08/06/07 Memo/Airport Task OrdersCity of Kalispell Post Ottice Box 1997 - Kalispell, Montana 5990 i-1997 -Tel cph one (406) 7�8-7000 Fax - (406) 758-7758 REPORT TO: Honorable Mayor and City Council FROM: James H. Patrick, City Manager SUBJECT: Airport Task Orders MEETING DATE: August 6, 2007 BACKGROUND: Council has budgeted $193,560 in this year's budget for the construction and acquisition of property at the airport in preparation for the airport phase 2 reconstruction. At the same time, the FAA is requesting an updated airport layout plan so that they can approve the plan and start the funding process. The radio engineer engaged by City Council to determine options to mitigate the KGEZ towers requires topographic information contained in these task orders to complete his study. By completing the below tasks reduces Hatfield and Dawson's cost from the original $40,000 approved by Council to an estimated $17,500. The information collected in these task orders is required for his study as well as for our plans preparation needed for the airport reconstruction. Robert Peccia and Associates are our airport engineers and we continue to use their services as our airport consultant. Task order #8 includes the survey control establishment and topographic survey of structures and trees. It also includes the remainder of a full blown topographic survey of the entire site for design of the exact runway position and elevations. This exact survey will not only serve as the basis of the final design, but also allow us to better evaluate adjacent developments for airspace issues. These final coordinates will also be used to update the Airport Layout Plan. The FAA will not fund this `update' until the KGEZ towers are mitigated. Peccia will use a summer intern to do the bulk of the topographic field collection since his rate is significantly lower than the typical `survey technician' rate. These savings will be passed on to us. The cost of Task Order # 8 is $23,660. Task order # 9 includes preliminary engineering for project design to include future runway elevations, new apron configurations, terminal access road configuration, preparing the preapplication and preliminary cost estimates for submission to the FAA, preparation of Montana Aeronautics Division Grant/Loan Application, coordination of field and legal land surveys, coordination of geotechnical investigations, and update cost estimates. The cost of Task Order #9 is $30,080. Task order #10 will provide the legal land surveying necessary to support the land acquisition effort. The cost of the Task Order is $25,430. These funds are budgeted and the task orders are a continuation of efforts to construct the new airport. Due to the dollar amounts involved I wanted to inform Council of the expenditures and on going actions on the City airport. Respectfully submitted, ames H. Patrick, City Manager