10. Enterprise FundsENTERPRISE FUNDS
Page
Fund
Dept
1-2
5160
Airport
$
224,014
3-10
5210
Water
$
5,171,851
11-16
5310
454 Sewer Operations & Billing
$
2,577,400
17-20
5310
455 Waste Water Treatment Plant
$
6,395,053
21-25
5349
Storm Sewer
$
2,250,765
26-28
5510
Solid Waste
$
1,419,199
Total
$ 18,038,282
AIRPORT
ACCOUNT # 5160-430
PURPOSE OF THIS DEPARTMENT: Why does this deparment exist?
The Kalispell City Airport is part of the overall transportation system for the City of Kalispell, serving both
recreational and commercial interests with an optional mode of transportation.
DEPARTMENT PERSONNEL:
GOALS OF THIS DEPARTMENT: What are the departmental goals that support the purpose?
The primary goal for the management of the Kalispell Airport is to maintain the airfield in a manner that
provides for the ability to effectively accommodate the air traffic using the facility.
INTENDED OUTCOMES FROM BUDGET EXPENDITURES
This fall, municipal voters will consider a ballot issue to either 1) move forward with improvements to the
airport as identified in the adopted airport master plan, or 2) not move forward with this course of action.
This situation presents a temporary degree of uncertainty within the airport budget as modifications may
be necessary, pending election results. However the vote ends, one of the issues at the airport is funding
ongoing maintenance. The FY2014 budget represents the intent to review the organizational structure that
best meets the needs of the airpport. This review would include looking at potential contract management
of the facility, which could result in substantial savings for the airport. These savings, if realized, could be
used for maintance of the facility.
AIRPORT ENTERPRISE FUND -operations
FUND: 5160-430-430310
PROJECTED REVENUE AND FUND SUMMARY
BEGINNING CASH
10100 Cash - Operations
10120 Cash: Reserve - Capital Improvements
10130 Cash: Previous Land Sales
REVENUES
343062
Commercial Fees
343063
Tie down fees
343069
Hangar Leases
343071
Hangar Site Leases (3%)
343101
FBO Lease - Red Eagle Aviation (2%)
343102
Ground Leases (Hilton) (3%)
343620
Fuel Tax
371010
Investment Earnings
change in A/R; comp abs.
Total Revenue
Total Available
EXPENDITURES
Airport Operations
Improvements using Land Sale Funds
Depreciation
Total Expenses
add back unfunded depreciation
ENDING CASH
10100 Cash: Operating
10120 Cash: Designated Capital Improvements
10130 Cash: land sales
Total Cash
estimated
proposed
ACTUAL
BUDGET
ACTUAL
BUDGET
FY11/12
FY12/13
FY12/13
FY13/14
$75,765
$90,171
$90,171
$93,791
$40,000
$45,000
$45,000
$50,008
$73,010
$28,979
$28,979
$0
$188,775
$164,150
$164,150
$143,799
$
9,615
$ 9,400
$ 10,000
$ 9,400
$
2,220
$ 3,500
$ 2,000
$ 2,500
$
14,885
$ 12,000
$ 12,000
$ 12,000
$
16,503
$ 16,500
$ 16,999
$ 17,510
$
17,045
$ 17,340
$ 17,386
$ 17,734
$
11,385
$ 11,726
$ 11,727
$ 12,078
$
4,919
$ 5,500
$ 5,500
$ 6,000
$
12,368
$ 3,000
$ 1,500
$ 2,000
$
88,940
$ 78,966
$ 77,112
$ 79,222
$277,715
$243,116
$241,262
$223,021
$69,534
$78,392
$68,492
$80,172
$44,031
$63,010
$28,971
$43,010
$100,832
$100,832
$100,832
$100,832
$214,397
$242,234
$198,295
$224,014
$100,832
$100,832
$100,832
$100,832
$90,171
$85,745
$93,791
$87,841
$45,000
$15,969
$50,008
$11,998
$28,979
$0
$0
$0
$164,150 $101,714 $143,799 $99,839
($5,000 designated annually from Operating cash account to Designated -Capital Improvements account.)
1
AIRPORT ENTERPRISE FUND -operations
FUND: 5160-430-430310
PERSONAL SERVICES: FTE's
EXPENSE DETAIL
proposed
ACTUAL
ACTUAL
BUDGET
BUDGET
FY10/11
FY11/12
FY12/13
FY13/14
0.50 0.50 0.50 0.50
110
Salaries
$
36,146
$ 33,710
$ 35,108
$ 20,898
121
Seasonal salary
$
1,671
$ 2,514
$ 3,258
$ 3,420
153
Health Insurance
$
3,178
$ 4,849
$ 7,308
$ 7,308
155
Retirement
$
2,224
$ 2,360
$ 2,497
$ 2,591
Total Personal Services
$
43,219
$ 43,433
$ 48,172
$ 34,216
Maintenance & Operations:
210
Supplies, postage, small equip
$
824
$ 633
$ 1,150
$ 3,000
341
Electricity
$
1,594
$ 1,606
$ 1,500
$ 1,500
345
Telephone/ cell
$
773
$ 806
$ 850
$ 800
354
Contract Services - Labor/materials
$
5,178
$ 7,181
$ 4,000
$ 18,780
356
Contract Services - Snow Removal
$
8,485
$ 1,600
$ 6,000
$ 5,000
362
Repair & Maintenance - Equip/Lights, etc
$
6,464
$ 1,703
$ 3,000
$ 2,000
373
Dues & Training
$
1,513
$ 701
$ 500
$ 500
390
Equipment Rental
$
1,970
$ 2,560
$ 2,000
$ 2,500
510
Property & Liability Ins.
$
3,838
$ 3,816
$ 4,000
$ 3,900
522
Administrative Transfer
$
4,465
$ 2,823
$ 4,398
$ 4,326
528
Data Processing
$
2,672
$ 2,672
$ 2,822
$ 3,650
Total Maintenance & Operations
$
37,776
$ 26,101
$ 30,220
$ 45,956
Improvements from Land Sale $:
357
Contract Services - Legal
$
32,810
$ 14,031
$ 10,000
$ -
355
Election
$
-
$ -
$ 10,000
$ -
950
Construction Projects
$
9,650
$ 30,000
$ 43,010
$ 43,010
$
42,460
$ 44,031
$ 63,010
$ 43,010
820 Depreciation (unfunded) $ 100,832 $ 100,832 $ 100,832 $ 100,832
Total Airport $ 224,287 $ 214,397 $ 242,234 $ 224,014
FA
WATER
ACCOUNT # 5210-447
PURPOSE OF THIS DEPARTMENT: Why does this department exist?
To provide safe, potable and palatable water for the needs of the domestic, commercial and industrial
consumers.
DEPARTMENT PERSONNEL: (14.80 FTE)
.20 Public Works Director/City Engineer
.25 Senior Civil Engineer
.15 Budget Resource Manager
.25 Construction Manager
.20 Administrative Coordinator
.20 Project Manager
.05 Road and Fleet Superintendent
.20 Administrative Assistant
A 0 General Laborer
.60 Utility Management Superintendent
.40 Assistant Civil Engineer
.25 Engineering Tech/GIS/IT Support
1 Water Meter Maintenance Supervisor
1 Water Meter Maintenance Technician
1 Water Maintenance Supervisor
4 Water Maintenance Operators
1 Water Production Supervisor
2 Water Production Operators
.50 Meter Reader
1 Utility Billing Clerk
.25 Finance Director
.15 City Accountant
.05 Assessment Coordinator
GOALS OF THIS DEPARTMENT: What are the departmental goals that support the purpose?
1. To operate the distribution and production facilities to meet Public Drinking Water Standards.
2. Provide drinking water that is safe and palatable.
3. Maintain the system to achieve adequate pressure and flows for fire emergencies.
INTENDED OUTCOMES FROM BUDGET EXPENDITURES:
This years budget presents a plan to maintain the water system that meets the city's current demands
through routine and specialized system improvements. The budget also addresses several larger
improvements and replacements to the water system infrastructure needed to improve reliability and
increase volume flows for fire protection.
WATER FUND (Operations & Billing)
FUND: 5210-447-430550
PROJECTED REVENUE AND FUND SUMMARY
BEGINNING CASH
10100
Operating Cash
10120
Impact Fee Cash
10125
Meter Replacement Cash
10107
Capital & Emergency Reserve -target $400,000
10130
Bond Reserves (restricted cash)
Adj. to Cash/ A/R/Comp. Abs.
