Loading...
07/16/05 Construction Progress and Inspection ReportU.S. Department CONSTRUCTION PROGRESS AND INSPECTION REPORT of Transportation Federal Aviation AIRPORT GRANT PROGRAM Administration Name: Kalispell City Airport: Kalispell, Montana umD npprovea azu-uuo.) Period Ending (soturday) July 16, 2005 Project Number Project Description: Construction of New Contractor's Name: Schellinger Construction Co., Inc. Taxiways, Aircraft Parking Apron, New Taxiway P.O. Box 39 Marking and Markers, New Access Road Columbia Falls. MT 59912 1. Rough Estimate of Percent Completion to Date of Construction Phases (Include items such as clearing, grading, drainage, base, surface, lighting. etc.) Final/ Item Completed Unit Percent No. Quantity Quantity Unit Description Completed 125 23,610 15,000 CY Topsoiling, Stripping, Stockpiling and Placing (T-905) 63.5% 2. Work Completed or In Progress This Period About 5% of the project has been completed. This is a cost based estimate from planned vs. final quantities. 3. Brief Weather Summary This Period Including Approximate Rainfall and Periods of Below Freezing Temperature (On earthwork jobs include soil conditions) Started construction on July 14, 2005. Weather has been mostly sunny with highs in the mid 80's and lows in the 50's. Winds have been out of the southwest at about 10 mph. 4. Contract Time 45 Day Contract No. Days Charged To Date 3 Days Charged 0 Days Shutdown DAYS CHARGED 3 Calendar Days Last Working Day Charged (Date) Saturday ulv 16. 2003 5. Summary of Laboratory and Field Testing This Period (Note failing tests and any retests. Summarize out -of -tolerance material. Identify material subject to pay reduction.) RPR checked benchmarks for elevation and was on -site part-time during this period. 6. Describe Anticipated Work by Contractor for Next Period Schellinger will continue to strip topsoil from Apron, Taxiway, and surrounding drainage areas. Schellinger is to prepare the west side of the two new "T" hangers for a staging area for the hanger construction crew. Kootenai Surveying is planning to start construction staking the Apron, Taxiways and Storm Drainage. Contractor plans start installing storm drain. 7. Problem Areas/Other Comments (Revisions to plans and specifications approved or denied, delays, difficulties, etc. and actions taken) None. SPONSOR'S INSPECTOR OR REPRESENTATIVE Date Typed or Printed Name and Title Signature July 16, 2005 Brandon M. Theis, E.I. — On -Site Representative FAA FORM 5370-1(8-89) Supersedes Previous Edition FAAIRPORTMALISPELL CITY-2003\NORTH END SURFACING\contadmin\progress-rpts\PR#t.doc U.S. Department of Transportation CONSTRUCTION PROGRESS AND INSPECTION REPORT Federal Aviation AIRPORT GRANT PROGRAM Administration Name: Kalispell City Airport: Kalispell, Montana um Hpprovea zizu-uuo.) Period Ending (Saturday) July 23, 2005 Project Number Project Description: Construction Of New Contractor's Name: Schellinger Construction Co., Inc. Taxiways, Aircraft Parking Apron, New Taxiway P.O. Box 39 Marking and Markers, New Access Road Columbia Falls. MT 59912 1. Rough Estimate of Percent Completion to Date of Construction Phases (Include items such as clearing, grading, drainage, base, surface, lighting, etc.) Final/ Item Planned Completed Unit Percent No. Quantit Quantity Unit Description Completed 101 1 0.5 LS Mobilization (Special Provisions) (Shall not exceed 5%) 50.0% 102* 14,010 10,000 CY lUnclassified Excavation (P-152) 71.4% 104 1,772 553 LF 18" RCP Class III (D-701) 31.2% 106 7 1 EA 48" Storm Drain Inlets (D-751) 14.3% 115 2 2 EA Catch Basin Removal 100.0% 116 36 27 EA Tie -down Removals 75.0% 125* 23,610 15,000 CY Topsoiling, Stripping, Stockpiling and Placing (T-905) 63.5% *Estimates based on field observations. Actual measurements for these quantities will be surveyed in the cut by Kootenai Surveying. 2. Work Completed or In Progress This Period About 10% of the project has been completed. This is a cost based estimate from planned vs. final quantities. 3. Brief Weather Summary This Period Including Approximate Rainfall and Periods of Below Freezing Temperature (On earthwork jobs include soil conditions) Weather has been mostly sunny with highs in the mid 80's and lows in the 50's. Winds have been out of the southeast at about 10- 20 mph. 4. Contract Time DAYS CHARGED 5. Summary of Laboratory and Field Testing This Period (Note failing tests and any 45 Day Contract 10 Calendar Days I retests. Summarize out -of -tolerance material. Identify material subject to pay reduction.) No. Days Last Working Several soil density tests have been performed on unclassified excavation and Charged Day Charged embankment. One failing density test was taken at Station 12+00 of Taxiway To Date (Date) 10 Days Charged Saturday A'. subgrade is pumping at this location and will need special attention. 