07. Public WorksPUBLIC WORKS
Page No.
Fund No.
1
1000
Public Works Administration
$
25,039
3
1000
Central Garage
$
532,085
5
2400
Light Maintenance
$
267,794
8
2420
Gas Tax
$
560,363
11
2500
Special Street Maintenance
$
2,051,115
19
2825
MACI Grant -sweepers
$
200,000
20
2990
Stimulus -Roads
$
343,549
21
4290
Sidewalk & Curb Construction
$
25,000
22
5210
Water Fund
$
4,156,786
34
5310
Sewer Operating/Wastewater Treatment
$
5,155,789
49
5349
Storm Sewer
$
1,010,553
55
5510
Solid Waste
$
777,817
$ 15,105,890
w
0
cn
w
o
o c4
c co
rn
:o
.8
.8
U
ry
Y
V
n N
.-.CIS
CIS
m
3
cn
w
0
�v
�
H
cn
.a
�.of)
fil
�y
u
5
w
0
ou
c
cd
�~
�
u0
3
a
RIBLIC WORKS - ADMINISTRATION
FUND: GENERAL 1000-410430100
Personal Services
Materials & Services
ACTUAL
BUDGET
ACTUAL
BUDGET
FY08/09
FY09/10
FY09/10
FY10/11
$12,347 $14,413 $13,114 $20,914
$3,043 $3,975 $3,288 $4,125
$15,390 $18,388 $16,402 $25,039
The responsibility of the Public Works Administration/Engineering Department is the design, construction, maintenance, and
administration of the City's infrastructure. These areas include streets, curbs, sidewalks, traffic signals, signage, water
production and distribution, stone water drainage, sewage collection, wastewater treatment, and equipment maintenance.
Line Item Detail: PUBLIC WORKS
110 Personal Services - Increased .10 FTE
Reviewed and updated the allocation of positions in each fund. No new FTE's were added.
FY 2010 ACCOMPLISHMENTS
Provided administrative and support services for management of Water, Sewer Collection, Storm Drainage, Wastewater
Treatment, Solid Waste enterprise funds, Street Maintenance, equipment maintenance and supporting administrative and
engineering assistance to all other General Fund departments of the City.
• Conducted a Property Tax Review and in the first phase located over $30,000 of annual revenue for the City.
• Submitted over 700 addresses to the County Land Information System that were missing from their system.
• Engineering staff designed several projects in-house resulting in a significant savings to the City.
• Issued 27 Right of Way Permits; each permit requires a minimum of three site visits.
• Reviewed 46 potential new projects for private development; site visits were made to all potential projects.
• Reviewed and made corrections on record drawings for 9 finished projects.
• Coordinated and participated in a joint effort between Flathead surveyors, engineers, MDOT, FVCC and the National
Geodetic Survey to up -date, up -grade and expand the high order horizontal and vertical survey control for the Flathead Valley.
• Administered environmental groundwater testing obligations at the New City Hall, the Old Armory/Hilton Garden Inn,
and the City parking lot next to Centre Court Manor.
• Submitted 3.7 Million in City assessments for the County tax bills.
• Updated and Revised Design Standards Adopted November 2009
PUBLIC WORKS - ADMINISTRATION
FUND: GENERAL 1000410-430100
Personal Services:
10149 D107 (1 1
ACTUAL
BUDGET
ACTUAL
BUDGET
FY08/09
FY09/10
FY09/10
FY10/11
0.15 0.15 0.15 0.25
110
Salaries and payroll costs
$10,086
$11,623
$10,787
$16,919
153
Health Insurance
$1,630
$1,990
$1,630
$2,901
155
Retirement
$631
$800
$697
$1,095
Total Personal Services
$12,347
$14,413
$13,114
$20,914
Materials & Services:
210
Office Supplies
$634
$675
$548
$775
213
Small Office Equipment
$732
$150
$119
$150
215
Computer Supplies & Support
$0
$250
$408
$300
216
Computer Equipment
$0
$350
$767
$350
229
Other Supplies
$214
$350
$366
$350
331
Publication
$206
$300
$246
$300
335
Membership & Dues
$433
$350
$603
$350
345
Telephone & Communications
$518
$1,000
$29
$1,000
354
Contract Services (parking permits)
$113
$150
$122
$150
373
School & Travel
$193
$400
$80
$400
Subtotal
$3,043
$3,975
$3,288
$4,125
TOTAL $15,390 $18,388 $16,402 $25,039
2
PUBLIC WORKS -CENTRAL, r
FUND: GENEF_AJ� 1000-410-431330
ACTUAL
BUDGET
ACTUAL
BUDGET
FY08/09
FY09/10
FY09/10
FY10/11
Personal Services
$184,179
$184,452
$166,972
Maintenance & Operations
$277,579
$292,210
$299,844
$461,758 $476,662 $466,816
PROGRAM DESCRIPTION
The Central Garage is responsible for maintaining all city vehicles and equipment in a safe and dependable condition at the
lowest cost per mile, or hour, with the least inconvenience to each department. An extensive record keeping system for
repairs and maintenance is maintained, and recommendations are provided to insure the City is receiving cost effective
use of vehicles and equipment.
Line Item Detail: CENTRAL GARAGE
$233,550
$298,535
$532,085
110 Personal Services
Actual change in personnel costs is an increase of $2,645 due to ASCME contract obligation. The remainder of the change reflects
an intrafund adjustment of contracted services cost for FY 09/10 required due to extended medical leave of a permanent employee.
FY 2010 ACCOMPLISHMENTS
• Provided passenger vehicle and equipment repair and maintenance services for over 200 equipment items for emergency
services, park maintenance, street maintenance, water, sewer, wastewater treatment, and construction, in 14 City General
Fund Departments and Enterprise Fund Operating Divisions, a total of 856 repair orders.
• Utilized and trained temporary personnel to fill in for an extended medical leave of absence.
Purchased a tire pressure monitoring system enabling us to read and reprogram the tire pressure sensors in newer vehicles.
Previously we were required to return the vehicle to the dealership to reprogram the sensors after seasonal tire changes.
• Entirely rebuilt the Street Division Snow Blower.
3
IT -CENTRAL
FUND: GENERAL 1000-410-431330
Personal Services: FTE'S
110
Salaries and payroll costs
112
Severance
121
Overtime
153
Health Insurance
155
Retirement
Total Personal Services
Maintenance & Operations:
210
Office Supplies
215
Computer Supplies & Support
218
Equipment (Non Capital)
221
Safety Equip & Supplies
229
Other Supplies
231
Gas and Oil
232
Motor Vehicle Parts
233
Tires
238
Filters
241
Consumable Tools
322
Books
341
Electricity
342
Water
344
Natural Gas
354
Contract Services -Repairs
362
Equipment Maint & Radios
366
Building Maint
373
School & Travel
388
Medical Services
Total M&O
920
Capital Outlay
Total Capital Outlay
TOTAL BUDGET
ACTUAL
BUDGET
ACTUAL
BUDGET
FY08/09
FY09/10
FY09/10
FY10/11
3
3
3
3
$146,831
$144,549
$131,615
$178,259
$5,500
$1,407
$1,500
$1,642
$1,500
$24,206
$29,106
$25,464
$37,356
$11,735
$9,297
$8,251
$10,935
$184,179
$184,452
$166,972
$233,550
$546
$300
$114
$300
$0
$800
$159
$800
$500
$850
$913
$700
$239
$150
$2,547
$250
$3,053
$3,500
$5,450
$3,600
$109,670
$122,500
$110,140
$122,500
$65,298
$64,000
$78,639
$76,000
$30,643
$27,000
$22,307
$27,000
$3,117
$3,500
$3,714
$3,500
$686
$500
$485
$500
$0
$150
$405
$150
$1,591
$1,700
$1,637
$1,700
$93
$100
$164
$100
$7,271
$9,000
$6,224
$8,000
$52,538
$56,600
$65,553
$52,000
$310
$250
$626
$250
$1,345
$335
$382
$335
$331
$600
$255
$500
$348
$375
$130
$350
$277,579
$292,210
$299,844
$298,535
$0
$0
$0
$0
$0
$0
$0
$0
$461,758
$476,662
$466,816
$532,085
F"
MAINTENANCELIGHT
FUND: 2400-410-430263
PROJECTED REVENUE AND FUND SUMMARY
BEGINNING CASH
10100 CASH:
REVENUES
363010 Maintenance Assessments
363040 Penalty & Interest
371010 Interest Eamings
TOTAL AVAILABLE
EXPENDITURES
Street Lighting
ENDING CASH
10100 CASH:
ACTUAL
BUDGET
ACTUAL
BUDGET
FY08/09
FY09/10
FY09/10
FY10/11
$117,269 $131,922 $131,922 $139,865
$211,972
$981
$224,000
$800
$223,659
$1,456
$1,186
$225,000
$1,200
$1200
$212,953
$224,800
$226,301
$227,400
$330,222
$356,722
$358,223
$367265
$198,300
$248,173
$218,358
$267,794
$131,922
$108,549
$139,865
$99,471
5
LIGHT MAINTENANCE
FUND: 2400-410-430263
I
ACTUAL
BUDGET
ACTUAL
BUDGET
FY08/09
FY09/10
FY09/10
FY10/11
Personal Services $21,399
$39,936
$33,207
$55,673
Materials and Services $160,971
$193,677
$170,810
$212,121
Debt Service $15,930
$14,560
$14,341
$0
$198,300
$248,173
$218,358
$267,794
The Street Lighting District is provided to improve visibility during darkness and to promote safe and efficient use of
street facilities. This is accomplished by reducing pedestrian accidents at night, by reducing vandalism, and by reducing
other crimes.
Budget provides for payment of electricity for City street lights. rate: 0.00300 sq. ft.
FY 2011 BUDGET HIGHLIGHTS
Line Item Detail:
110 Personal Services - Increased .20 FTE
Reviewed and updated the allocation of positions in each fund. No new FTE's were added.
341 Electricity - $163,000
$18,000 increase is needed to reflect actuals for FY 09/10 and for a I 1 % rate increase from Flathead Electric.
C
LIGHT
FUND: 2400-410-430263
•
Personal Services: FTE
110 Salaries
153 Health insurance
155 Retirement
Total Personal Services
Materials and Services:
244 Lighting Supplies
341 Electricity
360 Repair & Maint Services
510 Insurance
522 Administrative Transfer
Total M & S
Debt Service: internal loan repayment
Principal -5 year -final pymt 2010
Interest 4%
Total Debt
Total
ACTUAL
BUDGET
ACTUAL
BUDGET
FY08/09
FY09/10
FY09/10
FY10/11
0.6
0.60
0.60
0.80
$16256
$30,181
$25,456
$43,656
$4,150
$7,922
$6,171
$9,329
$993
$1,833
$1,580
$2,688
$21,399
$39,936
$33,207
$55,673
$6,993
$13,000
$6,780
$13,000
$138,648
$145,000
$145,426
$163,000
$8,503
$28,000
$10,927
$28.000
$0
$0
$0
$1,000
$6,827
$7,677
$7,677
$7,121
$160,971
$193,677
$170,810
$212,121
$15,000
$14,000
$14,000
$0
$930
$560
$341
$0
$15,930
$14,560
$14,341
$0
$198,300
$248,173
$218,358
$267,794
7
GASTAX
FUND: 2420421-430240
PROJECTED REVENUE AND FUND SUMMARY
BEGINNING CASH
10100 CASH
REVENUE
335040 Gas Tax Apportionment
371010 Interest
Total Revenue
TOTAL AVAILABLE
EXPENDITURES
Street Department
ENDING CASH
CASH
ACTUAL
BUDGET
ACTUAL
BUDGET
FY08/09
FY09/10
FY09/10
FY10/11
$410,396
$405,689
$405,689
$310,011
$354,677
$8,109
$360,000
$5,000
$361,348
$5,409
$360,000
$5,000
$362,786
$365,000
$366,757
$365,000
$773,182
$770,689
$772,446
$675,011
$367,493
$568,700
$462,435
$560,363
$405,689
$201,989
$310,011
$114,648
Section 15-70-101 MCA requires the State to allocate gas tax revenues to cities, towns
and counties. One-half of the city's allocation is based on population and one-half on
street and alley mileage. The funds may be used for construction, reconstruction,
maintenance and repair of streets, right of ways and alleys. The funds cannot be spent
for equipment purchases.
8
GASTAX
FUND: 2420-421-43 0240
Materials and Services
Capital Outlay
ACTUAL
BUDGET
ACTUAL
BUDGET
FY08/09
FY09/10
FY09/10
FY10/11
S298,016 $506,023
$69,477 $62,677
$407,070 $494,363
$55,365 $66,000
$367,493 $568,700 $462,435 $560,363
Funds received from Gas Tax will be used to support the street and alley maintenance/construction program.
This program is accomplished by prioritizing constriction and maintenance projects through the use of the
pavement management information system.
� i 1
Line Item Detail:
354 Contract Services/Striping City Streets - $149,663 Carryover $49,663 / New Appropriation $100,000
368 Overlay & Chipseals - $195,000 Carryover $95,000 / New Appropriation $100,000
533 Equipment Rental - $5,500
4 weeks rental of a dum patcher.
956 Sidewalk Replacement - Carryover $16,000 New Appropriation $25,000
$41,000 - (includes carryover) To be used for a matching program to assist homeowners with replacing bad sidewalks.
957 Alley Paving - $25,000
Pave approximately 10 alleys a year and overlay existing alleys with remaining funds.
FY 2010 BUDGET ACCOMPLISHMENTS
50150 Sidewalk Replacement Program - A total of 15 residents participated in the program, replacing 4.6 blocks.
Handicapped Ramp Upgrades - A total of 6 hazardous handicapped ramps were replaced and upgraded to current Standards.
Striped approximately 4,664 linear ft of City streets and 13,235 sq ft of pavement markings.
2009 Chipseal & Overlay Prj - Overlaid 29 blocks, & Chip Sealed 4.5 miles
Prepared Annual Fuel Tax report for MDT.
9
(31AS TAX
FUND: 2420421-43 0240
430240 Materials and Services -Streets
231 Gas & Oil
344 Natural Gas
354 Contract Services -striping
360 Contract Services/Snow remove & Constr. Support
368 Overlays & Chipseals
369 Radio Maintenance
452 Gravel
453 Materials -Contract Preparation
471 De-Icer/Road Oil
472 Asphalt
473 Crack Sealing Material
533 Equipment Rental
Total Materials & Services Streets
430234 Sidewalks / Alleys:
956 Sidewalk Construction
957 Alley Paving
Total Capital
ACTUAL
BUDGET
ACTUAL
BUDGET
FY08/09
FY09/10
FY09/10
FY10/11
$25,730
$35,000
$22,224
$30,000
$1,553
$2,500
$6,817
$3,500
$48,373
$100,000
$50,337
$149,663
$18,520
$21,793
$1,520
$17,000
$148,470
$251,530
$250,000
$195,000
$0
$700
$0
$700
$852
$4,000
$308
$3,000
$0
$5,000
$1,245
$5,000
$26,311
$50,000
$37,935
$50,000
$23,204
$25,000
$32,019
$30,000
$5,003
$5,000
$4,413
$5,000
$0
$5,500
$252
$5,500
$298,016
$506,023
$407,070
$494,363
$36,223 $37,677 $30,035 $41,000
$33,254 $25,000 $25,330 $25,000
$69,477 $62,677 $55,365 $66,000
Total $367,493 $568,700 $462,435 $560,363
10
SPECIAL STREET MAINTENANCE
FUND: 2500-421-430240
_.._............... .