REVENUES
343210
Metered Water Sales (billed) (10100)
343230
Meter Replacement Fee (10125)
343225
Impact Fees (10120) (adj for receivable- $4,094)
343365
Impact fee Admin (10100)
343260
Misc.-Installation/Reconnect/Tag fees (10100)
371010
Interest Earnings (10100)
Interest Earnings -Impact Fee Cash (10120)
Total Revenue
Total Available
estimated
proposed
ACTUAL
BUDGET
ACTUAL
BUDGET
FY11/12
FY12113
FY12/13
FY13/14
$2,321,299
$2,595,133
$2,595,133
$2,560,494
$448,354
$472,801
$472,801
$522,301
$266,434
$263,273
$263,273
$221,773
$340,000
$370,000
$370,000
$400,000
$515,449
$460,119
$460,119
$411,258
$2,102
$3,893,638
$4,161,326
$4,161,326
$4,115,826
$2,283,278
$2,600,000
$2,600,000
$2,800,000
$96,385
$95,000
$95,000
$95,000
$197,484
$225,000
$218,500
$190,000
$9,138
$13,000
$11,500
$10,000
$41,579
$40,000
$50,000
$40,000
$40,206
$40,000
$30,000
$27,000
$4,847
$10,000
$4,000
$3,000
$2,672,917
$3,023,000
$3,009,000
$3,165,000
$6,566,555
$7,184,326
$7,170,326
$7,280,826
EXPENSES
EXPENSES FROM RATES
$2,127,799
$3,614,781
$2,745,000
$3,868,251
Expenses from Meter cash (10125)
$99,546
$136,500
$136,500
$160,000
Capital Outlay - from Impact Fees (10120)
$77,884
$158,000
$73,000
$203,600
Debt Service -from Impact Fees (10120)
$100,000
$100,000
$100,000
$100,000
Depreciation
$825,000
$840,000
$840,000
$840,000
Total All Departments
$3,230,229
$4,849,281
$3,894,500
$5,171,851
add back depreciation
$825,000
$840,000
$840,000
$840,000
ENDING CASH
10100 Operating Cash
$2,595,133
$1,643,352
$2,560,494
$1,569,243
10120 Impact Fee Cash
$472,801
$449,801
$522,301
$411,701
10125 Meter Replacement Cash
$263,273
$221,773
$221,773
$156,773
10107 Capital & Emergency Reserve -target $400,000
$370,000
$400,000
$400,000
$400,000
10130 Bond Reserves (restricted cash)
$460,119
$460,119
$411,258
$411,258
Total cash
$4,161,326
$3,175,045
$4,115,826
$2,948,975
3
WATER FUND SUMMARY
FUND: 5310-454-43 0620-630/455-43 0640
EXPENDITURE SUMMARY
Personal Services:
Water billing
Water Operations
Total PERSONAL SERVICES
Maintenance & Operations:
Water Billing services
Water Operations
Total M & O from rates
Capital Outlay from rates:
Water Operations
Total CAPITAL from rates
Debt Service from rates:
Water
proposed
ACTUAL
ACTUAL
BUDGET
BUDGET
FY10/11
FY11/12
FY12/13
FY13/14
$111,182
$130,425
$110,766
$110,564
$872,930
$820,990
$924,404
$900,465
$984,112
$951,415
$1,035,170
$1,011,030
$72,617
$73,577
$84,306
$87,992
$642,612
$600,968
$726,985
$725,509
$715,229
$674,545
$811,291
$813,501
$311,786
$186,353
$1,417,261
$1,709,775
$311,786
$186,353
$1,417,261
$1,709,775
$411,212
$315,486
$351,059
$333,945
Total DEBT from rates
$411,212
$315,486
$351,059
$333,945
TOTAL EXPENSES FROM RATES
$2,422,339
$2,127,799
$3,614,781
$3,868,251
Capital Outlay - Meter Replacement funds:(10125)
$71,118
$99,546
$136,500
$160,000
Capital Outlay - from Impact Fee funds: (10120)
$471,093
$77,884
$158,000
$203,600
Debt Service -from Impact Fees: (10120)
$100,000
$100,000
$100,000
$100,000
Depreciation (non -cash item)
$825,000
$825,000
$840,000
$840,000
Grand Total
$3,889,550
$3,230,229
$4,849,281
$5,171,851
4
WATER OPERATIONS
FUND: 5210-447-430550
Personal Services: FTE's
EXPENSE DETAIL
proposed
ACTUAL
ACTUAL
BUDGET
BUDGET
FY10/11
FY11/12
FY12/13
FY13/14
19.60 13.25 12.90 12.80
110
Salaries & Wages
$665,155
$601,033
$664,242
$658,470
111
Seasonal Salaries
$1,712
$5,000
$5,000
112
Severance
$11,897
$17,545
$35,000
$33,000
121
Overtime/Call Outs
$25,564
$20,927
$20,000
$20,000
153
Health Insurance
$126,031
$139,939
$155,842
$143,055
155
Retirement - PERD
$44,283
$39,835
$44,321
$40,940
Total Personal Services
$872,930
$820,990
$924,404
$900,465
Maintenance & Operations:
210
Office Supplies/Equip/Computers/ GIS
$6,415
$6,718
$10,000
$10,000
218
Equip. (non-capital)/Safety Equip & Supplies
$16,649
$16,274
$9,500
$8,500
226
Chlorine & Chemical
$27,104
$29,438
$38,000
$38,000
229
Other Supplies/janitorial/consumable tools
$2,571
$2,832
$4,800
$4,500
231
Gas & Oil
$31,480
$31,624
$35,000
$36,000
312
Postage & printing
$3,698
$3,660
$4,500
$4,000
336
Public Water Supply Fee
$15,299
$15,206
$19,000
$18,000
341
Electricity
$121,103
$126,393
$143,000
$139,000
344
Natural Gas
$12,984
$11,691
$13,000
$13,000
345
Communications
$7,095
$8,464
$8,000
$8,000
349
Lab Services
$19,290
$11,480
$22,500
$22,000
353
Auditing
$2,550
$2,500
$3,000
$5,000
354
Contract Services
$41,618
$59,953
$55,000
$55,000
356
Consultants-Wtr Rights Acquisition/Wtr Modeling
$26,378
$17,992
$25,000
$25,000
357
Facility Plan /Rate Study /Impact Review
$3,921
$0
$6,500
$0
362
Repair & Maint./Equip. maint./radios/equip rental
$10,108
$11,723
$14,950
$15,000
366
Building Maintenance
$11,832
$7,049
$17,000
$12,000
373
Dues & Training
$10,309
$7,467
$9,200
$9,000
388
Medical/DrugTesting
$673
$755
$700
$700
410
Construction Materials
$37,452
$29,612
$32,000
$32,000
422
Hydrants
$3,057
$9,037
$10,000
$9,000
423
Materials - Mains
$8,117
$8,770
$11,000
$10,000
424
Materials -Service lines
$8,301
$11,639
$11,000
$14,000
425
Materials - Wells/Pumps
$24,008
$7,302
$30,000
$40,000
510
Property & Liability Ins.
$33,829
$33,193
$36,500
$32,000
512
Uninsured Loss -Deductible & Goodwill Expenditures
$26,669
$3,132
$24,000
$24,000
R
WATER OPERATIONS
5210-447-430550
EXPENSE DETAIL
proposed
ACTUAL
ACTUAL
BUDGET
BUDGET
FY10/11
FY11/12
FY12/13
FY13/14
Maintenance & Operations -continued:
521
Central Garage Transfer
$7,500
$8,000
$8,000
$12,398
522
Administrative Transfer
$94,723
$91,185
$96,825
$90,775
528
Data Processing Transfer
$20,041
$20,041
$21,172
$29,798
532
Office Rent/Lease Pymnt (Silverbrook Well)
$7,838
$7,838
$7,838
$8,838
Total Maintenance & Operations
$642,612
$600,968
$726,985
$725,509
490200
Debt Service- ALL BONDS & LOANS:
610/620
Principal, Interest, fiscal fees
$511,212
$415,486
$451,059
$433,945
CAPITAL OUTLAY
Capital Outlay: Operating funds (RATES)
935
Armory Well Generator
$0
$6,473
$90,000
$0
936
Noffsinger Spring Generator CARRYOVER
$0
$0
$90,000
$90,000
937
Sheepherder Backup Power CARRYOVER
$0
$0
$16,000
$16,000
938
Lower Zone Reservoir Imprvmnts CARRYOVER
$0
$0
$120,000
$120,000
940
Machinery & Equipment
$106,232
$33,948
$76,500
$16,375
941
Utility Asset Management Program
$0
$0
$34,000
$0
944
Water Maintenance Vehicle
$0
$24,156
$0
$30,000
947
Meters FY12; US 93 N. Utility Relocate
$0
$75,390
$0
$45,500
950
11 St E wtr FY 11; 4th Ave EN Wtr Main Reple
$167,942
$0
$0
$800,000
951
Security Upgrades FYI l/SCADA Upgrades FYI:
$31,286
$14,139
$25,861
$25,000
956
Upper Zone/Lower Zone Interconnection
$6,326
$32,247
$0
$0
958
Loop Projects (carryover)
$0
$0
$165,000
$0
962
S. Woodland Dr. System hnprvmmsCARRYOVE.
$0
$0
$311,900
$311,900
963
Abandon 2" water line CARRYOVER
$0
$0
$45,000
$45,000
964
2nd Ave WN Waterline Replacement (carryover)
$0
$0
$248,000
$210,000
965
East Arizona Pipe Up -Size
$0
$0
$195,000
$0
Subtotal capital from operating fund
$311,786
$186,353
$1,417,261
$1,709,775
430555 Capital Outlay -Impact Fee Funds (010120)
941
Meters
$65,000
$65,000
$65,000
$35,600
930
Contract Main Upsize (impact fee Acct)
$0
$0
$50,000
$133,000
953
Develop Wtr Supply Section 36 Well (carryover)
$92,626
$12,884
$43,000
$35,000
Subtotal capital from Impact Investment fees
$157,626
$77,884
$158,000
$203,600
430550
Settlement from Impact Fees (10120)
358
Owl Corporation
$313,467
$0
$0
$0
6
WATER OPERATIONS
5210-447-430550
EXPENSE DETAIL
proposed
ACTUAL
ACTUAL
BUDGET
BUDGET
FY10/11
FY11/12
FY12/13
FY13/14
Capital Outlay:
430550 Capital Outlay -Meter Funds (010125)
411 Meter Pit - Materials
$0
$0
$6,500
$0
944 Meter Maintenance Vehicle
$0
$24,156
$0
$0
948 Meters -Replacement$ subtotal
$71,118
$75,390
$130,000
$160,000
$71,118
$99,546
$136,500
$160,000
510400 Depreciation
831
Depreciation expense
$825,000
$825,000
$840,000
$840,000
Total Water Facilities
$3,705,751
$3,026,227
$4,654,209
$4,973,294
430560
WATER BILLING
Personal Services: FTE's
2
2
2
2
110
Salaries& Wages
$85,302
$87,680
$82,942
$86,192
112
Severance
$0
$12,000
$0
$0
153
Health Insurance
$20,305
$24,597
$22,343
$18,796
155
PERD
$5,575
$6,148
$5,481
$5,577
Total Personal Services
$111,182
$130,425
$110,766
$110,564
Maintenance & Operations:
210
Office Supplies/computers
$495
$1,435
$3,000
$2,500
353
Auditing
$1,500
$1,500
$1,500
$2,020
354
Contract Services
$3,566
$2,292
$4,000
$2,000
355
Postage/Other Billing Costs
$29,953
$30,098
$35,000
$35,000
373
Dues & Training
$1,046
$1,412
$1,500
$1,500
522
Administrative Transfer
$6,178
$6,961
$7,103
$7,336
528
Data Processing Transfer
$22,041
$22,041
$24,365
$29,798
532
Office rent
$7,838
$7,838
$7,838
$7,838
Total Maintenance & Operations
$72,617
$73,577
$84,306
$87,992
Total Water Billing
$183,799
$204,002
$195,072
$198,556
GRAND TOTAL WATER FUND
$3,889,550
$3,230,229
$4,849,281
$5,171,851
7
,�1iit� r � ez� 1� � �7�� r ���►��
FUND: 5210-447-43 0550/560
FY 2014 BUDGET HIGHLIGHTS
Line Item Detail: Water Fund
354 Contract Services - $55,000
This line item covers the cost of annual contracts, i.e., U-dig fees, generator testing and maintenance, coveralls, and
estimated electrical and system repairs.
