that the actual amount of work will correspond therewith, but reserves the right to increase or decrease the amount o: wn�Y class or portion of the work or to omit portions of the :or as may be deemed necessary or advisable by the City � and ' Golf Course Architect. Licensed in accordance with an Act providing for the re;istr.ation I / i of Contractor's License Number � ,2-24 , Class // (If an individual, so state. If, a firm is a'copart.nership, sLLte the firm name and give the names of all individuals or copartners composing the firm. If a corporation, state legal names of corporation, and also names of President, Secretary, Treasurer, and Manager thereof.) 372 Business Address ROBERT MUIR GRAVES OOV COURSE ARCRI1CCT OPEN BIDS . GOLF COURSE IRRIGATION SYSTEM. t� : G r '7 / BUFFALO HILL GOLF COURSE P-3 BID FORM ' Item Quantity Description Unit Price Total 1. Lump Sum Plans and Specifications, L.S. 129,007.00 $ and installation of a com- pletely functional fully automatic irrigation sys- tem for new holes 5-16, and parts of new holes ] and 2 for Buffalo Hill Golf Course. 2. Lump Sum Staking of all supply and L.S. 2,498.00 $ main lines, irrigation heads, and other features as required for approval and construction. 3. Lump Sum Plans and specifications L.S. 24,914.00 $ and installation ofcom- .a pletely functional pres- surized pump supply system. TOTAL LUMP SUM BID - Items 1,2 and 3, inclusive...., 156,419.00 $ These prices include Montana Contractors Tax. Catalogue Item Quantity Description Description Unit Price 4. 1 each Rotary pop-up irriga- tion sprinkler head ki i0 [j �ltne;- and complete riser unit, installed 1 rnn ,.c� % X �6 $ 5. 1 each Rotary pop-up,part- circle irrigation sprinkler head and Iii rrte r seer 6. 1 lin. ft. 8" Class 160 Ring- 378 1 tite P.V.C. pipe,�- installed as specified. -� $ 7• 1 lin, ft. 6" Class 160 Ring- � tite P.V.C. pipe, installed as specified. p C i �s i 6c� 1�',� J 8• 1 lin. ft. 4" Class 160 Ring-n[� o'+- fe_ J.�I- I�inc tite P.V.C, pipe, installed as specified. ROBERT MUIR GRAVES GOLF COURSE AIICMITCCT BUFFALO HILL GOLF COURSE P-2 BID FORM(cont.) Catalogue # f em Quantity Description Description Unit Price j 9. 1 lin. ft. 3" Class 160, Ring- tite P.V.C. pipe installed as specified. C".las. 1F`C, nlwst L S 11. 1 lin. ft. 2Y" Class 160,Ring- tite, P.V.C. pipe J installed as spec ified.R'Z+ +n .,eS:iR S } 1.. 1 lin. ft. 2" Class 160, Ring- tite P.V.C. pipe _ installed as .specified i\b� lay d�SsSh $ 3 Ciasi ZCQ ,l� �.. 1 lin. ft. 14ru-C1-a�s-s-1f4-,-Ring- •mite• P.V.C. pipe installed as specified or 2- 13. 1 lin. ft. 2k Class 200,Solvent- T ;"l• 5'"'fS`"` - weld,P.V.C. pipe, in- cc, Z stalled as specified. Cr Pk6tc S 14. 1 lin. ft. 2" Class 200, Solvent- S. M , 5 I rra weld,P.V.C. pipg,in- stalled as Specified. or (� SC +l�vslic S _ I S 1 lin. ft. lit"Class 200,Solvent- T h SImpscil weld,P.V.C. pipe in- stalled as specified. (�:r (CSC 0<i�k'Ic ?'S { S 1 lin. ft. 14"Class 200 Solvent- weld,P.V.C. pipe in- R SC 15 S stalled as specified. � ,- ��isstic 7. 1 lin.-ft. 1" Class 200 Solvent- S. Nl • 5 ` .^+(� weld,P.V.C. pipe in- c stalled as specified. C.'- 1 lin. ft. 1" Schedule 40 P.V.C. T. M. 5 15 pipe. r. r 3�C I I9: 1 each Quick Coupling Valve installed as specified R,�Tin,� +n 21 G C S� Z rC"-10 i 1 each Controller with re- r quired wiring, in- tP [3uc�„e, C`��I`(�`� 5 �' stalled as specified 1 each lk" Remote Control Valve,with required wiring,installed as 4 jvur�� i\c specified. jv Irr�\ $ ROBERT MUIR GRAVES GOLF COURSE AOCNITCCT BUFFALO HILL GOLF COURSE P-3 BID FORM, (cone) Item Quantity Cai:alogue Description Description 22. 1 each 3" Remote Control Valve with required wiring, installed as specified 11Otjz i eQuirc(t 23. 1 each 24. 1 each 25. 1 each 26. 1 each. 27. 1 each 28. 1 each 29. 1 each 30. 1 each 31. 1 each 3 1 each 3 ! . 1 each 34. 1 each 2�"Remote Control Valve with required wiring, installed as specified no rL e- (-e 2" Remote Control Valve J 5 q GC- &,Lkner with required wiring, installed as specified.1ccTriCycl�uC 1'h"Remote Control Valve 153 GL /)uc&ner with required wiring, installed as specified. E ( ectric Lr"Jue 8" Gate Valve,installed J<EA)ticuy RinJ- as specified. 