ADDENDUM NO.1 - 2023 Kalispell Tank and Wells ProjectPage 1 of 9 ADDENDUM NO. 1 2023 Kalispell Tank and Wells Project Kalispell, Montana Date of Addendum: March 15, 2023 Bid Opening Date: March 23, 2023 This addendum modifies the Contract Documents, Specifications and Construction Drawings for the 2023 Kalispell Tank and Wells Project in Kalispell, Montana, as set forth herein: PROJECT MANUAL DIVISION 00: BIDDING & CONTRACTING REQUIREMENTS 1. SECTION 00520-01 – 2023 KALISPELL TANK AND WELLS PROJECT – SCHEDULE 1 AGREEMENT Revise Article 4.03. Milestones, A., Milestone(s):, 1. to read as follows: 1. Milestone 1 – Schedule 1 shall be Substantially Completed and Operations by June 1, 2024. 2. SECTION 00520-03 – 2023 KALISPELL TANK AND WELLS PROJECT – SCHEDULE 3 AGREEMENT Revise Article 4.03. Milestones, A., Milestone(s):, 1. to read as follows: 1. Milestone 1 – Schedule 3 shall be Substantially Completed and Operations by June 1, 2024. 3. SECTION 00520-04 – 2023 KALISPELL TANK AND WELLS PROJECT – SCHEDULE 4 AGREEMENT Revise Article 4.03. Milestones, A., Milestone(s):, 1. to read as follows: 1. Milestone 1 – Schedule 4 shall be Substantially Completed and Operations by June 1, 2024. DIVISIONS 02 – 49: TECHNICAL SPECIFICATIONS 4. SECTION 099000 – PAINTING J. SYSTEM NO. 10: SUBMERGED METAL/POTABLE WATER RESERVOIR The tank interior coatings shall comply with the requirements of NSF 61 and NSF 600 requirements and be a four-coat consisting of the following: Page 2 of 9 Surface Prep. Coating Product Min. Coats, Cover Solvent Cleaning (SP-1) and Near White Blast Cleaning (SP-10) ZINC-RICH URETHANE PRIMER (Tnemec Series 94) 1 coat, 2-3 mils MDFT PHENALKAMINE EPOXY: POTABLE GRADE APPROVED FOR POTABLE WATER CONTACT AND CONFORMING TO NSF 600 REQUIREMENTS 3 coats 1st coat, 2-5 mils MDFT 2nd coat, 5-8 mils MDFT 3rd coat, 5-8 mils MDFT Phenalkamine epoxy manufactured by Tnemec to be: Series 21 Epoxoline (White) 1st coat; Series 21 Epoxoline (Beige) 2nd coat; Series 21 Epoxoline (Beige) 3rd coat; or approved equal Product data sheet shall be submitted to the Engineer prior to approval of the coating system. Contractor is advised that all manufactures must clarify that their coatings furnished are in compliance with these specifications. K. SYSTEM NO. 11: EXPOSED METAL – ATMOSPHERIC/POTABLE WATER RESERVOIR The exterior tank coatings shall be a three-coat system, consisting of the following: Surface Prep. Coating Product Min. Coats, Cover Abrasive Blast (SP-10) or Power Tool Cleaned (SP2) ZINC-RICH URETHANE PRIMER (Tnemec Series 94) 1 coat, 2-3 mils MDFT ACRYLIC POLYURETHANE (Tnemec Series 1095) 1 coat, 3-5 mils MDFT FLUOROPOLYMER (Tnemec HydroFlon Series 700) 1 coat, 2-3 mils MDFT Product data sheets shall be submitted to the Engineer prior to approval of the coating system. 5. SECTION 264343 – SURGE PROTECTION DEVICES FOR LOW VOLTAGE ELECTRICAL POWER CIRCUITS This technical specification is a duplicate. Delete Section 264313 in its entirety, page 775 through 786 of the QuestCDN electronic document “VU_Construction Drawings and Contract Documents and Specifications.PDF” Page 3 of 9 6. SECTION 323115 – VERTICAL PIVOT GATE Replace Part 2 - PRODUCTS, 2.1 MANUFACTURED UNIT through 2.2 COMPONENTS with the following: 2.1 MANUFACTURED UNIT A. Vertical Pivot Gate System: Ideal Mfg., Inc./TILT-A-WAY Model DCM-25. 2.2 COMPONENTS A. Gear Motor Unit: 1/2 HP 24V DC TENV motor, 1800 RPM, full load amps 13.5, continuous duty, right angle. 1. Gear motor will be all as one unit with lubricating fluid. 2. The gear motor will be designed to keep the gate locked in the closed position, keeping any person from lifting the gate open when it is in the closed position. 3. Pedestal Frame: Welded construction with removable outer skin of cross break 16 gauge aluminum panels. 