424 Materials - Service Lines - $14,000
Increased $3,000 due to new no lead EPA regulations effective in 2014, distributors have indicated a 37% increase for no lead fittings.
425 Materials - Wells/Pumps - $40,000
Increased $10,000 due to aging pumps in our system.
Capital Outlay: Operating Funds (Rates)
936 Noffsinger Spring Emergency Generator Replacement - CARRYOVER $90,000
Replace the old emergency generator which is currently inside the shop area, with a new emergency generator located outside and above
flood stage elevation. During our 2010 safety/building/fire audit many deficiencies were pointed out about the generator being at its current
location, with no containment area for either the generator or the fuel system, proper venting is a large problem, no seismic bracing to
prevent roll over, fire protection and accessibility. The age of the generator make it more and more difficult to find replacement parts.
By replacing this generator it reduces chances of fire and safety of workers from inside the shop area and meets the Fire Department safety
audit requirements. A new generator also increases efficiency and reliability. A Grant application has been submitted to supplement the
funding of the replacement generator. The Emergency Backup Grant, if received, will contribute 75% of the replacement cost (W-EX-160).
937 Sheepherder Tank Backup Power - CARRYOVER $16,000
Provide backup power for the SCADA system at Sheepherder Reservoir. Currently there is no backup power at Sheepherder Reservoir.
Power frequently goes out at this location, when the power is out the water level in the tank is unknown and signals are not being sent to
activate pumps. A Grant application has been submitted to supplement the funding of the replacement generator. The Emergency Backup
Grant, if received, will contribute 75% of the replacement cost (W-EX-161).
938 Lower Zone Reservoir Improvements- CARRYOVER $120,000
An inspection of the lower zone reservoirs identified structural and potential water quality risk inadequacies. The structural improvements
include pressure epoxy injection for the vertical cracking in perimeter walls. Surface concrete improvements involve replacing and sealing
areas of extreme spatting, chipping, and voids/gaps to the outside. Eaves and screen venting will be improved to meet DEQ Standards and
prevent degradation of the roof structure (W-EX-158).
8
WATER OPERATIONS
FUND: 5 210-447-43 05 5 0/5 60
FY 2014 BUDGET HIGHLIGHTS - con't.
Line Item Detail: continued
Capital Outlay: Operating Funds (Rates) Cont.
940 Machinery & Equipment- $16,375
$6,375 - Large Format Document Scanner & Plotter. Replaces current plotter that the electronic components
are starting to fail. The scanner would allow drawings of Public Works system improvements to be scanned into the nehvork
server for rapid retrieval, will also reduce space needed for storage.
Cost shared between/Street, Sewer, Storm, Water, Light Maint, Solid Waste -Total Cost $25,500
$10,000 - Survey Grade Global Positioning System (GPS). Current GPS system is over 12 yrs old and is no
longer functioning. The GPS system will be used to support the new Asset Management System for Water, Sewer, Street, and Storm
systems, and to identify GPS location ofCity's 500 plus lights, and to support right of way and routing of Solid Waste services.
Cost shared between/Street, Sewer, Storm, Water, Light Maint, Solid Waste - Total Cost $40,000
944 Vehicles - $30,000
$30,000 - 3/4 Ton 4x4 Pickup
947 US 93 North Utility Relocate Design & Construction - $45,500
This project replaces approximately 1,650 feet of 12" PVC water main with a combination of 12" PVC and 18" HDPE water main.
Currently, this main is the only major water transmission main connecting the areas west of the proposed bypass to the rest of the
City water distribution system. This project was necessitated by the revision of Three Mile Road as it relates to the proposed
Highway 93 Bypass. MDT placed this new intersection as a top priority and plans on constructing it with their next round of
available funding, requiring design to be completed and ready for 2013 construction. All water main relocated under the proposed
bypass will be upsized to 18" HDPE. This will allow for an easy future upgrade of connecting mains as development expands north
and west. The overall project also includes the replacement of sanitary sewer force main. Costs associated with the sewer main
are not included in this line item. The new 18" HDPE water main enables 56% more flow capacity. This project will be paid for by
water rates (44%) and impact fees (56%). Total project cost $103,500.
950 4th Avenue East North Water Main Replacement- $800,000
This project replaces approximately 2,000 feet of 12" CIP water main with 12" PVC water main. The new main will provide reliability
for system stresses associated with fire flows, and limit liability associated with claims from private properties and transportation
system right-of-ways arising from main breaks. The existing 12" cast iron water main within the limits of this project was installed
in 1925 and has had 8 recorded water main breaks/repairs resulting in an estimated $32,700 in time and materials for the repair.
The project includes installation of24" steel bore and jack pipe casing under the railroad north of center street and 12" HDPE under
Highway 2 (Idaho Street). This project will be paid for by water rates.
951 SCADA System Upgrade/Improvements - CARRYOVER $25,000
System improvements to include installing programmable logic controllers which monitor and control individual well sites
in conjunction with the SCADA system. City operators will be able to review the recorded well activities and corresponding
daily water level data, and perform long term trend analysis essential to the City's water operations.
0J
WATER OPERATIONS
FUND: 5210-447-43 05 50/560
FY 2014 BUDGET HIGHLIGHTS - con't.
Line Item Detail: continued
Capital Outlay: Operating Funds (Rates) Cont.
962 S. Woodland Dr. Water System Improvements - CARRYOVER $311,900
This project upgrades the fire flows by replacing the existing 6" and 4" water line to 8 "water line in S Woodland Ave, Lehi Lane,
Greendale Ct, and Rogers Ct. The project improves fire protection to 30 residential and commercial living units. Existing 6" and 4" water
line only provides fire flows up to 630 to 1100 gpm. Fire code requires fire flows to maintain 1,000 gpm for residential areas and
1,500 gpm for commercial areas (W-EX-24).
963 Abandon 2" Water Line - CARRYOVER $45,000
Abandon 2" line between 3rd Avenue West and 5th Avenue West. Reconnect existing services to existing main.
Work to be completed by City Crew (W-EX-153).
964 2nd Avenue WN Waterline Replacement- CARRYOVER $210,000
This project will replace the corroded 6" water main on 2nd Ave WN between Washington St and
California St. The project would install 800' of 8" C900 water main and appurtenances on the east side of 2nd Ave WN,
reconnect services and fire hydrants, and includes pavement repair (W-EX-154) .
Capital Outlay - Impact Fee funds (10120)
930 Contract Main Upsize - S133,000
$75,000 - Funds required for small city requested upsizing ofprivate development infrastructure (W-EX-1 19).
$58,000 - Funds to upsize water main for US 93 North Bypass (W-EX-162)
941 Meters - $35,600
New Services
953 Develop Water Supply for Section 36 Well - CARRYOVER $35,000
This project includes pump testing the existing well to determine drawdown and feasible pumping rates. The project also includes
the time and materials necessary to prepare a water right change application (W-EX-147).
Capital Outlay - Meter funds (010125)
948 Meters - S160,000
Replacing approximately (650) residential and (45) commercial meters.
m
SEWER DEPARTMENT
ACCOUNT # 5310
PURPOSE OF THIS DEPARTMENT: Why does this department exist?
To maintain and operate the wastewater collection and treatment facility to have a minimum impact on the
environment and enhance the quality of life for the community.
WWTP DEPARTMENT PERSONNEL: (7.55 FTE)
.20 Public Works Director/City Engineer 1 WWTP Manager
.10 Senior Civil Engineer 4 WWTP Operators
.15 Budget Resource Manager 2 WWTP Chemists
.10 Administrative Coordinator
SEWER DEPARTMENT PERSONNEL:
.15 Public Works Director/City Engineer
.15 Senior Civil Engineer
.15 Budget Resource Manager
.25 Construction Manager
.20 Administrative Coordinator
.20 Project Manager
.20 Administrative Assistance
.05 Road and Fleet Superintendent
(6.05 FTE & 1 Unfunded FTE)
.25 Engineering Tech/GIS/IT Support
2.5 Sewer Maintenance Technician
1 Vacant/Unfunded Swr Maint. Technician
.50 Storm/Sewer Maintenance Supervisor
05 Assessment Coordinator
50 Meter Reader
50 Utility Billing Clerk
25 Finance Director
15 City Accountant
GOALS OF THIS DEPARTMENT: What are the departmental goals that support the purpose?
WWTP
1. To protect the health of the community by discharging wastewater that meets state and federal regulations.
2. Economically maintain facilities to ensure maximum operational functions and equipment longevity.
Maximize secondary use of treatment biosolids.
SEWER COLLECTION
1. To ensure conveyance of wastewater in the community to the WWTP
Economically maintain facilities for maximum operational functions and equipment longevity.
INTENDED OUTCOMES FROM BUDGET EXPENDITURES
The FYI wastewater budget provides for routine replacement of equipment within the collection system and
treatment plant. The budget also provides for several improvements to the collection system infrastructure
needed to improve emergency backup, reliability, and capacity.
