Loading...
Stormwater Treatment Facilities Project Tabulation of Bids ReceivedItem Item Description Unit Quantity Unit Price Total Unit Price Total Unit Price Total Unit Price Total 1 Mobilization/Demobilization (10% Max)LS 1 $68,507.00 $68,507.00 $73,895.00 $73,895.00 $125,000.00 $125,000.00 $50,000.00 $50,000.00 2 Construction Traffic Control LS 1 $12,935.00 $12,935.00 $28,500.00 $28,500.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 3 Construction Surveying LS 1 $6,843.00 $6,843.00 $16,500.00 $16,500.00 $6,000.00 $6,000.00 $10,000.00 $10,000.00 4 Dewatering LS 1 $22,209.00 $22,209.00 $30,000.00 $30,000.00 $82,600.00 $82,600.00 $15,000.00 $15,000.00 5 Erosion Control & Stormwater Permitting LS 1 $1,267.00 $1,267.00 $8,500.00 $8,500.00 $8,700.00 $8,700.00 $10,000.00 $10,000.00 6 Type 2 Pipe Bedding CY 60 $135.59 $8,135.40 $80.00 $4,800.00 $87.00 $5,220.00 $25.00 $1,500.00 7 Manhole - 96" Storm Sewer EA 0 $0.00 $0.00 $77,630.00 $0.00 $0.00 $0.00 $16,000.00 $0.00 8 Manhole - 120" Storm Sewer EA 3 $98,444.00 $295,332.00 $95,380.00 $286,140.00 $86,200.00 $258,600.00 $18,000.00 $54,000.00 9 CDS Hydrodynamic Separator - 60" EA 1 $75,422.00 $75,422.00 $89,690.00 $89,690.00 $125,095.00 $125,095.00 $70,000.00 $70,000.00 10 CDS Hydrodynamic Separator - 120" EA 2 $157,418.00 $314,836.00 $263,550.00 $527,100.00 $234,978.00 $469,956.00 $185,000.00 $370,000.00 11 Membrane Filtration System - 54" Cartridges EA 0 $0.00 $0.00 $279,800.00 $0.00 $0.00 $0.00 $196,000.00 $0.00 12 Storm Drain Pipe - 12"LF 20 $217.75 $4,355.00 $250.00 $5,000.00 $460.00 $9,200.00 $200.00 $4,000.00 13 Storm Drain Pipe - 21"LF 80 $318.25 $25,460.00 $455.00 $36,400.00 $360.00 $28,800.00 $300.00 $24,000.00 14 Connect to Existing EA 7 $2,132.00 $14,924.00 $1,850.00 $12,950.00 $12,000.00 $84,000.00 $2,500.00 $17,500.00 15 Sawcut Pavement LF 600 $4.69 $2,814.00 $8.00 $4,800.00 $8.00 $4,800.00 $10.00 $6,000.00 16 Remove Pavement SY 600 $48.00 $28,800.00 $8.00 $4,800.00 $15.00 $9,000.00 $28.00 $16,800.00 17 4" Asphalt Concrete Pavement SY 600 $128.86 $77,316.00 $120.00 $72,000.00 $120.00 $72,000.00 $60.00 $36,000.00 18 Landscape Topsoil and Reseed LS 1 $2,530.00 $2,530.00 $9,500.00 $9,500.00 $2,500.00 $2,500.00 $500.00 $500.00 19 Pavement Markings LS 1 $1,711.00 $1,711.00 $4,750.00 $4,750.00 $5,700.00 $5,700.00 $500.00 $500.00 20 Remove and Replace Sidewalk SY 20 $284.35 $5,687.00 $261.50 $5,230.00 $190.00 $3,800.00 $35.00 $700.00 21 Remove and Replace Concrete Curb and Gutter LF 30 $95.54 $2,866.20 $125.00 $3,750.00 $100.00 $3,000.00 $65.00 $1,950.00 $971,949.60 $1,224,305.00 $1,313,971.00 $698,450.00 Alt 1 Mobilization/Demobilization (10% Max)LS 1 $74,000.00 $74,000.00 $84,468.00 $84,468.00 $125,000.00 $125,000.00 $50,000.00 $50,000.00 Alt 2 Construction Traffic Control LS 1 $15,876.00 $15,876.00 $28,500.00 $28,500.