BEGINNING CASH
10100
CASH: Operating
10107
Cash, Designated Equip. Replacement*
10108
Cash, Designated S & C repair
10109
Cash, Designated Pavement Replacement**
Total Cash
REVENUE
343011
Sidewalk repair penalty
343012
Public Works Charges
363010
Maintenance Assessments ($1,768,000)
-designated for pavement replacement**
-designated for equipment replacement**
363040
Penalty & Interest
364030
Sale ofMisc./auction
381060
Inception of Loan -10 year
371010
Investment
Total Revenue
Total Available
Street Department/TSS
Capital Equip. Replacement*
Pavement Replacement program**
S & C Repair funds
Total Expenditures
ENDING CASH
10100 Cash, OPERATING
10107 Cash, Designated Equip. Replacement*
10108 Cash, Designated S & C repair
10109 Cash, Designated Pavement Replacement**
Total Cash
ACTUAL
BUDGET
ACTUAL
BUDGET
FY08/09
FY09/10
FY09/10
FY10/11
S610238
$578,582
$578,582
$679,029
$99,367
$72,151
$72,151
$36,974
$37,337
$48,757
$48,757
$44,936
$140,000
$305,988
$305,988
$178,908
$886,942
$1,005,478
$1,005,478
$939,847
$11,420
$0
$2,475
$0
$6,088
$4,000
$2,745
$4,000
$1,275,623
$1,419,000
$1,374,619
$1,453,000
$280,000
$280,000
$280,000
$280,000
$35,000
$35,000
$7,369
$7,000
$9,945
$8,500
$5,289
$0
$170,000
$0
$0
$14,669
$12,000
$9,093
$7,500
$1,595,169
$1,892,000
$1,719,166
$1,788,000
$2,482,111
$2,897,478
$2,724,644
$2,727,847
$1,300,405
$1,625,900
$1,301,244
$1,506,166
$62,216
$70,000
$70,177
$55,000
$114,012
$585,988
$407,080
$458,908
$0
$37,337
$6296
$31,041
$1,476,633
$2,319,225
$1,784,797
$2,051,115
$578,582
$529,681
$679,029
$645,863
$72,151
$37,151
$36,974
$16,974
$48,757
$11,420
$44,936
$13,895
$305,988
$0
$178,908
$0
$1,005,478
$578,252
$939,847
$676,732
Current rates
vacant land .01222 90% non-residential .01803
residential .01222 100% commercial .01900
11
SPECIAL
FUND: 2500-421-430240
ACTUAL
BUDGET
ACTUAL
BUDGET
FY08/09
FY09/10
FY09/10
FY10/11
Personal Services
$894,318
$925,626
$877,329
$973,703
Materials and Services
$353,731
$471,547
$376,922
$474,943
Debt Service
$37,552
$28,727
$17,430
$17,520
Capital Outlay
$14,804
$200,000
$29,563
$40,000
Pavement Maintenance Funds
$114,012
$585,988
$407,080
$458,908
Equipment Replacement Funds
$62,216
$70,000
$70,177
$55,000
Sidewalk & Curb Repair Funds
$0
$37,337
S6,296
$31,041
$1,476,633
$2,319225
$1,784,797
$2,051,115
PROGRAM DESCRIPTION
Special Street Maintenance funds will be primarily used for street sweeping, flushing, leaf pick-up, sanding, deicing, snow plowing
and snow removal. The overall goal is to maintain all city streets in a clean, safe and drivable condition during all seasons.
The Special Street Maintenance funds also supports Traffic Signs & Signals. Traffic Signs & Signals is responsible for
determining proper sign location, maintenance of signs, striping of crosswalks and streets, maintenance of traffic signals and
placement of emergency signage where needed to provide the safe and orderly passage of vehicles and pedestrians
in the City of Kalispell. This division supports the Police Department for emergency traffic control and street blockage
for parades and other unique events.
12
SPECIAL STREET MAINTENANCE
FUND: 2500-421-430240
Line Item Detail: Street Division
110 Personal Services - Increased .35 FTE
Reviewed and updated the allocation of positions in each fund. No new FTE's were added
216 Computer Equipment/Software/Supplies - $4,500
AutoCAD licensing and supplies.
355 Contract Services - $8,000
$5,000 (reduced $5,000) - Transportation Traffic Reviews
Adoption of transportation impact fees will likely increase the need for supplemental transportation engineering analysis
services. These supplemental services will be necessary to review alternate data submitted by developers to support
their requests for lower impact fees.
$3,000 - Aerial Mapping (Carryover)
An examination of the large utility wall maps shows that because of our rapid growth, the mapping imagery is
out of date in terns of showing the newer subdivision areas. The surveys and topographic mapping does not need updating,
only the map imagery. Cost shared w/Storm, Water, Sewer - Total Cost $12,000.
362 Equipment Maintenance Parts - $23,000
Increase of $ I ,000 - Includes funds for tire chains and cutting edges for the graders and loaders, and brooms for the sweepers.
369 Radio Maintenance - $5,000
Jan. 1, 2012 the FCC will be making a change to the FCC bandwidth making all of our narrowband frequency
radios obsolete. The street division has approximately 30 radio that will need to be replaced. We plan on
replacing approximately seven radios next year.
Capital Outlay:
840 MACI Grant Match - $40,000 - operating transfer to MACI grant
The State is once again proposing to provide local governments the opportunity to purchase air quality management
equipment, like street sweepers, through the Montana Air & Congestion Initiative (MACI). The City is proposing to
purchase one new street sweeper. There is a City matching requirement of 13.84% ofthe cost of the new sweeper. Last year
the City requested two sweepers but only received one sweeper under this program.
13
SPECIAL STREET MAINTENANCE
FUND: 2500-421-430240
Line Item Detail Cont.: Street Division
Capital Outlay Cont.:
935 Pavement Maintenance funds - $458,908 = Carryover $178,908, New Appropriation $280,000
GASB 34 rules now require accounting for the value of public infrastructure so that adequate steps may be taken to ensure the
on going costs of operation, maintenance and replacement of these facilities may be adequately budgeted. The FY 2007/08
budget included a 10% rate increase that is reflected in this line item. The funds derived are reserved solely for pavement
maintenance and replacement of existing streets. Costs to replace existing pavements and street reconstruction are now
clearly separate from those related to growth -related costs funded by impact fees.
Capital Replacement Funds:
940 Machinery & Equipment - $55,000
$40,000 - (2) Used 5 Yard Dump Trucks
$15,000 - Used 26,000 G V W Cab & Chassis Truck
Debt Service: Internal Loan -Shop building (4th year of 5) paid to fund 2880 4.75%
610 $16,000 Principal
620 $1,520Interest
Street Division
Street Division maintained 144.5 miles of streets and alleys.
City crews milled, patched, and clearance pruned 14 blocks on 3rd Avenue East in preparation of the chip sealing project.
City crews milled and patched Conway Dr., Heritage Way, Conrad hill, and Woodland Park Dr. in preparation of the
overlay project.
City crews paved 3 Mile Drive from Meridian Rd to Stillwater Rd (1,087 tons of asphalt).
City crews paved W WTP road (237 tons of asphalt).
Milled and patched Claremont Street.
Assisted Parks Dept. with the Dutch Elm Tree project, hauling away 125 loads of diseased elm trees and chips.
Continue to utilize the Pavement Management Program for scheduling yearly street improvements.
Crack sealed 14 blocks of City streets.
Composted 3,096 cubic yards of leaves removed from city streets.
Prepped and patched water main and service line cut outs.
Equipment purchases included two used dump trucks, a used grader and a new sweeper purchased through the MAC[
grant program.
14
SPECIAL STREET MAINTENANCE
FUND: 2500-421-430240
FY 2011 BUDGET HIGHLIGHTS - TSS
Line Item Detail: Traffic Signs & Signals
218 Equipment (Non Capital) - $4,800
S800 - Metal Detector
$800 - Tool Boxes for Pickup
$1,200 - Portable Threader
$2,000 - Foot Shear
242 Street Signs - $38,000
$1,500 increase needed for special event signing
$1,500 increase cost of materials
Traffic Signs & Signals
Provided electrical, heating, air conditioning, and lighting assistance at the new City Hall, the old City Hall remodel,
and at the City Shops
Conducted numerous traffic counts.
Maintained the City owned traffic signals.
Painted yellow curbs and cross walks city wide.
In response to public concerns, reviewed and modified traffic control signage in the vicinity ofthe new high school to
improve safety.
In coordination with KFD, KPD, and local residents, modified parking restrictions in the vicinity of legends field to
improve emergency access during events.
The city wide replacement of the older style street signs required under the federal MUTCD regulations is 80% complete.
Repaired, replaced, and installed numerous street signs throughout the City.
Continue to hang and remove downtown area banners.
Maintained luminaries for streetscape lights, decorative lights, alley lights, and airport lighting.
Signed and barricaded for all major parades, Thursday Fest, city repairs, and emergencies.
Eliminated all sight obstructions of City street signs.
15
SPECIAL STREET MAINTENANCE
FUND: 2500-421-430240
ACTUAL
BUDGET
ACTUAL
BUDGET
FY08/09
FY09/10
FY09/10
FY10/11
STREET DIVISION
Personal Services: FTE's
12.10
12.30
12.30
12.65
110
Salaries and payroll costs
$555,603
$574,523
$537,563
$607,879
112
Severance
$4,588
$0
121
Overtime
$38,369
$30,000
$19,808
$30,000
153
Health Insurance
$102,039
$109,112
$107,860
$122,708
155
Retirement
$36,013
$35,243
$34,921
$37,403
Total Personal Services
$732,024
$748,878
$704,740
$797,989
Materials and Services:
213
Small Office Equipment
$155
$500
$230
$500
216
Computer Equipment/Software/Supplies
$1,828
$1,850
$2,646
$4,500
218
Equipment (Non Capital)
$1,863
$1,000
$440
$1,000
221
Safety Equipment
$813
$1,000
$1,811
$1,200
224
Janitorial supplies
$381
$700
$727
$700
229
Other Supplies
$1,078
$1,200
$1,244
$1,200
231
Gas & Oil
$25,975
$40,000
$22,776
$30,000
241
Consumable tools
$2,480
$2,000
$1,913
$2,000
341
Electric
$842
$700
$1222
$1,200
342
Water
$93
$150
$164
$175
345
Telephone
$984
$1,200
$954
$1,000
354
Contract Services
$22,126
$13,000
$8,933
$13,000
355
Transportation Traffic Reviews & Aerial Mapping
$0
$13,000
$127
$8,000
357
Rate Study 09/10
$0
$22,500
$16,034
$8,000
358
Impact Fee Study
$23,083
$7,000
$0
$14,000
362
Equipment Maint. Parts/supplies
$18,297
$22,000
$23,551
$23,000
366
BuildingMaint.
$2259
$1,500
$1,163
$1,500
369
Radio Maintenance
$240
$5,000
$5,550
$5,000
373
School & Travel
$1,376
$3,500
$1,081
$2,500
388
Medical services/drug test
$808
$900
$1,602
$1,300
510
Property & Liability Insurance $6,961 / $75,958
$21,943
$66,000
$65,037
$83,000
512
UninsuredLim-deductible$335
$16,500
$2,096
$16,500
521
Central Garage Transfer
$63,000
$63,000
$63,000
$66,000
522
Administrative Transfer
$55,413
$50,339
$50,339
$56,741
528
Data Processing Transfer
$10,898
$11,145
$11,145
$10,689
Subtotal M & O
$256,270
$345,684
$283,785
$352,705
N
3 SPECIAL STREET MAINTENANCE
FUND: 2 500-421-43 0240
EXPEDITU DETAIL-con't.
610/620 Debt Service -Principal & Interest
Capital Outlay:
840
MAGI Grant Match
940
Machinery & Equipment
Subtotal capital outlay
935
Pavement Maintenance funds
430245
Replacement Funds:
940
Machinery & Equipment
944
Vehicles
Subtotal Replacement
430248
Sidewalk & Curb Repair funds
354
contract services (carryover)
TOTAL STREET DIVISION
430264
TRAFFIC SIGN & SIGNALS
Personal Services: FTE's
110
Salaries
121
Overtime
153
Health Insurance
155
Retirement
Total Personal Services
Maintenance & Operations:
216
Computer Equipment & Software
218
Equipment (Non Capital)
221
Safety Equip & Supplies
224
Janitorial Supplies
ACTUAL
BUDGET
ACTUAL
BUDGET
FY08/09
FY09/10
FY09/10
FY10/11
$35,327
$28,727
$17,430
$17,520
$30,000
$29,563
$40,000
$11,536
$170,000
$0
$0
$11,536
$200,000
$29,563
$40,000
$114,012
$585,988
$407,080
$458,908
$57,705
$70,000
$70,177
$55,000
$4,511
$0
$0
$0
$62,216
$70,000
$70,177
$55,000
$0
$37,337
$6,296
$31,041
$1,211,385
$2,016,614
$1,519,071
$1,753,163
2.5
2.5
2.5
2.5
$129,596
$140,245
$137,547
$140,606
$9,376
$8,000
$9,025
$8,500
$14,950
$19,722
$16,971
$17,805
$8,372
$8,781
$9,046
$8,803
$162,294
$176,748
$172,589
$175,714
$2,292
$1,500
$257
$1,500
$4,153
$3,600
$3,602
$4,800
$334
$500
$704
$500
$487
$650
$630
$650
con t.
17
SPECIAL
FUND: 2500-421-43 0240
EXPENDITURE DETAIL-contt.
Maintenance & Operations: Cont.
229
Other Supplies
241
Consumable Tools
242
Street Signs
243
Traffic Signals
245
Barricade Materials
341
Electricity
345
Tele. & Communications
354
Contract Services
362
Equipment Maintenance Parts
366
Building Maintenance
369
Radio Maintenance
373
School & Travel
428
Paint Materials
510
Property & Liability Insurance $775/$2,995
512
Uninsured Loss -deductible property
532
Office Rent
Subtotal M & O
Debt Service: TSS
610/620
Debt /Principal/Interest
Subtotal Debt Service
Capital Outlay:
940
Machinery & Equipment
Subtotal capital outlay
Total Traffic Sign & Signals
Grand Total - STREETS & SIGNS
ACTUAL
BUDGET
ACTUAL
BUDGET
FY08/09
FY09/10
FY09/10
FY10/11
$572
$800
$410
$800
$1,287
$1,100
$1,431
$1,100
$34,138
$35,000
$39252
$38,000
$1,265
$10,000
$1,656
$10,000
$2,453
$4,000
S4,646
$4,000
$9,727
$11,000
$7,888
$10,000
$669
$800
$719
$700
$15,672
$10,000
$5,963
$10,000
$1,962
$1,400
$1,603
$1,400
$1,077
$1,500
$1,275
$1,500
S130
$900
$295
$900
$1,061
$3,500
$1,434
$2,500
$10,258
$25,000
$6,412
$20,000
$5,274
$5,775
$5,205
$4,050
$0
$1,000
$1,917
$2,000
$4,650
$7,838
$7,838
$7,838
$97,461
$125,863
$93,137
$122,238
$2,225
$0
$0
$0
$2,225
$3,268
$0
$0
$0
$0
$0
$0
$3,268
$0
$0
$0
$265,248
$302,611
$265,726
$297,952
$1,476,633
$2,319,225
$1,784,797
$2,051,115
18
AIR & CONGESTION GRANT
MT.
FUND: 2825... STREET .... 421.... FUNCTION .... 430240
BEGINNING CASH
CASH: Operating
REVENUES
331055 MACI Grant for Sweepers
383012 Transfer from Street Maintenance (match)
Total Revenue
TOTAL AVAILABLE
EXPENDITURES
940 CAPITAL EQUIPMENT -street sweeper
ENDING CASH
CASH: Operating
The MACI grant is a program to help solve Air Quality problems.
Amended
BUDGET
ACTUAL
BUDGET
FY09/10
FY09/10
FY10/11
$150,917 $150,917 $160,000
$29,563
$29,563
$40,000
$180,480
$180,480
$200,000
$180,480
$180,480
$200,000
$180,480 $180,480 $200,000
$0 $0 $0
The State has approved requests for equipment purchased through the Montana Air & Congestion Initiative (MACI)
grant. The City of Kalispell is submitting a request for one sweeper.
The budget includes the 13.4% match.