SEWER- SANITARY OPERATIONS, BILLING, WASTEWATER TREATMENT
FUND: 5310
PROJECTED REVENUE AND FUND SUMMARY
estimated
proposed
ACTUAL
BUDGET
ACTUAL
BUDGET
FY11/12
FY12/13
FY12/13
FY13/14
BEGINNING CASH
10100
Operating
$102,822
$353,471
$353,471
$1,261,719
10123
SANITARY Sewer Impact Fee Inv. Account
$1,752,917
$1,862,927
$1,862,927
$1,996,427
10124
WWTP Impact Fee Inv. Account
$398,388
$334,230
$334,230
$300,230
10125
WWTP Equipment Repl/Evergreen
$664,597
$969,880
$969,880
$1,156,531
1013x
Bond Reserves/ Operating reserve
$1,522,469
$1,522,469
$1,522,469
$1,109,313
Adjmts to Cash (comp abs., receivables, bond reserve)
$38,693
$0
$0
$0
REVENUES
343310 SEWER SERVICE -billed (10100)
343360 Misc. ; (10100)
343330 Impact Fce/Hookup-Sanitary (10123)
343330 Admin Impact Fees Sanitary (10100)
343335 Impact Fee/Hookup-WWTP (10124)
343335 Admin Impact Fees WWTP (10100)
Bonded Debt
371010 Interest -operations (10100)
Interest-WWTP/Evergreen (10 125)
Interest-WWTP Impact Fee Acct. (10124)
Interest -Sanitary Impact Fee Invest. Acct. (10123)
Total Revenue
Total Available
EXPENSES
EXPENSES FROM RATES
Capital Outlay City/Evergreen Funds (10125)
Capital Outlay / Bonded Debt
Capital Outlay - from Impact Fee funds:
Capital from impact fee funds Sanitary (10123)
Debt Service From Impact fees:
Portion of debt from impact Sanitary (10123)
Portion ofdebt from impact WWTP (10124)
Depreciation (non cash expense)
Total Expenses
Add depreciation to cash
Add cash distribution to Evergreen/City 10125 from 10100
ENDING CASH
10100 Operating
10123 SANITARY Impact Fee Inv. Account
10124 WWTP Impact Fee Inv. Account
10125 WWTP Equipment Replacement/Evergreen
1013x Bond Reserves (restricted funds)
$4,479,886 $5,042,977 $5,042,977 $5,824,220
$3,707,993
$4,115,000
$4,115,000
$4,200,000
$17,910
$2,000
$8,000
$5,000
$116,051
$87,400
$142,500
$142,500
$6,546
$4,600
$7,500
$7,500
$156,538
$117,800
$190,000
$190,000
$8,781
$6,200
$10,000
$10,000
$0
$865,000
$200,000
$1,071,000
$19,627
$20,700
$16,000
$16,000
$9,301
$4,050
$7,000
$7,000
$4,304
$3,600
$1,000
$1,000
$18,959
$16,650
$16,000
$16,000
$4,066,010
$5,243,000
$4,713,000
$5,666,000
$8,545,896
$10,285,977
$9,755,977
$11,490,220
$3,548,901
$3,786,614
$3,661,408
$4,006,053
$115,617
$731,948
$231,948
$921,000
$0
$865,000
$200,000
$1,071,000
$0
$245,000
$0
$479,400
$25,000
$25,000
$25,000
$25,000
$225,000
$225,000
$225,000
$225,000
$2,240,000
$2,245,000
$2,245,000
$2,245,000
$6,154,518
$8,123,562
$6,588,356
$8,972,453
$2,240,000
$2,245,000
$2,245,000
$2,245,000
$411,599
$411,599
$411,599
$411,599
$353,471
$715,357
$1,261,719
$1,408,877
$1,862,927
$1,696,977
$1,996,427
$1,650,527
$334,230
$230,630
$300,230
$266,230
$969,880
$653,581
$1,156,531
$654,130
$1,522,469
$1,522,469
$1,109,313
$1,194,603
$5,042,977
$4,819,014
$5,824,220
$5,174,367
11
SEWER - WWTP - BILLING FUND SUMMARY
FUND: 5310-454-43 0620-63 0/455-43 0640
EXPENSE SUMMARY
Personal Services:
Sewer billing
Sanitary Sewer
WWTP & LAB
Total PERSONAL SERVICES
Maintenance & Operations:
Sewer Billing services
Sanitary Sewer
WWTP & Lab
Total M & 0 from rates
Capital Outlay from rates:
Sanitary Sewer Operation
WWTP & Lab
proposed
ACTUAL
ACTUAL
BUDGET
BUDGET
FY10/tl
FY11/12
FY12/13
FY13/14
$91,336
$365,900
$575,515
$106,551
$249,577
$562,860
$92,651
$312,343
$597,402
$87,734
$326,829
$620,276
$1,032,751
$918,988
$1,002,396
$1,034,839
$73,570
$71,041
$82,076
$88,400
$364,281
$357,500
$391,122
$424,653
$685,198
$656,624
$799,083
$827,462
$1,123,049
$1,085,165
$1,272,281
$1,340,515
$0
$0
$36,500
$253,475
$0
$30,420
$110,000
$21,000
Total CAPITAL from rates
$0
$30,420
$146,500
$274,475
Debt Service from rates:
Sanitary Sewer
$80,075
$80,994
$81,500
$71,910
WWTP
$1,026,850
$1,021,735
$872,338
$872,715
Total DEBT from rates
$1,106,925
$1,102,729
$953,838
$944,625
City/Evergreen Replacement funded from rates:
$411,599
$411,599
$411,599
$411,599
TOTAL EXPENSES FROM RATES
$3,674,324
$3,548,901
$3,786,614
$4,006,053
Capital Outlay - Other funds:
WWTP Bonded Debt
$0
$0
$865,000
$1,071,000
WWTP (10125) City/Evergreen account
$82,507
$115,617
$731,948
$921,000
Capital Outlay - from Impact Fee funds:
SanitarySewer (10123)
$8,028
$0
$245,000
$479,400
Debt Service -from Impact Fees
Sanitary Sewer (10123)
$25,000
$25,000
$25,000
$25,000
WWTP (10124)
$225,000
$225,000
$225,000
$225,000
Depreciation (non -cash item)
Sanitary
$800,000
$815,000
$820,000
$820,000
WW'I'P
$1,415,855
$1,425,000
$1,425,000
$1,425,000
Grand Total $6,230,714 $69154,518 $8,123,562 $8,972,453
12
SEWER - OPERATIONS
FUND: 5310-454-430630
EXPENDITURE DETAIL
proposed
ACTUAL
ACTUAL
BUDGET
BUDGET
FY10/11
FY11/12
FY12/13
FY13/14
Personal Services: FTE's
6.95
6.05
5.50
5.55
110
Salaries & Wages
$257,425
$181,096
$233,868
$244,316
112
Severance
$25,843
$10,558
$2,500
$2,500
121
Overtime
$5,930
$1,976
$7,500
$7,500
153
Health Insurance
$57,509
$43,908
$53,882
$57,181
155
Retirement -PERD
$19,193
$12,039
$14,593
$15,332
Total Personal Services
$365,900
$249,577
$312,343
$326,829
Maintenance & Operations:
210
Office Supplies/equip/ computer supplies/GIS
$3,035
$4,079
$6,200
$7,200
218
Equipment (Non Capital)/Safety equip & supplies
$6,160
$2,934
$9,500
$6,500
229
Other Supplies/Janitorial/consurnabletools
$1,826
$1,313
$2,000
$2,000
231
Gas & Oil
$9,216
$9,395
$9,500
$10,000
312
Postage & Shipping / Printing
$480
$114
$300
$300
341
Electricity
$46,918
$45,197
$48,500
$54,500
344
Natural Gas
$13,014
$12,482
$13,500
$13,500
345
Telephone & Comm., alarms
$21,392
$23,108
$21,700
$20,000
353
Auditing
$2,000
$2,000
$2,000
$3,000
354
Contract Services
$28,743
$28,788
$21,000
$21,000
356
Consultants
$77
$3,928
$7,500
$11,500
357
Impact Fee Study/Review Impact Fees
$3,921
$0
$6,500
$9,600
362
Equipment Maintenance/buildings & radios
$6,787
$3,250
$6,800
$5,000
373
Dues & Training, licenses
$1,600
$2,264
$2,500
$3,000
388
Medical Services
$841
$508
$800
$800
410
Construction Materials
$1,974
$2,099
$9,000
$9,000
425
Materials - Pumps/Lift Stations
$32,873
$20,154
$20,000
$35,000
510
Property & Liability Ins
$50,621
$65,059
$73,700
$77,000
512
$5,000 Uninsured loss/$15,000 goodwill expenditures
$18,813
$15,602
$16,000
$20,000
521
Central Garage Transfer
$2,500
$2,500
$2,500
$6,259
522
Administrative Transfer
$63,374
$63,571
$61,533
$53,670
528
Data Processing Transfer
$14,697
$14,697
$16,751
$20,486
532
Office Rent
$7,838
$7,838
$7,838
$7,838
535
Usage charge for 100,000 gallons-Trumble Creek
$25,581
$26,620
$25,500
$27,500
Total Maintenance & Operations
$364,281
$357,500
$391,122
$424,653
13
SEWER - OPERATIONS & Billing
FUND: 5310-454-430630
EXPENDITURE DETAIL
Capital Outlay: from rates (10100)
920 Install Lift Station Enclosure
940 Machinery & Equipment
947 Hwy 93 N Bypass Utility Relocate Design FYI 3, Constr FY14
950 Back Up Generator for L.S. 11
951 1 st Alley EN Pipe Upsize (34% rate 66% impact fees)
954 Sanitary Liquid Disposal Site
960 Manhole Rehabilitation /Sewer Main Replacements
Total Capital Outlay
430635 Capital Outlay -Impact Fee funds (10123)
955 Main & Lift Station Upsize
951 1 st Alley EN Pipe Upsize (34% rate 66% impact fees)
957 Grandview L.S. & main FYI I
Total Capital from Impact fee funds
610 Debt Service -Principal, Interest, fiscal agent fees
510400
831 Depreciation expense
Total Sanitary Sewer Budget
430620 SEWER BILLING F
110 Salaries & Wages
112 Severance
153 Health Insurance
155 Retirement - PERD
Total Personal Services
Materials and Services:
215 Office supplies/computers
353 Auditing and other contract services
355 Billing Costs/postage
373 Dues & Training
522 Administrative transfer
528 Data Processing
532 Office Rent
Total Materials and Services
Total Billing Budget
proposed
ACTUAL
ACTUAL
BUDGET
BUDGET
FY10/11
FY11/12
FY12/13
FY13/14
$0
$0
$6,500
$23,000
$0
$0
$0
$24,875
$0
$0
$10,000
$33,600
$0
$0
$0
$40,000
$0
$0
$0
$107,000
$0
$0
$15,000
$0
$0
$0
$5,000
$25,000
$0
$0
$36,500
$253,475
$0
$0
$245,000
$271,400
$0
$0
$0
$208,000
$8,028
$0
$0
$0
$8,028
$0
$245,000
$479,400
$105,075
$105,994
$106,500
$96,910
$800,000
$815,000
$820,000
$820,000
$1,643,284
$1,528,071
$1,911,465
$2,401,267
1.5
1.5
1.5
1.5
$72,179
$72,337
$67,647
$70,490
$0
$12,000
$0
$0
$14,616
$17,067
$20,675
$12,707
$4,541
$5,147
$4,329
$4,537
$91,336
$106,551
$92,651
$87,734
$583
$1,379
$3,000
$2,500
$2,097
$2,500
$4,000
$5,350
$32,870
$30,954
$35,000
$35,000
$907
$526
$1,500
$1,500
$7,234
$5,803
$6,373
$6,414
$22,041
$22,041
$24,365
$29,798
$7,838
$7,838
$7,838
$7,838
$73,570
$71,041
$82,076
$88,400
$164,906
$177,592
$174,727
$176,134
14
FUND: 5310-454-430630
FY 2014 BUDGET HIGHLIGHTS
Line Item Detail: SANITARY SEWER
354 Contract Services-$21,000
Covers the cost of annual contracts, i.e., U-dig fees, generator testing and maintenance, coveralls, and estimated system repairs.
