Loading...
TOC & IntroductionCITY OF KALISPELL FINAL DRAFT PHASE I - MASTER PLAN STUDY AIRPORT FEASIBILITY STUDY Morrison-Maierle, Inc. 910 Helena Avenue Helena, MT 59601 January 1999 Kalispell City Airport Feasibility Study January 1999 TABLE OF CONTENTS INTRODUCTION.............................................................I AIRPORT HISTORY AND SUMMARY OF PREVIOUS STUDIES ..................... 1 SUMMARY OF ISSUES ....................................................... 3 IssueNumber .........................................................3 IssueNumber .........................................................4 CHAPTER ONE - INVENTORY ................................... .............. 5 EXISTING FACILITIES..................................................5 RUNWAY LENGTH ..................................................... 6 DESIGN STANDARDS .................................................. 6 LAND USE AND ZONING ............................................... 8 GROUND ACCESS, CIRCULATION AND PARKING ......................... 9 AIR TRAFFIC MANAGEMENT .......................................... 10 METEOROLOGICAL DATA ............................................. 10 AVIATION ACTIVITY, SOCIO-ECONOMIC, AND DEMOGRAPHIC DATA..... 12 CHAPTER TWO - FORECASTS ................................................ 15 FORECASTS..........................................................15 CHAPTER THREE - FEASIBILITY STUDY ...................................... 18 THROUGH THE FENCE OPERATIONS ................................... 18 AM TOWERS EVALUATION ............................................ 19 AIRSPACE ANALYSIS.................................................23 LAND ACQUISITION..................................................24 COST ESTIMATES .................................................... 25 Noise..........................................................28 Compatible Land Use ............................................. 30 Social Impacts...................................................32 Induced Socio-Economic Impacts .................................... 32 Air Quality......................................................33 EXECUTIVE SUMMARY ..................................................... 40 Kalispell City Airport Feasibility Study January 1999 TABLE OF CONTENTS (Cont'd) APPENDIXES Appendix A - Tower Report (Vir James) Appendix B - Land Values Annex B-I Property Map Annex B-2 Roger Jacobson Report, dated 30 July 1998 Annex B-3 Roger Jacobson Report, dated 31 August 1998 Annex B-4 Engineers Opinion of Land Required Appendix C - Cost Estimates Appendix D - Airport Layout Drawings Appendix E - Airport Master Record Appendix F - Correspondence with the Federal Aviation Administration Annex F-1 Letter from Dave Gabbert, dated 21 February 1997 Annex F-2 Letter to Dave Gabbert, dated 3 October 1998 Annex F-3 Letter from Dave Gabbert, dated 8 October 1998 Appendix G - FAA Airport Design Standards Annex G-1 Design Standards for a B-I Airport Annex G-2 Design Standards for a B-II Airport Annex G-3 Runway Length Requirements Appendix H - Pilot Survey Results Summary LIST OF TABLES Table 1 Summary of Tower Alternatives .................................... 4 Table 2 - Baseline Summary ............................................... 5 Table 3 - Forecast Air Operations ........................................... 5 Table 4 - Forecast Based Aircraft ........................................... 4 Table 5 - Uniform Act Reimbursable and Non -reimbursable Expenses ............. 5 Table 6 - Summary of Initial Development Costs ............................... 5 Table 7 - Summary of Environmental Impacts ................................ 15 ii Kalispell City Airport Feasibility Study January 1999 KALISPELL CITY AIRPORT MASTER PLAN FEASIBILITY STUDY INTRODUCTION The City of Kalispell has retained the services of Morrison-Maierle, Inc., to conduct an two- phase airport master plan study. The first phase is a feasibility level study to compare the cost of upgrading the existing airport to a B-II Utility Airport with the costs of developing a B-II Utility Airport at a "generic" site near the City of Kalispell. Phase II of the master plan study is to be the "classic" master plan report as outlined in Federal Aviation Administration (FAA) Advisory Circular (AC) 150/5070-6A Airport Master Plans. Phase I was to address issues surrounding the KGEZ radio towers, an airspace analysis, forecasts of future aviation demand, land acquisition costs, cost estimates, and finally an environmental overview. Phase I ends after completion of a public meeting to obtain input from interested parties and to present findings. This report is organized so that only those items specifically required under the terms of the contract are addressed as part of this study. Paragraphs highlighted in bold -face print are reproduced verbatim from the contract. This was done to provide guidance to the reader as to what was required as a part of this study and to focus the report. AIRPORT HISTORY AND SUMMARY OF PREVIOUS STUDIES The Kalispell City Airport has been the focus of three different studies within the last twenty years. The first was the "Mini Master Plan" prepared by T.A.P., Inc, Aviation Consultants of Bozeman, Montana in 1979 for the Kalispell Airport Association. The second study was the Airport Neighborhood Plan , City of Kalispell, Amendment to the Kalispell City -County Master Plan prepared by Montana Planning Consultants, of Kalispell, Montana in 1993. The final study was the Kalispell City Airport/Athletic Complex Redevelopment Plan Analysis in 1996 by the Kalispell Planning, Economic & Community Development Office. The earliest recorded aircraft activity was in June 1911 when Eugene Ely flew from the county fairgrounds in a Curtis bi-plane. ' In 1928 the City of Kalispell purchased 135 acres southeast of town to establish a municipal airport2. Public use of the airport has continued uninterrupted except for a short time in the 1950's when the airport was closed. 