7-de ue 6" Gate Valve,installed Ki+u.vr-or' t�inJ- as specified. •Ti•te CIAL 444(ue. 4" Gate Valve,installedi+- as specified. :lit Ct'J'? vrduc 3" Gate Valve,installed % "" OY Ri��- as specified. Td-e e ; "'(0e 2'k" Gate valve,installed Unit Price i S O0 1 $ on cc $ or. CIO $ `. as specified. f16Yte_ eciu�krect $ 2" Gate Valve ,installed as specified. n C"'Ie •i-I? q LL rec� $ 6" check valve, installed G F% A I" -S t as specified. 6" pressure relief valve, installed as specified. jC� (,_ C.1e, % I C' o $ Float valve and control valve combination, in- stalled as specified. CL Q0 t2. i eC) U I f'(,_J $ The foregoing unit prices are to be used solely for determining possible changes in the contract amount resulting from possible changes in the plans or work and for determining the value of work completed for progress payments. Any contract entered into will, however, be Lump Sum. The following breakdown will be required as part of bids submitted, as well as being part of any contract which may be entered into: Required working days to complete each Operation operation exclusive of inclement weather. 1. Staking of Supply and Main Lines, Irrigation Heads, and Other Fea- tures as required for approval. 2. Supply, 'main line installation and installation of pump supply, com- plete, tested and operable. 3. All piping, heads, valves and ap- purtenances, complete, tested and operable. 10 days 40 days 40 days 50 days TOTAL CONSTRUCT''_ 375 General Conditions This proposal is valid only if the signature of the bidder is affixed hereon and the date completed in the space provided. Proposal (conL.) The listed items represent pay items. All other work indicated in the plans and specifications shall be included in the I,:id items stated herein. No other ii.ems will be paid. Extension of these unit prices is an the basis of estimated quantities (said estimated quantities are not warranted or guaranteed) and the totaling of these extensions is for t.hc purpose of comparing bids only. All applicable sales taxes, State and/or Federal, and any other special taxes, patent rights or royalties are included in thu prices quoted in this Proposal. Any furnished quantities are approximate only, being given as a basis for the comparison of bids, and*the City and Golf Course Architect do not, expressly or by implication, agr.ec. that the actual amount of work will correspond ther^with, but reserves the right to increase or decrease the amount of any class or portion of the work or to omit portions of the work as may be deemed necessary or advisable ley the City and Golf Course Architect. Licensed in accordance with an Act providing for the registration of Contractor's License Number 1721 , Class A (If an individual, so state. If a firm is a copartnership, state the firm name and give the names of all individuals or copartners composing the firm. -'If a corporation, state legal names of corporation, and also names of President., Secretary, Treasurer, and Manager thereof.) LOFTUS LANDSCAPING, INC. President: Pat W. Loftus Vice -President: B. J. Loftus Vice -President: Patrick D. Loftus Secretary: Elaine K. Loftus Treasurer: Elaine K. Loftus P.O. Box 6028, Kenne%,Ack, 4lashineton 90336 Address business ROUCRT MUIR GRAVES sou COURSE •RCMITCCT BUFFALO HILL GOLF COURSE P-6 376 BID FORM Item 1. Quantity Description Lump Sum Plans and Specifications, and installation of a com- pletely functional fully automatic irrigation sys- tem for new holes 5-16, and parts of new holes 3. and 2 for Buffalo Hill Golf Course. Unit Price Total L. S. /3,E 31— $ 2. Lump Sum Staking of all supply and L.S. $ main lines, irrigation heads, and other features as required for approval and construction. 1 3. Lump Sum Plans and specifications L.S. SZ D D a $ and installation of a com- pletely functional pres- a-4veQy 15'a ,,5 surized pump supply system. I TOTAL LUMP SUM BID - Items 1,2 and 3, inclusive..... 4? y ZA/ $ Catalogue Item Quantity Description Description Unit Price 4. 