356 Consultants - $11,500
The City sewer model is 5 years old and the system has incurred multiple changes from development in the last 5 years. The updated
model assist the Public Works staffto analyze system capacity and planning for future development.
425 Materials - Pumps/Lift Stations - $35,000
The City maintains 39 lifl stations, which contain 78 pumps and motors, numerous drives, check valves and controls.
During FY 12/13 staffendured unexpected repairs to 8 different lift stations. In additional to routine maintenance, repairs were
mostly associated with pump and motor faults, or level transmission and control malfunctions. Many ofour pumps have reached
the end oftheir life cycle. Budgeting an additional $15,000 to accommodate 5-6 pump replacements a year.
Capital Outlay: from rates (10100)
920 Sanitary Lift Station Enclosure - $23,000
Three (3) lift station building structures to protect lift station equipment. Enclosures provide weather protection and covering during
winter maintenance activities, as well as reduces heating costs. Covered lift stations protect the equipment and allows maintenance to
be performed efficiently and in a safer environment (SEW-63).
940 Machinery & Equipment- $24,875
$3,500 Power Lift Assembly for swr/storm inspection camera. Costs shared w/storm - Total Cost $7,000
$5,000 Large Diameter Rooter. Costs shared w/storm - Total Cost $10,000
$6,375 - Large Format Document Scanner & Plotter. Replaces current plotter that the electronic components
are starting to fail. The scanner would allow drawings of Public Works system improvements to be scanned into the network
server for rapid retrieval, will also reduce space needed for storage.
Cost shared between/Street, Sewer, Storm, Water, Light Maint, Solid Waste -Total Cost $25,500
$10,000 - Survey Grade Global Positioning System (GPS). Current GPS system is over 12 yrs old and is no
longer functioning. The GPS system will be used to support the new Asset Management System for Water, Sewer, Street, and Storm
systems, and to identify GPS location ofCity's 500 plus lights, and to support right of way and routing of Solid Waste services.
Cost shared between/Street, Sewer, Storm, Water, Light Maint, Solid Waste - Total Cost $40,000
947 Hwy 93 N Bypass Utility Relocate (3 Mile Dr) - $33,600
This project replaces approximately 900 feet of existing 6" PVC force main with approximately 800 feet of 8" HDPE force main
and 100 feet of 12" PVC gravity main. This project was necessitated by the revision of Three Mile Road as it relates to the
proposed Highway 93 Bypass. MDT placed this new intersection as a top priority and plans on constructing it with their next round
of available funding, requiring design to be completed and ready for 2013 construction. All of the existing 6" PVC sewer force main
relocated under the proposed bypass will be upsized to 8" HDPE to allow additional flow capacity and reduced head losses. The
overall project also includes the replacement of a water main. Costs associated with the water main are not included in this item.
The new 8" HDPE force main enables 44% more flow capacity. This project will be paid for by sewer rates (56%) and impact
fees (44%). Total project cost $60,000.
15
FUND: 5310-454-430630
FY 2014 BUDGET HIGHLIGHTS
Line Item Detail: SANITARY SEWER
Capital Outlay: from rates (10100) Cont.
950 Back Up Generator for E. Nicklaus Dr. Lift Station (#I1)-$40,000
Currently no emergency back-up power exists at the East Nicklaus Lift Station (#11), that serves 37 homes. Back-up power would
facilitate the sustainability of facilities during power outages.
960 Manhole & Sewer Main Rehabilitation & Replacement- $25,000
This project would allow for the reconstruction or replacement of sanitary sewer manholes and mains that have deteriorated and are
approaching a potential failure. The sewer crews review and record the function of manholes and mains. During this
review, the crews prioritize the potential projects according to the severity ofthe deterioration (SEW-33).
Capital Outlay - Impact Fee funds (10123)
955 Main & Lift Station Upsize - CARRYOVER $271,400
$45,000 Misc. sewer contract main upsize, and or facility enlargements. $200,000 Regional Lift Station (SEW-52).
$26,400 - Funds to upsize sewer main for US 93 North Bypass (SEW-66)
Capital Outlay - 5107,000 from rates (10100) and $208,000 from impact fee funds (10123)
951 Ist Alley EN Pipe Upsize - $315,000
This project replaces 1,110 ft of 8" gravity sewer main with a 12" sewer main from E Nevada St to E Washington. The pipe increase
will eliminate the current surcharging and main backage created from upstream development's increase flow to the down gradient
sewer conveyance system. The existing 8" gravity sewer main is downstream of the large sewage flow basin associated with the
Buffalo Hill Lift Station (LS 9). The force main from LS 9 was upsized from an 8" to a 10" diameter pipe in 2007. The force main
upsize allows more wastewater flow when the pumps are running. The force main outlets into the gravity conveyance system
approximately 4 blocks north of the beginning of 1 st Ave E Alley Sewer Replacement project. The project cost will be paid
for by sewer rates and impact fees. The new 12" pipe enables 66% more wastewater flow through the upsized conveyance section.
(SEW-47)
16
WASTEWATER TREATMENT PLANT
FUND: 5 310-45 5 -43 0640
EXPENSE DETAIL
Personal Services: FTE's
110 Salaries & Wages
III Seasonal Salaries
112 Severance
121 Overtime
153 Health Insurance
155 Retirement - PERD
Total Personal Services
Maintenance & Operations:
