Loading...
04/25/07 Donaldson/Preapp- wbr � va - From: "Rick Donaldson" <rick@rpa-hln.com> To: <Gary.Gates@faa.gov> Cc: "'Fred Leistiko"' <fleistiko@centurytel.net>; <jpatrick@kalispell.com> Sent: Wednesday, April 25, 2007 3:39 PM Attach: Preapp-pkg.pdf Subject: Kalispell City Airport - Draft Preapplication Gary, Attached is a draft of a Preapplication for this location. The actual package will also include the existing Exhibit "A" property map and the Airspace Map with the radio towers highlighted. As you are aware, the Owner is involved with the radio tower removal negotiations which could come to fruition and so they want the ability to access their NPE funds this year. A previous Preapplication submitted in CY 2005 showed an estimate for removal and relocation at $800,000. Since the level FAA participation in the project has not been determined yet, showing the full amount of the NPE available for this single work item (less estimated amounts for the preliminary engineering roughly estimated) in the Preapplication seems reasonable. From our earlier discussion I understand that the Preapplication is needed by the end of this month, but that the scope and amount may be modified at a later date. Please review and contact me to discuss prior to the Owner signing of the Preapplication. Rick Donaldson, P.E. Airports iiviision Manager Robert Peccia and Associates Box 555 406-447-5036 9�1 4 C ZC7 0 4/25/2007 a usr ..,a From: "Rick Donaldson" <rick@rpa-hln.com> To: "'Fred Leistiko"' <fleistiko@centurytel.net> Cc: <jpatrick@kalispell.com> Sent: Wednesday, April 25, 2007 3:39 PM Subject: FW: Kalispell City Airport - ALP Eligibility Fred / Jim, Based on the reply by Gary Gates below, I restructured the Preapplication a little to show some "Preliminary Engineering", which will serve as a precursor to get the information on the ALP as well as facilitate future designs. Essentially, the FAA has recommended that you update your ALP, but they cannot retroactively fund "planning" work like an ALP. So for them to fund it (ALP), the towers have to go down first and a Grant be offered. I'm recommending we try to get the bulk of the work classified as "Preliminary Engineering" so that there isn't a question about eligibility if you don't get a Grant for awhile. If we can get a concurrence, we make sure to structure our contracts that way. (See my next email which will follow momentarily to Gary.) Rick onaldson, P.E. Airports ivision Manager Robert eccia and Associates Box 5653 Helena, MT 5964 ( )406-447-5000 ( 46 7-536 (c) 3 05 -----Original Message ----- From: Gary.Gates@faa.gov [mailto:Gary.Gates@faa.gov] Sent: Wednesday, April 25, 2007 10:21 AM To: Rick Donaldson Cc: airport@kalispell.com; Dave.Stelling@faa.gov Subject: Re: Kalispell City Airport - ALP Eligibility Rick, an ALP update could be included as a planning element, but cannot be started until the grant is issued as you indicate, if it is to be funded by AIP. This could be included with the preapplication in the event that we have a grant this year for the tower removal. Gary M. Gates, P.E. Airport Engineer and Planner FAA, Helena Airports District Office 2725 Skyway Drive, Suite 2 Helena, MT 59602 4/25/2007 "Rick Donaldson" <rick@rpa-hln.com> To Gary Gates/ANM/FAA@FAA 04/24/2007 01:28 PM cc Subject: Kalispell City Airport - ALP Eligibility Gary, Here is one that woke me up in the wee hours this morning: Is the City of Kalispell going to have a problem with eligibility of the ALP Update since it is a "planning component" that isn't supposed to be started until a grant is issued? Possible options: Plan to issue a grant in 2007 regardless of the tower status (which would mean include it on the Preapplication); RPA do the work but not invoice until after the grant is offered / signed; Since a large part of the effort will be surveying and setting a runway profile, call it preliminary engineering which can be reimbursed retroactively; Some combination of the above (break out surveying and profile design from ALP) Let me know what you think on this since I am sure Kalispell feels this will be reimbursable item since it was suggested by the ADO. Thanks. Rick Donaldson, P.E. Airports Division Manager Robert Peccia and Associates P.O. Box 5653 Helena, MT 59604 (w) 406-447-5000 (f) 406-447-5036 (c) 406-439-4905 4/25/2007 Fred and Connie Leistiko From: "Fred and Connie Leistiko" <Leistiko@centurytel.net> To: "Rick Donaldson" <rick@rpa-hln.com> Sent: Tuesday, April 24, 2007 9:58 PM Subject: Re: Kalispell City Airport - Preapplication & ALP Update Rick: 1 am buried in projects at the airport right now, plus fighting off attacks by the radio station owner. Yes, I would like you to do the pre-app and get it over to Gary Gates by the May 1st deadline. The City DUN # is 02199665 and the City Tax I.D. # is 81-6001281 would you please put those in your files. Please substitute the second paragraph in the Project Justification with the following: An interested third party is negotiating to buy the radio station and associated real property. In that negotiations the City of Kalispell has indicated their desires to have the 325' twin towers removed, relocated, or reduced in height to 100' which will take them out of protected airspace. The City of Kalispell may have to pay to have the towers removed along with the associated apparatus. This would be designated as a removal of an obstruction since the FAA has made this a criteria for funding the new construction of the airport. Let me know whatelse you need, and you can complete the form and email it to me. We will sign it and overnight it to ADO in Helena. Fred Original Message -- From: Rick Donaldson Monday,To: airport@kali •2007 Subject: Kalispell City Airport - 1 4 ALP Update Fred, J041J»WtiIW11i Thanks for the new insight on the towers. Did anything ever occur after the case was heard in Missoula and sent back to Kalispell? I have not heard anything in regards to that and so I didn't think you would have anything on the plate this year (from an FAA funding perspective). However, it is a good idea to get a Preapplication in to the FAA in case there is tower removal this year. As a go-by, attached is the last FAA Preapplication form sent in to the FAA. I have also attached the start of a new one for this year. I would be happy to complete it or help you complete it. I did give Gary Gates a call to make sure we are all on the same page. To summarize our conversation: - There is no FAA State Apportionment money available for Kalispell City this year and so you will be limited to the amount of Non -Primary Entitlement funds available to you. It looks like there is $150k available, but it also looks like you have `loaned" $300K out. So if that is available, you may have as much as $450,000 to work with. - Gary suggested that just the radio tower work be shown on the Preapplication. That will be enough for their purposes now. If the towers do come down in a timely fashion, they would be able to amend to work scope to include land or the previous paving work at the Grant Application stage to the dollar amount available. 4/24/200'7 - Attaching the Exhibit "A" from the approved ALP will be fine. An amended version is not necessary. Some items that usually need to be included: DUNS Number: Tracking number that the City should have on hand Project Schedule — Draft attached for your review / editing Environmental Checklist - Draft attached for your review / editing Exhibit "A"— Property map (existing one is ok) Detailed breakdown of costs shown on this form (Estimates) Narrative — I've attached a blank. Gary might not need this since it would essentially be the same information from the Preapplication form Project Sketch — Usually needed but I'd say not in this case I just included the full amount of the FAA money that would be available on the Preapplication form. You probably have more insight to the actual costs estimated. It would probably be a good idea for you or me to email this to Gary for review before having Jim sign it since we have such little time left. WM We've still been working on the ALP. The Kalispell office has some of the Engineering Task Orders drafted for the surveying. I need to review them and draft one for the ALP itself. This hasn't held up our progress so far, but 1 need to get that done and to you pretty soon. Donaldson,Rick Airports Div.: r P.O. Box 5653 i a 0 406-447-5036 i 4/24/2007