Loading...
07/19/07 Peccia/Task OrdersMessage To: Name: 1' II'I2llA �cliC�': Address*. City, State. Zip: Phone dumber: Robert Peccia & Associates TRANSMITTAL LETTER Date: July 19, 2007 Project #: 07006.000 Attention: Fred Leistiko Regarding: Contracts Fred Leistiko, Airport Manager Jim Patrick, Kalispell City Manager City of Kalispell P.O. Box 1997 Kalispell, Montana 59903-1997 250-3065 Message From: tialne: Rick Donaldson Transmitted are the following items: Item No. Copies Description 1 3 Task Order #8 — Topographic Survey 2 3 Task Order #9 — Preliminary Engineering 3 3 Task Order #10 — Legal Land Survey Remarks: Gentleman, The above are enclosed for your review and signature. Please let Ryan or me know if you have any questions on the scope of work or hours estimated. Please keep one set for your records and return 2 sets to me. Task Order #8 includes the survey control establishment and topographic survey of structures and trees already done. It also includes the remainder of a full blown topographic survey of the entire site for design of the exact runway position and elevation. This exact establishment will not only serve as the basis of the final design, but also allow us to better evaluate adjacent developments for airspace issues. These final coordinates will also be used to `Update' the ALP. The FAA will not fund this `update' until an FAA grant is established, which in turn relies on the KGEZ mitigation. However, this topography and preliminary design goes a long way in accomplishing the `Update'. 825 Custer Avenue Helena, MT 59601 Phone 406-447-5000 100 Cooperative Way Kalispell, MT 59903-5100 Phone 406-752-5025 Fax 406447-5036 Fax 406-752-5024 Task Order #9 includes project administration and the runway coordination establishment. It includes the determination of a preferred apron and access road layout already accomplished through coordination with Fred. Task Order #10 will provide the Legal Land Surveying necessary to support the land acquisition effort. Task Order #11 will be for land acquisition assistance. I have not completed the coordination with the proposed land negotiator yet for development of this Task Order. I thought it best to get #8 - #10 executed in order to get those elements underway. I will send you a draft of Task Order #11 as soon as we get it completed. PS: In Task Order #8, we plan on using a summer intern to do the bulk of the topographic field collection. We have been using him extensively this year and he has been doing good work for us. As an intern, his rate is significantly lower than the typical `survey technician' rate. Provided we can complete the bulk of Task Order #8 by the end of August, we plan on passing that savings on to you. 825 Custer Avenue Helena, MT 59601 Phone 406-447-5000 100 Cooperative Way Kalispell, MT 59903-5100 Phone 406-752-5025 Fax 406447-5036 Fax 406-752-5024