210 Office Supplies/equip/computers
218 Safety Equipment & Supply
225 Alum
226 Chemicals
229 Other Supplies/janitorial/consumable tools/equip rental
231 Gas & Oil
312 Postage & Shipping
336 Licenses and Fees
341 Electricity
342 Water
344 Natural Gas
345 Telephone & Alarms
353 Auditing
354 Contract Services -Glacier Gold
355 Other Contract Services
356 Consultant - Elec Eng/Permit Asst & Optimization Study
357 Impact Fee Study/Review Impact Fees
358 Consultant - TMDL
360 Maintenance Service -mist.
366 Building Maintenance
373 Dues, Training & Training Materials
388 Medical Services
510 Property & Liability Insurance
521 Central Garage Transfer
522 Administrative Transfer
528 Data Processing Transfer
Total Maintenance & Operations
proposed
ACTUAL
ACTUAL
BUDGET
BUDGET
FY10/11
FY11/12
FY12/13
FY13/14
6.05
5.90
5.55
5.55
$326,265
$324,306
$346,973
$354,909
$0
$1,712
$5,000
$5,000
$12,160
$1,078
$0
$0
$20,292
$18,522
$21,000
$21,000
$56,957
$56,929
$61,569
$64,629
$23,199
$21,584
$21,473
$22,025
$438,873
$424,131
$456,015
$467,563
$2,410
$4,283
$5,000
$5,000
$3,017
$2,797
$2,500
$2,500
$15,368
$3,283
$25,000
$20,000
$14,659
$9,717
$12,000
$13,000
$6,130
$5,908
$7,000
$7,000
$10,527
$14,731
$15,000
$15,500
$367
$298
$350
$350
$6,646
$7,325
$11,000
$11,000
$159,496
$158,225
$170,000
$170,000
$5,475
$5,603
$6,000
$6,000
$52,717
$50,405
$55,000
$55,000
$4,292
$4,851
$5,500
$5,000
$2,750
$2,750
$2,750
$4,000
$106,814
$114,009
$118,000
$115,000
$34,162
$31,296
$30,000
$30,000
$19,609
$5,820
$35,000
$65,000
$0
$0
$0
$0
$0
$0
$15,000
$15,000
$12,169
$14,373
$28,000
$30,000
$2,053
$1,973
$3,000
$3,000
$8,528
$5,243
$8,500
$7,500
$806
$196
$550
$600
$51,379
$41,680
$46,750
$44,000
$3,500
$4,000
$5,500
$19,161
$105,424
$122,598
$126,734
$117,592
$18,705
$18,705
$20,899
$25,559
$647,003
$630,069
$755,033
$786,762
17
WASTEWATER TREATMENT PLANT
FUND: 5310-455-430640
EXPENSE DETAIL
proposed
ACTUAL
ACTUAL
BUDGET
BUDGET
FY10/11
FY11/12
FY12/13
FY13/14
430640 Capital Outlay: Operating Funds
920 Roof Replcmnt Main Bld FY13; Digester Bld FY14 $0 $0 $110,000 $21,000
940 Nitrogen Removal Improvements $0 $30,420 $0 $0
Total Outlay Funds $0 $30,420 $110,000 $21,000
430644 Capital Outlay: BONDED PROJECT
935 Plant inspect.FY 09/10; Constr Digester Lid
Total WWTP CONSTRUCTION
430645 WWTP Replacement Funds:Evg (10125)
362 Equipment Maintenance
933 Solids Dewatering Design & Construction
940 Machinery & Equipment
Total Replacement Funds
490210
610/620 Debt Service (see debt page)
831 Replacement Reserve -Evergreen
Depreciation expense (non cash)
Subtotal WWTP
430646 LABRATORY OPERATIONS FTE's
Personal Services:
110 Salaries & Wages
153 Health Insurance
155 Retirement - PERD
Total Lab Personal Services
430646 Laboratory Maint. & Operations:
210 Office Supplies/Computers/other supplies/shipping
218 Equipment
222 Lab Supplies
349 Lab services Newly Mandated Pretreatment Testing
362 Equipment Maintenance
373 Dues & Training, licenses
Subtotal Laboratory M & O
$10,895
$0
$865,000
$1,071,000
$10,895
$0
$865,000
$1,071,000
$57,024
$44,065
$70,000
$70,000
$0
$0
$560,000
$610,000
$14,588
$71,552
$101,948
$241,000
$71,612
$115,617
$731,948
$921,000
$1,251,850 $1,246,735 $1,097,338 $1,097,715
$411,599
$1,415,855
$411,599
$1,425,000
$411,599
$1,425,000
$411,599
$1,425,000
$4,247,687
$4,283,571
$5,851,933
$6,201,639
2.0
2.0
2.0
2.0
$113,134
$113,605
$115,328
$125,146
$16,505
$18,035
$18,912
$19,851
$7,003
$7,089
$7,147
$7,716
$136,642
$138,729
$141,387
$152,714
$2,309
$466
$7,350
$4,500
$7,920
$1,696
$3,000
$2,500
$7,347
$7,940
$7,500
$7,500
$14,885
$11,264
$20,000
$20,000
$3,923
$4,197
$3,500
$3,500
$1,811
$992
$2,700
$2,700
$38,195
$26,555
$44,050
$40,700
TOTAL SEWER TREATMENT & LAB $4,422,524 $4,448,855 $6,037,370 $6,395,053
18
WASTEWATER TREATMENT PLANT
FUND: 5 310-45 5 -43 0640
FY 2014 BUDGET HIGHLIGHTS
Line Item Detail - Wastewater Treatment Plant
355 Other Contract Services - $30,000
Rag /grit and landfill biosolids disposal fees and other contract services.
356 Consultant -Electrical Engineer, Permit Assistance & Optimization Study - $65,000
$20,000 Electrical Engineer - Continue to update the 1992 antiquated computer control programming for operations of the modernized
equipment in the current plant. Ongoing trouble shooting when failures occur in communications and the computer control program.
$15,000 - Permit Assistance - Discharge permit renewal work and negotiation assistance with DEQ.
$30,000 - Optimization Study - The future implementation of numeric water quality standards and Flathead Lake TMDL by MDEQ,
will limit the amount of nutrients discharged from the W WTP. There is a high potential Kalispell will not be able to meet the required
nutrient limits, and will have to apply for a general nutrient standard variance as outline in SB 367. The bill requires dischargers
receiving a variance to perform an optimizing study. The optimization study requires evaluation of the current facility operation
to optimize nutrient reduction with existing infrastructure and shall analyzes cost-effective methods of reducing nutrient loading,
including but not limited to nutrient trading without substantial investment in new infrastructure. The analysis is to include
cost-effective methods of reducing nutrient loading without substantial investment in new infrastructure, there should not be structural
changes, and there should not be an increase in rates. MDEQ's expectation is the study be performed by a third party professional
engineer specializing in wastewater nutrient removal processes, and includes modeling of alternative plant configuration and operation
scenarios to determine if operational modification could be made to achieve better nutrient removal performance. The study must also
explore the feasibly of nutrient trading within the watershed.
358 Consultants -Total Maximum Daily Load (TMDL) / Permit - $15,000
The State of Montana is under Federal Court order to develop a TMDL for pollutants flowing
from the Flathead basin into Flathead Lake. These TMDL restrictions have potentially very serious consequences for
the City's historical ability to drain storm waters to Flathead tributaries and its community wastewater to Ashley creek.
A TMDL that is unreasonably restrictive could greatly impair the City's ability to grow and would greatly raise the cost of
treating community wastewater and storm water discharges. We have engaged an experienced consultant to provide
assistance to the City for working with MDEQ to develop a satisfactory TMDL. This budget item also includes funds for
potential legal costs related to the TMDL issue.
430640 Capital Outlay -Operating Funds (rates)
920 Digester Building Roof Replacement - $21,000
The 20 plus year old roof is leaking and causing damage to the interior walls and finishes.
19
WASTEWATER TREATMENT PLANT
FUND: 5 310-45 5 -43 0640
FY 2014 BUDGET HIGHLIGHTS
Line Item Detail - Wastewater Treatment Plant
430644 Capital Outlay -Bonded
935 Digester Lid Construction - CARRYOVER $1,071,000
This project is to replace the failing Primary Digester Lid and mixing equipment. The Primary Digester Lid is bulging in cracked
areas which indicate methane gases are being released. The unstable condition of the lid creates safety hazards for the WWTP
Operation Staff and for surrounding facility. A consultant engineer was hired in 2011 to perform an analysis and complete the
design and bid documents for the replacement lid and mixing equipment. The design and bid process is scheduled to be complete
in the summer of2012. Construction is anticipated to start in the fall of2012.
430645 Capital Outlay - Replacement Funds
933 Solids Dewatering Design & Construction - CARRYOVER $500,000, New Appropriation $110,000
The 2008 Facility Plan Update included $1.9 million to update the Solids Dewatering in Phase 3 of the AWWTP Expansion. The
installation of I new screw press is a portion of the suggested improvements to replace 1 of belt filter press.
430645 Capital Outlay - Replacement Funds
940 Machinery & Equipment Replacement Fund - $241,000
$100,000 - Replace Digester Gas Room Piping
$41,000 - Replace Fermenter Recirculation Piping
$20,000 CARRYOVER - Primary Digester Lid Design
$80,000 - Replace Odor Control Filter Bed Bark
20
STORM SEWER
ACCOUNT # 5349-453
PURPOSE OF THIS DEPARTMENT: Why does this department exist?
The purpose of this department is to provide for a means of conveyance of storm water to designated outfalls, thus
reducing the localized and undesirable occurrence of storm water collection.
DEPARTMENT PERSONNEL: (6.20 FTE)
.10 Public Works Director/City Engineer
.25 Senior Civil Engineer
.15 Budget Resource Manager
.25 Construction Manager
.10 Administrative Coordinator
.20 Project Manager
.05 Road and Fleet Superintendent
.20 Assessment Coordinator
.60 Assistant Civil Engineer
.25 Engineering Tech/GIS/IT Support
.20 Administrative Assistance
.50 Storm/Sewer Maintenance Supervisor
2.5 Storm Maintenance
.25 Special Street Maintenance Operator
.20 General Laborer
.40 Utility Management Superintendent
GOALS OF THIS DEPARTMENT: What are the departmental goals that support the purpose?
1. To maintain and operate the storm water collection and treatment facilities for the conveyance of storm water.
2. Implement requirements of the Municipal Separate Storm Water Discharge Permit.
INTENDED OUTCOMES FROM BUDGET EXPENDITURES
The FYI budget for Storm Sewer recommends purchase of maintenance equipment to aid in maintaining and
providing a reliable and efficient conveyance system within the city. The budget also provides for several
improvements for storm water conveyance and collection mitigation within the communitie.
STORM SEWER
FUND: 5349-453 -43 0246
PROJECTED REVENUE AND FUND SUMMARY
BEGINNING CASH
10100
CASH: Operating
10120
Cash, Impact Fees
10122
Cash, Capital Reserve
10127
Cash, Emergency Reserve
10190
Cash, Designated for Equipment Replacement
10193
Cash, Designated Capital Projects
Adjustments to Cash - A/R, Comp Abs.
