08/06/05 Construction Progress and Inspection Report6/LU-UUo_) U.S. Department CONSTRUCTION PROGRESS AND INSPECTION REPORT of Transportation Federal Aviation AIRPORT GRANT PROGRAM Administration Period Ending (Saturday[ August 6.2005 Project Number I Airport Name: Kalispell Citv Airport: Kalispell, Montana I Project Description: Construction of New Contractor's Name: Schellinger Construction Co., Inc. Taxiways, Aircraft Parking Apron, New Taxiway P.O. Box 39 Marking and Markers, New Access Road Columbia Falls. MT 59912 1. Rough Estimate of Percent Completion to Date of Construction Phases (Include items such as clearing, grading, drainage, base, surface, lighting, etc.) Item No. Planned Quantity Final/ Completed Quantity Unit Unit Description Percent Completed 101 1 0.5 LS Mobilization (Special Provisions) (Shall not exceed 5% 50.0% 102* 14,010 12,132 CY Unclassified Excavation (P-152) 86.6% 103 1,251 625 SY Remove Existing Asphalt pavement (P-101) 50.0% 104 1,772 1,772 LF 18" RCP Class III D-701 100.0% 106 7 7 EA 48" Storm Drain Inlets D-751) 100.0% 109 33,418 10,483 SY Subsurface Se eration Fabric P-670) 31.4% 110 11,139 3,690 CY Subgrade Material (P-154) 26.9% 115 2 2 EA Catch Basin Removal 100.0% 116 36 27 EA Tiedown Removals 75.0% 125* 23,610 22,464 CY Topsoiling, Stripping, Stockpiling and Placing (T- 905 42.4% CHANGE ORDERS: 1-1 3,273 4092 CY Muck Excavation & Haul 1 125.0% 1-2 3,273 4092 CY Fill Replacement in Sub -excavated Areas I125.0% *Estimates based on field observations. Actual measurements for these quantities will be surveyed in the cut by Kootenai Si 2. Work Completed or In Progress This Period About 50% of the Droiect has been comDeted. This is a cost based estimate from Dlanned vs. final 3. Brief Weather Summary This Period Including Approximate Rainfall and Periods of Below Freezing Temperature (On earthwork jobs include soil conditions) Weather has been mostly sunny with highs in the mid 80's and lows in the 50's. Winds have out of the southeast at 10-25 mph. 4. Contract Time 45 Day Contract No. Days Charged To Date 24 Days Charged 0 Days Shutdown DAYS CHARGED 24 Calendar DaS Last Working Day Charged (Date) Saturday ueust 6. 2003 5. Summary of Laboratory and Field Testing This Period (Note failing tests and any retests. Summarize out -of -tolerance material. Identify material subject to pay reduction.) Soil density testing has been performed on P-154 and P-152. 6. Describe Anticipated Work by Contractor for Next Period The contractor plans to continue hauling in and placing P-154 and P-208 for the Apron and Taxiways on the southern portion of the project. The contractor plans to finish installing the 12" diameter Storm Drain lateral connectors. Subgrade "Dig -outs" are scheduled to continue to take place to remove pumping subgrade material along Taxiway A. B, C, D & E. 7. Problem Areas/Other Comments (Revisions to plans and specifications approved or denied, delays, difficulties, etc. and actions taken) We are currently performing "Dig -outs' in the areas where subgrade pumping has occurred. These areas are very sensitive and are being monitored closely. Current work is being performed under Change Order No. 1. At this time, there is concern that the current method may not stabilize the subgrade in some areas showing extreme disturbance. Utilities that were just recently installed have shown to be crossing too shallow along Taxiway E. Current measures are being taken to deepen the utilities as needed. SPONSOR'S INSPECTOR OR REPRESENTATIVE Date Typed or Printed Name and Title Signature August 6, 2005 Brandon M. Theis, E.I. — On -Site Representative FAA FORM 5370-1(8-89) Supersedes