4. Inspection Door Hardware: Stainless steel continuous hinges and heavy- duty lockable pull down catches to hold inspection door shut. 5. Power: 115 Volt AC 24 Volt DC battery back up [24 Volt DC gear motor and control board] [115 Volt AC for battery charger and optional accessories]. Battery supplied by installer, or owner. Total gate system requires 20-amp minimum service, with no more than 3% drop in voltage, while gate is in operation. (FOR WIRE SIZE: CONSULT LOCAL ELECTRICAL CODE.) 6. Soft stop on both ends. 7. Gear Motor will move the barrier from the closed position to open position, and open position to closed position in approximately 10 to 12 seconds each direction. B. Gate actuating System: Number 40 Roller Chain and Sprockets. 1. Hardened teeth sprocket, adjustable magnetic switch stops on each end of travel. 2. Gear Motor Fluid: Manufacturer’s standard, factory checked, filled, and tested. C. Balance System: System designed to allow barrier to be hand raised and to be hand lowered with 12 to 15 pounds of pressure, consisting of manufacturer’s standard cables, sheaves, sealed cam yoke roller bearings, and tension springs pulled in a straight line. 1. Safety Control Switch: Provide built-in safety control switch capable of stopping barrier in any position should balance system fail. 2. Testing: Factory test and adjust balance system to ensure gate may be manually raised and lowered with specified pressure. 3. Signage: Signage to be added to the gate barrier must be declared at the time of order so the manufacturer can add the signs on the barrier, to ensure Ideal Mfg. balances the barrier correctly at the time of manufacturing. D. Electrical System: Oversized rain tight enclosure housing electrical components except limit switches, safety switches, and motor. 1. Wire: Oil and gasoline resistant. 2. Overload Protection: 20-amp fuse to protect motor. Page 4 of 9 3. Reversing Controller: Provide as required to operate gear motor. 4. Magnetic Switches: Adjustable magnetic limit switches capable of stopping barrier at each end of travel. 5. Logic Board: Programmable logic board with manufacturer’s full range of available functions. a. Built in Amp Meter. b. Over current protection against entrapment. c. Battery Charger. d. Cycle Counter. e. Built in 7-day programmable timer. f. LCD trouble shooting diagnostic screen. g. Pre wired for safety, and free exit loop. h. Pre wired for photo eye. i. Pre wired for radio receiver. j. Pre wired for master slave. 6. All gates are equipped with a dry contactor to accommodate all types of access equipment 8. Options: a. Cold Weather Package: (required in areas where the temperature drops to less than 35° F). b. Stanchion: (this is for the free end of the gate). c. Loop Detectors: 1) Provide detector system to allow free exit/safety, safety or close gate operation; system to be factory wired inside electrical box and tested. 2) Loops shall be made of 14AWG wire. 3) Wire shall be UL 493 certified designed for a direct burial application. 4) Loops shall be a kit by a single source manufacturer. 5) Loops shall be BD Loops, or approved equal. d. Reversing Edge: Provide manufacturers standard reversing edge system. e. Photo Eye: Used as a form of safety f. Ice Scrapers: (for cable sheaves). g. Access Control Systems: 1) A programmable keyless entry / keypad shall be installed and function as the entry / ingress device. The keypad shall be mounted on a single height pedestal. 2) Five (5) handheld one button remote controls shall be provided and function as the entry / ingress device. 7. SECTION 331613 – COMPOSITE ELEVATED WATER STORAGE Part 1: GENERAL, 1.4 WARRANTY, A: Change “5-year” to “2-year”. Part 1: GENERAL, 1.4 WARRANTY, B: Change “5-year” to “2-year” and “4-year” to “1- year” Page 5 of 9 Add to Part 2: PRODUCTS, 2.1 ACCEPTABLE MANUFACTURERS, A: 3. Caldwell Tanks, Inc. Add to Part 2: PRODUCTS, 2.1 ACCEPTABLE MANUFACTURERS, B: 2. Proco Products, Inc. Revise to Part 3: EXECUTION, 3.1 INSTALLATION, B.1.a to read: a. Concrete pour height: 4 FT minimum, 12 FT maximum. 