01-12-06 Site Review MinutesSITE DEVELOPMENT REVIEW COMMITTEE SUMMARY Thursday, January 12, 2006 Building Department Conference Room ATTENDING: Brent Christopherson, Fire Marshal Jeff Clawson, Plans Examiner Mark Crowley, Construction Manager Tom Jentz, Planning Director Craig Kerzman, Building Official Roger Krauss, Asst. Police Chief P. J. Sorensen, Zoning Administrator, Chair Sandy Wheeler, Comm. Dev. Mgr. Kathy Kuhlin, Recording Secretary Hear the Public: None. Performance Bond Reminders: Stratford Village is getting a new bond in. Blue Herron is going to Final Plat on Tuesday. The left over issues from Phase I are due by June 30t'` OLD BUSINESS: 30 Meridian Court — Great Bear Builders — Steve came back with some changes on this. Regarding the site lighting, they are not planning on putting in any posts. The lighting will only be on the building, and they are working with Alpine Lighting to put in residential "Dark Skies" lights. They will be putting in a fence with slats, and may run it in the back. The committee requests no fencing west of the storage area. They have an ADA ramp, but will need to expand the HC aisle to 8 ft in width. Landscape rock with small shrubs. They will be in excess of the required 5% landscaping. Final landscaping details are to be coordinated with the Parks Department. Public Works will review the Drainage Plan. They will extend the sidewalk from the front of the building to the public sidewalk as previously requested. Fire has looked at the hydrants and the access. They will need one more hydrant within 400'. This is approved subject to final review on the lighting, parks, and the check off from Public Works after reviewing their calculations. NEW BUSINESS: 139 —1st Avenue West —Bay Bar & Grill —expansion of the restaurant/casino. They want to expand the building into the open patio area in the middle along the north side of the building. There is a CUP from 1998. There is a window well in the patio area that provided egress for the basement. Without that, they would have to sprinkler the basement. They plan to expand the kitchen preparation area into the basement and will sprinkler it. Roger asked if they have contacted the Dept of Revenue — there was a referral a few months ago. This will need to go through Architecture Review. They will need to add three additional parking spaces. There could be a loading area requirement. They are adding about 900 square feet. The CUP was discussed. PJ will discuss all of these issues with them. PLANNING OFFICE ITEMS: Ashley Park Phase 8 — There is a greenbelt along that area. They will be coming in with the Final Plat. Willis Addition #3 - Near the intersection of Sunnyside and Denver — Adding a 150' driveway for a "flag" lot. These are '/2 acre lots. Extensive discussion was held. One question related to whether the proposal is "in -fill," which would be allowed by the subdivision regulations, or would not be permitted due to the recent creation of the subdivision (the flag lot would not have been allowed when the subdivision was created). Fire and Public Works are not comfortable with this proposal. The matter will be taken under advisement. OTHER REPORTS: None. The meeting was adjourned at 11:00 a.m. cc: Police City Manager Bldg Fire Planning Parks Comm. Dev. Public Works FCAOA MDOT