19
Street Department Stimulus Funds
FUND: 2990-421-43 0240
BEGINNING CASH
10100 CASH
REVENUE
331190 State HB645 Stimulus
371010 Investment Earnings
TOTAL AVAILABLE
F,XPENDITURES
950 Street Improvements
ENDING CASH
CASH
BUDGET
ACTUAL
BUDGET
FY09/10
FY09/10
FY10/11
$0
$0
$308,705
$342,000
$305,595
$3,110
$33,954
$890
$342,000
$308,705
$34,844
$342,000
$0
$343,549
$0
$308,705
$0
Money received will be used to supplement the chipseal and overlay, and the pavement
maintenance projects for the current fiscal year.
20
SIDEWALK & CURB CONSTRUCTION
FUND: 4290-410-430234-937
PROJECTED 1 1
BEGINNING CASH
10100 CASH:
REVENUES
381004 Proceeds S & C Warrants
373017 Owner Contribution
Total Revenue
TOTAL AVAILABLE
937 Sidewalk Construction Costs
ENDING CASH
ACTUAL
BUDGET
ACTUAL
BUDGET
I
FY08/09
FY09/10
FY09/10
FY10/11
$0
$0
$0
$0
$8,553
$25,000
$7,630
$25,000
$8,553
$25,000
$3,807
$25,000
$8,553
$25,000
$3,807
$25,000
$8,553
$25,000
$3,807
$25,000
10100 CASH: $0 $0
PROGRAM DESCRIPTION
The sidewalk and curb construction fund is used to record expenditures for replacing sidewalks and
curbs which residents request or which the City orders in. The costs are paid for by the property owner.
They are billed for the cost of construction plus 5% for administration. The property owner can have the cost
put on the tax notice for a period of 8 years. The City issues sidewalk & curb warrants to fund.
21
WATER IJ (Operations & Billing)
FUND: 5210-447-43 0550
BEGINNING CASH
10100
Operating Cash
10120
Impact Fee Cash
10125
Meter Replacement Cash
10107
Capital Improvement Reserve -target $300,000
10127
Emergency Reserve -target $100,000
10130
Bond Reserves (Restricted Cash)
Adj. to Cash/ aft & Bond Reserves
REVENUES
343210
Metered Water Sales (billed)
343230
Meter Replacement Fee
343225
Impact Fees
343365
Impact fee Admin
343260
Misc.-Installation/Reconnectfrag fees
331 158
State Bypass Relocation Reimbursement -amended
371010
Interest Earnings
Interest Earnings - Impact Fee Cash Account
Total Revenue
Total Available
EXPENSES
Water Department
Billing
Facilities=M & O, debt service, depreciation
debt service from impact fees
capital outlay: from operating funds
from impact fees
from meter replacement funds
Total All Departments
add back depreciation
ENDING CASH
10100
Operating Cash
10120
Impact Fee Cash
10125
Meter Replacement Cash
10107
Capital Improvement Reserve -target $300,000
10127
Emergency Reserve -target $100,000
10130
Bond Reserves (Restricted Cash)
Total cash
Capital improvement reserve funded $30,000 from operations
Amended
ACTUAL
BUDGET
ACTUAL
BUDGET
FY08/09
FYO9/10
FY09/10
FY10/11
$1,858,159
$2,293,714
$2,293,714
$2,585,510
$1,085,218
$676,427
$676,427
$778,004
$170,189
$218,390
$218,390
$240,800
$150,000
$180,000
$180,000
$210,000
$100,000
$100,000
$100,000
$100,000
$515,449
$515,449
$515,449
$515,449
($18,019)
$22,289
$3,860,996
$3,983,980
$4,006,269
$4,429,763
$2,395,832
$2,400,000
$2,461,049
$2,450,000
$94,024
$90,000
$94,952
$95,000
$276,291
$300,000
$243,490
$209,000
$12,815
$11,000
$72,713
$50,000
$68,521
$40,000
$230,154
$134,263
$0
$94,396
$70,000
$65,874
$45,000
$37,292
$20,000
$12,826
$7,500
$2,970,548
$3,160,154
$3,093,790
$2,857,500
$6,831,544
$7,144,134
$7,100,059
$7,287,263
$159,048
$196,794
$187,097
$194,552
$2,640,631
$2,833,826
$2,558,143
$2,789,234
$100,000
$100,000
$100,000
$100,000
$54,688
$1,185,432
$397,775
$793,000
$622,374
$240,000
$54,739
$215,000
$45,823
$105,000
$72,542
$65,000
$3,622,564
$4,661,052
$3,370,296
$4,156,786
$675,000
$700,000
$700,000
$725,000
$2,293,714
$1,597,816
$2,585,510
$2,049,724
$676,427
$656,427
$778,004
$679,504
$218,390
$203,390
$240,800
$270,800
$180,000
$210,000
$210,000
$240,000
$100,000
$100,000
$100,000
$100,000
$515,449
$515,449
$515,449
$515,449
$3,983,980
$3,283,082
$4,429,763
$3,855,477
22
WATER OPERATIONS
FUND: 5210-447-430550/560
Personal Services
Maintenance & Operations
Debt Service
Capital Outlay from operations
Capital Outlay -Impact Fee Investment funds
Capital Outlay -Meter Funds
Depreciation Expense
ACTUAL
BUDGET
ACTUAL
BUDGET
FY08/09
FY09/10
FY09/10
FY10/11
$924,172
$939,705
$872,840
$909,415
$626,073
$782,216
$574,188
$743,902
$515,386
$511,905
$511,115
$510,917
$54,688
$1,185,432
$397,775
$793,000
$622,374
$240,000
$54,739
$215,000
$45,823
$105,000
$72,542
$65,000
$675,000
$700,000
$700,000
$725,000
$3,463,516
$4,464,258
$3,183,199
$3,962.234
R 1 R • WINOT MIL
The water facilities budget accounts for the costs associated with providing safe, potable and palatable water for the needs
of the domestic, institutional, industrial and commercial consumers and to provide adequate pressure and flow to meet
fire fighting and irrigation needs. Maintenance of the five wells and Noffsinger Spring as water sources along with
maintenance of the distribution system, storage facilities, fire hydrants, valves, meters and related controls is an integral
part of the function of this department. This budget is responsible for pumping and treating millions of gallons annually.
23
♦ � , 11 11 �.
FUND: 5210-447-43 0550/5 60
1
Line Item Detail: Water Fund
110 Personal Services - Reduced .35 FTE
Reviewed and updated the allocation of positions in each fund. No new FTFs were added.
218 Equipment - Non Capital - $10,200
$1,800 - Air Compressor
$500 - Mise Replacements
$2,700 - Lift Gate - install on water production service trk, needed for transfer of chemicals, motors, etc.
$1,500 - Utility Trailer - Needed for transport of lawn mower to 2 reservoirs, and 6 well sites.
$3,700 - Line Tracer - Current unit is no longer operable, used to trace main locations.
221 Safety Equipment & Supplies - $3,700
Increase of $ I ,200 for a fire resistant safety can cabinet for storage of oils and fuels.
226 Chlorine & Chemicals - $33,000
Increase of $3,000 needed due to the increased cost of chemicals and the additional wells added to the system.
Increase of $5,000 for two (2) Chemical Feed Pumps for injecting chlorine.
231 Gas & Oil - $27,000 (reduced $11,000)
Reduced $11,000 to reflect actuals.
341 Electricity - $148,000
increase of $6,000 to reflect actuals (several new facilities have been added to the system)
349 Lab Services - $25,500 (reduced $10,000)
Mandated sampling of eight wells and a groundwater spring.
$5,000 for purchase of five (5) water sample stations.
354 Contract Services - $60,000 (reduced $5,000)
This line item covers the cost of annual contracts, i.e., U-dig fees, generator testing and maintenance, coveralls, and estimated
system repairs. The elevated tanks are also due for inspection (inspected every 5 yrs) at a cost of $3,000.
355 Contract Services - Aerial Mapping - $3,000 (Carryover)
An examination of the large utility wall maps shows that because of our rapid growth, the mapping imagery is
out of date in terms of showing the newer subdivision areas. The surveys and topographic mapping does not need updating,
only the map imagery. Cost shared w/Storm, Sewer, Spec. St. - Total Cost $12,000.
24
FUND: 5210-447-43 0550/560
Line Item Detail: continued
356 Consultants — $20,000 (Reduced $15,000)
* Water Rights Review - $15,000
The City has previously annexed large properties into the City. Many of these properties have water rights associated with them.
These water rights can have great potential value to the City. This budget item provides funds for water rights analysis of
individual properties. Valuable water rights will be transferred to the City so that they do not impede the City's long-term ability
to provide service to annexed properties when they are developed
* Water Modeling - $5,000
As new development occurs, the Public Works Department has a consultant update the water model to reflect this additional
system demand. This model update allows the City to monitor changes in remaining capacity. The Public Works Department
uses this updated information to prioritize and schedule capital projects.
356 Water Shed Control Program (State Mandate) - $5,000
The City of Kalispell obtains its raw water supply from eight wells and a groundwater spring, historically referred to as Noffsinger
Spring. In 1998 the spring was classified as Groundwater Under the Influence of Surface Water (GUDISW). In order to meet
filtration avoidance criteria, the City developed a Watershed Control Program (WCP) for Noffsinger Spring in adherence with
Montana (ARM) 17.38.208. The purpose of the WCP is to minimize the potential for contamination by Giardia lamblia cysts,
Cryptosporidium, and viruses. City is required to perform management tasks to adhere to the approved WCP.
369 Radio Maintenance - $2,450
Jan. 1, 2012 the FCC will be making a change to the FCC bandwidth making all of our narrowband frequency
radios obsolete. The water division has approximately 10 radio that will need to be replaced. The plan is to
replace approximately three radios next year.
422 Hydrants - 26,000
Reduced line item by $8,000 - Completed 3 year hydrant program.
Capital Outlay
935 Armory Well Generator Replacement - $60,000
This project would replace the 1920's generator at the Armory Well site. The existing generator has a failing injector
pump and parts to replace and repair the injector pump are no longer made. Armory Well was the largest production well
in 2009. During power outages it is essential to have Armory Well online during peak demand. The ability to provide water
during emergencies is compromised when the backup generator is failing. A new diesel generator will allow the City to provide
water from this well site during power outages.
940 Machinery & Equipment - $105,000
$105,000 - Backhoe - Replace a 1974 Backhoe
25
is 11111111
FUND: 5210-447-43 0 5 50/5 60
Line Item Detail: continued
Capital Outlay Cont.
950 11tit Street East Water Main (Prj. #W-EX-I9) - Carryover $156,000
This project would replace the existing 2" copper line between 8th Ave. East at I I th St. East and Woodland Drive at I 1 th St.
East with an 8" diameter main. In addition, the 2" copper line between I lth St. East at Woodland
and 9th St. East at Woodland and the 4" line between 9th St. East at Woodland and 8th St. East at Woodland would be
abandoned and new service taps would be provided to the residences now being supplied by the undersized water line.
There is an existing 8" diameter water main along Woodland Avenue between 8th St. East and 1 I th St. East.
951 Security System Upgrades - Carryover $32,000
Install an advanced well and storage security system to meet state and federal vulnerability assessment standards
and install data trend graphs to monitor and operate each well site.
956 Upper Zone/Lower Zone Interconnection - Carryover $8,800 New Appropriation $21,200
This project would install a pressure relicf/pressurc sustaining valve near the intersection ofThrce Mile Drive and Meridian
Road. The upper water zone piping and the lower water zone piping are within 15 feet of each other at this location. The upper
zone water pressure at this location is approximately 85 psi with the lower zone water pressure at approximately 35 psi. With
the addition of the 2 million gallon storage tank on the west side of the city, this would allow the system to boost the pressure
in the lower zone at this location to about 50 psi. The valve would shut if the upper zone pressure in this area dropped to a
determined low pressure. Initial engineering anticipated that city crews could perform the construction. The installation
became more complex with the final design involving two pressure reducing valves and the construction of a building to
house the components. The city has purchased the above ground valves and appurtenances and will contract the
installation of the valves, related equipment and building. The anticipated cost for the construction work is $30,000.
958 Loop Projects - Carryover $335,000, New Appropriation $60,000 (added Hawthorn to 2 Mile Dr)
* $188,000 - Install an eight inch water main in West Colorado Street eastward from 5'h Ave. WN to U.S. Highway 93 thence
along the highway to W. Utah Street. This area has no fire protection. Fire hydrants will be installed at appropriate
locations along this water main (W-EX-28).
* $147,000 - First Avenue EN north of Arizona east of North Main Street is currently provided water service with a two inch water
pipe. This piping is inadequate for providing water service and provides no fire protection. An eight inch water main with fire
hydrant will be installed to provide adequate fire protection to this area. An eight inch water main will be installed in First Avenue
EN from East Arizona Street to North Main Street (W-EX-30). This project will be combined with W-EX-I32).
* 60,000 - Hawthorn Avenue to Two Mile Drive Loop - This project (W-EX-31) would enhance the fire protection reliability
for the Hawthorne Avenue and Two Mile area. The water main within Hawthorne Avenue north of Two Mile Drive is not
looped or tied to the 8-inch water main in Two Mile Drive. The fire flow at the west end ofGlacier Street is 996 gallons per minute.
This project would install approximately 180 linear feet of 8-inch water main and appurtenances including pavement repair from
the west end of Glacier Street south to the 8-inch water train in Two Mile Drive. The installation of the 8-inch water main
increases the fire flow to 2,000 gpm at the west end of Glacier Street.
c
WATER OPERATIONS
FUND: 5210-447-430550/560
Line Item Detail: continued
Capital Outlay - Impact Fee funds (10120)
930 Contract Main Upsize - $75,000
Funds required for small city requested upsizing of private development infrastructure.
941 Meters (new services) - $65,000
Meters provided for new hook-ups.
953 Develop Water Supply for Section 36 Well - Carryover $75,000
This project includes pump testing the existing well to determine drawdown and feasible pumping rates. The project also includes
the time and materials necessary to prepare a water right change application.
Operated and maintained 129.4 miles of water mains, 4 water storage tanks, 8 water wells, and 1 groundwater spring.
Added 16 new fire hydrants to the system, replaced 8 fire hydrants, and repaired 4 fire hydrants.
Added 3,697 linear feet of new water main to City system.
Replaced 372 old water meters in our system and installed 71 new water meters.
Installed 14 new water main taps, repaired 21 service lines, 2 main breaks, and 22 curb boxes.
Installed 5 sampling ports in areas throughout Kalispell to ensure sample monitoring of the entire system.
City crews extended the water line in the Spring Creek subdivision area to improve the efficiency of the new two million gallon
tank.
Completed the Kalispell Bypass Utility Relocation Project in preparation of the first phase construction of the bypass.
Participated in State DEQ Sanitary Survey of the Kalispell Public Water Supply System. Updated and repaired identified
deficiencies to the system.
Developed a Water Shed Control Program (WCP), including management tasks and an implementation schedule, developed
an emergency response procedure for potential pollutant threats within the Noffsinger watershed zone, and completed a WCP
annual report.
Equipment purchases included a commercial grade lawn mower for grounds maintenance at our well sites.
Worked with County Fair personnel to ensure proper backflow preventors were in place during the fair, protecting the City's
water system from any backflow contaminations as well as ensuring fair patrons were provided with safe drinking water.
Two operators became certified to rebuild and repair larger water meters. Rebuilding our larger water meters instead of replacing
them will result in a significant savings to the City.
Responded to 1,710 Utility Location Requests.
Performed routine cleaning and exercising of valves in the system.
Various maintenance included installing a new magnetic flow meter at Buffalo Hill well, installing electrical conduit and a
transformer vault for Noffsinger Spring electrical upgrade, replaced upper shaft on Buffalo Hill pump motor, repaired oil leak
and line shaft in Depot pump motor, replaced turbo and exhaust system on Armory well generator, installed sodium hypochlorite
tanks at Old School well, replaced bearings on exhaust fan at Depot well, and painted several water production buildings.
