FW: KCA Option 1 Estimate (2)Jane: Here are the estimates from Stelling Engineers on the deferred maintenance at the airport that will need to be done under Option #1 and #2. There are two other projects that need to be considered along with these 1) KGEZ Tower Mitigation and 2) Fix the rotating beacon. I gave Wade the information on these two projects along with this information so he can prepare his cost estimates for Options #1 & #2. Also, we need to talk about coming up with a Task Order for Stelling if we want them to do any other work for us. I think their generosity might be running out. Fred A. Leistiko Airport Manager City of Kalispell P.O. Box 1997 Kalispell, MT 59903 406-250-3065 From: Jeff Walla [mailto:Jwalla@stellinginc.com] Sent: Thursday, April 08, 2010 4:13 PM To: Fred Leistiko Subject: KCA Option 1 Estimate Fred, Please find attached the Excel spreadsheet breaking down all of the cost items you requested. I highlighted work quantities for culvert replacement and fencing because I had to guess on these items. You may want to revise the quantities. Thanks and let me know if you need anything else. Jeff Walla, PE Stelling Engineers, Inc. 1372 Airport Road Kalispell, MT 59901 phone: 406-755-8602 fax: 406-755-8710 email: jwalla@stellinginc.com <mailto:jwalla@jwalla@stellinginc.com>