Water Tank and Wells Bid Tabulation MemoTO: FROM: DATE: Susie Turner City of Kalispell Director of Public Works Kaela Murphy, PE and Brad Koenig, PE Project Engineers March 29, 2023 SUBJECT: 2023 Kalispell Tank and Wells Project Summary of Bids Received Project Overview The 2023 Kalispell Tank and Wells Project includes four (4) schedules. Schedule 2 includes two (2) additive alternates. Schedule 1: Sheepherder Tank Control Valve Building will be in place to control flow to and from the Sheepherder Tank and is to be located in the UPZ on West Spring Creek Road between Two Mile Drive and Three Mile Drive in Kalispell, MT. Schedule 2: Utility Lot 2; 1 MG Elevated Storage Tank and Well includes the construction of a 1 MG elevated tank in the UPZ, well building, and the completion of the PWS well. Utility Lot 2 is located adjacent to and east of US Highway 93 approximately 0.60-miles north of Rose Crossing in Kalispell, MT. Schedule 2 includes two (2) additive alternates for the water main connection, only one of which will be awarded. Schedule 3: Utility Lot 3; Four Mile Drive Water Well includes construction of a well building and well completion of the PWS well. Utility Lot 3 is located adjacent to and south of Four Mile Drive approximately 0.50-miles west of Stillwater Road in Kalispell, MT. Schedule 4: North Main Well includes construction of a well building and well completion of the PWS well located in the LPZ. The North Main Well site is located adjacent to North Main Street near the entrance of the Buffalo Hills Golf Course in Kalispell, MT. Bid Opening Bids were received on March 28, 2023, and opened through QuestCDN at 2:00 PM., local time, in the 1st Floor Conference Room at City Hall in Kalispell, MT. A total of two (2) bidders submitted bids for the project. All were complete and all required items were submitted with each bid. This memorandum summarizes the bid received for the 2023 Kalispell Tank and Wells Project. March 29, 2023 Page 2 of 3 Summary of Bids Received The Summary of Bids is attached to this memorandum. SCHEDULE 1: One (1) bid was received for Schedule 1. The bid for Schedule 1 is 53.8% higher than the Engineer's Estimate. No bid irregularities were found. The low bidder for Schedule 1 is S & L Underground, Inc. SCHEDULE 2: Two (2) bids were received for Schedule 2. The bids for Schedule 2 ranged from 52.6% higher to 73.7% higher than the Engineer's Estimate. No bid irregularities were found. The low bidder for Schedule 2 is Landmark Structures. SCHEDULE 2 ADDITIVE ALTERNATE #1: This alternate includes installation of piping north of Utility Lot 2 and connection to the existing transmission main west of Highway 93. All bidders who submitted a bid on Schedule 2 were required to submit a bid on Additive Alternate #1. Two (2) bids were received for Additive Alternate #1. The bids for Additive Alternate #1 ranged from 14.2% higher to 63.5% higher than the Engineer's Estimate. No bid irregularities were found. If awarded, the Schedule 2 Additive Alternate #1 would be awarded to the low bidder for Schedule 2, Landmark Structures. SCHEDULE 2 ADDITIVE ALTERNATE #2: This alternate includes installation of piping south of Utility Lot 2 and connection to the existing main at the intersection of Eagle Valley Ranch Road and Highway 93, east of Highway 93. All bidders who submitted a bid on Schedule 2 were required to submit a bid on Additive Alternate #2. Two (2) bids were received for Additive Alternate #2. The bids for Additive Alternate #2 ranged from 5.6% lower to 15.3% higher than the Engineer's Estimate. No bid irregularities were found. If awarded, the Schedule 2 Additive Alternate #1 would be awarded to the low bidder for Schedule 2, Landmark Structures. SCHEDULE 