8. SECTION 407000 – PROCESS INSTRUMENTS Revise Part 2: PRODUCTS, 2.3 INSTUMENT SPECIFICATIONS, E.2.f to read as follows: Unit shall be HACH CLF10, or approved equal. 9. SECTION 224000 – PLUMBING FIXTURES Revise Part 2: PRODUCTS, 2.4 HOSE VALVES/WALL HYDRANTS to read as follows: A. Unit shall include a brass single globe valve with operator. Provide mounting plate, integral hose rack, and ¾” NPT threaded inlet and outlet. Unit shall be SuperKlean 600M Series, or approved equal. 10. SECTION 400567 – CONTROL VALVES Under Part 2: PRODUCTS, replace paragraph E.4 with the following: 4. A parallel pressure pilot shall sense downstream pressure and open the valve fully should downstream pressure fall below a pre-set minimum (61 psi at the 1 MG Elevated Tank and 76 psi at the Sheepherder Control Valve Building) and close the valve should the downstream pressure rise above the pre-set minimum. Under Part 2: PRODUCTS, DELETE paragraph E.5: Regarding Technical Specification 400567 – Control Valve Part 2 – Products, E. Function The solenoid operated control valves located at the Sheepherder Control Valve Building and the 1 MG Elevated Tank must be capable of electronically opening and closing based on inputs received from the PLC. The contractor and valve manufacturer will not be responsible for any system programming. The set points included as part of this specification are to provide a general range of operation but will be field adjusted by the City’s software integrator upon completion of construction. Page 6 of 9 11. SECTION 406113 – PROCESS CONTROL SYSTEM GENERAL REQUIREMENTS Under Part 1 - GENERAL; DELETE the paragraph 1.2.B and replace with the following. B. Qualifications: 1. System Integrator: a. Experience: 1) Have satisfactorily provided control system integration for a minimum of five projects of similar magnitude and function. b. Qualification: 1) Regularly engaged in the design and the installation of process control and instrumentation systems and their associated subsystems as they are applied to the municipal water and wastewater industry. 2) Maintains a permanent, fully staffed and equipped service facility within 400 miles of the project site with full time employees capable of designing, documenting, fabricating, installing, calibrating, programming, configuring, providing training services, and testing the systems specified herein. 3) Capable of responding to on-site problems within12 hours of notice. Provide an on-site response within 12 hours of notification starting at two months before scheduled startup to two months after startup completion. 12. SECTION 460550 – SUBMERSIBLE WELL PUMP AND APPURTENANCES Delete Technical Specification 264313 in its entirety. The Schedule 2 improvements will now include a vertical turbine well pump housed in a 8’ x 12’ pump house and all associated equipment as shown in the attached “A1” Construction Drawings. 13. SECTION 463300 – VERTICAL TURBINE WELL PUMPS Replace Part 2 – PRODUCTS, 2.1 VERTICAL TURBINE WELL PUMPS, A. Manufacturer and Model, 3. With the following: 3. The pump manufacturer and model shall be: a. Schedule 3 – Four Mile Drive Well: Gould’s Water Technology Model DWT-DITM 12FDLC, 11 Stages, or approved equal b. Schedule 4 – North Main Well: Gould’s Water Technology Model DWT-DITM 14RJHC, 4 Stages, or approved equal c. Schedule 2 – Utility Lot 2 Well: American- Marsh Pumps Model 6YC, 10 Stages, or approved equal Add the following paragraph to Part 2 – PRODUCTS, 2.1 VERTICAL TURBINE WELL PUMPS, C. Performance Requirements: 4. Schedule 2 – Utility Lot 2 Well a. Number of Required Units: 1 b. Well Casing Diameter: 8 inches c. Discharge Capacity: 500 gpm. d. Discharge Head: 415’ TDH. e. Drive Horsepower: 100 hp. Page 7 of 9 f. Rated Speed: 3,500 rpm g. Minimum Bowl Efficiency(design point): 72% h. Column and Discharge Diameter: 4” i. Column Piping Length: 260’ The Schedule 2 vertical turbine well pump shall follow Technical Specification 463300. 