27
WATER OPERATIONS
FUND: 5210-447-430550
ACTUAL
BUDGET
ACTUAL
BUDGET
FY08/09
FY09/10
FY09/10
FY10/11
Personal Services: FTE'S
13.75
13.95
13.95
13.60
110
Salaries & Wages
$715,733
$717,372
$684,980
$691,214
112
Severance
$4,400
121
Overtime/CallOuts
$17,156
$20,500
$17,695
$20,500
153
Health Insurance
$147,173
$156,754
$126,546
$150,401
155
Retirement - PERD
$44,110
$45,079
$43,619
$42,900
Total Personal Services
$924,172
$939,705
$872,840
$909,415
Maintenance & Operations:
210
Office Supplies
$317
$400
S377
$450
213
Small Office Equip
S155
$1,000
$0
$1,000
214
GIS/GPS Supplies
$2,575
$5,000
S416
$3,000
215
Computer Supplies & Support
$1,631
$3,000
$4,162
$3,000
216
Computer Equipment
$4,833
$5,000
$4,782
$5,000
218
Equip. (Non Capital)
$8,843
$8,475
$6,401
$10200
221
Safety Equip & Supplies
$5,084
$2,500
$938
$3,700
224
Janitorial Supplies
$849
S800
$892
$800
226
Chlorine & Chemical
$23,953
$25,000
$23,896
$33,000
229
Other Supplies
$822
$1,500
$1,187
$1,500
231
Gas & Oil
$24,028
$38,000
$19,303
$27,000
241
Consumable Tools
$2,745
$2,500
$2,720
$2,500
312
Postage
$647
$2,500
$612
$2,500
320
Printing
$0
$2,000
$3,912
$2,000
335
Membership & Dues
$899
$1,200
$1,110
$1,200
336
Public Water Supply Fee
$16,091
$19,000
$16,477
$19,000
341
Electricity
$136,394
$142,000
$137,459
$148,000
342
Water/Sewer
S375
$500
$348
$500
344
Natural Gas
$12,690
$16,000
$9,644
$15,000
345
Communications
$7,385
$8,000
$8,003
$8,000
349
Lab Services
$23,488
$35,500
$20,069
$25,500
353
Auditing
$3,000
$3,000
$3,000
$3,000
354
Contract Services
$58,210
$65,000
$32,559
$60,000
355
Contract Services - Aerial Mapping
$0
$3,000
$302
$3,000
356
Consultants -Water Rights Acquisition / Water Modeling
$46,715
$35,000
$10,754
$20,000
356
Watershed Control Program (Mandated)
$5,000
con't.
28
WATER OPERATIONS
5210-447-430550
ACTUAL
BUDGET
ACTUAL
BUDGET
FY08/09
FY09/10
FY09/10
FY10/11
Maintenance & Operations -continued:
357
Rate Study
$0
$10,000
$7,132
$4,500
358
Review Impact Fees
$4,006
$5,000
$2,268
$5,000
360
Repair & Maintenance
$0
$7,000
$34
$7,000
362
Equipment Maintenance
$3,181
$4,000
$2,256
$4,000
363
Office Equip Maintenance
$0
$200
$0
$200
366
Building Maintenance
$11,587
$20,000
$5,486
$17,000
369
Radio Maintenance
$293
$2,450
$945
$2,450
373
School & Travel
$6,244
$6,500
$4,815
$5,500
380
Training Materials
$104
$500
$0
$500
388
Medical/DrugTesting
$1,060
$800
$635
$800
395
Equipment Rental
$0
$1,500
$0
$1,500
410
Construction Materials
$30,575
$30,000
$24,238
$30,000
422
Hydrants
$17,888
$34,000
$2,560
$26,000
423
Materials - Mains
$7,571
$12,000
$5,179
$11,000
424
Materials - Service lines
$2,877
$8,000
$6,163
$9,000
425
Materials - Wells/Pumps
$17,777
$36,000
$25,925
$36,000
510
Property & Liability Ins. $10,000/ 26,500
$28,692
$38,000
$37,905
$36,500
512
Uninsured loss -deductible
$2,731
$4,000
$11,933
$4,000
513
Uninsured loss -Goodwill Expenditures
$0
$7,500
$0
$7,500
521
Central Garage Transfer
$8,500
$8,500
$8,500
$7,500
522
Administrative Transfer
$76290
$90,156
$90,156
$94,723
528
Data Processing Transfer
$18,697
$20,897
$20,897
$20,041
532
Debt service transfer/building
$6275
$7,838
$7,838
$7,838
810
Bad Debt Expense
($4)
$1,500
$0
$1,500
Total Maintenance & Operations
$626,073
$782,216
$574,188
$743,902
490200 Debt Service- ALL BONDS & LOANS:
610/620/630 Principal, Interest, fiscal fees
CAPITAL OUTLAY
Capital Outlay: Operating funds
935 Armory Well Generator Replacement
940 Equipment
$515,386 $511,905
$32,338 $55,000
$511,115 $510,917
$60,000
$45,001 $105,000
con't.
29
WATER OPERATIONS
5210-447-430550
EXPENSE DETAIL
Capital Outlay: Operating Cont.
944 Vehicles
950 Grandview Water main replacement
951 Security System Upgrades
954 US 93 S. Bypass Relocation Design
954 US 93 S. Bypass Relocation CONSTRUCTION -amended
956 Upper Zone/Lower Zone Interconnection
958 Loop Projects
961 Replace undersized piping (E. Arizona & 1 st Ave. EN)
962 1 st Ave E. & Idaho Street Crossing
Subtotal capital from operating fund
430555 Capital Outlay -Impact Fee Funds
941 Meters (new services)
930 Contract Main Upsize (Impact fee inv. Acct)
953 Develop Water Supply for Section 36 Well
956 Upper Zone Storage & Production
Subtotal capital from Impact Investment fees
430550 Capital Outlay -Meter Funds
948 Meters -Replacement $ subtotal
Total Capital Outlay
510400 Depreciation
831 Depreciation expense
Total Water Facilities
ACTUAL
BUDGET
ACTUAL
BUDGET
FY08/09
FY09/10
FY09/10
FY10/11
$22,350
$0
$0
$0
$0
$156,000
$69,818
$156,000
$0
$32,000
$0
$32,000
$0
$30,560
$0
$0
$0
$306,872
$219,169
$15,000
$0
$40,000
$31,402
$30,000
$0
$335,000
$0
$395,000
$0
$195,000
$0
$0
$0
$35,000
$32,385
$0
$54,688
$1,185,432
$397,775
$793,000
$40,194
$65,000
$54,739
$65,000
$8,882
$100,000
$0
$75,000
$0
$75,000
$0
$75,000
$573,298
$0
$0
$0
$622,374
$240,000
$54,739
$215,000
$45,823
$105,000
$72,542
$65,000
$722,885
$1,530,432
$525,056
$1,073,000
$675,000 $700,000 $700,000 $725,000
$3,463,516 $4,464,258 $3,183,199 $3,962,234
$187,097
$3,370,296
30
WATER
FUND: 5210-447-430560
Personal Services
Materials and Services
r ,, 10
ACTUAL
BUDGET
ACTUAL
BUDGET
FY08/09
FY09/10
FY09/10
FY10/11
$89,385
$120,836
$114,906
$116,495
$69,663
$75,958
$72,191
$78,057
$159,048
$196,794
$187,097
$194,552
The City bills customers for water service on a bi-monthly schedule. The administrative fee effective July I st, 2007,
is $3.75 per billing period.
FX 2011 BUDGET HIGHLIGHTS
Remit Plus software licensehnaint. $1,200; VeriSign security for web bill payments.
Postage/Other Billing - cost of mail service and fees associated with electronic
receipting including cost of shredding checks/documents.
Water customers can choose to have their bills paid automatically out of their bank account, auto pay or on-line
credit/debit card payment.
Upgrade of Utility Billing software to web based programs by ADG, our software vendor, is complete.
Staff trained on use of software.
31
WATER BILLING
FUND: 5210-447-430560
Personal Services: FTE's
110
Salaries & Wages
153
Health Insurance
155
PERD
Total Personal Services
Maintenance & Operations:
210
Office Supplies/furniture
218
Computers & supplies
335
Memberships & Dues
353
Auditing
354
Contract Services
355
Postage/Other Billing Costs
373
School & Travel
522
Administrative Transfer
528
Data Processing Transfer
532
Debt Service transfer/building
Total Maintenance & Operations
Total Water Billing
► � r
ACTUAL
BUDGET
ACTUAL
BUDGET
FY08/09
FY09/10
FY09/10
FY10/11
2.00
2.00
2.00
2.00
$71,329
$91,459
$91233
$91,807
$13,608
$23,486
$17,934
$18,774
$4,448
$5,891
$5,739
$5,914
$89,385
$120,836
$114,906
$116,495
$0
$500
$124
$500
$1,366
$3,000
$151
$2,500
$285
$350
$238
$300
$1,500
$1,500
$1,875
$1,500
$7,803
$7,500
$3,847
$7,500
$24,767
$25,000
$28,373
$28,500
S973
$1,200
$675
$1,200
$6,273
$6,173
$6,173
$6,178
$21,196
$22,897
$22,897
$22,041
$5,500
$7,838
$7,838
$7,838
$69,663
$75,958
$72,191
$78,057
$159,048
$196,794
$187,097
$194,552
32
WATER FUND
5210-447490XXX
DEBT SERVICE DETAIL
ACTUAL
BUDGET
ACTUAL
BUDGET
FY08/09
FY09/10
FY09/10
FY10/11
REVENUE BONDS
490250 Debt Service-2001 WRF Loan - 4% (Main & Idaho Project)
610 Principal $35,000 $36,000 $36,000 $38,000
620 Interest $21,740 $20,350 $20,320 $18,560
490204 Debt Service-2004 Revenue Bond:( includes Refunding 1996)(Hwy 93 S)
610 Principal $140,000 $140,000 $140,000 $145,000
620 Interest $56,083 $51,535 $51,533 $46,635
630 Fiscal Agent Fees $300 $350 $300 $300
490206
Debt Service•2007 WRF loan 3.75% A Refunding BOI loans meters & hydrants
610
Principal $145,000
$151,000
$151,000
$157,000
620
Interest $41,463
$35,985
$35,985
S30,262
630
Fiscal Agent Fees $0
$350
$0
$0
490206
Debt Service-2007 WRF loan 3.75% B Water Reservoir project
610
Principal $21,000
$22,000
$22,000
$22,000
620
Interest $54,800
$54,335
$53,977
$53,160
Subtotal Operations $515,386
$511,905
$511,115
$510,917
33
SEWER - SANITARY OPERATIONS, BILLING, WASTEWATER TREATMENT
FUND: 5310
PROJECTED REVENUE AND FUND SUMMARY
BEGINNING CASH
10100
Operating
10123
* SANITARY sewer Impact Fee Inv. Account
10124
*** WWTP Impact Fee Inv. Account
10125
** WWTP Equipment Repl/Evergreen
10126
**** Sewer replacement
1013X
Bond Reserves (restricted funds)
Adjmts to Cash (comp abs., receivables, bond reserv)
REVENUES
343310
SEWER SERVICE -billed (Proposed 5% increase)
343330
* Impact Fee/Hookup-Sanitary Sewer (10123)
343330
Admin impact fees Sanitary (10100)
343335
*** Impact Fee/Hookup-WWTP (10124)
343335
Admin impact fees WWTP (10100)
331158
State bypass relocation reimbursement -amended
371010
Interest -operations
** Interest-WWTP/Evergreen (10125)
*** Interest-WWTP Impact Fee Acet (10124)
* Interest -Sanitary Impact Fee Invest Acct. (10123)
343360
Misc.; 343365 Late customers fees
WWTP bonding -DNRC
Total Revenue
Total Available
Amended
ACTUAL
BUDGET
ACTUAL
BUDGET
I
FY08/09
FY09/10
FY09/10
FY010/11
$1,052,539
$727,324
$723,556
$516,727
$1,988,945
$2,061,328
$2,061,328
$1,623,691
$3,418,894
$692,728
$692,728
S447,048
$747,283
$387,349
$387,349
$328,970
$218,863
$192,718
$192,718
$0
$1,584,162
$1,584,162
$1,584,162
$1,584,162
$73,958
$0
($22,063)
$0
$9,084,644
$5,645,609
$5,619,778
$4,500,598
$3,385,107
$3,450,000
$3,313,978
$3,500,000
$166,280
$175,000
$122,067
$95,000
$6.425
$5,000
$206,378
$246,000
$159,130
$118,750
$8,375
S6,250
$217,431
$121185
$16,237
$134,500
$100,000
$52,701
$40,000
$11,948
$10,000
$6,514
$6,000
$74,169
$15,000
$8,528
$5,000
$54,667
$40,000
$31,492
$23,000
$1,288
$1,850
$1,921
$2,000
$3,903,287
$0
$0
$0
$7,937,624
$4,255,281
$3,833,316
$3,817,237
$17,022,268
$9,900,890
$9,453,094
$8,317,835
EXPENSES
Billing Costs
$186,228
$172,382
$155,981
$168,430
SANITARY Operations/depreciation &debt
$1,342,740
$1,420,360
$1,627,907
$1,687,536
Capital from operating cash
$18,511
$303,308
$183,105
$21,650
*Portion of debt from impact (10123)
$25,000
$25,000
****Sewer replacement (10126)
$126,145
$40,000
$19,815
$0
*from impact fee account (10123)
$123,564
$575,832
$553,710
$50,000
WWTP operating/capital & DEBT
$2,997,357
$3,259,928
$2,777,810
$2,893,172
*** Portion of debt from impact (10124)
$225,000
$225,000
*** from capital impact fee funds & bond(10124)
$6,685,000
$375,071
$119,090
$0
** from Evergreen repl. Funds (10125)
$768,109
$533,000
$484,268
$85,000
Total Expenses
$12,247,654
$6,679,881
$6,171,686
$5,155,789
Add depreciation to cash
$867,227
$919,375
$1,219,375
$1,211,599
ENDING CASH
10100
Operating
$723,556
$90,627
$516,727
$107,649
10124
*** WWTP Impact Fee Inv. Account
$692,728
$353,657
$447,048
$345,798
10125
** WWTP Equipment Repl/Evergreen
$387,349
$283,724
$328,970
$669,345
10126
**** Sewer equip. replacement (unfunded -closed)
$192,718
$152,718
$0
$0
10123
* SANITARY Impact Fee Inv. Account
$2,061,328
$1,675,496
$1,623,691
$1,666,691
1013X
Bond Reserves (restricted funds)
$1,584,162
$1,584,162
$1,584,162
$1,584,162
$5,641,841
$4,140,384
$4,500,598
$4,373,645
Budget to fund debt service with Impact fee charges for $250,000 ( wwtp $225,000; sanitary $25,000)
34
SEWER - OPERATIONS
FUND: 5310-454430620-630/45 5-430640
ACTUAL
BUDGET
ACTUAL
BUDGET
FY08/09
FY09/10
FY09/10
FY10/11
Personal Services
$444,680
$462,257
$452,412
$448,027
Maintenance & Operations
$322,447
$352,404
$294,795
$359,134
Capital Outlay - from operations
$18,511
$303,308
$183,105
$21,650
Capital Outlay- Replacement funds
$126,145
$40,000
$19,815
$0
Capital Outlay - from Impact Fee funds
$123,564
$575,832
$553,710
$50,000
Debt Service
$104,613
$105,700
$105,700
$105,375
Depreciation
$471,000
$500,000
$800,000
$800,000
$1,610,960
$2,339,501
$2,409,537
$1,784,186
PROGRAM DESCRIPTION
It is the responsibility of the Sewer Maintenance Division to operate and maintain the sewer collection and transmission
system. Maintenance procedures include jet rodding, flushing, TV inspection, mechanical and chemical cleaning
methods as required.
35
FUND: 5310-454430630
FY 2011 BUDGET HIGHLIGHTS
Line Item Detail: SEWER FUND
110 Personal Services - Increased .05 FTE reorganization
Salaries reduced due to vacancy savings - retirement
221 Safety Equipment & Supplies - $7,500
Increased $1,500 for purchase of (2) back-up cameras for jet truck and camera van (Cost $3,000 - 50% budgeted in Storm Fund).