3: One (1) bid was received for Schedule 3. The bid for Schedule 3 is 23.5% higher than the Engineer's Estimate. No bid irregularities were found. The low bidder for Schedule 3 is S & L Underground, Inc. SCHEDULE 4: One (1) bid was received for Schedule 4. The bid for Schedule 4 is 30.0% higher than the Engineer's Estimate. No bid irregularities were found. The low bidder for Schedule 4 is S & L Underground, Inc. March 29, 2023 Page 3 of 3 Award Options The City of Kalispell has the following options available in terms of awarding a contract for this project. 1. Accept the bid received as received and award each Schedule individually. If Schedule 2 is awarded the City can award Additive Alternative #1, Additive Alternative #2, or both of the Additive Alternatives. 2. Reject the bids and re-bid the project at a later date. Recommendation of Award Prior to advertisement of the bid, RPA spent a substantial amount of time preparing detailed cost estimates for all four (4) Schedules of the 2023 Kalispell Tank and Wells Project. Material costs were gathered from various suppliers in January and February 2023 to provide an accurate up-to-date cost estimate for the project. In talking with DEQ it is evident that these bid prices are not out of the ordinary given the current bidding environment. The difference in bids compared to the engineer’s estimate appears to be due to the volatile construction market and the large amount of work available to contractors. Given the difference between the quoted material prices and the bid prices, we don’t feel that value engineering would result in large returns. The project could certainly be re-bid; however, there is a possibility that bids may be higher or lower than the current bids. There is also a possibility that the City may not receive any bids if the project is re-bid. Additionally, Schedule 4 includes ARPA funding which includes deadlines that must be met to ensure use of funding. After discussing the bid results with Susie Turner, Director of Public Works, RPA recommends that the City of Kalispell further review the City’s budget and financial position and spend additional time dissecting the bid results to determine what will be most beneficial for the City before considering award of any of the four (4) Schedules of the 2023 Kalispell Tank and Wells Project. Attachment SUMMARY OF BIDS 2023 KALISPELL TANK AND WELLS PROJECT KALISPELL, MT Acknowledged Addendum No. 1 Acknowledged Addendum No. 2 Bid Bond MT Contractors Registration No.Schedule 1 Schedule 2 Addivite Alternate #1 (Additional for Schedule 2) Additive Alternate #2 (Additional for Schedule 2) Total of Schedule 2 PLUS Additive Alternate #1 Total of Schedule 2 PLUS Additive Alternate #2 Schedule 3 Schedule 4 Apparent Low Bidder Total Low Bid All Schedules WITHOUT AA's Total Low Bid All Schedules PLUS All AA's Engineer's Estimate N/A N/A N/A N/A $1,416,833.00 $7,832,000.00 $310,730.00 $485,850.00 $8,142,730.00 $8,317,850.00 $2,217,655.00 $1,901,487.00 N/A $13,367,975.00 $14,164,555.00 Landmark Structures Yes Yes Yes - 10%No. 159181 NO BID $11,954,000.00 $508,000.00 $560,000.00 $12,462,000.00 $12,514,000.00 NO BID NO BID Landmark Structures - For Schedule 1 $11,954,000.00 $13,022,000.00 S & L Underground, Inc.Yes Yes Yes - 10%No. 53299 $2,179,500.00 $13,607,000.00 $355,000.00 $460,000.00 $13,962,000.00 $14,067,000.00 $2,738,832.00 $2,471,184.00 S & L Underground, Inc. - For Schedule 1, 3 and 4 $7,389,516.00 $7,389,516.00 $19,343,516.00 $20,411,516.00 Bid Opening Date / Time / Location: Tuesday, March 28, 2023 @ 2:00 PM City Hall First Floor Conference Room, Kalispell, Montana Robert Peccia & Associates, Inc. 102 Cooperative Way, Suite 300 * Kalispell * Montana * (406) 752-5025 Engineer's Estimate S & L Underground, Inc. Item Unit Unit Price Total Price Unit Price Total Price No.Quantity Unit Description (Figures)(Figures)(Figures)(Figures) SCHEDULE 1 - SHEEPHERDER CONTROL VALVE BUILDING Contract Time = 200 Calendar Days 1.01 1 LS Mobilization, Bonding and Submittals (5% Max)$67,460.00 $67,460.00 $95,000.00 $95,000.00 1.02 1 LS Sheepherder Control Valve Building - Civil $193,818.00 $193,818.00 $199,500.00 $199,500.00 1.03 1 LS Sheepherder Control Valve Building - Structural $275,860.00 $275,860.00 $745,000.00 $745,000.00 1.04 1 LS Sheepherder Control Valve Building - Mechanical $454,020.00 $454,020.00 $500,000.00 $500,000.00 1.05 1 LS Sheepherder Control Valve Building - Transmission Main $320,925.00 $320,925.00 $475,000.00 $475,000.00 1.06 1 LS Sheepherder Control Valve Building - Electrical $104,750.00 $104,750.00 $165,000.00 $165,000.00 4.76%4.36% $1,416,833.00 $2,179,500.00 Robert Peccia & Associates Today's Date: March 28, 2023 ________________________________________________________ TRUE TABULATION OF BIDS RECEIVED TOTAL BASE BID: SUMMARY OF BIDS 2023 KALISPELL TANK AND WELLS PROJECT KALISPELL, MT PREPARED BY RPA 3/29/2023 Page 2 Robert Peccia & Associates, Inc. 102 Cooperative Way, Suite 300 * Kalispell * Montana * (406) 752-5025 Engineer's Estimate Landmark Structures S & L Underground, Inc. Item Unit Unit Price Total Price Unit Price Total Price Unit Price Total Price No.Quantity Unit Description (Figures)(Figures)(Figures)(Figures)(Figures)(Figures) SCHEDULE 2 - UTILITY LOT 2; 1 MG ELEVATED STORAGE TANK AND WELL Contract Time = 540 Calendar Days 2.01 1 LS Mobilization, Bonding and Submittals (5% Max)$372,950.00 $372,950.00 $100,000.00 $100,000.00 $650,000.00 $650,000.00 2.02 1 LS Utility Lot 2 - 1 MG Elevated Tank $4,520,000.00 $4,520,000.00 $6,754,000.00 $6,754,000.00 $6,000,000.00 $6,000,000.00 2.03 1 LS Utility Lot 2 - Tank Foundation $1,300,000.00 $1,300,000.00 $2,125,000.00 $2,125,000.00 $1,500,000.00 $1,500,000.00 2.04 1 LS Utility Lot 2 - Tank Overflow & Drain $63,980.00 $63,980.00 $140,000.00 $140,000.00 $250,000.00 $250,000.00 2.05 1 LS Utility Lot 2 - Well Completion $147,200.00 $147,200.00 $400,000.00 $400,000.00 $520,000.00 $520,000.00 2.06 1 LS Utility Lot 2 - Well Piping $31,780.00 $31,780.00 $60,000.00 $60,000.00 $97,000.00 $97,000.00 2.07 1 LS Utility Lot 2 - Civil $494,230.00 $494,230.00 $775,000.00 $775,000.00 $1,510,000.00 $1,510,000.00 2.08 1 LS Utility Lot 2 - Mechanical $516,110.00 $516,110.00 $875,000.00 $875,000.00 $1,220,000.00 $1,220,000.00 2.09 1 LS Utility Lot 2 - Electrical $175,060.00 $175,060.00 $400,000.00 $400,000.00 $485,000.00 $485,000.00 2.10 1 LS Utility Lot 2 - Water Main Piping East-West $54,960.00 $54,960.00 $105,000.00 $105,000.00 $550,000.00 $550,000.00 2.11 1 LS Utility Lot 2 - Water Main Piping North-South $117,205.00 $117,205.00 $145,000.00 $145,000.00 $675,000.00 $675,000.00 2.12 1 LS Utility Lot 2 - Water Main Piping Future Water Main Connection $38,525.00 $38,525.00 $75,000.00 $75,000.00 $150,000.00 $150,000.00 4.76%4.78% $7,832,000.00 $11,954,000.00 $13,607,000.00 Robert Peccia & Associates Today's Date: March 28, 2023 ________________________________________________________ SUMMARY OF BIDS 2023 KALISPELL TANK AND WELLS PROJECT KALISPELL, MT TOTAL BASE BID: TRUE TABULATION OF BIDS RECEIVED PREPARED BY RPA 3/29/2023 Page 3 Robert Peccia & Associates, Inc. 102 Cooperative Way, Suite 300 * Kalispell * Montana * (406) 752-5025 Engineer's Estimate Landmark Structures S & L Underground, Inc. Item Unit Unit Price Total Price Unit Price Total Price Unit Price Total Price No.Quantity Unit Description (Figures)(Figures)(Figures)(Figures)(Figures)(Figures) ADDITIVE ALTERNATE NO. 1 - WATER MAIN