0 Days Shutdown July 23, 2003 6. Describe Anticipated Work by Contractor for Next Period The Contractor will continue to excavate to subgrade elevation over the Apron and Taxiways. Storm Drain installation will continue throughout the period. P-154 (subbase) is planned to arrive onsite on Thursday for Taxiway `A' south and the Apron. 7. Problem Areas/Other Comments (Revisions to plans and specifications approved or denied, delays, difficulties, etc. and actions taken) After striping the topsoil from the southern end of Taxiway `A', the underlain subgrade became weakened and started to pump severely in several locations. Different remedies are currently being utilized to firm up the subgrade to provide support for the new Taxiway section. Further efforts over the course of the next period will be taken in improving these areas along with close observations and monitoring of adjacent areas to assure that the problem does not worsen. SPONSOR'S INSPECTOR OR REPRESENTATIVE Date Typed or Printed Name and Title Signature July 23, 2005 Brandon M. Theis, E.I. — On -Site Representative FAA FORM 5370-1 (8-89) Supersedes Previous Edition FAAIRPORTSWALISPELL CITY-2003\NORTH END SURFACING\contadmin\progress-rpts\PR#2.doc uain nanrovea uzu-uuoo U.S. Department CONSTRUCTION PROGRESS AND INSPECTION REPORT Period Ending (saturday) of Transportation Federal Aviation AIRPORT GRANT PROGRAM July 30, 2005 Administration Project Number I Airport Name: Kalispell Citv Airport: Kalispell. Montana I Project Description: Construction of New Contractor's Name: Schellinger Construction Co., Inc. Taxiways, Aircraft Parking Apron, New Taxiway P.O. Box 39 Marking and Markers, New Access Road Columbia Falls. MT 59912 1. Rough Estimate of Percent Completion to Date of Construction Phases (Include items such as clearing, grading, drainage, lease, surface, lighting, etc.) Item No. Planned Quantity Final/ Completed Quantity Unit Unit Description Percent Completed 101 1 0.5 LS Mobilization (Special Provisions) (Shall not exceed 5%) 50.0% 102* 14,010 12,000 CY Unclassified Excavation (P-152) 85.7% 103 1,251 625 SY Remove Existing Asphalt pavement (P-101) 50.0% 104 1,772 400 LF 18" RCP Class III (D-701) 22.6% 106 7 1 EA 48" Storm Drain Inlets (D-751) 14.3% 109 33,418 10,483 SY Subsurface Separation Fabric (P-670) 31.4% 110 11,139 3,000 CY Sub radeMaterial(P-154) 26.9% 115 2 2 EA Catch Basin Removal 100.0% 116 36 27 EA I Tiedown Removals 75.0% 125* 23,610 10,000 CY I Topsoiling, Stripping, Stockpiling and Placing (T-905) 42.4% CHANGE ORDERS: 1-1 3,273 1322 CY Muck Excavation & Haul 40.4% 1-2 3,273 1322 CY Fill Replacement in Sub -excavated Areas 40.4% 'Estimates based on field observations. Actual measurements for these quantities will be surveyed in the cut by Kootenai Surveying. 2. Work Completed or In Progress This Period About 30% of the project has been completed. This is a cost based estimate from planned vs. final quantities. 3. Brief Weather Summary This Period Including Approximate Rainfall and Periods of Below Freezing Temperature (On earthwork jobs include soil conditions) Weather has been mostly sunny with highs in the mid 80's to lower 90's and lows in the 50's. Winds have been out of the southeast at about 10-25 mph. 4. Contract Time DAYS CHARGED 45 Day Contract 17 Calendar Days 5. Summary of Laboratory and Field Testing This Period (Note jailing tests and any retests. Summarize out -of -tolerance material. Identify material subject to pay reduction.) Soil density testing has been performed on P-154 and P-152. Random No. Days Last Working Charged Day Charged elevation checks have been performed on the Storm Drain `A' during To Date (Date) 17 Days Charged Saturday installation to assure grade has been met. 0 Days Shutdown Julv 30. 2003 6. Describe Anticipated Work by Contractor for Next Period The contractor plans to continue hauling in and placing P-154 for the Apron and Taxiways on the southern portion of the project. The contractor plans to finish installing the Storm Drain along alignment A and also being installing some of the 12" diameter lateral connectors. Subgrade "Dig -outs" are scheduled to continue to take place to remove pumping subgrade material along Taxiway A, B, C, D & E. 7. Problem Areas/Other Comments (Revisions to plans and specifications approved or denied, delays, difficulties, etc. and actions taken) We are currently performing "Dig -outs' in the areas where subgrade pumping has occurred. These areas are very sensitive and are beiu monitored closely. A Chance Order was administered to account for the work of di)?Rin)z out the pumping subgrade areas. SPONSOR'S INSPECTOR OR REPRESENTATIVE Date Typed or Printed Name and Title Signature July 30, 2005 Brandon M. Theis, E.I. — On -Site Representative FAA FORM 5370-1(8-89) Supersedes Previous Edition FAAIRPORTMALISPELL CITY-2003\NORTH END SURFACING\contadmin\progress-rpts\PR#3.doc