Loading...
10/17/05 Blanden/Red Eagle Aviation ApproachOCT-17-2005 MON 02:37 PM SCHELLINGER CONSTRUCTION FAX N0, 4068922187 P. 01 PO Box 39 250 Truck Route Columbia Falls, MT 55912 406-892-2188 40C-892-2187 fax dr —0- AL- �Al To: FRED LEISTIKO Irrain: MARC BLANDEN comIar+Y- CITY OF KALISPELL Pages: 2 Fax: (406) 758-7754 Date: OCTOBER 17, 2005 Re: ICED EAGLE AVIATION APPROACH CC: D Urgent 0 K'ar Review ❑ Please Comment ❑ Please Reply ❑ Please Recycle rno, ATTACHED IS YOUR QUOTATION FOR THE APPROACH AT RED EAGLE AVIATION. IF YOU HAVE ANY QUESTIONS OR REQUIRE ADDITIONAL INFORMATION DO NOT HESITATE TO GIVE ME A CALL. Sincerel , Marc R. Blan en Project Manager _................................................................................................................ OOT-17-2005 MON 02:38 PM SCHELLINGER CONSTRUCTION FAX NO, 4068922187 P. 02 Schelliriger Construction Co., Inc. RO. BOX 39 COLUMBIA FALLS, MT 59912-0029 AL ,�c,I )�LUNGCf� FHONE: (406) INFO CLIFF c.0 (ELLIIN5M FAX: (A06) 802-2 187 GEORGE .9CI IMII) I Monday, October 17, 2005 Fred Leistiko City of Kalispell 312 1st Ave East Kalispell, MT 59901 Re; Red Eagle Aviation Approach — Bid Proposal Mr. Leistiko, Schellinger Construction Co., Inc. is pleased to offer the following quotation as requested on the above mentioned project. Following is our price to provide labor, equipment, and materials necessary to complete the work as described with the clarifications as noted. CLARIFICATIONS' • Our scope of work for this project includes stripping of approximately 12" of topsoil, excavation to subgrade elevations, remove existing curb & install laydown curb, supply/haul/placement of 12" of pit run subbase course, supply/haul/placement of 4" of 3/4" crushed base Course, and demolition of the existing buildings, All gravels will be placed to 95% compaction requirements per public works specifications. • The Owner will provide all surveying and permits as required. • All topsoil that is stripped and waste material from excavation will be wasted onsite in the existing Swale located to the West of Rosauers. • Removal of the existing chain link fencing and existing power poles will be the responsibility of others. Pricing for Bid Item 50 — Building Demolition & Haul Off includes demolition of the 3 existing buildings at the armory, and includes hauling the waste to the landfill. The City of Kalispell will be responsible for any dump fees required by the FCSWD. • Progress payments will be billed monthly. Payment is due within 15 days from the date of the related bill. • This is a unit priced contract and final billing will reflect actual in place quantities multiplied by their respective unit price as quoted. Our price to perform the work as described above is as stated below. Item 10 - Strip Topsoil/Haul to Waste Area 311 CY @ $ 5,15 per CY $ 1601,65 Item 20 -- Excavation/Subgrade Prep 278 CY @ $ 22.00 per CY $ 6116.00 Item 30 — Pit Run Subbase Course (12"} 278 CY @ $ 33.50 per CY $ 9313.00 Item 40 -- 3/4" Crushed Base Course (4) 92 CY @ $ 54.00 per CY $ 4968.00 Item 45 — Concrete Curb & Cutter (Laydown) 35 LF @ $ 20,15 per LF $ 705,25 Item 50 — Building Demolition & Haul Off 1 LS @ $ 5125.0o $ 5125.00 Item 60 — Mobilization, Bonds, & Ins, 1 LS @ $ 8900.00 $ 8900.00 Estimated Total w $36,728.90 Thank you for the opportunity to quote you on this project and we look forward to working with You toward its successful completion. If you have any questions or require additional information do not hesitate to give me a tali. Sinter Acceptance; Marc R. Blanden _ Project Manager Signature and Title pate AUTOMATIC COVER SHEET f in lj� "i WISH I 03 PAGES (INCLUDING 0 . A