Increase of $5,000 for installation of fall protection at (3) lift stations where wet wells are accessed through a large,
unprotected access hatch. $1,000 to correct safety audit deficiencies.
341 Electricity - $43,000
Increased $7,000 due to rate increase from local electrical supplier.
355 Contract Services - Aerial Mapping Carryover $3,000
An examination of the large utility wall maps shows that because of our rapid growth, the mapping imagery is
out of date in terms of showing the newer subdivision areas. The surveys and topographic mapping does not need updating,
only the map imagery. Cost shared w/Storm, Water, Spec. St. - Total Cost $12,000.
356 Consultants - $7,500 (reduced $7,500)
The Department of Environmental Quality requires the City to maintain a record of sanitary sewer system capacity and demand.
As new development occurs, the Public Works Department has a consultant update the sanitary sewer model to reflect this
additional system demand. This model update allows the City to monitor changes in remaining capacity. The Public Works
Department uses this updated information to prioritize and schedule capital projects.
369 Radio Maintenance - $1,000
Jan. 1, 2012 the FCC will be making a change to the FCC bandwidth making all of our narrowband frequency
radios obsolete. The sewer division has approximately 6 radio that will need to be replaced. We plan on
replacing approximately one radio next year.
Capital Outlay - Impact Fee funds (10123)
955 Main & Lift Station upsize-$44,000
Funds required for small city requested upsizing of private development infrastructure.
957 Grandview Pump Station -carryover $6,000
36
FUND: 5310454-43 0630
1
Operated and maintained 112.3 miles of gravity sewer mains, 19.6 miles of sewer force mains and 41 sewage lift stations.
Added 1,521 linear feet of new sewer main to City's system..
Completed the Kalispell Bypass Utility Relocation Project in preparation of the first phase construction of the bypass.
Completed construction on the Grandview Sewage Pump Station & Gravity Main Upgrade.
Replaced a 30 year old pump at Lift Station #10 (W. Nicklaus).
Contracted replacement and repair of various manholes.
Made several sewer service line repairs within the City.
Hired and trained new employee.
Continued TV inspection of new construction.
Continued regular maintenance, cleaning and inspections of sewer mains, storm drains and pump station wet wells.
Responded to 1,710 Utility Location Requests.
Equipment purchases included a new root cutter.
UNFUNDED Capital Outlay
950 By -Pass Pump Grandview Lift Station - $56,000
UNFUNDED
The Grandview lift station is considered a regional lift station due to the large area it serves. The bypass
pump is the only means of keeping this station functional during any number of station failures, including
pump failure, control failure and loss of manual override, backup power failure, and flooding of the control
well. This bypass pump is a mobile unit, and would serve as backup for any one of the City lift stations.
959 Sanitary Liquid Disposal Site - $15,000 UNFUNDED
This is a structure located at the WWTP which would allow the City's sewer maintenance jet trucks to discharge the solid and liquid waste
collected during sanitary sewer cleaning operations. The liquid waste will be treated in the WWTP. From time to time the solids (gravel,
mud, sticks, debris, etc.) will be removed from the structure and placed with the other solid waste collected at the WWTP for off -site
disposal.
952 Manhole & Sewer Main Rehabilitation & Replacement - $15,000 UNFUNDED
This project would allow for the reconstruction or replacement of sanitary sewer manholes and mains that have deteriorated and are
approaching a potential failure. The sewer crews continually review and record the function of manholes and mains. During this
review, the crews prioritize the potential projects according to the severity of the deterioration.
37
SEWER - OPERATIONS
FUND: 5310-454-430630
Personal Services: FTE's
110 Salaries & Wages
112 Severance
121 Overtime
153 Health Insurance
155 Retirement - PERD
Total Personal Services
Maintenance & Operations:
210 Office Supplies
213 Small Office Equipment
214 GIS/GPS Equip/Supplies
215 Computer Software & Supplies
216 Computer Equipment
218 Equipment (Non Capital)
221 Safety Equip & Supplies
224 Janitorial Supplies
229 Other Supplies
231 Gas & Oil
241 Consumable Tools
312 Postage & Shipping / Printing
336 Licenses & Fees
341 Electricity
342 Water
344 Natural Gas
345 Telephone & Comm., alarms
353 Auditing
354 Contract Services
355 Contract Services - Aerial Mapping
356 Consultants
357 Facility Plan FY08/Rate Study FY09 & FY10
358 Impact Fee Study/Review Impact Fees
362 Equipment Maintenance
366 Building Maintenance
369 Radio Maintenance
373 School & Travel
388 Medical Services
U 010 1110t_0j 1
ACTUAL
BUDGET
ACTUAL
BUDGET
FY08/09
FY09/10
FY09/10
FY10/11
6.7
$347,788
$7,151
$64,860
$24,881
6.9
$364,781
$6,500
$68,379
$22,597
6.9
$356,535
$8,334
$64,763
$22,780
6.95
$342,562
$13,900
$7,000
$61,635
$22,931
$444,680
$462,257
$452,412
$448,027
$324
$450
$301
$450
$158
$500
$0
$250
$2,165
$2,000
$61
$1,000
$2,020
$2,000
$2,275
$2,000
$630
$2,500
$2,589
$2,500
$801
$5,500
$2,016
$1,000
$1,136
$900
$1,472
$7,500
$735
$600
$673
$700
$599
$800
$608
$600
$9,110
$14,500
$8,200
$9,500
$1,331
$1,200
$1,039
$1,000
$717
$750
$148
$500
$560
$450
$240
$450
S37,215
$36,000
$39,728
$43,000
$132
$175
$201
$175
$13,304
$12,500
$12,984
$13,000
$20,965
$20,500
$21,676
$21,000
$2,000
$2,000
$2,000
$2,000
$24,564
$22,100
$19,588
$14,000
$0
$3,000
$0
$3,000
$9,018
$15,000
$0
$7,500
$0
$12,500
$8,930
$3,000
$4,512
$5,000
$2,268
$5,000
$5,812
$7,800
$3,156
$4,800
$452
$1,000
$1,677
$1,000
$270
$1,000
$0
$1,000
$1,603
$3,000
$2,274
$2,000
$806
$800
$811
$800
38
SEWER - OPERATIONS
FUND: 5310454-430630
ACTUAL
BUDGET
ACTUAL
BUDGET
FY08/09
FY09/10
FY09/10
FY10/11
Maintenance & Operations -continued:
410
Construction Materials
$5,746
$10,000
$6,121
$9,000
425
Materials - Pumps/Lift Stations
$13,433
$14,500
$7,936
$12,500
510
Property & Liability Ins $7,000/$49,000
$15,726
$28,500
$25,027
$56,000
512
Uninsured loss/goodwill expenditures
$48,727
$18,000
$16,692
$18,000
521
Central Garage Transfer
$2,500
$3,000
$3,000
$2,500
522
Administrative Transfer
$50,110
$54,771
$54,771
$63,374
528
Data Processing Transfer
$13,498
$15,325
$15,325
$14,697
532
Office Rent
$6,275
$7,838
$7,838
$7,838
535
Usage charge for 100,000 gallons-Trumble Creek
$25,501
$25,000
$23,170
$25,500
810
Bad Debt expense
($8)
$945
$0
$1,000
Total Maintenance & Operations
$322,447
$352,404
$294,795
$359,134
Capital Outlay: Operating funds
940
Machinery, Equipment & Vehicles
$18,511
$0
$0
$0
954
US 93 S. Bypass Utility Relocation Design
$0
$13,400
$0
$0
954
US 93 S. Bypass Utility Relocation Construction
$0
$289,908
$183,105
$21,650
Total Capital Outlay
$18,511
$303,308
$183,105
$21,650
430633 Capital Outlay -Sewer Equip Replacement funds (10126)
940 Machinery & Equipment, Vehicles
$126,145
$0
$0
$0
952 Manhole & Sewer Main Rehabilitation & Replacement
$0
$10,000
$10,000
$0
956 Replacement Pumps for Lift Station #28 (Cottonwood)
$0
$20,000
$0
$0
960 Replacement Pump for Lift Station #10 (W. Nicklaus)
$0
$10,000
$9,815
$0
Total Equipment Replacement funds
$126,145
$40,000
$19,815
$0
430635 Capital Outlay -Impact Fee funds (10123)
955 Main & Lift Station Upsize
957 Grandview Pump Sta./gravity main
Total Capital from Impact fee funds
610 Debt Service
Principal, Interest, fiscal fees
510400
831 Depreciation expense
Total Sanitary Sewer
$49,168
$75,832
$0
$44,000
$74,396
$500,000
$553,710
$6,000
$123,564
$575,832
$553,710
$50,000
39
$104,613 $105,700 $105,700 $105,375
$471,000 $500,000 $800,000 $800,000
$1,610,960 $2,339,501 $2,409,537 $1,784,186
WASTEWATER TREATMENT PLANT
FUND: 5310-455430640
Personal Services
Materials and Services
Capital Outlay -Capital Improvement
Debt Service
WWTP Replacement/equip. (Evg)
Replacement Reserve (Evergreen)
ACTUAL
BUDGET
ACTUAL
BUDGET
FY08/09
FY09/10
FY09/10
FY10/11
$651,181 $669,441 $637,449 $642,194
$743,435
$921,182
$696,718
$805,529
$7,372,795
$375,071
$119,090
$7,000
$1,206,514
$1,249,930
51,249,268
$1,251,850
580,314
$533,000
$484,268
$95,000
$396,227 $419,375 $419,375 $411,599
$10,450,466 $4,167,999 $3,606,168 $3,203,172
The Wastewater Treatment Plant Facility is responsible for treating domestic wastewater to meet the discharge permit issued
by the Montana Department of Environmental Quality. The treated wastewater is discharged to Ashley Creek in accordance
with specific limitations, requirements, and conditions.
Facility Maintenance: 9 buildings, 55 pumps, 14 gear reducers, 24 mixers, 6 large & 12 small submersible pumps, 1 scum buster
pump, 210 valves of all sizes, 5 air compressors, I electric generator, 2 gas boilers, 4 make-up air units, 8 ventilation fans,
16 electric heaters, 3 air conditioners, 3 gas heaters, 16 sand filters, (5) 125 hp air blowers, 17 auto electric valves, 20 flow meters,
15 gas detectors, 4 programmable logic controllers, 2 ultraviolet light disinfection units, 5 clarifiers, 13 bio-cells, I equalization tank,
3 digesters, 1 fermenter tank, 2 dissolved air floatation tanks, 2 belt presses, 15,000 gal. Alum tank, 2 pickups and 3 sludge trucks.
OBJECTIVES: WWTP
1. Monitor and adjust the wastewater treatment process to meet the discharge permit; monitor Ashley Creek for flow above
the plant and dissolved oxygen above and below the plant.
2. Perform a minimum of 6,200 laboratory analyses per year to monitor and control the biological nutrient removal process;
perform analyses of specific parameters to meet the discharge permit requirements.
3. Continue efforts to reduce the inflow into the Plant which occurs during rainfall and snow melt events.
4. Continue work on the Pretreatment Program to control wastewater quality; monitor the sludge for heavy metals and nutrients to
insure that it is acceptable for disposal.
5. Perform work orders (approximately 1500 per year) to keep equipment and processes functioning properly; perform equipment
repairs and respond to alarms quickly so the treatment process is not interrupted.
6. Continue public relations (tours and articles) to educate the public on this unique process and the excellent quality of the treated
wastewater.
7. Optimize nutrient removal following the plant expansion.
40
WASTEWATER
FUND: 5310-45 5-430640
FY 2011 BUDGET HIGHLIGHTS
Line Item Detail - Wastewater Treatment Plant
110 Personal Services- Decreased 1.15 FTE
Reviewed and updated the allocation of positions in each fund. No new FTE's were added.
225 Alum - $35,000 (reduced $35,000)
New plant 1 year inspection requires the use of Alum.
341 Electricity - $200,000 (reduced $35,000)
354 Contract Services - Glacier Gold - $123,000 (reduced $7,000)
This line item is sludge disposal fees to Glacier Gold,
355 Other Contract Services - $38,000 (reduced $7,000)
Rag /grit and landfill biosolids disposal fees and other contract services.
356 Consultant - Electrical Engineer - $19,000 (reduced $6,000)
Plant expansion operations may require troubleshooting new systems; Ashley Creek flow study-$10,000.
358 Consultants - Total Maximum Daily Load (TMDL) / Permit - $15,000 (reduced $10,000)
The State of Montana is under Federal Court order to develop a TMDL for pollutants flowing
from the Flathead basin into Flathead Lake. These TMDL restrictions have potentially very serious consequences for
the City's historical ability to drain storm waters to Flathead tributaries and its community wastewater to Ashley creek.
A TMDL that is unreasonably restrictive could greatly impair the City's ability to grow and would greatly raise the cost of
treating community wastewater and storm water discharges. We have engaged an experienced consultant to provide
assistance to the City for working with MDEQ to develop a satisfactory TMDL. This budget item also includes funds for
potential legal costs related to the TMDL issue.
360 Maintenance - Post construction Building & Grounds Maintenance - $15,000 (no change)
Plant grounds & buildings need maintenance following construction.
430644 Capital Outlay:. Impact Fee funds (10124)
933 Plant Expansion - Carryover $25,000
Construction of the expansion project is complete. The contractor, engineer, and operating staff are working together to
correct minor operational and warranty -related repairs and changes. The final significant task to perform is the one-year
final warranty inspection and closure of the project. This task is extremely important and will be directed by the City's design
and construction engineer. The amount of carry-over shown is the cost to perform this final inspection and project close-out.
41
WASTEWATER TREATMENT PLANT
FUND: 5 310-4 5 5-43 0640
FY 2011 BUDGET HIGHLIGHTS-con't.
Laboratory Operations:
216 Computer Equipment - $1,400
Lab computer needs to he replaced.
218 Equipment - Non Capital - $4,000 (Reduced line item by $1,400)
$3,500.00 - Portable sampler for pre-treatment program
$500.00 - Misc Replacements
222 Lab Supplies - $10,000
$10,000 - Additional permit required testing & pretreatment program testing.
349 Outside Lab Services ( Mandated Pretreatment Testing) - $20,000
$11,000 for yearly pretreatment testing; additional for fish toxicity, heavy metals, & new permit requirements.
Capital Outlay:
940 Laboratory Refrigerator - $7,000
Current refrigerator is 18 yrs old and too small to hold all of the current samples as mandated by the MT DEQ.
• Completed the 2 year Wastewater Treatment Plant expansion on 8/31/09. Expansion increased the plant capacity 75%
from 3.1 MGD to 5.4 MGD.
• Upgraded and installed new gas detection system plant wide.
• Installed new 18" stainless steel main roller on west belt filter press, over hauled two supernatant pumps, replaced motor on
recirculation pump, overhauled shredder/grinder pump, and installed new 10" swing check on lift pump #3.
• Integrated the new electronic Operations and Maintenance manuals to plant server.
• Completed office addition in the main office building.
• Continued efforts on the Total Maximum Daily Load (TMDL) development with the Montana State DEQ and USEPA.
• Continued Pretreatment Program development and completed the Laboratory Quality Assurance plan.
• Laboratory personnel proficiency rating was 100%.
• Laboratory personnel passed the State wastewater examination and are Certified Wastewater Operators.
FY 2011 BUDGET CONTRAINTS
366 Building Maintenance - $8,000
$8,000 for atrium windows. Current windows are 18 yrs old, the seals are broken, windows are discolored, and leak.
Evergreen Sample shed odor control - $32,000 UNFUNDED
WWTP Server - $5,000 UNFUNDED
The W WTP server is City Hall's old server taken out of production because it had reached it's end of life. No guarantee the
server will last for any period of time.