1 each Rotary pop-up irriga- tion sprinkler head R(Icenf.P and complete riser k unit, installed _33SD 5A161)( 4b oo 5. 1 each .Rotary pop-up,part- ' circle irrigation sprinkler head and &C&f-e complete riser unit, installed �{,�9K �bx �%;z _ 70 $ 6. 1 lin. ft. 8" Class 160 Ring- tite P.V.C. pipe, installed as ew specified. 4(n — $ 7. 1 Tin. ft. 6" Class 160 Ring- tite P.V.C. pipe, installed as specified. IQ S C S 00 $ 8. 1 lin. ft. 4" Class 160 Ring- tite P.V.C. pipe, installed as specified. \4'5 C 7 RGGERT MUIR GRAVES BUFFALO HILL GOLF COURSE P-2 �. 004s COURSE ARCHITECT - BID FORM(cont.) Catalogue ' Item Quantity Description Description Unit Price 9. 1 lin. ft. 3" Class 160, Ring- tite P.V.C. pipe installed as specified. , C_ $ 10. 1 lin. ft. 2h" Class 160,Ring- tite, P.V.C. pipe .installed as specified. q SC $ 11. 1 lin. ft. 2" Class 160, Ring- tite P.V.C. pipe installed as specified H$G S 1 12. 13. 14. 17. 18. 19. 20. 21. 1 lin. it. 1." Class 160,Ring- tite P.V-C- pipe installed as - specified w� CC- 1 lin. ft. 2� Class 200,Solvent- weld,P.V.C. pipe, in- stalled as specified. /S C 1 lin. ft. 2" Class 200,solvent- weld,P.V.C. pipe,in- stalled as specified. BSc 1 lin. ft. 1�"Class 200;Solvent- weld,P.V.C. pipe in- A S G stalled as specified. 1 lin. ft. 1,"Class 200 Solvent- weld,P.V.C, pipe in- f}� �- stalled as specified. 1 lin. ft. 1" Class 200 Solvent- weld,P.V.C. pipe in- stalled as specified. 1 lin. ft. 1".Schedule 40 P.V.C. S G pipe. 1 each Quick Coupling Valve installed as specified Cknege 1 each Controller with re- wiring, in- �j(�GILh%G2 quired stalled as specified 1 each lo" Remote Control Valve,with required wiring,installed as $ ' specified. BID FORM, (cont) Catalogue Item Quantity Description Description Unit Price 22. 1 each 3" Remote Control Valve with required wiring, installed as specified $. 23. 1 each 2h"Remote Control Valve with required wiring, installed.as specified $ 24.. 1 each 2" Remote Control Valve with required wiring, installed as specified. $CACe/M ./5Y ,G �7S` $ 25. 1 each lh,"Remote Control Valve with required wiring, installed &iCkA16 i53 6C- o� as specified. 26. 1 each. 8" Gate Valve,installed as specified. 27. 1 each 6" Gate Valve,installed y as specified, S 28. 1 each 4" Gate Valve,installed as specified. 29. 1 each 3" Gate Valve,installed as specified. __- S ��. 1 each 2;" Gate valve,installed as specified. S 31. 32. 33. 34. 1 each 2" Gate Valve ,installed as specified. 1 each 6" check valve,installed as specified. F 19 1 each 6" pressure relief valve, installed as specified. &).AT&mAnl 1 each Float valve and control valve combination, in- stalled as specified. The foregoing unit prices are to be used solely for determining possible changes in the contract amount resulting from possible changes in the plans or work and for determining the value of work completed for progress payments. Any contract entered into will, however, be Lump Sum. The following breakdown will be required as part of bids submitted, as well as being part of any contract which may be entered into: Required working days to complete each Operation operation exclusive of inclement weather 1. Staking of Supply and Main Lines, Irrigation Heads, and Other Fea- tures as required for approval. S days 2. Supply, main line installation and installation of pump supply, com- plete, tested and operable. days ' 3. All piping, heads, valves and ap- purtenances, complete, tested and operable., ,?'