14. SECTION 463342 – CHEMICAL FEED PUMPS Replace PART 2 – MATERIALS, 2.1 CHEMICAL METERING SYSTEM COMPONENTS. A. with the following: A. A single chemical metering pump manufacturer will be responsible for supplying all components of the metering pump feed system. The chlorination system shall be ProMinent Fluid Controls Inc., The pump shall be chemically compatible with Sodium Hypochlorite and include the following components: 1. Chemical Metering Pump. 2. Pump Inputs a. Analog (4-20mA) speed command b. Digital (on/off) run command 3. Outputs a. Digital (on/off) run status b. Digital (on/off) alarm status c. Digital (on/off in-remote status d. Analog (4-20mA) speed indication When operating the chlorine metering pumps shall be capable of delivering the following: 1. Schedule 2: 500 gpm Well (At 1-MG Tank) a. 0.02 gph of chlorine (minimum). b. 0.20 gph of chlorine (maximum). 2. Schedule 3: Four Mile Drive Water Well a. 0.06 gph of chlorine (minimum). b. 0.62 gph of chlorine (maximum). 3. Schedule 4: North Main Well a. 0.08 gph of chlorine (minimum). b. 0.80 gph of chlorine (maximum). APPENDIX A: WAGE RATES 15. Regarding Montana residence requirements for labor refer to Part N on page 5 of the Prevailing Wage Rates which states the following: Page 8 of 9 CONSTRUCTION DRAWINGS 16. SHEET C1-2 The perimeter fence should be terminated at the entrance gates. The fence will not extend west beyond the gates. 17. SHEET GC-8 Chain Link Fence Details – Tension wire shall be installed along the bottom of the chain link fence. A top rail shall be installed along the entire stretch of fence at all locations showing new chain link fencing in the Construction Drawings. Delete note 10 and note 13. Installation of grounding rods will not be required as part of this project. 18. SHEET C2-10 Improvement to Eagle Valley Ranch Rd have been completed. The Contractor will be responsible for removal and replacement of curb and gutter, sidewalk, asphalt, landscaping, and any other surface restoration necessary upon completion of the Water Main Alt 1 South Connection. 19. SHEET C2-20 Delete Detail 1. Replace Detail 2, Note 8 with the following: 8. 8” PRODUCTION CASING IS 8.625” OD WITH .322” WALL THICKNESS AND AN ID OF 7.981”. 20. SHEET E2-7 Provide for heat trace per notes on drawing M2-9 and specification section 404113 (Heat Tracing Cable). Heat trace system shall be contractor/vendor designed. Power for the heat trace system may come from either the 480VAC panelboard P1, or the 240VAC panelboard P2. 21. SHEETS E2-6 and E2-7 A. The well pump/motor will now be 100HP vertical turbine – see mechanical sheets. 1) Upsize motor circuit protection components and VFD to serve 100HP motor. Size per manufacturer’s recommendation. 2) Upsize conduit and conductors from the 480VAC panelboard at the Tank electrical room to the Well Pump VFD panel, and from the VFD panel to the 100HP well pump. 3) Provide local disconnect at new well building for well pump motor. a. Provide aux contact on local disconnect and wire back to Well Pump VFD panel for use in shutting down VFD upon opening of local disconnect. 4) Provide control wiring between Well Pump VFD panel and new well building for control of added pump control valve and pre-lube systems. B. Upsize generator to be 125KW. C. Provide new “Mini-Power-Zone” combination transformer and load center at new well building to service 240/120VAC lighting, receptacle and heating/ventilation components. 