CONNECTION EAST OF HIGHWAY 93 2.AA1 1 LS Water Main Connection on Eastside of Highway 93 $310,730.00 $310,730.00 $508,000.00 $508,000.00 $355,000.00 $355,000.00 $310,730.00 $508,000.00 $355,000.00 Robert Peccia & Associates Today's Date: March 28, 2023 ________________________________________________________ SUMMARY OF BIDS 2023 KALISPELL TANK AND WELLS PROJECT KALISPELL, MT TOTAL BASE BID: TRUE TABULATION OF BIDS RECEIVED PREPARED BY RPA 3/29/2023 Page 4 Robert Peccia & Associates, Inc. 102 Cooperative Way, Suite 300 * Kalispell * Montana * (406) 752-5025 Engineer's Estimate Landmark Structures S & L Underground, Inc. Item Unit Unit Price Total Price Unit Price Total Price Unit Price Total Price No.Quantity Unit Description (Figures)(Figures)(Figures)(Figures)(Figures)(Figures) ADDITIVE ALTERNATE NO. 2 - WATER MAIN CONNECITON WEST OF HIGHWAY 93 2.AA2 1 LS Water Connection Across Highway 93 $485,850.00 $485,850.00 $560,000.00 $560,000.00 $460,000.00 $460,000.00 $485,850.00 $560,000.00 $460,000.00 Robert Peccia & Associates Today's Date: March 28, 2023 ________________________________________________________ SUMMARY OF BIDS 2023 KALISPELL TANK AND WELLS PROJECT KALISPELL, MT TOTAL BASE BID: TRUE TABULATION OF BIDS RECEIVED PREPARED BY RPA 3/29/2023 Page 5 Robert Peccia & Associates, Inc. 102 Cooperative Way, Suite 300 * Kalispell * Montana * (406) 752-5025 Engineer's Estimate S & L Underground, Inc. Item Unit Unit Price Total Price Unit Price Total Price No.Quantity Unit Description (Figures)(Figures)(Figures)(Figures) SCHEDULE 3 - UTILITY LOT 3; FOUR MILE DRIVE WELL Contract Time = 200 Calendar Days 3.01 1 LS Mobilization, Bonding and Submittals (5% Max)$105,600.00 $105,600.00 $120,000.00 $120,000.00 3.02 1 LS Utility Lot 3 - Civil $432,310.00 $432,310.00 $348,416.00 $348,416.00 3.03 1 LS Utility Lot 3 - Structural $328,030.00 $328,030.00 $800,000.00 $800,000.00 3.04 1 LS Utility Lot 3 - Mechanical $926,150.00 $926,150.00 $575,000.00 $575,000.00 3.05 1 LS Utility Lot 3 - Electrical $282,960.00 $282,960.00 $520,000.00 $520,000.00 3.06 1 LS Utility Lot 3 - Water Main $110,400.00 $110,400.00 $345,416.00 $345,416.00 3.07 1 LS Utility Lot 3 - Water Service $7,035.00 $7,035.00 $7,500.00 $7,500.00 3.08 1 LS Utility Lot 3 - Sewer Service $25,170.00 $25,170.00 $22,500.00 $22,500.00 4.76%4.38% $2,217,655.00 $2,738,832.00 Robert Peccia & Associates Today's Date: March 28, 2023 ________________________________________________________ SUMMARY OF BIDS 2023 KALISPELL TANK AND WELLS PROJECT KALISPELL, MT TOTAL BASE BID: TRUE TABULATION OF BIDS RECEIVED PREPARED BY RPA 3/29/2023 Page 6 Robert Peccia & Associates, Inc. 102 Cooperative Way, Suite 300 * Kalispell * Montana * (406) 752-5025 Engineer's Estimate S & L Underground, Inc. Item Unit Unit Price Total Price Unit Price Total Price No.Quantity Unit Description (Figures)(Figures)(Figures)(Figures) SCHEDULE 4 - NORTH MAIN WELL Contract Time = 200 Calendar Days 4.01 1 LS Mobilization, Bonding and Submittals (5% Max)$90,540.00 $90,540.00 $110,000.00 $110,000.00 4.02 1 LS North Main Well - Civil $223,450.00 $223,450.00 $411,184.00 $411,184.00 4.03 1 LS North Main Well - Structural $328,030.00 $328,030.00 $800,000.00 $800,000.00 4.04 1 LS North Main Well - Mechanical $818,787.00 $818,787.00 $575,000.00 $575,000.00 4.05 1 LS North Main Well - Electrical $289,800.00 $289,800.00 $400,000.00 $400,000.00 4.06 1 LS North Main Well - Water Main $150,880.00 $150,880.00 $175,000.00 $175,000.00 4.76%4.45% $1,901,487.00 $2,471,184.00 Robert Peccia & Associates Today's Date: March 28, 2023 ________________________________________________________ SUMMARY OF BIDS 2023 KALISPELL TANK AND WELLS PROJECT KALISPELL, MT TOTAL BASE BID: TRUE TABULATION OF BIDS RECEIVED