-U days TOTAL CONSTRUCTION TIME ,SD days General Conditions This proposal is valid only if the signature of the bidder is affixed hereon and the date completed in the space provided. I'rol)c> _al (cunL. ) Tho listed items represent pay items;. Al.l. other work indicated in the plans and Spec ifi.cat:ions uliall be includes) in the ),.id items Stated herein. No other items will be paid. Extension of these unit prices is on the basis of: estimated quantities (said estimated cluantitics are not war.rantccl Or guaranteed) and the totaling of these extensions is for the purpose of comparing bids only. All applicable sales taxes, statra and/or Federal, and any other special taxes, patent rights or royaltics arc: inc.luc:icd in the prices quoted in this Proposal. �. Any furnished quantities are approximate only, being givon a-• a basis for the comparison of bids, and'the Cites ar,ri Golf Course Architect do not, expressly or by implication, arr.ec that the actual amount of work will correspond then^rr]t.1,, b:1 reserves the right to increase or decrease the amo-ant of +any class or portion of the work or to omit portions o the work as may be deemed necessary or advisable by the City and Golf Course Arrhi tc ct.. Licensed in accordance with an Act providing for the reri.str.AH I Item of Contractor's License Number _02 5 8 , Class _g___ (If an individual so state. if a firm is a coparta:ers::ip. state the firm name and give the names of all individuals or copartners composing the firm. If a corporation, state legal names of corporation, and also names of President, Secretary, Treasurer, and Manager thereof.) ROOERT MUIR GRAVCS BID FORM Quantity Description Lloyd C. Lockre.. , jr. fbes�de.+t gmy_ nn. I.,x.k�«. v.« Pics:deV*- IJ ica.�0. K�1a•a � Sa.e. 'Ges,. t = Ta"wy PO. 00v- 30i81 A: ff: r, a s. an4-% ..ems SeJIoZ Busi.neas ddress Unit Price Total 1. Lump Sum Plans and Specifications, L.S. $ and installation of a com- pletely functional fully automatic irrigation sys- tem for new holes 5-16, and parts of new holes ]. and 2 for Buffalo Bill Golf Course. 2. Lump Sum Staking of all supply and L.S. $ main lines, irrigation heads, and other features' as required for approval and construction. 3. Lump Sum Plans and specifications L.S. yoo O° $ and installation of a com- pletely functional pres- surized pump supply system. TOTAL LUMP SUM BID - Items 1,2 and 3, inclusive..... 7,S/,?,°d $ Catalogue Item Quantity Description Description Unit Price 4. 1 each Rotary pop-up irriga- tion sprinkler head /;/I,;I and complete riser unit, installed // ,�% `�/�f�i_ .ilti G!j �� $ 5. 1 each Rotary pop-up,part- circle irrigation sprinkler head and complete riser unit,. installed CL /_/,_ $ 380 6. 7. 8. 1 lin. ft. 8" Class 160 Ring- tite P.V.C. pipe, IVA installed as _ specified. $ 1 lin. ft. 6" Class 160 Ring- tite P.V.C. pipe, installed as specified. So2 c. 3.0 $ 1 lin. ft. 4" Class 160 Ring- tite P.V.C. pipe, installed as specified. - ROBERTMUIR GRAVES -BUFFALO HILL GOLF COURSE P-2 I GOLF COURSE ARCHITECT BID FORM(cont.) Catalogue Item Quantity Description Description Unit Price 9. 1 lin, ft. 3" Class 160, Ring- tite P.V.C. pipe installed as specified. �2jf $ 10. 1 lin. ft. 24" Class 160,Ring- tite, P.V.C. pipe installed as specified. 11. 1 lin. ft. 2" Class 160, Ring- tite P.V.C. pipe installed as specified AAA — $ 12. 1 lin. ft. 1'h" Class 160,Ring- tite P.V.C. pipe installed as specified _ jV,f — $ 13. 1 lin. ft. 2h Class 200,Solvent- weld,P.V.C., pipe, in- stalled as specified. 14. 1 lin. ft. 2" Class 200,Solvent- weld,P.V.C. pipp,in- stalled as specified. ��� Sy`.c, /,37 $ is. 1 lin. ft. 1'k"Class 200,Solvent- weld,P.V.C. pipe in- stalled as specified. 16. 1 lin. ft. 14"Class 200'Solvent- weld,P.V.C. pipe in- stalled as specified. 17. 1 lin. ft. 1" Class 200 Solvent- weld,P.V.C. pipe in- stalled as specified. JYA $ 18. 1 lin. ft. 1" Schedule 40 P.V.C. pipe. �IriY Si�/��. /• �G $ 19. 20. 21. 1 each Quick Coupling Valve installed as specified 1 each Controller with re- A, quired wiring, in- stalled as specifiedO- 1 each 14" Remote Control Valve,with required wiring,installed as specified. .S, 7 _j 7,19. uo ROBERT MUIR GRAVES 40LF COURSE A84WECT BUFFALO ]TILL GOLF COUIZSF P-3 381 I I Item 22. ' 23. 2 Q. 25. 26. 27. 28. 29. :.., 30. 31. 32. 33. 34. BID FORM,,(cont) Catalogue Quantity Description Description Unit. Price 1 each 3" Remote Control Valve with required wiring, _ installed as specified 1 each 2Y'Remote Control Valve with required wiring, installed as specified 1 each 2" Remote Control Valve with required wiring, installed as specified. SL3 /��cn GF /3�• $ 1 each 1'h"Remote Control Valve with required wiring, installed as specified. " ;0;/.S0 i�=s /7/•vim $ 1 each. 8" Gate Valve,installed as specified. /Y/.i $ 1 each 6" Gate Valve,installed as specified. Ae,r S"&ee" �d�•�o $ 1 each 4" Gate Valve,installed as specified. 