Loading...
***Smith/Storm Drainage at Hangar A511RAMM All ROBERT EVE 1>C June 19, 2009 Fred Leistiko Kalispell City Airport Manager P.O. Box 1997 312 1" Avenue East Kalispell, MT 59901 RE: Storm Drainage at Hangar A5 (#61) Dear Fred: When we performed the topo and staking of Hangar #61 for Todd Berg, we provided him with the four corners stakes and a benchmark elevation for his reference, along with a map showing contours and surface utility locations. According to sheet C-8 (Hangar Access Taxiway E Plan and Profile) of the Kalispell City Airport Improvements project, the plan was for two separate hangars in this location. The westerly hangar's planned finished floor elevation is shown as 2930.12 and the easterly is shown as 2929.63. After measuring as -built elevations on 6-19-09 we have found the finished floor elevation to be 2929.75, which is between the two planned elevations and the adjacent culvert invert elevation is 2928.49. We recommend grading the area between the taxiway/hangar and culvert to get water to flow to the culvert will take care of any ponding in this area. We also recommend that the roof drains be piped to the drainage swale on the southerly side of the hangar to minimize storm flows near the taxiway. Sincerely ROBERT-,P79CCIA & ASSOCIATES son Smit ,-PLS". �Proj-&—<`Land Surveyor K Kat -Prof -Data AIR -PORTS KALISPELL CITY 6rv,o619JLltr.dcc HELENA : - - = KALISPELL �C. B x 56:3 P.0. 8cx 5100 Helena, uff 59604 Kalispell, uT 59403 14061 44'-5000 FAX 40e; 447-5036 14061 752-5-025 FAX (406} 752.5024