42
WASTEWATER TREATMENT PLANT
FUND: 5310-455430640
Personal Services: FTE's
110
Salaries & Wages
112
Severance
121
Overtime
153
Health Insurance
155
Retirement - PERD
Total Personal Services
Maintenance & Operations:
210
Office Supplies
213
Small Office Equip & Furniture
215
Computer Supplies & Support
216
Computer Equipment
221
Safety Equipment & Supply
222
Lab Supplies
224
Janitorial Supplies
225
Alum
226
Chemicals
229
Other Supplies
231
Gas & Oil
241
Consumable tools
312
Postage & Shipping
335
Membership and Dues
336
Licenses and Fees
341
Electricity
342
Water
344
Natural Gas
345
Telephone & Alarms
353
Auditing
354
Contract Services -Glacier Gold
355
Other Contract Services
356
Consultant - Electrical Engineer
357
Rate study
358
Consultant - TMDL
360
Maintenance Service -misc.
ACTUAL
BUDGET
ACTUAL
BUDGET
FY08/09
FY09/10
FY09/10
FY10/11
7.2 7.2 7.2 6.05
$395,515
$400,679
$373,817
$382,859
$8,800
$20,903
$20,000
$20,877
$20,000
$64,914
$68,415
$64,914
$66,146
$24,524
$24,751
$24,874
$23,932
$505,856
$513,845
$484,482
$501,738
$917
$1,000
$989
$1,000
$155
$500
$828
$1,000
$740
$500
$807
$500
$2,143
$1,500
$936
$2,500
$1,552
$2,500
$1,714
$1,500
$1,628
$0
$0
$0
$205
$250
$262
$200
$38,257
$70,000
$20,156
$35,000
$9,064
$12,500
$7,738
$12,000
$6,464
$4,000
$4,186
$5,000
$7,889
$14,000
$12,545
$11,000
$4,758
$1,000
$1,010
$1,000
$828
$500
$231
$400
$1,388
$1,200
$401
$800
$5,514
$7,500
$6,703
$8,000
$190,767
$235,000
$168,619
$200,000
$6,564
$8,500
$5,344
$7,500
$52,539
$65,000
$50,002
$60,000
$5,908
$6,000
$5,179
$6,000
$2,750
$2,750
$2,750
$2,750
$120,550
$130,000
$128,712
$123,000
$34,893
$45,000
$36,164
$38,000
$18,066
$25,000
$13,674
$19,000
$0
$12,500
$8,930
$5,000
$3,140
$25,000
$1,075
$15,000
$16,908
$15,000
$5,442
$15,000
con't.
43
TREATMENTWASTEWATER
FUND: 5310455-430640
Maintenance & Operations -continued:
361 Maintenance -Digester clean/inspect
366 Building Maintenance
373 School & Travel
380 Training Materials
388 Medical Services
395 Equipment Rental
510 Property & Liability Insurance $40,000/$12,000
521 Central Garage Transfer
522 Administrative Transfer
528 Data Processing Transfer
Total Maintenance & Operations
ACTUAL
BUDGET
ACTUAL
BUDGET
FY08/09
FY09/10
FY09/10
FY10/11
$13,348
$0
$1,600
$0
52,225
$2,500
$2,246
$2,300
$13,145
$14,000
$5,206
$10,000
$165
$500
$82
$500
S610
$700
$482
$500
$960
$1,000
$75
$800
$43,409
$56,500
$46,941
$52,000
$3,500
$4,000
$4,000
$3,500
$93,014
$95,228
$95,228
$105,424
$18,197
$19,504
$19,504
$18,705
$722,160
$880,632
$659,761
$764,879
430644 Capital Outlay: BONDED, Replacement & Impact Fee funds
933 WWTP-eng,constr./Impact fee(10124)
$2,781,713
934 WWTP - Bond Construction Funds
$3,903,287
935 Plant closeout -final inspection (10125)
$687,795
Total WWTP CONSTRUCTION
$7,372,795
430645 WWTP Replacement Funds:Evg (10125)
362 Equipment Maintenance
940 Machinery & Equipment
Total Replacement Funds
490210 Debt Service
610 Principal & Interest (see debt page)
$375,071
5119,090
$0
$0
$0
$0
$400,000
5400,000
$25,000
$775,071
$519,090
$25,000
$46,363
$60,000
$57,901
$40,000
$33,951
$73,000
$26,367
$20,000
$80,314
$133,000
$84,268
$60,000
$1,206,514 $1,249,930 $1,249,268 $1,251,850
831 *Deprec./Replacement Reserve $396,227 $419,375 $419,375 $411,599
Subtotal WWTP $10,283,866 $3,971,853 $3,416,244 $3,015,066
*Note: Replacement reserve is the amount of cash moved to the Evergreen/Kalispell equipment replacement account.
con't.
44
WASTEWATER TREATMENT PLANT
FUND: 5310-45 5-430640
430646 Laboratory Operations FTE's
Personal Services:
110 Salaries & Wages
121 Overtime
153 Health Insurance
155 Retirement - PERD
Total Personal Services
430646 Laboratory Maint. & Operations:
210 Office Supplies
215 Computer Supplies & Support
216 Computer Equipment
218 Equipment (Non Capital)
222 Lab Supplies
224 Janitorial Supplies
229 Other Supplies
312 Postage & Shipping
335 Membership and Dues
336 Licenses and Fees
345 Telephone
349 Lab Services/Newly Mandated Pretreatment Testing
362 Equipment Maintenance
373 School & Travel
380 Training Materials
Capital Outlay: from operations
940 Laboratory Refrigerator
Subtotal Laboratory Operations
ACTUAL
BUDGET
ACTUAL
BUDGET
FY08/09
FY09/10
FY09/10
FY10/11
2.2 2.2 2.2 2.0
$119,963
$126,206
$127,328
$114,033
$0
$300
$0
$200
$17,702
$21,295
$17,702
$19,226
$7,660
$7,795
$7,937
$6,997
$145,325
$155,596
$152,967
$140,456
$100
$0
$100
$50
$0
$50
$304
$0
$0
$1,400
$5,400
$7,597
$4,000
$2,392
$7,500
$8,211
$10,000
$50
$0
$50
$43
$200
$98
$200
$1,200
$0
$500
$100
$0
$100
$280
$200
$80
$200
$50
$0
$50
$14,622
$20,000
$16,315
$20,000
$1,787
$1,500
$1,742
$1,300
$1,847
$4,000
$2,914
$2,500
$200
$0
$200
$21,275
$40,550
$36,957
$40,650
$7,000
$166,600 $196,146 $189,924 $188,106
Total Sewer Treatment & Laboratory $10,450,466 $4,167,999 $3,606,168 $3,203,172
ak,
SEWER BILLING
FUND: 5310-454-43 0620
Personal Services
Materials and Services
r 01011111110 r �
L
ACTUAL
BUDGET
ACTUAL
BUDGET
FY08/09
FY09/10
FY09/10
FY10/11
$116,125 $97,963 $83,159 $94,517
S70,103 $74,419 $72,822 $73,913
$186228 $172,382 $155,981 $168,430
The City bills customers for sewer service on a bi-monthly schedule. The administrative fee effective July Ist, 2007,
is $3.75 per billing period. A 5% increase in rates is requested
Remit Plus software license/maint. $1,200; VeriSign security for web bill payments.
Postage/Other Billing - cost of mail service and fees associated with electronic
receipting including cost of shredding checks/documents.
FY 2010 BUDGET ACCOMPLISHMENTS
Water customers can choose to have their bills paid automatically out of their bank account, auto pay or on-line
credit/debit card payment.
Upgrade of Utility Billing software to web based programs by ADG, our software vendor, is complete.
Staff trained on use of software.
46
SEWER BILLING
FUND: 5310-454-430620
Personal Services:
110
Salaries & Wages
153
Health Insurance
155
Retirement - PERD
Total Personal Services
Materials and Services:
215
Office supplies
218
Computers/supplies
335
Membership & Dues
353
Auditing
354
Contract services
355
Billing Costs/postage
373
School & Travel
522
Administrative transfer
528
Data Processing
532
Office Rent
Total Materials and Services
Total Billing Costs
ACTUAL
BUDGET
ACTUAL
BUDGET
FY08/09
FY09/10
FY09/10
FY10/11
FTE's 2
1.5
1.5
1.5
$88,140
$75236
$65,223
$75,471
$22,485
$17,935
$13,608
$14,240
$5,500
$4,792
$4,328
$4,807
$116,125
$97,963
$83,159
$94,517
$0
$1,000
$108
$1,000
$1,290
$1,500
$231
$1,500
$258
$300
$315
$300
$1,500
$1,500
$1,875
$1,500
$7,087
$7,500
$1,077
$7,500
$25,710
$24,000
$30,935
$24,000
$1,053
$1,000
$662
$1,000
$6,509
$6,884
$6,884
$7,234
$21,196
$22,897
$22,897
$22,041
$5,500
$7,838
$7,838
$7,838
$70,103
$74,419
$72,822
$73,913
$186,228
$172,382
$155,981
$168,430
47
SEWER- OPERATIONS, BILLING, WASTEWATER TREATMENT
FUND: 5310
DEBT SERVICE SCHEDULE
ACTUAL
BUDGET
ACTUAL
BUDGET
FY08/09
FY09/10
FY09/10
FY10/11
SANITARY SEWER
490204 Debt Service-2004 bonds: (HWY 93 So.)
610
Principal
$58,000
$61,000
$61,000
$63,000
620
Interest/fiscal agent fees
$46,613
$44,400
$44,400
$42,075
630
Fiscal Agent Fees
$0
$300
$300
$300
Total Debt Service Sanitary Sewer
$104,613
$105,700
$105,700
$105,375
WASTEWATER
TREATMENT PLANT
490210
Debt Service-2002 bonds
610
Principal
$215,000
$220,000
$220,000
$230,000
620
Interest
$26,508
$18,230
$18,230
$9,430
630
Fiscal Agent Fees
$600
$300
$0
$300
490215
Debt Service-SRF Loan 1991
610
Principal
$241,000
$250,000
$250,000
$261,000
620
Interest
$44,140
$34,400
$34,400
$24,300
490227
Debt Service-SRF Loan (new construction)
610
Principal
$212,000
$207,000
$207,000
$215,000
620
Interest
$467,266
$520,000
$519,638
$511,820
Total Debt Service WWTP
$1,206,514
$1,249,930
$1,249,268
$1,251,850
Total Sewer Fund debt service
$1,311,127
$1,355,630
$1,354,968
$1,357,225
48
SEWERSTORM
FUND: 5349-453-430246
BEGINNING CASH
10100
CASH: Operating
10120
Cash, Impact Fecs*
10122
Cash, Capital Reserve **
10127
Cash, Emergency Reserve***
10190
Casty Designated for Equipment Replacement ****
10193
Cash, Designated Capital Projects *****
Adjustments to Cash - A/R, Comp Abs.
Total Cash
REVENUES
331158 State Bypass Relocation Reimb.
334040 Petro Tank/Monitoring Reimb. State
334041 DEQ Mini Grant/SEEP
343033 Impact Fees*
Impact Fees 5% administration
343034 Permit fees
343035 Charge for services
343370 Storm Assessments -billed ($825,000 total)
Assessments -designated for equipment ****
Assessments -designated for capital projects *****
363040 Penalty & interest
371010 Interest
Total Revenue
Total Available
EXPENSES
Operations/Capital
Capital Projects -impact fee $*
Capital Projects -replacement from Cap. Proj. $ *****
ACTUAL
BUDGET
ACTUAL
BUDGET
FY08/09
FY09/10
FY09/10
FY10/11
$714,892
$786,696
$819,511
$1,011,348
$444,632
$656,285
$623,470
$454,667
$140,000
$140,000
$140,000
$140,000
$25,000
$25,000
$25,000
$25,000
$80,000
$120,000
$120,000
$160,000
$391,701
$265,844
$265,844
$315,844
(S15,625)
$0
($10,201)
$0
$1,780,600
$1,993,825
$1,983,624
$2,106,859
$1,655 $0
$0 $5,000 $87,401
$20,000
$1,500
$0
$211,653 $200,000 $240,479
$190,000
$0 $12,657
$10,000
$1,665
$1,800
$2,365
$1,500
$2,986
$1,000
$2,228
$2,500
$679,352
$710,000
$713,042
$735,000
$40,000
$40,000
$40,000
$40,000
$50,000
$50,000
$50,000
$50,000
$3,361
$2,500
$4,445
$3,500
$45,069
$30,000
$32,295
$20,000
$1,034,086
$1,040,300
$1,188,067
$1,072,500
$2,814,686
$3,034,125
$3,171,691
$3,179,359
$645,004 $868,493 $655,550 $750,553
$0 $580,000 $409,282 $35,000
$175,857 $0 $0 $0
Depreciation**
$220,000
$225,000
$225,000
$225,000
Total Expenses
$1,040,861
$1,673,493
$1,289,832
$1,010,553
**add back unfunded depreciation
$220,000
$225,000
$225,000
$225,000
ENDING CASH
10100
Cash, Operating
$819,511
$668,503
$1,011,348
$1,053,295
10120
Cash, Impact Fees*
$623,470
$276,285
$454,667
$609,667
10122
Cash, Capital Reserve ** (target $140,000)
$140,000
$140,000
$140,000
$140,000
10127
Cash, Emergency Reserve *** (target $25,000)
$25,000
$25,000
$25,000
$25,000
10190
Cash, Designated Equipment Replacement****
$120,000
$160,000
$160,000
$200,000
10193
Cash, Designated Capital Projects *****
$265,844
$315,844
$315,844
$365,844
$1,993,825
$1,585,632
$2,106,859
$2,393,806
11V
SEWERSTORM
FUND: 5349-453-430246
Personal Services
Materials and Services
Capital Improvements -rates
Capital Improvements -Impact Fees
Capital Project $ -Replacement
Depreciation (fund $40,000)
ACTUAL
BUDGET
ACTUAL
BUDGET
FY08/09
FY09/10
FY09/10
FY10/11
$413,852
$433,467
$406,938
$445,114
$124,323
$212,509
$160,001
$195,439
$106,829
$222,518
$88,611
$110,000
$0
$580,000
$409,282
$35,000
$175,857
$0
$0
$0
$220,000
$225,000
$225,000
$225,000
$1,040,861
$1,673,494
$1,289,832
$1,010,553
MOTO ITENN a 1 "A I W I NO
The Storm Sewer Maintenance Division is responsible for the maintenance and operation ofthe Storm
water collection, transmission, detention and disposal facilities of the City of Kalispell. The purpose of
this system is to collect and properly dispose of stone water from snow melt, rainfall and other sources
without going through the wastewater treatment plant. The division maintains over 34 miles of storm water
facilities including catch basins, inlet, culverts, storm drains, detention basins and outfalls.
Rates 2010-2011 (no change) sq.ft.
VACANT LAND 0 capped at $250.90
RESIDENTIAL PROPERTY 0.005569 capped at $121.29
Non-residential improved:
90% Covered 0.009990
100% up to Covered 0.012488
50
'k1ciTORM SEWER
FUND: 5349-453-430246
Line Item Detail: STORM SEWER FUND
110 Personal Services - Increased .20 FTE
Reviewed and updated the allocation of positions in each fund No new FTE's were added.
214 GIS/GPS Supplies & Equipment - $2,000
Reduced $1,000
221 Safety Equipment & Supplies - $2,500
Increase of $1,500 for the purchase of (2) back-up cameras for our jet truck and camera van.
Cost is $3,000 - 50% budgeted in Sewer Fund.
355 Contract Services - Aerial Mapping - Carryover $3,000
An examination of the large utility wall maps shows that because of our rapid growth, the mapping imagery is
out of date in terms of showing the newer subdivision areas. The surveys and topographic mapping does not need updating,
only the map imagery. Cost shared w/Spec. St., Water, Sewer - Total Cost $12,000.
356 Stormwater Regulatory Compliance- $25,500
Additional $13,000 -is for an increase in the annual MS-4 permit fee and $12,000 for (2) stormwater Composit Samplers.
Under new general permit the requirements have changed on obtaining samples. The stormwater composit samplers will allow us
to collect the samples within our specified rain parameters.