Total Cash
REVENUES
343370
Storm Assessments -billed (10100)
Assessments -designated for equipment (10190)
Assessments -designated for capital projects (10193)
334040
Petro Tank/Monitory Reimbursement (10100)
343035
Permit fees & other Charges for Service (10100)
363040
Penalty & Interest (10100)
371010
Interest (10100)
343033
Impact Fees (10120)
Impact Fee 5%Admin (10100)
Total Revenue
Total Available
EXPENSES
EXPENSES FROM RATES (10100)
Capital Outlay -impact fee (10120)
Capital Equipment - replacement (10190)
Depreciation (non -cash expense)
Total Expenses
add back depreciation
ENDING CASH
10100
Cash, Operating
10120
Cash, Impact Fees
10122
Cash, Capital Reserve (target $140,000)
10127
Cash, Emergency Reserve (target $25,000)
10190
Cash, Designated Equipment Replacement
10193
Cash, Designated Capital Projects
amended
estimated
proposed
ACTUAL
BUDGET
ACTUAL
BUDGET
FY11/12
FY12/13
FY12/13
FY13/14
$1,205,923
$1,390,822
$1,390,822
$754,937
$573,530
$671,921
$671,921
$760,671
$140,000
$140,000
$140,000
$140,000
$25,000
$25,000
$25,000
$25,000
$200,000
$198,316
$198,316
$238,316
$365,844
$415,844
$415,844
$465,844
$2,510,297
$2,841,903
$2,841,903
$2,384,768
$732,838
$730,000
$730,287
$730,000
$40,000
$40,000
$40,000
$40,000
$50,000
$50,000
$50,000
$50,000
$2,416
$2,415
$7,488
$2,500
$1,560
$420
$1,115
$1,000
$5,266
$5,000
$3,500
$3,500
$27,445
$22,000
$16,750
$15,000
$98,391
$50,000
$118,750
$71,250
$5,037
$2,500
$6,250
$3,750
$962,953
$902,335
$974,140
$917,000
$3,473,250
$3,744,238
$3,816,043
$3,301,768
$589,663
$1,745,775
$1,401,275
$1,565,390
$0
$74,000
$30,000
$174,000
$41,684
$201,500
$0
$226,375
$260,000
$285,000
$285,000
$285,000
$891,347
$2,306,275
$1,716,275
$2,250,765
$260,000 $285,000 $285,000 $285,000
$1,390,822
$407,382
$754,937
$445,297
$671,921
$647,921
$760,671
$657,921
$140,000
$140,000
$140,000
$140,000
$25,000
$25,000
$25,000
$25,000
$198,316
$36,816
$238,316
$51,941
$415,844
$465,844
$465,844
$15,844
$2,841,903
$1,722,963
$2,384,768
$1,336,003
21
STORM SEWER
FUND: 5349-453-43 0246
EXPENSE DETAIL
Personal Services:
110
Salaries & Wages
112
Severance
121
Overtime
153
Health Insurance
155
Retirement
Subtotal Personal Services
Maintenance & Operations:
210 Office Supplies/Equip./computer/GIS
218 Equipment (non capital)/ Safety Equip & Supplies
229 Other Supplies/Consumable tools
231 Gas & Oil
345 Telephone & Communication
353 Auditing
354 Contract Services
356 Storm water Reg Compliance Program/Permit
357 Impact Fee Update
358 Consultants
359 Consultants/fMDL / Permit
360 Repair & Maint. Services
362 Groundwater Monitoring
371 Curb & Gutter
373 Dues & Training
388 Medical Services
410 Construction materials
510 Liability Ins. $8,000; $5,500 uninsured loss)
521 Central Garage Transfer
522 Administrative Transfer
528 Data Processing Transfer
530 Lease PaymentsBNSF
532 Office rent
Subtotal materials & services
amended
proposed
ACTUAL
ACTUAL
BUDGET
BUDGET
FY10/11
FY11/12
FY12/13
FY13/14
6.40
6.45
6.20
6.20
$314,949
$281,344
$324,215
$340,360
$13,004
$12,539
$2,500
$0
$938
$1,934
$5,000
$5,000
$59,817
$59,118
$70,795
$75,030
$20,815
$18,458
$20,441
$21,382
$409,523
$373,393
$422,951
$441,772
$952
$9,746
$9,100
$9,100
$186
$2,321
$3,500
$3,500
$559
$2,621
$2,200
$2,200
$8,410
$9,320
$10,500
$11,500
$853
$885
$950
$800
$500
$550
$600
$2,340
$1,517
$2,162
$6,200
$6,000
$26,638
$5,853
$30,000
$30,000
$0
$0
$8,000
$15,000
$10,689
$0
$7,000
$7,000
$22,071
$5,169
$15,000
$15,000
$2,358
$1,117
$1,500
$2,500
$11,530
$6,677
$17,000
$15,000
$5,827
$510
$5,000
$5,000
$3,113
$2,464
$3,500
$3,500
$185
$0
$200
$100
$353
$2,470
$10,000
$10,000
$7,557
$12,307
$13,500
$8,000
$2,500
$2,500
$3,000
$6,259
$31,957
$30,376
$32,704
$28,416
$5,344
$5,344
$5,969
$7,301
$5,018
$4,902
$5,200
$5,500
$7,838
$7,838
$7,838
$7,838
$155,955
$115,132
$198,461
$201,854
22
STORM SEWER
FUND: 5349-453-430246
EXPENSE DETAIL-Cont.
amended
proposed
ACTUAL
ACTUAL
BUDGET
BUDGET
FY10/11
FY11/12
FY12/13
FY13/14
430246
Capital Outlay: from rates (10100)
840
MACI Grant Match
$0
$0
$0
$42,264
941
Utility Asset Management Program
$0
$0
$38,738
$0
944
Vacuum Jet Truck - 38% CARRYOVER
$0
$0
$123,500
$123,500
951
9th St. E. Stormwater Impry
$0
$0
$0
$200,000
952
Storm Drain Correction funds
$0
$2,563
$100,000
$100,000
953
Willows Stormwater Improvement Prj CARRYOVER
$0
$0
$156,000
$156,000
954
South Meadows Phase 1-Fy12; Phase2-FY I 3,Phase3 -FY 14
$5,300
$98,575
$706,125
$300,000
Subtotal Capital from rates
$5,300
$101,138
$1,124,363
$921,764
430248 Capital Outlay: Impact Fee $ (10120)
953
Willows Stormwater Improvement Prj CARRYOVER
$0
$0
$44,000
$44,000
960
Stormwater Facility Upsizing
$0
$0
$30,000
$130,000
Subtotal from Impact fee funds
$0
$0
$74,000
$174,000
430249
Capital Outlay: from replacement $ (10190)
940
Machinery & Equipment
$0
$0
$0
$24,875
944
Vacuum Jet Truck - 62%CARRYOVER
$0
$41,684
$201,500
$201,500
$0
$41,684
$201,500
$226,375
510400
Depreciation:
831
Depreciation:
$225,000
$260,000
$285,000
$285,000
TOTAL Storm Sewer
$795,778
$891,347
$2,306,275
$2,250,765
23
STORM SEWER
FUND: 5349-453-430246
FY 2014 BUDGET HIGHLIGHTS
Line Item Detail: STORM SEWER FUND
356 Storm Water Regulatory Compliance Program/Permit Fees - $30,000
The Stormwater MS4 Permit requires the City to implement a Stormwater Management Program (SWMP). The SWMP
outlines and defines Best Management Practice (BMPs) and Programs the City will implement and maintain to meet the
regulatory requirements. Programs to implement and/or maintain are outlined and require yearly funding, these include
1) Erosion and sediment control annual training, 2) Public education and participation handouts and advertising,
3) Strom drain ID decals, 4) Car wash equipment, 5) Good housekeeping BMPs, 7) Site inspection and enforcement for post
construction structural BMPs, 7) Redevelopment Water Quality Implementation Assistance policy to be
developed to provide financial assistance to businesses for smaller redevelopment projects.
430246 Capital Outlay: from rates (10100)
840 MACI Grant Match - $42,264 - operating transfer to MACI grant
The State is once again proposing to provide local governments the opportunity to purchase air quality management equipment, like street
sweepers, through the Montana Air & Congestion Initiative (MACI). The City is proposing to purchase a new street sweeper
(replacing a 1991 model) in order to continue to support the City's Stormwater Management Program. As a permitted Municipal
Separate Storm Sewer System (MS4), the City of Kalispell is required to develop controls in order to reduce or eliminate the
discharge of pollutants from streets, roads, highways, municipal parking lots, maintenance and storage yards, vehicle fleet or
maintenance shops with outdoor storage areas, salt/sand storage locations, and snow disposal areas operated by the permittee.
As part of the Stormwater Management Program, a Street Sweeping Program has been developed to meet permit requirements.
By implementing the Street Sweeping Program and performing routine street sweeping, the City is able to meet permit requirements
by collecting sediments, metals, organics, and oil and grease wastes that would otherwise be transported by stormwater runoff
to surface waters.
951 9th Street East between 4th and 6th Avenue East Storm Drain Improvements-$200,000
This project includes new construction of approximately 1,200 feet of 12" storm main, 230 square yards of valley gutter, 3 manholes,
reconstruction of 2 blocks of street surfacing, and other associated project costs. Construction of the new storm drainage system will
eliminate the historical ponding problems at street intersections within the project. Mitigation of the ponding areas reduces the negative
impacts to the structural integrity of the street surfacing. The project also increases pedestrian safety at street intersection crossings in
the vicinity of Hedges Elementary School by keeping crosswalks visible and available for pedestrian use. This project will be paid for
by storm rates.
952 Storm Drain Correction - $100,000 (Carryover $35,000, New Appropriation $65,000)
The goal ofthis project is to provide design and construction for areas in the City that are in need ofstorm drainage
systems and storm drainage system upgrades. Some ofthese areas had old storm sewers draining into the sanitary sewer.
Areas in sections ofthe City that have extensive ponding at the intersection caused from minor rain events.
24
STORM SEWER
FUND: 5349-453 -43 0246
FY 2014 BUDGET HIGHLIGHTS
430246 Capital Outlay: from rates (10100) Cont.
954 South Meadows Phase 3 - $300.000
The purpose of this project is to relieve compounding drainage issues due to drainage areas (ditches, swales, outfalls) being eliminated
by residential use. This is phase III ofa three phase project that when completed will relieve the flooding and ponding in the subdivision.
Engineering and partial construction of the project have were completed in 2012. A total of 1,515 L.F. of 12" pipe as well as 1,410 L.F.
of ditch regrading is left to be completed for the three remaining additive alternates no previously awarded.
The project will be bid and constructed in the spring/summer of 2014.
Capital Outlay: $123,500 from rates (10100) and $201,500 from replacement (10190)
944 Machinery & Equipment - $325,000 CARRYOVER
$325,000 Vacuum Jet Truck -replacing 19 year old vacuum truck.
