Loading...
Goose Bay ConstructionGoose Bay Construction 1285 Stillwater Road Kalispell, MT 59901 _--.-___----- Phone: 406-752-421 5 Fax 406-752-7348 To: City Of Kalispell Contact: Fred Lustigo Address: Kalispell, MT 59901 Phone: Fax: Project Name: City Airport Paving Bid Number: Project Location: Kalispell, MT Bid Date: 5/5/2008 Item # Item Description Estimated Quantity Unit Unit Price Total Price 1 Digout Existing Road 229.00 CY $10.95 $2,507.55 2 12" Of 3" Minus Pit Run 153.00 CY $30.70 $4,697.10 3 3" Of 3/4" Minus Crushed 39.00 CY $50.70 $1,977.30 4 3" Asphalt Paving 4,125.00 SF $1.25 $5,156.25 5 Mob 1.00 LS $1,198.20 $1,198.20 6 Stabilization Fabric 459.00 SY $1.40 $642.60 Total Bid Price: $16,179.00 Notes: • Conditions -Bid valid thorugh-05/20/08 -Items to be paid by units placed. -Bid cannot be split without Goose Bay approval. -Quote to be used as contract document. -It is assumed that Goose Bay may dump spoils on site. -This bid is based on an area that is 250' x 16.5' • General -Bid does not include payment or performance bonds. -Bid does not include GRT. -Bid does not include any testing unless otherwise stated. -Accemtance of quote dependant upon mutually acceptable schedule. • All material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to standard practices. Any alteration or deviation from above specifications involving extra costs will be excecuted upon written orders and will become an extra charge over and above the estimate. All agreements contingent upon strikes, accedents, weather, or delays beyond our control. Owner to carry fire, natural disaster and other necessary insurances. Our workers are fully covered by Workman's Compensation Insurance. We are not responsible for any hazardous materials encountered on this project. Payment Terms: Acceptance of Proposal: The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. Payment will be made within 15 days of monthly billing date. In the event I do not pay for the labor and materials within 30 days of monthly billing date, I agree to Pay Goose Bay Equipment, Inc. the maximum amount of interest allowable under Montana Law, not to exceed one and one-half percent (1 1/2%) per month. In the event a dispute arises over payment of the labor and material under this proposal, or any other terms of the proposal, I agree to pay the attorney's fees and/or collection fees incurred by Goose Bay Equipment, Inc., if GBE is successfull in any such dispute. ACCEPTED: The above prices, specifications and conditions are satisfactory and are hereby accepted. Buyer: Signature: Date of Acceptance: 5/6/2008 11:26:44 AM CONFIRMED: Goose Bay Construction Authorized Signature: Estimator: Kris Anderson Page 1 of 1