Loading...
FW: FAA Questions (14) Development: The Kalispell City Airport does not quite meet ARC B-I design standards. Would the FAA support improvements at the Kalispell City Airport to improve the facility in compliance with B-I design standards? What are the minimum design standards and/or requirements that the FAA would support at Kalispell City Airport? Funding: The City of Kalispell has expended considerable local funds (in excess of $3 million) for land acquisition and improvements at the Airport in anticipation of future FAA funding. Is the City's eligibility to receive Federal reimbursement for past expenditures contingent solely on the removal of the KGEZ radio towers? Are there any other obligations or conditions the City would need to meet to receive Federal reimbursement for past expenditures? Assuming the KGEZ towers are successfully removed, would the FAA be able to begin funding the reimbursement to the City for past expenditures at the airport? Will the FAA require that the City complete the proposed runway improvements at the airport before they will reimburse for expenditures already incurred by the City? If the City decides to postpone improvements at this time, is there any risk of losing FAA . Grant Assurances: There is some general concern in the community that the City of Kalispell will lose control of the airport to the FAA by accepting Federal funding and agreeing to grant assurances. Could you explain about the purpose of the grant assurances and how they affect the City's control of the airport? By accepting the grant assurances, can the city limit the use of the airport either by the type of aircraft or times of operation? Environmental Assessment: There has been some criticism in the community that the original EA was a boiler plate document which did not adequately address the issues at the airport and the needs of the community. Will a revised noise study be required? Will a revised site selection study be required? Will the FAA fund the EA? Land Acquisition: The City has never condemned land before and does not desire to do so at this time. Would the FAA support alternatives to the proposed development that would minimize controversial land acquisition requirements ? Subject areas: 1. Grant Assurances - Why get into bed with the FAA 2. Funding - What do we gain by getting into bed with the FAA 3. EA - Really the first step in the process 4. Development - What options do we have 5. Land Acquisition - We have issues that may be difficult Can you take this list from here and modify it as you see fit? Will you forward it off to Gary. I've cc'd Mitch with this list as he may have some input also. Thanks Jeff Walla, PE Stelling Engineers, Inc. 1372 Airport Road Kalispell, MT 59901 phone: 406-755-8602 fax: 406-755-8710 email: jwalla@stellinginc.com <mailto:jwalla@jwalla@stellinginc.com>