Capital Outlay from Replacement
940 Machinery & Equipment- $24,875
$3,500 Power Lift Assembly for swr/storm inspection camera. Costs shared w/sewer- Total Cost $7,000
$5,000 Large Diameter Rooter. Costs shared w/sewer - Total Cost $10,000
$6,375 - Large Format Document Scanner & Plotter. Replaces current plotter that the electronic components
are starting to fail. The scanner would allow drawings of Public Works system improvements to be scanned into the network
server for rapid retrieval, will also reduce space needed for storage.
Cost shared between/Street, Sewer, Storm, Water, Light Maint, Solid Waste -Total Cost $25,500
$10,000 - Survey Grade Global Positioning System (GPS). Current GPS system is over 12 yrs old and is no
longer functioning. The GPS system will be used to support the new Asset Management System for Water, Sewer, Street, and Storm
systems, and to identify GPS location ofCity's 500 plus lights, and to support right of way and routing of Solid Waste services.
Cost shared between/Street, Sewer, Storm, Water, Light Maint, Solid Waste - Total Cost $40,000
430248 Capital Outlay: from impact fees (10120)
960 Stormwater Facility Upsizing - $130,000
$130,000 - Misc. Stormwater contract main upsize, and or facility enlargements. Increase due to new development in Section 36
and Highway 93 South.
Capital Outlay: $156,000 from rates (10100) and $44,000 from impact fees (10120)
953 Willows Stormwater Improvement Project- $200,000 CARRYOVER
This project includes improvements to the stormwater conveyance system including flood control and water quality treatment for the
Willows Subdivision. The project includes the installation of a hydromechanical stormwater treatment system; capacity increase for
approximately 1,250 feet of storm main; and installation of erosion control measures for the outfall into the Stillwater River.
Completion ofthis project will help mitigate main surcharges during major storm events, reduce the likelihood ofassociated property
damage, and size the downstream main(s) to appropriately convey contributing flows.
Total Project costs $428,000 - $228,000 funded through an SID.
25
SOLID WASTE
ACCOUNT # 5510-460
PURPOSE OF THIS DEPARTMENT: Why does this department exist?
The Solid Waste Department collects and disposes of solid waste material from residential and
commercial entities to provide a cleaner and healthier condition for the City of Kalispell.
DEPARTMENT PERSONNEL: (7.40 FTE)
.10 Public Works Director/City Engineer .20 Administrative Assistant
.15 Budget Resource Manager .15 Project Manager
.20 Assessments Coordinator 5 Solid Waste Operators
.20 Administrative Coordinator I Solid Waste Supervisor
.30 Road and Fleet Superintendent 10 General Laborer
GOALS OF THIS DEPARTMENT: What are the departmental goals that support the purpose?
1. Collect, handle, and transport solid waste in a safe and effective manner.
2. Provide solid waste services to the community of Kalispell in a respectable and reliable manner.
INTENDED OUTCOMES FROM BUDGET EXPENDITURES
The FY2014 budget recommends the routine replacement of equipment for the collection, transport, and
disposal of refuse accumulated within the City. This budget also provides for the extension of solid waste
services to the community in service areas contiguous to current routes without the addition of personnel
and equipment.
SOLID WASTE
FUND: 5 510-460-43 0840;430845
PROJECTED REVENUE AND FUND SUMMARY
BEGINNING CASH
10100 CASH: operating
10120 Replacement Account
Total Cash
REVENUES
343410
Assessments
343420
garbage collections billed (part year)
363040
Penalty & Interest
371010
Interest Earnings
BOI - Inception of Loan
Misc.
Total Revenue
Total Available
EXPENSES
Total Expenses from Rates (10100)
CapitalOutlay-replacement (10120)
*Depreciation/Replacement Fund
Total Expenses
add back transfer to replacement account
ENDING CASH
10100 Operating
10120 Replacement Account
Total Cash
estimated
proposed
ACTUAL
BUDGET
ACTUAL
BUDGET
FY11/12
FY12/13
FY12/13
FY13/14
$400,630
$573,376
$573,376
$644,549
$235,625
$130,241
$130,241
$235,241
$636,255 $703,617 $703,617 $879,790
$811,610
$843,000
$867,173
$868,000
$29,688
$15,000
$30,000
$18,000
$7,875
$5,500
$4,500
$4,500
$5,242
$5,000
$4,500
$4,000
$0
$0
$0
$200,000
$41,164
$0
$0
$0
$895,579
$868,500
$906,173
$1,094,500
$1,531,834
$1,572,117
$1,609,790
$1,974,290
$597,833
$695,627
$685,000
$975,924
$230,384
$45,000
$45,000
$293,275
$125,000
$150,000
$150,000
$150,000
$953,217
$890,627
$880,000
$1,419,199
$125,000
$150,000
$150,000
$150,000
$573,376
$596,249
$644,549
$613,125
$130,241
$235,241
$235,241
$91,966
$703,617
$831,490
$879,790
$705,091
26
SOLID WASTE
FUND: 5510-460-430840;430845
EXPENSE DETAIL
proposed
ACTUAL
ACTUAL
BUDGET
BUDGET
FY10/11
FY11/12
FY12/13
FY13/14
Personal Services: FTE's
7.35
7.25
7.35
7.40
110
Salaries & Wages
$303,958
$303,309
$355,936
$380,443
112
Severance
$4,789
$5,940
$12,500
$0
121
Overtime/Call outs
$2,802
$2,059
$5,000
$5,000
153
Health Insurance
$64,477
$58,483
$85,902
$88,081
155
Retirement -PERD
$19,627
$19,339
$22,084
$23,726
Total Personal Services
$395,653
$389,131
$481,422
$497,249
Materials and Services:
213
Office Equip/ computer equip & supplies
$2,424
$2,566
$3,500
$5,500
218
Non Capital Equip: Garbage Containers
$12,212
$33,082
$20,000
$35,000
229
Other Supplies/Safety equip/Consumable tools
$4,196
$1,614
$5,500
$5,500
231
Gas and Oil
$41,466
$48,953
$50,000
$52,000
341
Electricity
$1,681
$1,328
$1,700
$1,850
344
Natural Gas
$3,304
$3,570
$4,000
$4,000
345
Telephone
$424
$678
$700
$700
354
Contract Services
$3,373
$7,531
$12,000
$9,000
362
Equipment Maint. & Supplies/radios
$5,675
$4,188
$5,700
$5,700
366
Building Maintenance
$1,437
$3,099
$2,500
$2,500
373
Dues & Training
$449
$3,338
$2,500
$3,500
388
Medical services
$313
$591
$500
$600
510
Property & Liability ins.
$10,008
$10,036
$12,500
$13,000
512
Uninsured Loss - Deductible
$0
$230
$6,500
$6,500
521
Central Garage Transfer
$26,000
$26,000
$28,500
$47,140
522
Administrative Transfer
$29,995
$29,835
$27,753
$27,760
528
Data Processing Transfer
$9,353
$9,353
$7,614
$9,312
532
Office Rent
$7,838
$7,838
$7,838
$7,838
600
Debt Service
$25,875
Total M&O
$160,148
$193,829
$199,305
$263,275
430845
Wash bay/Materials & Services
224
Janitorial Supplies
$68
$200
$200
341
Electricity
$3,261
$3,366
$3,200
$3,700
342
Water
$491
$759
$500
$500
344
Natural Gas
$8,870
$8,911
$8,500
$7,500
360
Repair & Maint Services/building maint
$637
$1,837
$2,500
$3,500
$13,327
$14,873
$14,900
$15,400
27
SOLID WASTE
FUND: 5510-460-430840;430845
EXPENSE DETAIL
proposed
ACTUAL
ACTUAL
BUDGET
BUDGET
FY10/11
FY11/12
FY12/13
FY13/14
430840 Capital Outlay: (Financed 5 yr)
944 Garbage Truck $0 $0 $0 $200,000
$0 $0 $0 $200,000
430840 Capital Outlay: Replacement funds (10120)
940 Machinery & Equipment
$0
$0
$45,000
$3,275
944 Garbage Truck
$0
$230,384
$0
$290,000
Subtotal Capital Outlay
$0
$230,384
$45,000
$293,275
510400 Depreciation (fund Replacement account $150,000)
831 Depreciation expense
$100,000
$125,000
$150,000
$150,000
Total Solid Waste $669,128 $953,217 $890,627 $1,419,199
FY 2014 BUDGET HIGHLIGHTS
Line Item Detail: Solid Waste Fund
218 Garbage Containers - $35,000
$15,000 increase to purchase residential containers for additional service areas added to system.
Capital Outlay: (Financed 5 yr)
944 Machinery & Equipment - $200,000
25 Yard Rear Loader Garbage Truck - Replacing a 1997 rear loader, newer units have more capacity, reducing trips to the landfill
and enabling us to continue to improve on our efficiency and time savings. The rear loader is used primarily for alley clean-up and
commercial steel bin containers. In the last year we have gone from 20 steel bin accounts to 90.
Capital Outlay: Replacement funds (10120)
940 Machinery & Equipment - $3,275
$1,275 - Large Format Document Scanner & Plotter. Replaces current plotter that the electronic components
are starting to fail. The scanner would allow drawings of Public Works system improvements to be scanned into the network
server for rapid retrieval, will also reduce space needed for storage.
Cost shared between/Street, Sewer, Storm, Water, Light Maint, Solid Waste -Total Cost $25,500
$2,000 - Survey Grade Global Positioning System (GPS). Current GPS system is over 12 yrs old and is no
longer functioning. The GPS system will be used to support the new Asset Management System for Water, Sewer, Street, and Storm
systems, and to identify GPS location of City's 500 plus lights, and to support right ofway and routing of Solid Waste services.
Cost shared between/Street, Sewer, Storm, Water, Light Maint, Solid Waste - Total Cost $40,000
944 Machinery & Equipment - $290,000
27 yard Sidearm Garbage Truck - Replacing a 2002 Sidearm that has reached the end of its life cycle and has had repeated
mechanical failures.
28