359 TMDL / Permit - $15,000 (reduced $10,000)
The State of Montana is under Federal Court order to develop a TMDL for pollutants flowing from the Flathead basin into
Flathead Lake. These TMDL restrictions have potentially very serious consequences for the City's historical ability to drain
storm waters to Flathead tributaries and its community wastewater to Ashley creek. Discussions with MDEQ have continued
to be reasonably productive. However, recent permit and TMDL decisions by MDEQ for other Cities indicate that Kalispell
may need to consider the possibility of litigation to ensure reasonable and fair treatment by the State. This budget item
addresses ongoing consultant assistance to negotiate a satisfactory TMDL and also provides for potential legal assistance.
362 Groundwater Monitoring - $26,000 (Reduced $1,000)
The City has purchased or otherwise acquired numerous properties that were later found to have serious pollution problems
that affect the groundwater. MDEQ has required the City to develop and maintain long-term groundwater monitoring plans
for a number of pollutants. The monitoring is usually done on a quarterly basis for each site. This new budget item
provides funds for this long-term monitoring obligation.
51
STORM
FUND: 5349-453-430246
Capital outlay:
952 Storm Drain Correction - $100,000 (Carryover)
The goal of this project is to provide design and construction for areas in the City that are in need of storm drainage
systems and storm drainage system upgrades. Some of these areas had old storm sewers draining into the sanitary sewer.
Areas in sections of the City that have extensive pending at the intersection caused from minor rain events.
954 South Meadows Survey - $10,000 (Carryover)
Survey South Meadows Subdivision Drainage Area to Ashley Creek. The purpose is to relieve compounding drainage issues
due to drainage areas (ditches, swales, curtails) being eliminated by residential use. The goal of this project is to survey
the South Meadows Subdivision to aid in the drainage analysis, design, and construction to relieve the flooding and
ponding in the subdivision (Pd. STX-34)
Maintained 57.3 miles of storm sewer mains.
90 Residential/Commercial MS4 permits were issued.
Added 165 linear feet of storm drain to City system.
Completed design, surveying and construction on the Glenwood Dr. Drainage Improvement project, Willow Glen Dr. Drainage
Imprvmnt Project, Stillwater Rd. Drainage Imprvmnt project, i l th St. E. and 6th Ave. E. Drainage Imprvmnt Project, and the
18th St. W. Ditch Drainage Imprvmnt projects.
Ongoing public/school education regarding stormwater pollution. 30 contractors, engineers and developers attended the
City's construction site erosion and sediment control training.
Developed program to place stormwater educational decals on storm drain inlets. Boy Scouts placed over 300 decals in
downtown area.
Mapped new stormwater utilities and ditch systems.
Developed 2010 to 2015 Stormwater Management Program.
Completed the 2009 MS4 Phase II annual permit report and submitted to DEQ for review and approval.
Adopted 2009 updated design standards which incorporated requirements of the MS4 permit.
52
STORM SEWER
FUND: 5349-453-430246
Personal Services:
110
Salaries & Wages
112
Severance
121
Overtime
153
Health Insurance
155
Retirement
Subtotal Personal Services
Maintenance & Operations:
210 Office Supplies & Small Office Equip.
214 GIS/GPS Supplies & Equipment
215 Computer Software & Support
216 Computer Equipment
218 Equipment (non capital)
221 Safety Equip. & Supplies
229 Other Supplies
231 Gas & Oil
241 Consumable Tools
320 Printing -blue prints, etc.
345 Telephone & Communication
353 Auditing
354 Contract Services
355 Contract Services/Aerial Mapping
356 Storm water Reg Compliance Program/Permit
357 Rate Study
358 Review Impact Fees
359 TMDL / Permit
360 Repair & Maint. Services
362 Groundwater Monitoring
371
Curb & Gutter
373
School & Travel
388
Medical Services
410
Construction materials
510
Liability his. $7,557
521
Central Garage Transfer
522
Administrative Transfer
1
ACTUAL
BUDGET
ACTUAL
BUDGET
FY08/09
FY09/10
FY09/10
FY10/11
6
6.20
6.20
6.4
$331,006
$342,098
$325,179
$347,937
$4,400
$3,705
$4,500
$3,666
$4,500
$55,611
$65,457
$56,978
$66241
$23,530
$21,412
$21,115
$22,037
$413,852
$433,467
$406,938
$445,114
$17
$1,200
$390
$600
$2,061
$3,000
$160
$2,000
$1,868
$4,000
$4,736
$4,000
$1,179
$3,000
$2,999
$3,000
$1,013
$2,200
$1,640
$1,000
$101
$1,000
$1,730
$2,500
$557
$1,200
$930
$1,200
$8,417
$13,500
$8,103
$10,500
$437
$1,000
$0
$1,000
$0
$200
$0
$200
$729
$700
$832
$750
$600
$600
$600
$600
$9,094
$2,000
$4,342
$3,000
$0
$3,000
$0
$3,000
$8,218
$12,500
$17,672
$25,500
$0
$22,500
$16,034
$8,000
$4,512
$5,000
$0
$7,000
$0
$25,000
$0
$15,000
$1,398
$1,200
$1,850
$1,500
$23,115
$27,000
$24,654
$26,000
$1,095
$5,000
$7,504
$5,000
$2,739
$4,500
$2,560
$3,500
$100
$250
$0
$250
$3,109
$10,000
$105
$10,000
$8,531
$10,000
$9,282
$8,500
$2,500
$2,500
$2,500
$2,500
$26,068
$32,848
$32,848
$31,957
53
STORM SEWER
FUND: 5349-453-430246
EXPENSE DETAIL-Con't.
Materials and Operations Cont.:
528 Data Processing Transfer
530 Lease Payments/BNSF
532 Office rent
Subtotal materials & services
430246 Capital Outlay: from rates
940 Machinery & Equipment / vehicles
952 Storm Drain Correction funds
954 South Meadows Survey
958 Stillwater & Willow Glen Construction (design FY08/09)
Subtotal Capital from rates
430246 Capital Outlay: Capital Project $
944 Vehicles
955 Lift Station #1 Replacement
Subtotal from Capital Project Replacement
430248 Capital Outlay: Impact Fee $ 010120
958 Stillwater & Willow Glen Construction
959 Southeast Storm Drain Improvements Phase I
960 Stormwater Facility Upsizing
Subtotal from Impact fee funds
510400 Depreciation:
831 Depreciation
TOTAL Storm Sewer
ACTUAL
BUDGET
ACTUAL
BUDGET
FY08/09
FY09/10
FY09/10
FV10/11
$6,399
$5,573
$5,573
$5,344
$4,191
$4,200
$5,119
$4,200
$6,275
$7,838
$7,838
$7,838
$124,323
$212,509
$160,001
$195,439
$24,374 $0
$27,482 $132,518
$10,000
$54,973 $80,000
$106,829 $222,518
$0
$0
$15,000
$100,000
$0
$10,000
$73,611
$0
$88,611
$110,000
$4,510
$171,347
$0
$0
$0
$0
$0
$0
$175,857
$0
$0
$0
$0
$380,000
$246,868
$5,000
$170,000
$162,414
$0
$30,000
$0
$30,000
$0
$580,000
$409,282
$35,000
$220,000
$225,000
$225,000
$225,000
$1,040,861
$1,673,494
$1,289,832
$1,010,553
54
SOLID WASTE
FUND: 5510-460-430840;430845
BEGINNING CASH
10100 CASH: operating
10120 *Replacement Account
Total Cash
REVENUES
343410
Assessments
363040
Penalty & Interest
371010
Interest Earnings
Change in A/R, Comp. Abs.
Total Revenue
Total Available
EXPENSES
Operations
Capital Outlay -operations
Capital Outlay -replacement
*Depreciation/Replacement Fund
Total Expenses
ENDING CASH
10100 Operating
10120 *Replacement Account
Total Cash
ACTUAL
BUDGET
ACTUAL
I
BUDGET
I
FY08/09
FY09/10
FY09/10
FY10/11
$228,147
$210,382
$210,382
$274,647
$125,624
$35,624
$35,624
$135,624
$353,771
$246,006
$246,006
$410,271
$754268
$750,000
$761,522
$771,500
$3,835
$3,500
$5,882
$3,500
$6,468
$3,500
$2,983
$3,500
($10,417)
$0
$5,951
$0
$754,154
$757,000
$776,338
$778,500
$1,107,925
$1,003,006
$1,022,344
$1,188,771
$620,566
$711,668
$612,073
$677,817
$51,353
$0
$0
$0
$190,000
$0
$0
$0
$100,000
$100,000
$100,000
$100,000
$961,919
$811,668
$712,073
$777,817
$210,382
$155,714
$274,647
$275,330
$35,624
$135,624
$135,624
$235,624
$246,006
$291,338
$410,271
$510,954
55
SOLID WASTE
FUND: 5510-460-430840;430845
ACTUAL
BUDGET
ACTUAL
BUDGET
FY08/09
FY09/10
FY09/10
FY10/11
Personal Services
$462268
$483,802
$448,966
$458,981
Materials and Services
$158,298
$227,866
$163,107
$218,836
Capital Outlay
$51,353
$0
$0
$0
Capital Outlay- Replacement
$190,000
$0
$0
$0
Depreciation & Replacement
$100,000
$100,000
$100,000
$100,000
$961,919
$811,668
$712,073
$777,817
PROGRAM DESCRIPTION
The Solid Waste Operating Division is responsible for the collection, conveyance, and disposal of all refuse
accumulated within the city in an efficient and sanitary manner.
GARBAGE RATES
The garbage rates:
Residential: $108.00 per year
Non -Residential:
300 Gal. 400 Gal.
DUMPSTER Pick up
current rates
1 Weekly
$335.00 $408.00
2 Weekly
$552.00 $698.00
3 Weekly
$819.00 $1,038.00
56
SOLID
FUND: 5510-460-430840;430845
Line Item Detail : Solid Waste Fund
110 Personal Services -Reduced .25 FTE
Reviewed and updated the allocation of positions in each fund. No new FTE's were added.
218 Non Capital Equipment -Garbage Containers - $25,000
Several subdivisions are beyond the mandatory 5 yr waiting period for City garbage service and have picked up the
necessary documents to petition the City for service. Additional containers will need to be purchased when these
petitions for City garbage service are accepted.
362 Equipment Maintenance & Supplies - $2,000
Reduced $2,750 - completed undercoating on packer bodies last yr.
369 Radio Maintenance - $1,700
Jan. 1, 2012 the FCC will be making a change to the FCC bandwidth making all of our narrowband frequency radios
obsolete. We plan on replacing (2) radios a year.
Collected 7,444.13 tons of garbage from 5,124 residential and commercial accounts.
Solid Waste took over servicing the downtown decorative garbage containers from Parks Dept.
Cleaned, trimmed, and eliminated alley right-of-way encroachments which interfered with refuse collection.
Undercoated (2) two side -arm garbage trucks to protect from corrosion.
Solid Waste personnel cross trained in the Traffic Sign & Signal Division.
After receiving the required petitions the Solid Waste Division started serving Ashley Park Phase 1, Phase 2,
and Phase 4.
• 211 new commercial and residential accounts.
Delivered 174 - 100 gallon containers to new customers
Delivered 15 - 300 gallon containers to new customers
Delivered 22 - 400 gallon containers to new customers
57
SO"LID
FUND: 5510-460-430840;430845
Personal Services: FTE's
110
Salaries & Wages
121
Overtime/Call outs
153
Health Insurance
155
Retirement - PERD
Total Personal Services
Materials and Services:
213 Small Office Equipment
216 Computer Equipment & Support
218 Non Capital Equip, Garbage Containers
221 Safety Equipment & Supplies
224 Janitorial Supplies
229 Other Supplies
231 Gas and Oil
241 Consumable Tools
341 Electricity
344 Natural Gas
345 Telephone
354 Contract Services
362 Equipment Maintenance & Supplies
366 Building Maintenance
369 Radio Maintenance
373 School & Travel
388 Medical services
510 Property & Liability Insurance $1,10458,904
512 Uninsured Loss - Deductible
521 Central Garage Transfer
522 Administrative Transfer
528 Data Processing Transfer
532 Office Rent
Total M & O
ACTUAL
BUDGET
ACTUAL
BUDGET
FY08/09
FY09/10
FY09/10
FY10/11
7.60
$366,573
$8,071
$64,801
$22,823
7.60
$381,964
$9,500
$68,729
$23,609
7.60
$358,158
$3,686
$64,743
$22,379
7.35
S361,733
$9,500
$65,453
$22295
$462268
$483,802
$448,966
$458,981
$155
S500
S40
$500
$2,512
$2,500
$421
$3,000
$1,453
$25,000
$4,205
$25,000
$450
$1,500
$970
$1,500
$211
$400
$370
$400
$1,509
$2,000
$1,098
$2,000
$33,315
$47,800
$32,806
$47,000
$739
$1,500
$87
$1,500
$1,601
$1,600
$1,593
$1,600
$2,800
$8,000
$1,476
$7,000
$624
$700
$625
$700
$13,061
$12,000
$11,921
$12,000
$1,038
$4,750
$4,160
$2,000
$2,370
$2,500
$1,667
$2,500
$120
$1,700
$1,995
$1,700
$802
$3,500
$777
$2,500
$498
$550
$606
$550
$10,897
$14,500
$13,749
$12,500
$0
$6,500
$0
$6,500
$26,000
$26,000
$26,000
$26,000
$28,498
$30,683
$30,683
$29,995
$10,898
$11,145
$11,145
$9,353
$6,275
$7,838
$7,838
$7,838
$145,826
$213,166
$154,232
$203,636
58
SOLID WASTE
FUND: 5510-460-430840;430845
430845
Wash bay/Materials & Services
224
Janitorial Supplies
341
Electricity
342
Water
344
Natural Gas
360
Repair & Maint Services
366
Building Maintenance
430840
Capital Outlay:
940
Machinery & Equipment
944
Garbage Truck 26%
430840
Capital Outlay: Replacement funds
944
Garbage Truck 74%
Subtotal Capital Outlay
510400
Depreciation (fund Replacement account)
831
Depreciation expense
Total Solid Waste
EXPENSE DETAIL
ACTUAL
BUDGET
ACTUAL
BUDGET
FY08/09
FY09/10
FY09/10
FY10/11
$0
$350
$0
$350
$2,973
$2,500
$3,139
$3,000
$472
$350
$438
$350
$8,712
$9,500
$3,627
$9,500
$182
$1,000
$693
$1,000
$133
$1,000
$978
$1,000
$12,472
$14,700
$8,875
$15,200
$11,536
$0
$0
$0
$39,817
$0
$0
$0
$51,353
$0
$0
$0
$190,000
$0
$0
$0
$190,000
$0
$0
$0
$100,000
$100,000
$100,000
$100,000
59
$961,919 $811,668 $712,073 $777,817
General Fund Revenue Recap
General Fund Expenditure Recap
All Funds- Recap of Revenue, Expenditures and Cash
GxENERAL FUN
FUND: 1000
PROPERTY TAXES:
311100
Real Property Taxes
311105
PILOT payment
311200
Personal Property
312000
Penalty & Interest
MILL VALUE
$ 36.507 $ 37.982 $ 37.982 $ 39.448
ACTUAL
I BUDGET
I ACTUAL
BUDGET
FY08/09
FY09/10
FY09/10
I FY10/11
GENERAL FUND MILL LEVY 138.76
4 mills to Parks
SUBTOTAL
BUSINESS LICENSES:
322101 Alcohol Beverage
322300 General and occupational
322500 Amusement
323012 Planning fees & Sign permits
323107 Excavation Permits , house moving
323109 Zoning & Site Plan Review Fees
323300 Animal licenses
SUBTOTAL
INTERGOVERNMENTAL REVENUE:
334015
Grants moved to Special Revenue
334017
911 reimb. -dispatch training -County
335030
MV Tax Ad Valorem
335076
Gaming Machine Permits
335110/077
Live Card Game, keno & bingo
335230
HB124 ENTITLEMENT
SUBTOTAL
FINES AND FORFEITURES:
351017 Technology fees
351000 City Court Fines & fees, admin
SUBTOTAL
117.71 117.71 119.1
24 mills to Parks
4,766,114
4,226,561
4,168,867
4,448,257
3,119
7,818
231,991
244,319
251,077
250,000
21,604
25,000
25,951
25,000
$
5,019,709 $
4,495,880 $
4,449,014 $
4,731,075
$
(150,000) to Parks
26,581
26,381
24,594
24,381
1,217
1,200
986
1,200
350
600
350
600
74,592
75,000
62,985
65,000
715
500
340
500
92,678
95,000
23,635
8,500
1,381
1,200
975
900
$
197,514 $
199,881 $
113,865 $
101,081
57,547
grant fund
0
0
990
3,000
627
0
1,844
1,844
2,156
2,100
60,625
60,325
58,850
58,850
3,600
3,600
2,650
2,650
2,175,464
2,270,106
2,268,836
2,272,379
$
2,300,070 $
2,338,875 $
2,333,119
2,335,979
21,290
21,000
28,529
28,000
467,818
476,000
468,597
475,000
$
489,108 $
497,000 $
497,126 $
503,000
con't.