1) Mini-Power-Zone to be 15KVA with minimum 6 circuit load center. UTILITY LOT 2 WELL PIPING PLAN AND PROFILE US H W Y 9 3 C2 - 5 UT I L I T Y L O T 2 WE L L P I P I N G PL A N A N D P R O F I L E C2-5 DE S I G N E D B Y DR A W N B Y CH E C K E D B Y DA T E PR O J E C T N O . FI L E SHEET PR O J E C T T I T L E SH E E T T I T L E AP P R . DA T E RE V I S I O N SY M BY OF 20 2 3 K A L I S P E L L TA N K A N D W E L L S P R O J E C T Ka l i s p e l l , M o n t a n a RPA Copyright ã Robert Peccia & Associates 2023 K. M U R P H Y , P . E . G. L E S O F S K I B. K O E N I G , P . E . FE B R U A R Y 2 0 2 3 PR E L I M I N A R Y NO T F O R CO N S T R U C T I O N 20 7 0 6 NOTES: LO T 2 _ W E L L B L D G _ D E T A I L S CI V I L D E T A I L S A1G-1 DE S I G N E D B Y DR A W N B Y CH E C K E D B Y DA T E PR O J E C T N O . FI L E SHEET PR O J E C T T I T L E SH E E T T I T L E AP P R . DA T E RE V I S I O N SY M BY OF 20 2 3 K A L I S P E L L TA N K A N D W E L L S P R O J E C T Ka l i s p e l l , M o n t a n a RPA Copyright ã Robert Peccia & Associates 2023 K. M U R P H Y , P . E . G. L E S O F S K I B. K O E N I G , P . E . FE B R U A R Y 2 0 2 3 PR E L I M I N A R Y NO T F O R CO N S T R U C T I O N 20 7 0 6 MONOLITHIC PAD CONSTRUCTION NOTES: LO T 2 _ W E L L B L D G _ D E T A I L S CI V I L D E T A I L S A1G-2 DE S I G N E D B Y DR A W N B Y CH E C K E D B Y DA T E PR O J E C T N O . FI L E SHEET PR O J E C T T I T L E SH E E T T I T L E AP P R . DA T E RE V I S I O N SY M BY OF 20 2 3 K A L I S P E L L TA N K A N D W E L L S P R O J E C T Ka l i s p e l l , M o n t a n a RPA Copyright ã Robert Peccia & Associates 2023 K. M U R P H Y , P . E . G. L E S O F S K I B. K O E N I G , P . E . FE B R U A R Y 2 0 2 3 PR E L I M I N A R Y NO T F O R CO N S T R U C T I O N 20 7 0 6 BUILDING SECTION CONSTRUCTION NOTES: TYPICAL PUMPHOUSE WALL CONNECTION · · · · · · · · · · · · · DE S I G N E D B Y DR A W N B Y CH E C K E D B Y DA T E PR O J E C T N O . FI L E SHEET PR O J E C T T I T L E SH E E T T I T L E AP P R . DA T E RE V I S I O N SY M BY OF 20 2 3 K A L I S P E L L TA N K A N D W E L L S P R O J E C T Ka l i s p e l l , M o n t a n a RPA Copyright ã Robert Peccia & Associates 2023 K. M U R P H Y , P . E . G. L E S O F S K I B. K O E N I G , P . E . FE B R U A R Y 2 0 2 3 PR E L I M I N A R Y NO T F O R CO N S T R U C T I O N 20 7 0 6 we l l p l a n WE L L B U I L D I N G PL A N A1M-1LOT 2 WELL BUILDING PLAN NOTESUTILITY LOT 2 PUMP HOUSE VENTILATION SCHEDULE Description Number Flow Rate Conditions Duct Size Model Number HP Electrical Requirement Damper Roof/wall Opening Notes/Accessories Sidewall Mounted Exhaust Fan (EF-1)1 200 200 @ 0.25 in wg NA Greenheck SE1-10-428-PX-QD 1/20 120V, 1Ø 12" X 12"15" X 15"Provide with internal disconnect, aluminum birdscreen, gravity damper, and 45° weather hood Fixed Louver with Motorized Damper (ID-1)1 200 200@ < 0.05 in wg NA EAC-601 NA NA 16" X 16"Provide insect screen UTILITY LOT 2 PUMP HOUSE HEATING SCHEDULE Description Number Size Type Model Number Electrical Requirements Notes/Accessories Unit Heater (UH-1)1 3 kW Electric Unit Heater Reznor EGHB 240V, 1Ø Provide 24v T-Stat and Combined Venting ROOF ANCHOR DE S I G N E D B Y DR A W N B Y CH E C K E D B Y DA T E PR O J E C T N O . FI L E SHEET PR O J E C T T I T L E SH E E T T I T L E AP P R . DA T E RE V I S I O N SY M BY OF 20 2 3 K A L I S P E L L TA N K A N D W E L L S P R O J E C T Ka l i s p e l l , M o n t a n a RPA Copyright ã Robert Peccia & Associates 2023 K. M U R P H Y , P . E . G. L E S O F S K I B. K O E N I G , P . E . FE B R U A R Y 2 0 2 3 PR E L I M I N A R Y NO T F O R CO N S T R U C T I O N 20 7 0 6 We l l P l a n _ M 2 WE L L B U I L D I N G PR O F I L E A1M-2 SECTION DE S I G N E D B Y DR A W N B Y CH E C K E D B Y DA T E PR O J E C T N O . FI L E SHEET PR O J E C T T I T L E SH E E T T I T L E AP P R . DA T E RE V I S I O N SY M BY OF 20 2 3 K A L I S P E L L TA N K A N D W E L L S P R O J E C T Ka l i s p e l l , M o n t a n a RPA Copyright ã Robert Peccia & Associates 2023 K. M U R P H Y , P . E . G. L E S O F S K I B. K O E N I G , P . E . FE B R U A R Y 2 0 2 3 PR E L I M I N A R Y NO T F O R CO N S T R U C T I O N 20 7 0 6 M2 - 3 TA N K S T E M ME C H A N I C A L SE C T I O N S M2-3 SECTION NOTES: