Loading...
Task Order No. 10Kalispell City Airport Improvements TASK ORDER NUMBER TEN AGREEMENT TO FURNISH ENGINEERING SERVICES to CITY OF KALISPELL for IMPROVEMENTS TO THE KALISPELL CITE' AIRPORT This Task Order provides for professional engineering services to be performed by ROBERT PECCIA & ASSOCIATES, INC. (hereinafter the Engineer), for the CITY OF KALISPELL (hereinafter the Owner), in accordance with Article 1 of the Agreement to Furnish Engineering Services to the CITY OF KALISPELL, for Improvements to the KALISPELL CITY AIRPORT, dated February 22, 2005 (hereinafter the Agreement). This Task Order represents an authorization to proceed with the scope of services, schedule, and compensation described herein. This Task Order, when executed by both parties, shall become a supplement to and part of the basic Agreement. The Engineer agrees to furnish the following professional surveying services in connection with the design engineering services for improvements to the KALISPELL CITY AIRPORT. The improvements to the KALISPELL CITY AIRPORT contemplated under this Task Order include surveying for: 1. Boundary Line Adjustments; 2. Land Transfers; 3. Boundary Retracements; 4. Easement Exhibits. The Engineer shall be responsible for the following services during this surveying phase: 1. Records Research The Engineer will perform research of all pertinent properties at the Flathead County Courthouse. This will included Certificates of Survey, Plats, Deeds Easements, Corner Records, and Highway Right -of -Way Plans. The Engineer will also order all notes and plat maps from the BLM for included sections. Title searches may be necessary for any or all properties. This will be included in subsequent Task Orders. 2. Section Breakdown The Engineer will locate all section controlling corners of record including subsequent monumentation (center '/< corners, 1 / 16 corners, etc.). The Engineer will breakdown the section using existing monuments and the original GLO notes from the BLM. 3. Boundary Retraeement The Engineer will locate all existing boundary and right-of-way monuments to retrace those properties involved with any boundary line adjustments, land acquisitions, and/or easements. Task Order Number Ten TO#10-I Kalispell City Airport Improvements 4. Download/Calculations Using the field survey and existing drawings, The Engineer will calculate existing legal boundaries and new boundaries for ultimate airport property. 5. Set Monuments The Engineer will set a 5/8" rebar with aluminum cap stamped with the professional licensed land surveyor in charge's name and number at those locations necessary to monument an existing boundary or show new boundary location as shown on a filed certificate of survey. 6. Certificates of Survey/Exhibits The Engineer will draft and file five Certificates of Survey for boundary line adjustment or land transfer and one easement with exhibit for ultimate airport properties. Additional Certificates of Survey and/or easements may be necessary. This will be included in subsequent Task Orders. Task Order Number Ten TO410-2