17
GENERALFUND
Revenue - Page 2
CHARGES FOR SERVICES:
341020
Administrative chg.
341022
Bond '09/ Admin. EPA 6mnt/Lutheran Home
341024
EPA Grant - Fire Dept direct reimbursement
341025
City Collections/other charges
341027
Bresnan Franchise Fees
342010
KPD -Public safety fees
342014
KPD -School Resource Officers
342015
KPD-School Reimb./Special Events
342016
KPD -Regional Training /testing Reimb.
342023
Fire Prevention fees
342025
Fire Engine Response Fee
343005
Central Garage Charges
346030
Parks, Rec. & Pool
SUBTOTAL
MISC. REVENUE
362010 Golf Course Lease
362015 Insurance Reimbursements
364030 Auction & misc. collections/rent/donations
365015 Kidsport- lease reimbursement
365018 Band shell contribution
381060 Operating transfer 2372 -health insurance
381050 Inception of lease - Police cars
381080 Equity transfer from SID revolving
SUBTOTAL
371010/12 INVESTMENT REVENUE:
TOTAL GENERAL REVENUE
CASH JULY 1 (Includes designated $)
TOTAL AVAILABLE FOR BUDGET
RECOMMENDED EXPENDITURES
CASH CARRYOVER (year end operating)
Des€=lsrarted lor Capital
Designated Court Technology fees
Designated for Bandshell
Designated for Parking (loan $15,000 to Parking)
Total cash available
Expenditures/total cash carryover
ACTUAL
I BUDGET
I ACTUAL
BUDGET
FY08/09
FY09/10
FY09/10
I FY10/11
490,702
492,998
500,463
490,321
32,900
15,500
0
30,000
50,000
0
20,000
1,418
1,500
28,096
1,500
152,797
155,000
152,447
152,000
16,585
20,000
13,287
15,000
86,000
86,000
86,000
86,000
14,713
moved
0
0
5,734
15,000
14,242
10,000
66,247
17,000
17,725
0
3,360
5,000
6,650
6,500
118,518
118,000
118,800
118,000
258,171
0
0
0
$
1,247,145 $
975,998 $
937,710 $
929,321
25,471
25,471
24,843
25,000
8,069
3,000
3,289
3,500
4,481
500
41,651
42,000
42,275
44,000
0
0
2,927
0
576,615
516,615
516,615
514,326
80.850
$
15,000
0
0
0
$
662,026 $
587,586 $
599,210 $
667,676
$
85,809
85,000
54,639
55,000
$
9,855,250 $
9,180,220 $
8,984,683 $
9,323,132
$
459,907 S
244.122 $
244,122 $
649,843
$
10,315,157 $
9,424,342 $
9,228,805 $
9,972,975
$
10,070,785 $
9,108,115 $
8,578,962 $
99072,078
$
174,169 $
246,274 $
553,609 $
716,663
$
100,000
$
23,916 $
23,916 $
47,271 $
35,271
$
9,205 $
9,205 $
12,131 $
12,131
$
36,832 $
36,832 $
36,832 $
36,832
$
244,122 $
316,227 $
649,843 $
900,897
2.42%
3.47%
7.57%
9.93%
adjusted
for Parks-3mo
18
# FTE's approriated
FTE's
1
1.5
0.55
1.34
3.2
General
City
Human
Mayor
Media
Government
Manager
Resources
Council
Specialist
City Clerk
Finance
110 Salaries
$ 124,038
$ 103,338 $
63,162
$ 20,102
$ 80,620
$ 191,986
114 Comptime Buyback & severance
121 Overtime & Spec. Assign PD,kelly-fire,Def. Comp.
5,000
500
153 Health Insurance
13,770
15,236
31,815
8,190
9,446
30,604
155 Rctircment
8,350
6,700
2,432
1,299
5,049
12,431
TOTAL PERSONAL SERVICES
-
151,158
125,274
97,409
29,591
95,615
235,021
210 Supplies/office/computers/Non-capital equip 218
3,000
1,150
800
100
3,000
150
220 Other supplies, safety equip, ammo,
200
230 Supplies & FUEL chemicals, concession sup
500
50
240 Consumable Tools
SUBTOTAL SUPPLIES
3,000
1,650
1,000
100
3,000
200
-
312 Postage
18,000
320 Printing & advertising
5,850
100
330 Books, Dues,Memberships, filing fees
3,500
2,000
550
4,811
275
1,300
340 Electricity, natural gas
345 Telephone, web, cell, radio, security cameras
400
150
100
400
100
350 Professional Services/contract services
432,366
3,600
2,500
3,525
5,500
362 Maint, services, building, equip,radios,landscaping
360 Technology services (court)
370 School & Travel
1,000
3,500
3,000
2,500
380 Training, medical services, meetings
S00
300
390 Other Purchased Services
SUBTOTAL PURCHASED SERVICES
459,716
3,900
7,900
8,211
2,500
4,200
9,400
500 Fixed Charges, Insurance, County taxes,transfers
327,000
0 Contingency
43,231
SUBTOTAL MISCELLANEOUS
370,231
-
-
-
-
-
-
TOTAL M & O
832,947
5,550
8,900
8,311
5,500
4,400
9,400
600 DEBT SERVICE
940 CAPITAL OUTLAY -Police Cars
DEPARTMENT TOTAL 2011 $ 832,947 $ 156,708 $ 134,174 $ 105,720 $ 35,091 $ 100,015 $ 244,421
19
4.66
4
0.25
3
1.4
39
27.3
4.75
91.95
Municipal
Public
Central
Planning
Attorney
Court
Works
Garage
City Hall
Police
Fire
Department
TOTAL
$ 307,944 $
199,353 $
16,919 $
178,259 $
65,147 $
2,310,022 $
1,490,105
$ 257,172
$ 5,408,167
5,500
6,500
$ 12,000
1,500
200
122,500
25,000
$ 154,700
48,958
38,271
2,901
37,356
13,295
386,978
243,487
54,388
$ 934,695
19,972
12,908
1,095
10,935
3,976
300,915
191,408
16,671
S 594,141
376,874
250,532
20,915
233,550
82,618
3,126,915
1,9509000
328,231
S 7,103,703
3,200
3,000
1,925
1,800
19,500
10,200
7,500
$ 55,325
1,500
3,850
5,750
52,500
16,500
$ 80,300
229,000
5,500
$ 235,050
500
700
15,000
$ 16,200
3,200
4,500
1,925
235,150
6,450
77,500
41,700
7,500
$ 386,875
$ 18,000
7,000
500
5,000
700
500
$ 19,650
2,500
1,550
650
150
1,250
1,600
3,800
$ 23,936
9,800
84,300
19,500
$ 113,600
1,200
1,400
1,000
250
15,000
8,500
900
$ 29,400
5,000
5,750
150
52,000
19,000
17,500
8,000
1,300
$ 556,191
585
25,000
24,500
19,500
$ 69,585
40,000
$ 40,000
2,000
6,000
400
500
26,000
2,500
2,000
$ 49,400
350
23,000
13,800
$ 37,950
5,500
1,500
$ 7,000
17,700
60,700
2,200
63,385
128,550
113,750
74,100
8,500
$ 964,712
2,000
73,500
$ 402,500
$ 43,231
-
-
-
-
2,000
73,500
-
-
$ 445,731
20,900
65,200
4,125
298,535
1379000
264,750
115,800
16,000
1,797,318
169986
7,200
669021
S 90,207
-
-
-
-
-
80,850
-
-
$ 80,850
$ 397,774 $
315,732 $
25,040 $
532,085 $
236,604 $
3,479,715 $
2,131,821 S
344,231
$ 99072,078
WE
CITY OF KALISPELL
Fund Description
1000 General Fund
General Fund- On -behalf payments
Special Revenue Funds:
2185 TAX INCREMENT -AIRPORT
2188 TAX INCREMENT-WESTSIDE
2210 PARKS IN LIEU OF
2215 PARKS & RECREATION FUND
2310 OLD SCHOOL TECHNOLOGY TIF
2372 HEALTH -PERMISSIVE LEVY
2311 OLD SCHOOL INDUSTRIAL TIF
2398 TRANSPORATION IMPACT FEES
2399 IMPACT FEE FUND
2230 AMBULANCE
2394 BUILDING CODE ENFORCEMENT
2400 LIGHT MAINTENANCE
2420 GAS TAX
2500 SPECIAL STREET/TSS
2600 URBAN FORESTRY DISTRICT
2601 DEVELOPER'S TREES
2602 ARRA URBAN FORESTRY GRANT
2825 MACI GRANT
2880 CD LOAN REVOLVING
2882 COURTYARD RESERVE FUND
2886 COMMUNITY DEVELOPMENT
2887 RURAL DEVELOPMENT
2888 RURAL DEVELOPMENT #2
2915 HOMELAND SECURITY STONEGARDEN GRANT
2916 DRUG ENFORCEMENT GRANT
2917 COPS TECHNOLOGY PROGRAM GRANT
2918 COPS HIRING RECOVERY PROGRAM
2919 LAW ENF. BLOCK GRANT
2921 DRUG COURT GRANT
2951 DUI COURT GRANT
2927 CULTURAL ARTS GRANT
2944 CDBG-ED FOR FVCC #1
2946 CDBG-ED FOR FVCC #2
2953 EPA BROWNFIELDS ASSESSMENT GRANT
2957 FEMA GRANT
2975 TRAILS/CTEP
2990 STIMULUS -STREET DEPT.
2991 NEIGHBORHOOD STABILIZATION GRANT
2992 STIMULUS - ENERGY PROGRAM
2993 STIMULUS - ENERGY PROGRAM #2
2995 Safer Grant
Total Special Revenue Funds
2011 BUDGET
FUND POSITION
Resources
Anticipated
BUDGETED
Estimated
Available
Revenue
Expenditures
Ending Balance/
Beginning Year
Carry over
$ 649,843 $ 9,323,132 $ (9,072,078) $ 900,897
$ 1,200,000 $ (1,200,000) $ -
$
825,460
$
561,152
$
(49,725) $
1,336,887
$
1,904,967
$
400,550
$
(2,261,198) $
44,319
$
41,324
$
23,950
$
(56,000) $
9,274
$
71,664
$
1,429,943
$
(1,344,572) $
157,035
$
8,624
$
33,700
$
(40,950) $
1,374
$
12,054
$
580,018
$
(577,326) $
14,746
$
7
$
9,275
$
(9,000) $
282
$
65,088
$
40,000
$
- $
105,088
$
235,071
$
103,300
$
(285,740) $
52,631
$
106,764
$
752,500
$
(777,087) $
82,177
$
26,979
$
270,300
$
(260,542) $
36,737
$
139,865
$
227,400
$
(267,794) $
99,471
$
310,070
$
365,000
$
(560,363) $
114,707
$
939,798
$
1,788,000
$
(2,051,115) $
676,683
$
56,367
$
233,000
$
(241,499) $
47,868
$
101,512,,
$
-
$
(101,512) $
-
$
-
$
24,561
$
(24,561) $
$
-
$
200,000
$
(200,000) $
-
$
254,808
$
81,769
$
(225,000) $
111,577
$
2,259
$
85,260
$
(87,519) $
-
$
423,428
$
14,820
$
(132,373) $
305,875
$
271,972
$
29,048
$
(269,827) $
31,193
$
112,916
$
37,135
$
(95,930) $
54,121
$
-
$
26,998
$
(26,998) $
-
$
4,311
$
91,600
$
(91,855) $
4,056
$
-
S
750,000
$
(750,000) $
-
$
5,000
$
90,370
$
(70,370) $
25,000
$
156
$
113,845
$
(112,845) $
1,156
$
-
$
326,262
$
(326,262) $
-
$
$
42,224
$
(42,224) $
$
$
8,950
$
(8,950) $
$
$
81,518
$
(81,518) $
$
$
273,945
$
(273,945) $
$
320
$
395,832
$
(396,152) $
$
34,109
$
239,371
$
(273,480) $
-
$
18,436
$
250,779
$
(265,000) $
4,215
$
308,705
$
34,844
$
(343,549) $
-
$
-
$
2,832,976
$
(2,832,976) $
$
$
88,700
$
(88,700) $
$
$
103,000
$
(103,000) $
-
$
$
457,887
$
(187,000) $
270,887
$
6,282,034
$
13,499,782
$
(16,194,457) $
3,587,359
21
Debt Service Funds:
SID Revolving Fund
G.O. BOND, series 2002 - Pool
G. O. BOND, series 2005 - Fire Hall
NEW CITY HALL Debt Service
SIDEWALK & CURBS
SIDS
AIRPORT TIF DEBT SERVICE
Total Debt Service funds
Capital Project Funds:
4290 WALK & CURB
4150 Fire Station #61 Remodel
4300 FAA Non -Primary Entitlement
4312 FAA Planning Grant
Total Capital Projects
Enterprise Funds:
5210 WATER
5310 SEWER/WWTP
5349 STORM SEWER
5510 SOLID WASTE
5610 AIRPORT *
Total Enterprise Funds
Internal Service Funds:
6030 DATA PROCESSING FUND
Total Internal Service Funds
TOTAL CITY BUDGET
2011
PAGE 2 - Fund Position
Resources
Anticipated
BUDGETED
Estimated
Available
Revenue
Expenditures
Ending Balance/
Beginning Year
Carry over
S
245,590
$ 4,000
S
(12,000) $
237,590
$
12,072
$ 296,760
$
(291,888) $
16,944
$
31,693
$ 266,702
$
(267,358) $
31,037
S
314
$ 156,753
$
(156,757) $
310
$
-
$ 17,673
$
(17,673) $
$
365,542
$ 524,473
S
(528,733) $
361,282
$
211,384
$ 662,500
$
(680,435) $
193,449
$
866,595
$ 1,928,861
$
(1,954,844) $
840,612
$ 25,000
$
(25,000) $
-
$ 1,258,398
$
(1,258,398)
$ 600,000
$
(600,000) $
$ 100,000
$
(100,000)
$
-
$ 1,983,398
$
(1,983,398) $
-
$
4,429,253
$ 2,857,500
$
(4,156,786) $
3,854,967
$
4,500,344
$ 3,817,237
$
(5,155,789) $
4,373,391
$
2,106,859
$ 1,072,500
$
(1,010,553) $
2,393,806
$
410,271
$ 778,500
$
(777,817) $
510,954
$
218,343
$ 89,199
$
(295,845) $
112,529
$
11,665,070
$ 8,614,936
$
(11,396,790) $
11,245,647
$
140,516
$ 323,184
$
(413,419) $
55,281
$
140,516
$ 323,184
$
(413,419) $
55,281
$ 19,604,058 $ 36,873,293 $ (42,214,986) $ 16,629,796
* cash adjusted +$2,374,431 for non -cash line items (depreciation)
Component Units
5720 PARKING COMMISSION* $ 51,331 $ 155,750 $ (155,272) $ 58,809
2700 BUSINESS IMPROVEMENT DISTRICT $ 115,960 $ 86,136 $ (199,323) $ 2,773
Total with Component units S (42,569,581)
22