Previous Edition OMB Approved 2120-06 U.S. Department CONSTRUCTION PROGRESS AND INSPECTION REPOT Period Ending (Saturday) of Transportation Federal Aviation AIRPORT GRANT PROGRAM August 6, 2005 Administration Project Number Airport Name: Kalispell City Airport: Kalispell, Montana Project Description: Construction of New Contractor's Name: Schellinger Construction Co., Inc. Taxiways, Aircraft Parking Apron, New Taxiway P.O. Box 39 Marking and Markers, New Access Road Columbia Falls, MT 59912 1. Rough Estimate of Percent Completion to Date of Construction Phases (Include items such as clearing, grading, drainage, base, surface, lighting, etc.) Item No. Planned Quantity Final/ Completed Quantity Unit Unit Description Percent Completed 101 1 0.5 LS Mobilization (Special Provisions) Shall not exceed 5% 50.0% 102* 14,010 12,132 CY Unclassified Excavation P-152 86.6% 103 1,251 625 SY Remove Existing Asphalt pavement P-101 50.0% 104 1,772 1,772 LF 18" RCP Class III D-701 100.0% 106 7 7 EA 48" Storm Drain Inlets D-751 100.0% 109 33,418 10,483 SY Subsurface Se eration Fabric P-670 31.4% 110 11,139 3,690 CY Subgrade Material P-154 \1 26.9% 115 2 2 EA Catch Basin Removal 100.0% 116 36 27 EA Tiedown Removals 75.0% 125* 23,610 22,464 CY Topsoiling, Stripping, Stockpiling and Placing (T- 905 42.4% CHANGE ORDERS: 1-1 3,273 4092 CY Muck Excavation & Haul 125.0% 1-2 3,273 4092 CY Fill Replacement in Sub -excavated Areas 125.0% *Estimates based on field observations. Actual measurements for these quantities will be surveyed in the cut by Kootenai Surveying. 2. Work Completed or In Progress This Period About 50% of the project has been c( This is a cost based estimate from planned vs. final quantities. 3. Brief Weather Summary This Period Including Approximate Rainfall and Periods of Below Freezing Temperature (On earthwork jobs include soil conditions) Weather has been mostly s nny with highs in the mid 80's and lows in the 50's. Winds have out of the southeast at 10-25 mph. 4. Contract Time DAYS CHARGED 5. Summary of Laboratory and Field Testing This Period (Noce failing tests and any 45 Day Contract 24 Calendar Days retests. Summarize out -of -tolerance material. Identify material subject to pay reduction.) Soil density testing has been performed on P-154 and P-152. No. Days Last working Charged Day Charged To Date (Date) 24 Days Charged Saturday 0 Days Shutdown August 6, 2003 6. Describe Anticipated Work by Contractor for Next Period The contractor plans to continue hauling in and placing P-154 and P-208 for the Apron and Taxiways on the southern portion of the project. The contractor plans to finish installing the 12" diameter Storm Drain lateral connectors. Subgrade "Dig -outs" are scheduled to continue to take place to remove pumping subgrade material along Taxiway A, B, C, D & E. 7. Problem Areas/Other Comments (Revisions to plans and specifications approved or denied, delays, difficulties, etc. and actions taken) We are currently performing "Dig -outs' in the areas where subgrade pumping has occurred. These areas are very sensitive and are being monitored closely. Current work is being performed under Change Order No. 1. At this time, there is concern that the current method may not stabilize the subgrade in some areas showing extreme disturbance. Utilities that were just recently installed have shown to be crossing too shallow along Taxiway E. Current measures are being taken to deepen the utilities as needed. SPONSOR'S INSPECTOR OR REPRESENTATIVE Date Typed or Printed Name and Title August 6, 2005 Brandon M. Theis, E.I. - On -Site Representative Signature FAA FORM 5370-1(8.89) supersedes Previous Edition