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 Alt 3 Construction Surveying LS 1 $7,254.00 $7,254.00 $16,500.00 $16,500.00 $6,000.00 $6,000.00 $10,000.00 $10,000.00 Alt 4 Dewatering LS 1 $22,209.00 $22,209.00 $30,000.00 $30,000.00 $82,600.00 $82,600.00 $15,000.00 $15,000.00 Alt 5 Erosion Control & Stormwater Permitting LS 1 $1,267.00 $1,267.00 $8,500.00 $8,500.00 $8,700.00 $8,700.00 $10,000.00 $10,000.00 Alt 6 Type 2 Pipe Bedding CY 60 $135.39 $8,123.40 $80.00 $4,800.00 $87.00 $5,220.00 $25.00 $1,500.00 Alt 7 Manhole - 96" Storm Sewer EA 1 $97,734.00 $97,734.00 $77,630.00 $77,630.00 $65,300.00 $65,300.00 $16,000.00 $16,000.00 Alt 8 Manhole - 120" Storm Sewer EA 2 $91,732.00 $183,464.00 $95,380.00 $190,760.00 $86,200.00 $172,400.00 $18,000.00 $36,000.00 Alt 9 CDS Hydrodynamic Separator - 60" EA 1 $75,422.00 $75,422.00 $89,690.00 $89,690.00 $117,398.00 $117,398.00 $70,000.00 $70,000.00 Alt 10 CDS Hydrodynamic Separator - 120" EA 2 $152,366.00 $304,732.00 $263,550.00 $527,100.00 $223,550.00 $447,100.00 $185,000.00 $370,000.00 Alt 11 Membrane Filtration System - 54" Cartridges EA 1 $175,125.00 $175,125.00 $279,800.00 $279,800.00 $193,000.00 $193,000.00 $196,000.00 $196,000.00 Alt 12 Storm Drain Pipe - 12"LF 35 $266.53 $9,328.55 $250.00 $8,750.00 $400.00 $14,000.00 $200.00 $7,000.00 Alt 13 Storm Drain Pipe - 21"LF 80 $318.25 $25,460.00 $455.00 $36,400.00 $360.00 $28,800.00 $300.00 $24,000.00 Alt 14 Connect to Existing EA 7 $2,220.00 $15,540.00 $1,850.00 $12,950.00 $12,000.00 $84,000.00 $2,500.00 $17,500.00 Alt 15 Sawcut Pavement LF 600 $4.69 $2,814.00 $8.00 $4,800.00 $8.00 $4,800.00 $10.00 $6,000.00 Alt 16 Remove Pavement SY 600 $48.00 $28,800.00 $8.00 $4,800.00 $14.00 $8,400.00 $28.00 $16,800.00 Alt 17 4" Asphalt Concrete Pavement SY 600 $128.86 $77,316.00 $120.00 $72,000.00 $120.00 $72,000.00 $60.00 $36,000.00 Alt 18 Landscape Topsoil and Reseed LS 1 $2,530.00 $2,530.00 $9,500.00 $9,500.00 $2,500.00 $2,500.00 $500.00 $500.00 Alt 19 Pavement Markings LS 1 $1,711.00 $1,711.00 $3,250.00 $3,250.00 $5,700.00 $5,700.00 $500.00 $500.00 Alt 20 Remove and Replace Sidewalk SY 20 $284.35 $5,687.00 $261.50 $5,230.00 $190.00 $3,800.00 $35.00 $700.00 Alt 21 Remove and Replace Concrete Curb and Gutter LF 30 $95.11 $2,853.30 $125.00 $3,750.00 $100.00 $3,000.00 $65.00 $1,950.00 Additive Alternative Base Bid Schedule Total=$1,137,246.25 $1,499,178.00 $1,459,718.00 $895,450.00 Engineer Estimate Total Base Bid Price= Stormwater Treatment Facilities Project Tabulation of Bids Received LHC, Inc NCC Neumann Construction Co. Western Municipal Construction, Inc