Loading...
01-26-06 Site Review MinutesSITE DEVELOPMENT REVIEW COMMITTEE SUMMARY Thursday, January 26, 2006 Building Department Conference Room ATTENDING: Frank Castles, Asst. City Engineer Jeff Clawson, Plans Examiner Mark Crowley, Construction Manager Tom Jentz, Planning Director Roger Krauss, Asst. Police Chief P. J. Sorensen, Zoning Administrator, Chair Jennifer Young, Recreation Supervisor Kathy Kuhlin, Recording Secretary Guests: Frank DiStefano with Architects Design Group Hear the Public: None. Performance Bond Reminders: Muskrat Slough's bond expires today. National Flood's Certificate of Occupancy checks have not been received back yet. The hydrant will occur when Westwood Estates comes in. Fire will require a performance bond. Public Works has not yet received any engineering calculations. They need to submit an estimate to Parks for approval. PJ will have them send a proposed bond to Fire and Parks. 15 Meridian Court_- office building - has some various issues; Ron Terry's office building to the east will need to make some adjustments (they have not requested a C/O). They will need to make a parking bumper, cut out some of the parking asphalt, and put in landscaping. They will need to coordinate their drainage with Public Works. Since this project is less than 10,000 square feet, they should have depressed landscaping and 5' setbacks. OLD BUSINESS: Meridian Court - Great Bear Builders — A drainage plan is needed. They are waiting for approval from Public Works and Parks. The fence can run to the setback, just not in the front setback area. NEW BUSINESS: Dr. Stebbins' Office — preliminary review — adding another office on the upper floor. Parking requirements will drive the square footage. The lower lot can be increased by four spaces by building in the setback and using compact spaces. They agreed to a condition that would not allow access on Meridian from the lower parking area, and no access to the upper lot from Parkway Drive. 540 West Idaho — preliminary review — Grizzly Building Co. Would like to have storage units as display models on the front of the lot. The buildings would be assembled on site. They would need two parking spaces. B-5 zone. A CUP would likely be required, with 20' setbacks. We would need a condition that the units could not be used for storage on site. They have a signed lease on this property and will be on the premises by February 6th. The building will be used mostly for an assembly shop. The loading area was discussed. PLANNING OFFICE ITEMS: Car Wash and Small Retail or Office — Michael Blend project - on corner of Meridian and Liberty. The present zoning is R-5. They are asking to go B-1 Commercial. 10' landscape area. The intersection with the parking area on Meridian next to the offices would need to be reconfigured. Granary Ridge — Final Plat. Discussion was held regarding the setback area. Tom will discuss this with them. Appleway Business Park — need something from Fire. They will bond for the sidewalk and have bonded for the landscaping. They need a 10' x 30' pad for their mailboxes. They need to show us the plan for this, which needs to be approved by the Postal Service and Public Works. Old School Station — Waiting for Final Plat to come in. Northland Phase II - ? Debbie Willis Proiect — The flag lot proposal is being put on hold. Kelso Subdivision — May be annexed eventually. We will need to make sure it is built to the City standards. OTHER REPORTS: None. The meeting was adjourned at 11:15 a.m. cc: Police City Manager Bldg Fire Planning Parks Comm. Dev. Public Works FCAOA MDOT