'Kalispell Mini -Master Plan; TAP, Inc; October 1979; page 1-1. 2Kalispell City Airport/Athletic Complex Redevelopment Plan; Kalispell Planning, Economic, and Community Development Office; February 1996; page 1. 1 Kalispell City Airport Feasibility Study January 1999 In early 1966, a group of airport users and concerned businessmen formed the Kalispell Airport Association which then took a lease on the airport and organized and oversaw its revitalization. Prior to the revitalization, the primary use of the airport was as a convenience strip with few permanently based aircraft. After the revitalization, more and more planes based at Kalispell City Airport, until 1979 when there were 60 to 65 aircraft were based there. The 1979 TAP "Mini -Master Plan" outlined nine recommendations that are reproduced here': Revise as necessary and adopt airport rules and regulations printed in their report. Appoint an airport manager. Overlay Runway 13-31 with a 2" asphaltic mat in 1980 4. The City (and the Association) should revise or amend the airport lease agreement for the mutual benefit of both parties, and to better reflect the airport changes which have occurred since 1966. This revision or amendment could be made at any rather than wait for the lease expiration date 1985. Proceed with land acquisition of some 9 acres on the southeast end of the airport. Secure an easement for the future clear zone on the southeast end. 7. Proceed with the development schedule for construction of the items recommended in that plan. 8. Upon completion of new paved aprons, assign the tie -down spaces and commence with the rates and rates and charges schedule as set forth in the plan. 9. Make certain all airport land lease income and land sales revenue are credited to the airports account for future capital expenditures for construction items. In 1986 the Kalispell Airport Association dissolved in the face financial difficulties and a lack of clear lines of authority and direction from the City. Operational and fiscal responsibility passed back to the City at that time. Consequently only Recommendation #3 has been completed fully. 'Kalispell Mini -Master Plan; TAP, Inc; October 1979. 2 Kalispell City Airport Feasibility Study January 1999 It is important to note that of the original 135 acres purchased in 1928, only 77.11 acres remain in City ownership in a form usable as an airport. The rest has been sold to finance other City projects through the years. This figure includes land that is currently used for soccer and little league baseball fields. It is further important to note that the Kalispell City Airport has been developed so far without any participation from the FAA. In 1996, the City hired Robert Peccia and Associates to draw an airport layout plan (ALP) to assist the city with future planning. Among the developments shown on that ALP are: A relocation of the threshold of Runway 13 (the north end) 600 feet south along the runway centerline in order to protect the runway protection zone (RPZ). 2. A widening of the runway to 75 feet from 60 feet. An ultimate runway length of 4,300 feet. 4. Land acquisition to protect the lateral dimensions of a B-II airport.4 5. Hangar development in the vicinity of the existing soccer fields. 6. A perimeter fence for airport security. All of these ideas have merit, so in 1997 the City of Kalispell sponsored this study to determine the best way to achieve the airport shown on that ALP. SUMMARY OF ISSUES There are a number of issues facing Kalispell City Airport. The purpose of this Master Plan Study is to identify these issues and provide recommendations to best resolve these issues. Issue Number 1 The number one issue facing Kalispell City Airport is the safety of its users and neighbors. Currently, the airport does not meet any of the safety requirements for a B-Is airport as described in 4 See later part of report for discussion of Airport Reference Code. -'FAA AC 150/5300-13, change 5, 2/14/97, the Airport Reference Code (ARC) is a combination of the Aircraft Approach Category and the Airplane Design Group, of the most demanding aircraft intended to use the airport. For a B-I Airport, aircraft having approach speeds of 91 knots or more but less than I21 knots, and having wingspans up to but not including 49 feet (15 m). W Kalispell City Airport Feasibility Study January 1999 Federal Aviation Administration (FAA) Advisory Circular (AC)150/5300-13 Airport Design. The FAA has been reluctant to admit into the National Plan of Integrated Airports Systems (NPIAS) airports which are not or cannot be brought up B-II6 requirements. The airport, in its current configuration, suffers penetrations of both approach surfaces, encroachments into the runway object free area, and non -compatible use of the Runway Protection Zones. The airport has a partial perimeter fence, however, it is possible for the general public to have unhindered access to all air operations areas including the runway. Aircraft storage and parking is inadequate for the level of use. Finally, although the runway has a runway lighting system, an upgrade will probably be required. Issue Number 2 A secondary issue is the financial commitment for improvement/expansion of Kalispell City Airport. At a special session of the Kalispell City Council on March 28, 1998, a $1,000,000 limit was placed on improvements at the airport. If the airport were to be designated as a NPIAS airport, the funding committed by the City would provide significant match money for FAA Airport Improvement Program (AIP) grants. 6Ibid. For a B-II Airport, aircraft having approach speeds of 91 knots or more, but less than 121 knots, and having wingspans of at Ieast 49 feet(15 m), but less than 79 feet (24 m). . M