1 each 3" Gate Valve,installed as specified. ��T S/��. _�� ov $ 1 each 2�" Gate valve,installed as specified. 1 each 2" Gate Valve ,installed as specified. /✓y — $ 1 each 6" check valve,installed as specified. _ 1 each -=F-" pressure relief valve, installed as specified;, n Lt %/G-v/-A<b 1 each Float valve and control valve combination, in- stalled as specified. The foregoing unit prices are to be used solely for determining possible changes in the contract amount resulting from possible changes in the plans or work and for determining the value of work completed for progress payments. Any contract entered into will, however, be Lump Sum. ' The following breakdown will be required as part of bids submitted, as well as being part of any contract which may be entered into: Required working days to complete each Operation operation exclusive of inclement weather. 1. Staking of Supply and Alain Lines, Irrigation Heads, and Other Fea- tures as required for approval. days b 3 2 2. Supply, main line installation and installation of pump supply, com- plete, tested and operable. ifs days 3. All piping, heads, valves and ap- purtenances, complete, tested and operable. days TOTAL CONSTRUCTION TIME S O days General Conditions This proposal is valid only if the signature of the bidder is ' affixed hereon and the date completed in the space provided. Proposal. (coat.) The listed items represent pay items. All other work indicated in the plans and specifications shall be included in the ),:id items stated herein. No other items will be paid. � Extension of these unit prices is on the basi.s of es.timated quantities (said estimated quantities are not warranted or guaranteed) and the totaling of these extensions is for t.h(.! purpose of comparing bids only. All applicable sales taxes, State and/or. Federal, and any other special taxes, patent rights or royalties are included in the prices quoted in this Proposal.. Any furnished quantities are approximate only, being given as a basis for the comparison of bids, and'the City and Golf Course Architect do not, expressly or by implication, agree that the actual amount of work will correspond thercwit.h, but. reserves the right to increase or decrease the amount of any ' class or portion of.the work or to omit portions of the work as may be deemed necessary or advisable by the City and Golf Course Architect, Licensed in accordance with an Act providing for the registration of Contractor's License Number Class z (If an individual, so state. If a firm is a copartnersiiiY, state the firm name and give the names of all individuals or copartners composing the firm. If a corporation, state legal names of corporation, and also names of President, Secretary, Treasurer, and Manager thereof.) 1 ELL c' y Fig TILL /-',� ) Business Address ROOCRT MUM GRAYCS GOLF COURSE •NCM,Tccl BUFFALO HILL GOLF COURSE P-6 M';,] Councilman Daley moved all bids be referred to the Park Committee and Golf Course Expansion Committee with power to act. Seconded by Councilman Olson. Carried. Mel Wollan, County Commissioner, reported that the county is ready to advertise for bids for the construction of the Northwest Drainage System which is being participated 50/50 with the City of Kalispell. He submitted a preliminary contract and a few changes were made by City Attorney Donahue. Councilman Sliter moved Acting Mayor Happ be authorised to sign the Northwest ' Drainage System agreement as revised. Seconded by Councilman Olson. Carried. Councilman Sliter moved that a title research on the land exchange between the Thompson and City of Kalispell in Lawrence Park be made at city expense. Seconded by Councilman Allen. Carried. There being no further business, the meeting was adjourned. Minutes approved as read, July 21, 1975. ATTEST: Marjo ie Giermann, Deputy City Clerk L7 Norma E. Happ, Acting Mayor