Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Water and Sewer Main Replacement Bid Worksheet
Kalispell Water and Sewer Main Replacement - (#5352299) Owner: Kalispell MT, City of Solicitor: Kalispell MT, City of 01/05/2023 02:00 PM MST Engineer Estimate Section Tit Line Item Item Code Item Description UofM Quantity Unit Price Extension SCHEDULE 1 $777,135.00 1 1.01 Project Mobilization (5% max) LS 1 $37,270.00 $37,270.00 2 1.02 Construction Surveys LS 1 $16,300.00 $16,300.00 3 1.03 Material Testing LS 1 $24,500.00 $24,500.00 4 1.04 Traffic Control - Devices DAY 45 $500.00 $22,500.00 5 1.05 Traffic Control - Flaggers DAY 10 $2,000.00 $20,000.00 6 1.06 Remove Asphalt (All Depths) SY 1153 $20.00 $23,060.00 7 1.07 Remove Curb LF 70 $10.00 $700.00 S 1.05 Remove and Reset Fence LF 50 $100.00 $5,000.00 9 1.09 Sewer Bypass Pumping LS 1 $65,100.00 $65,100.00 10 1.1 Remove Manhole EA S $1,800.00 $14,400.00 11 1.11 Remove Pipe LF 1095 $30.00 $32,940.00 12 1.12 Survey Monuments EA 2 $800.00 $1,600.00 13 1.13 Manhole -4S" Sanitary Sewer(4' Depth) EA 9 $6,800.00 $61,200.00 14 1.14 Additional Depth Manhole -4S"Sanitary Sewer VF 39 $250.00 $9,750.00 15 1.15 Pipe - Buried: 10" Sanitary Sewer Main (ASTM D3034 - SDR 35) LF 571 $230.00 $131,330.00 16 1.16 Pipe - Buried: S" Sanitary Sewer Main (PVC C900, DR 18) LF 113 $220.00 $24,860.00 17 1.17 Pipe - Buried: 10" Sanitary Sewer Main (PVC C900, DR 18) LF 191 $230.00 $43,930.00 18 1.15 Pipe - Buried: 12" Sanitary Sewer Main (PVC C900, DR 18) LF 223 $250.00 $55,750.00 19 1.19 Existing Sewer Service -4"- Connect to New Main EA 18 $3,300.00 $59,400.00 20 1.2 Existing Sewer Service-6"- Connect to New Main EA 5 $4,000.00 $20,000.00 21 1.21 Existing Sanitary Sewer Main Connection EA 7 $3,500.00 $24,500.00 22 1.22 Type II Bedding LF 275 $15.00 $4,125.00 23 1.23 Flowable Fill- Trench Backfill(Per Crossing) EA 2 $3,200.00 $6,400.00 24 1.24 Select Subbase Gravel -9"Thick CY 290 $45.00 $13,050.00 25 1.25 Crushed Base Course Gravel -6"Thick CY 200 $50.00 $10,000.00 26 1.26 Asphalt Surfacing -4"Thick TON 260 $140.00 $36,400.00 27 1.27 Concrete Curb LF 70 $50.00 $3,500.00 28 1.25 Concrete Collar EA 9 $650.00 $5,850.00 29 1.29 Vegetation Restoration - Lawn LS 1 $3,720.00 $3,720.00 SCHEDULE 2 (Must also complete Additive Alternate No. 1) $3,025,970.00 31 2.01 Project Mobilization (5% max) LS 1 $144,090.00 $144,090.00 32 2.02 Construction Surveys LS 1 $63,310.00 $63,310.00 33 2.03 Material Testing LS 1 $93,530.00 $93,530.00 34 2.04 Traffic Control - Devices DAY 75 $500.00 $37,500.00 35 2.05 Traffic Control - Flaggers DAY 25 $2,000.00 $50,000.00 36 2.06 Temporary Water Supply LS 1 $5,000.00 $5,000.00 37 2.07 Remove Asphalt (All Depths) SY 6880 $20.00 $137,600.00 38 2.05 Remove Concrete (All Depths) SF 3050 $5.00 $15,250.00 39 2.09 Remove Curb LF 320 $10.00 $3,200.00 40 2.1 Remove Tree or Stump (6" DBH and Larger) EA 2 $600.00 $1,200.00 41 2.11 Remove and Reset Fence LF 20 $100.00 $2,000.00 42 2.12 Remove Fire Hydrant EA 12 $1,200.00 $14,400.00 43 2.13 Remove Pipe LF 460 $30.00 $13,800.00 44 2.14 Survey Monuments EA 1 $800.00 $800.00 45 2.15 Water Main Vertical Adjustment EA 3 $8,200.00 $24,600.00 46 2.16 Existing Water Main Connection EA S $5,000.00 $40,000.00 47 2.17 Pipe - Buried: S" Water Main (PVC C900, DR 18) LF 240 $170.00 $40,800.00 48 2.15 Pipe - Buried: 12" Water Main (PVC C900, DR 18) LF 4360 $240.00 $1,046,400.00 49 2.19 Pipe - Buried: 14" Water Main (PVC C900, DR 18) LF 20 $400.00 $8,000.00 50 2.2 Valve - Buried: S" Gate Valve EA 6 $3,800.00 $22,800.00 51 2.21 Valve - Buried: 12" Gate Valve EA 28 $7,000.00 $196,000.00 52 2.22 Valve - Buried: 14" Butterfly Valve EA 2 $9,000.00 $18,000.00 53 2.23 Fire Hydrant Assembly EA 12 $7,400.00 $88,800.00 54 2.24 New Water Service - Meter Pit without Meter EA 124 $3,500.00 $434,000.00 55 2.25 Type II Bedding LF 1000 $20.00 $20,000.00 56 2.26 Flowable Fill- Trench Backfill(Per Crossing) EA 9 $3,200.00 $28,800.00 57 2.27 Select Subbase Gravel -9"Thick CY 1350 $45.00 $62,100.00 58 2.28 Crushed Base Course Gravel -6"Thick CY 920 $50.00 $46,000.00 Sandry Construction Unit Price Extension $804,901.00 $35,814.00 $35,814.00 $2,850.00 $2,850.00 $10,000.00 $10,000.00 $487.00 $21,915.00 $2,243.00 $22,430.00 $9.00 $10,377.00 $9.00 $630.00 $150.00 $7,500.00 $45,161.00 $45,161.00 $1,238.00 $9,904.00 $12.00 $13,176.00 $1,740.00 $3,480.00 $8,646.00 $77,814.00 $490.00 $19,110.00 $165.00 $94,215.00 $162.00 $18,306.00 $197.00 $37,627.00 $214.00 $47,722.00 $5,901.00 $106,218.00 $6,666.00 $33,330.00 $2,908.00 $20,356.00 $25.00 $7,700.00 $3,541.00 $7,082.00 $52.00 $23,780.00 $90.00 $18,000.00 $280.00 $72,800.00 $60.00 $4,200.00 $1,537.00 $13,833.00 $19,571.00 $19,571.00 $0.00 S & L Underground, Unit Price Extension $898,929.00 $44,000.00 $44,000.00 $20,000.00 $20,000.00 $25,000.00 $25,000.00 $1,500.00 $67,500.00 $1,500.00 $15,000.00 $16.00 $18,448.00 $26.00 $1,820.00 $45.00 $2,400.00 $55,000.00 $55,000.00 $650.00 $5,200.00 $12.00 $13,176.00 $2,500.00 $5,000.00 $7,500.00 $67,500.00 $150.00 $5,850.00 $275.00 $157,025.00 $285.00 $32,205.00 $300.00 $57,300.00 $325.00 $72,475.00 $2,600.00 $46,800.00 $3,400.00 $17,000.00 $5,800.00 $40,600.00 $26.00 $7,150.00 $5,000.00 $10,000.00 $47.00 $13,630.00 $52.00 $10,400.00 $195.00 $50,700.00 $75.00 $5,250.00 $500.00 $4,500.00 $28,000.00 $28,000.00 $3,678,520.00 $180,000.00 $180,000.00 $35,000.00 $35,000.00 $45,000.00 $45,000.00 $1,500.00 $112,500.00 $1,500.00 $37,500.00 $300,000.00 $300,000.00 $16.00 $110,050.00 $16.00 $48,800.00 $15.00 $4,800.00 $1,200.00 $2,400.00 $45.00 $960.00 $1,800.00 $21,600.00 $12.00 $5,520.00 $2,500.00 $2,500.00 $18,000.00 $54,000.00 $8,000.00 $64,000.00 $255.00 $61,200.00 $278.00 $1,212,080.00 $345.00 $6,900.00 $2,600.00 $15,600.00 $4,850.00 $135,800.00 $8,500.00 $17,000.00 $9,500.00 $114,000.00 $3,800.00 $471,200.00 $26.00 $26,000.00 $5,000.00 $45,000.00 $47.00 $64,860.00 $52.00 $47,840.00 NCC Neumann Construction Co. Unit Price Extension $991,990.60 $45,000.00 $45,000.00 $52,000.00 $52,000.00 $47,500.00 $47,500.00 $395.00 $17,775.00 $2,300.00 $23,000.00 $6.70 $7,725.10 $19.00 $1,330.00 $65.00 $3,250.00 $32,500.00 $32,500.00 $2,450.00 $19,600.00 $12.50 $13,725.00 $4,400.00 $8,800.00 $8,650.00 $77,850.00 $180.00 $7,020.00 $290.50 $165,875.50 $305.00 $34,465.00 $322.00 $61,502.00 $341.00 $76,043.00 $7,200.00 $129,600.00 $8,430.00 $42,150.00 $2,650.00 $18,550.00 $25.00 $7,700.00 $2,850.00 $5,700.00 $56.00 $16,240.00 $62.00 $12,400.00 $160.00 $41,600.00 $33.00 $2,310.00 $920.00 $8,280.00 $12,500.00 $12,500.00 $0.00 JR CIVIL LLC LHC, Inc Unit Price Extension Unit Price Extension $943,710.00 $0.00 $47,180.00 $47,180.00 $45,100.00 $45,100.00 $22,397.00 $22,397.00 $700.00 $31,500.00 $2,015.00 $20,150.00 $10.00 $11,530.00 $30.00 $2,100.00 $54.00 $2,700.00 $36,309.00 $36,309.00 $5,800.00 $46,400.00 $75.00 $82,350.00 $1,304.00 $2,608.00 $6,328.00 $56,952.00 $1,202.00 $46,878.00 $145.00 $82,795.00 $250.00 $28,250.00 $260.00 $49,660.00 $293.00 $65,339.00 $3,200.00 $57,600.00 $4,200.00 $21,000.00 $4,574.00 $32,018.00 $69.00 $18,975.00 $5,103.00 $10,206.00 $50.00 $23,200.00 $55.00 $17,000.00 $190.00 $49,400.00 $52.00 $3,640.00 $2,443.00 $21,987.00 $8,486.00 $8,486.00 $3,560,247.00 $3,048,263.35 $178,012.00 $178,012.00 $146,085.00 $146,085.00 $50,170.00 $50,170.00 $28,160.00 $28,160.00 $13,759.00 $13,759.00 $67,650.00 $67,650.00 $858.00 $64,350.00 $578.48 $43,386.00 $2,015.00 $50,375.00 $1,647.29 $41,182.25 $7,278.00 $7,278.00 $31,770.00 $31,770.00 $5.00 $55,040.00 $25.95 $199,176.00 $9.00 $27,450.00 $5.53 $26,016.50 $23.00 $7,360.00 $35.33 $11,305.60 $2,368.00 $4,736.00 $1,480.00 $2,960.00 $57.00 $1,740.00 $71.13 $1,422.60 $1,066.00 $12,792.00 $1,506.00 $18,072.00 $113.00 $51,980.00 $65.92 $31,703.20 $1,304.00 $1,304.00 $1,233.00 $1,233.00 $7,016.00 $21,048.00 $5,252.00 $15,756.00 $7,782.00 $62,256.00 $1,506.00 $12,048.00 $115.00 $27,600.00 $198.49 $47,637.60 $170.00 $741,200.00 $168.08 $732,828.80 $198.00 $3,960.00 $726.03 $14,520.60 $3,677.00 $22,062.00 $2,431.00 $14,586.00 $6,724.00 $188,272.00 $4,520.00 $126,560.00 $9,619.00 $19,238.00 $5,689.00 $11,378.00 $13,198.00 $158,376.00 $10,898.00 $130,776.00 $7,729.00 $958,396.00 $6,288.00 $779,712.00 $69.00 $69,000.00 $10.14 $10,140.00 $5,102.00 $45,918.00 $2,717.00 $24,453.00 $73.00 $100,740.00 $37.53 $51,791.40 $76.00 $69,920.00 $53.13 $48,879.60 59 2.29 Asphalt Surfacing- 4" Thick TON 1740 $140.00 $243,600.00 $155.00 $269,700.00 $166.00 $288,840.00 $117.16 $203,858.40 60 2.3 Concrete Curb LF 320 $50.00 $16,000.00 $75.00 $24,000.00 $51.00 $16,320.00 $43.29 $13,852.80 61 2.31 Concrete Collar EA 48 $650.00 $31,200.00 $500.00 $24,000.00 $2,431.00 $116,688.00 $500.00 $24,000.00 62 2.32 Concrete Flatwork - 4" Thick with Base Gravels SF 2440 $20.00 $48,800.00 $16.00 $39,040.00 $27.00 $65,880.00 $17.88 $43,627.20 63 2.33 Concrete Flatwork - 6" Thick with Base Gravels SF 610 $25.00 $15,250.00 $24.00 $14,640.00 $29.00 $17,690.00 $16.75 $10,235.80 64 2.34 Vegetation Restoration- Lawn (for water services) LS 1 $13,140.00 $13,140.00 $65,000.00 $65,000.00 $40,497.00 $40,497.00 $81,500.00 $81,500.00 SCHEDULE 3 (Must also complete Additive Alternate No. 2) $884,997.00 $0.00 $1,007,350.00 $0.00 $1,058,485.00 $0.00 65 3.01 Project Mobilization (5% max) LS 1 $42,280.00 $42,280.00 $50,000.00 $50,000.00 $52,924.00 $52,924.00 66 3.02 Construction Surveys LS 1 $21,000.00 $21,000.00 $18,000.00 $18,000.00 $48,425.00 $48,425.00 67 3.03 Material Testing LS 1 $31,400.00 $31,400.00 $22,000.00 $22,000.00 $35,860.00 $35,860.00 68 3.04 Traffic Control - Devices DAY 40 $500.00 $20,000.00 $1,500.00 $60,000.00 $715.00 $28,600.00 69 3.05 Traffic Control - Flaggers DAY 15 $2,000.00 $30,000.00 $1,500.00 $22,500.00 $2,015.00 $30,225.00 70 3.06 Remove Asphalt (All Depths) SY 1369 $20.00 $27,380.00 $16.00 $21,904.00 $10.00 $13,690.00 71 3.07 Remove Concrete (All Depths) SF 35 $5.00 $175.00 $16.00 $560.00 $30.00 $1,050.00 72 3.05 Remove Curb LF 160 $10.00 $1,600.00 $15.00 $2,400.00 $23.00 $3,680.00 73 3.09 Sewer Bypass Pumping LS 1 $83,700.00 $83,700.00 $85,000.00 $85,000.00 $42,184.00 $42,184.00 74 3.1 Remove Manhole EA 5 $1,800.00 $9,000.00 $650.00 $3,250.00 $6,293.00 $31,465.00 75 3.11 Remove Pipe LF 918 $30.00 $27,540.00 $12.00 $11,016.00 $52.00 $47,736.00 76 3.12 Survey Monuments EA 3 $800.00 $2,400.00 $2,500.00 $7,500.00 $1,304.00 $3,912.00 77 3.13 Manhole -4S"Sanitary Sewer EA 6 $6,800.00 $40,800.00 $7,500.00 $45,000.00 $6,327.00 $37,962.00 78 3.14 Additional Depth Manhole -4S"Sanitary Sewer VF 12 $250.00 $3,000.00 $150.00 $1,800.00 $1,248.00 $14,976.00 79 3.15 Pipe - Buried: S" Sanitary Sewer Main (ASTM D3034 - SDR 35) LF 1001 $220.00 $220,220.00 $268.00 $268,268.00 $285.00 $285,285.00 SO 3.16 Pipe- Trenchless Technology Installation LF 226 $195.00 $44,070.00 $310.00 $70,060.00 $250.00 $56,500.00 81 3.17 Existing Sewer Service-4"- Connect to New Main EA 10 $3,300.00 $33,000.00 $2,600.00 $26,000.00 $2,380.00 $23,800.00 82 3.15 Existing Sewer Service-6"- Connect to New Main EA 24 $4,000.00 $96,000.00 $3,400.00 $81,600.00 $2,580.00 $61,920.00 83 3.19 Existing Sanitary Sewer Main Connection EA 5 $3,500.00 $17,500.00 $5,800.00 $29,000.00 $4,767.00 $23,835.00 84 3.2 Type 11 Bedding LF 250 $15.00 $3,750.00 $26.00 $6,500.00 $69.00 $17,250.00 85 3.21 Flowable Fill- Trench Backfill(Per Crossing) EA 2 $3,200.00 $6,400.00 $5,000.00 $10,000.00 $5,103.00 $10,206.00 86 3.22 Stabilization Fabric SY 1369 $3.00 $4,107.00 $5.00 $10,952.00 $4.00 $5,476.00 87 3.23 Select Subbase Gravel -9"Thick CY 350 $45.00 $15,750.00 $47.00 $16,450.00 $50.00 $28,000.00 SS 3.24 Crushed Base Course Gravel -6"Thick CY 230 $50.00 $11,500.00 $52.00 $11,960.00 $55.00 $19,550.00 89 3.25 Asphalt Surfacing -4"Thick TON 310 $140.00 $43,400.00 $195.00 $60,450.00 $180.00 $55,800.00 90 3.26 Concrete Curb LF 278 $50.00 $13,900.00 $75.00 $20,850.00 $55.00 $15,290.00 91 3.27 Concrete Collar EA 7 $650.00 $4,550.00 $500.00 $3,500.00 $2,447.00 $17,129.00 92 3.25 Concrete Flatwork - 4" Thick with Base Gravels SF 35 $20.00 $700.00 $16.00 $560.00 $70.00 $2,450.00 93 3.29 Concrete Flatwork - 6" Thick with Base Gravels SF 1015 $25.00 $25,375.00 $15.00 $18,270.00 $25.00 $28,420.00 94 3.3 Vegetation Restoration - Lawn LS 1 $4,500.00 $4,500.00 $22,000.00 $22,000.00 $14,885.00 $14,885.00 Additive Alternate 1 $1,863,295.00 $0.00 $2,943,340.00 $0.00 $2,294,874.00 $2,125,413.50 96 AA1.01 Project Mobilization (5% max) LS 1 $88,700.00 $88,700.00 $140,000.00 $140,000.00 $49,930.00 $49,930.00 $48,650.00 $48,650.00 97 AA1.02 Construction Surveys LS 1 $56,400.00 $56,400.00 $85,000.00 $85,000.00 $30,240.00 $30,240.00 $34,160.00 $34,160.00 98 AA1.03 Material Testing LS 1 $79,600.00 $79,600.00 $45,000.00 $45,000.00 $17,521.00 $17,521.00 $31,955.00 $31,955.00 99 AA1.04 Traffic Control - Devices DAY 55 $500.00 $27,500.00 $1,500.00 $82,500.00 $819.00 $45,045.00 $578.48 $31,816.40 100 AA1.05 Traffic Control - Flaggers DAY 20 $2,000.00 $40,000.00 $1,500.00 $30,000.00 $2,015.00 $40,300.00 $1,647.29 $32,945.80 101 AA1.06 Remove Asphalt (All Depths) SY 10565 $15.00 $162,975.00 $16.00 $173,840.00 $5.00 $86,920.00 $41.94 $455,678.10 102 AA1.07 Remove Concrete (All Depths) SF 1720 $5.00 $8,600.00 $16.00 $27,520.00 $9.00 $15,480.00 $7.36 $12,659.20 103 AA1.08 Remove Curb LF 2220 $10.00 $22,200.00 $15.00 $33,300.00 $22.00 $48,840.00 $52.37 $116,261.40 104 AA1.09 Remove Inlet EA 9 $1,500.00 $13,500.00 $650.00 $5,850.00 $1,149.00 $10,341.00 $795.00 $7,155.00 105 AA1.10 Remove Manhole EA 2 $1,800.00 $3,600.00 $650.00 $1,300.00 $2,250.00 $4,500.00 $1,215.00 $2,430.00 106 AA1.11 Remove Pipe LF 265 $30.00 $7,950.00 $65.00 $17,225.00 $54.00 $14,310.00 $41.01 $10,867.65 107 AA1.12 Survey Monuments EA 3 $800.00 $2,400.00 $2,500.00 $7,500.00 $1,304.00 $3,912.00 $1,233.00 $3,699.00 108 AA1.13 Inlet -30"Storm Drain EA 20 $2,600.00 $52,000.00 $365.00 $7,300.00 $3,695.00 $73,900.00 $3,965.00 $79,300.00 109 AA1.14 Relocate Existing Storm Inlet EA 1 $800.00 $800.00 $4,500.00 $4,500.00 $5,077.00 $5,077.00 $2,342.00 $2,342.00 110 AA1.15 Manhole -4S"Storm Manhole EA 5 $4,000.00 $20,000.00 $7,500.00 $37,500.00 $6,498.00 $32,490.00 $5,036.00 $25,180.00 111 AA1.16 Manhole -60"Storm Manhole EA 1 $6,000.00 $6,000.00 $9,500.00 $9,500.00 $6,650.00 $6,650.00 $5,044.00 $5,044.00 112 AA1.17 Pipe - Buried: S" Storm Sewer Main (ASTM D3034 - SDR 35) LF 410 $200.00 $82,000.00 $210.00 $86,100.00 $77.00 $31,570.00 $127.99 $52,475.90 113 AA1.18 Pipe - Buried: 12" Storm Sewer Main (ASTM D3034 - SDR 35) LF 840 $210.00 $176,400.00 $268.00 $225,120.00 $106.00 $89,040.00 $119.45 $100,338.00 114 AA1.19 Pipe - Buried: 24" Storm Sewer Main (ASTM D3034 - SDR 35) LF 10 $320.00 $3,200.00 $285.00 $2,850.00 $299.00 $2,990.00 $526.87 $5,268.70 115 AA1.20 Adjust Manhole to Grade EA 11 $800.00 $8,800.00 $250.00 $2,750.00 $601.00 $6,611.00 $630.00 $6,930.00 116 AA1.21 Adjust Inlet to Grade EA 1 $600.00 $600.00 $500.00 $500.00 $1,884.00 $1,884.00 $650.00 $650.00 117 AA1.22 Stabilization Fabric SY 19390 $2.00 $38,780.00 $5.00 $155,120.00 $2.00 $38,780.00 $1.05 $20,941.20 118 AA1.23 Select Subbase Gravel -9"Thick CY 3545 $45.00 $159,525.00 $47.00 $166,615.00 $72.00 $255,240.00 $37.53 $133,043.85 119 AA1.24 Crushed Base Course Gravel -6"Thick CY 2450 $50.00 $122,500.00 $65.00 $159,250.00 $76.00 $186,200.00 $53.13 $130,168.50 120 AA1.25 Asphalt Surfacing -4"Thick TON 2250 $120.00 $273,600.00 $195.00 $444,600.00 $162.00 $369,360.00 $117.16 $267,124.80 121 AA1.26 Concrete Curb LF 5510 $25.00 $212,750.00 $75.00 $638,250.00 $51.00 $434,010.00 $29.15 $248,066.50 122 AA1.27 Concrete Collar EA 17 $650.00 $11,050.00 $500.00 $8,500.00 $2,437.00 $41,429.00 $909.00 $15,453.00 123 AA1.28 Concrete Flatwork-4" Thick with Base Gravels SF 3540 $15.00 $57,600.00 $16.00 $61,440.00 $25.00 $96,000.00 $15.01 $69,158.40 124 AA1.29 Concrete Flatwork-6" Thick with Base Gravels SF 2605 $15.00 $39,075.00 $15.00 $46,890.00 $26.00 $67,730.00 $16.96 $44,180.80 125 AA1.30 Concrete Flatwork - S" Thick with Base Gravels SF 3530 $15.00 $57,450.00 $24.00 $91,920.00 $25.00 $107,240.00 $16.71 $63,999.30 126 AA1.31 Truncated Domes EA 20 $400.00 $8,000.00 $2,400.00 $48,000.00 $1,042.00 $20,840.00 $325.00 $6,500.00 127 AA1.32 Reset Existing Sign on New Post EA 20 $300.00 $6,000.00 $1,500.00 $30,000.00 $784.00 $15,680.00 $641.00 $12,820.00 128 AA1.33 New Sign EA 1 $600.00 $600.00 $2,600.00 $2,600.00 $15,498.00 $15,498.00 $941.00 $941.00 129 AA1.34 Vegetation Restoration - Lawn LS 1 $13,140.00 $13,140.00 $65,000.00 $65,000.00 $29,316.00 $29,316.00 $47,210.00 $47,210.00 Additive Alternate 2 $1,155,510.00 $0.00 $1,265,822.00 $0.00 $1,075,378.00 $0.00 130 AA2.01 Project Mobilization (5% max) LS 1 $55,290.00 $55,290.00 $60,000.00 $60,000.00 $40,639.00 $40,639.00 140 AA2.02 Construction Surveys LS 1 $23,500.00 $23,500.00 $25,000.00 $25,000.00 $32,105.00 $32,105.00 150 AA2.03 Material Testing LS 1 $35,300.00 $35,300.00 $18,000.00 $18,000.00 $9,434.00 $9,434.00 160 AA2.04 Traffic Control - Devices DAY 50 $500.00 $25,000.00 $1,500.00 $75,000.00 $549.00 $27,450.00 170 AA2.05 Traffic Control - Flaggers DAY 15 $2,000.00 $30,000.00 $1,500.00 $22,500.00 $2,015.00 $30,225.00 180 AA2.06 Remove Asphalt (All Depths) SY 1525 $20.00 $36,500.00 $16.00 $29,200.00 $5.00 $14,600.00 190 AA2.07 Sewer Bypass Pumping LS 1 $94,000.00 $94,000.00 $85,000.00 $85,000.00 $32,309.00 $32,309.00 200 AA2.08 Remove Manhole EA 5 $1,800.00 $9,000.00 $650.00 $3,250.00 $2,250.00 $11,250.00 210 AA2.09 Remove Pipe LF 1549 $30.00 $46,470.00 $12.00 $18,588.00 $54.00 $83,646.00 220 AA2.10 Survey Monuments EA 5 $800.00 $4,000.00 $2,500.00 $12,500.00 $1,304.00 $6,520.00 230 AA2.11 Manhole -4S"Sanitary Sewer EA 5 $6,800.00 $34,000.00 $7,500.00 $37,500.00 $6,328.00 $31,640.00 240 AA2.12 Additional Depth Manhole -4S"Sanitary Sewer VF 27 $250.00 $6,750.00 $150.00 $4,050.00 $1,202.00 $32,454.00 250 AA2.13 Pipe - Buried: S" Sanitary Sewer Main (ASTM D3034 - SDR 35) LF 1425 $220.00 $313,500.00 $268.00 $381,900.00 $180.00 $256,500.00 260 AA2.14 Pipe - Buried: S" Sanitary Sewer Main (PVC C900, DR 18) LF 124 $220.00 $27,280.00 $275.00 $34,100.00 $142.00 $17,608.00 270 AA2.15 Existing Sewer Service -4"- Connect to New Main EA 12 $3,300.00 $39,600.00 $2,600.00 $31,200.00 $2,398.00 $28,776.00 280 AA2.16 Existing Sewer Service -6"- Connect to New Main EA 43 $4,000.00 $172,000.00 $3,400.00 $146,200.00 $2,786.00 $119,798.00 290 AA2.17 Existing Sanitary Sewer Main Connection EA 5 $3,500.00 $17,500.00 $5,800.00 $29,000.00 $4,615.00 $23,075.00 300 AA2.18 Type II Bedding LF 387 $15.00 $5,805.00 $26.00 $10,062.00 $69.00 $26,703.00 310 AA2.19 Flowable Fill -Trench Backfill or Pipe Encasement EA 1 $3,200.00 $3,200.00 $5,000.00 $5,000.00 $5,103.00 $5,103.00 320 AA2.20 Stabilization Fabric SY 1525 $3.00 $5,475.00 $5.00 $14,600.00 $2.00 $3,650.00 330 AA2.21 Select Subbase Gravel -9"Thick CY 460 $45.00 $20,700.00 $47.00 $21,620.00 $73.00 $33,580.00 340 AA2.22 Crushed Base Course Gravel -6"Thick CY 310 $50.00 $15,500.00 $52.00 $16,120.00 $76.00 $23,560.00 350 AA2.23 Asphalt Surfacing -4"Thick TON 410 $140.00 $57,400.00 $195.00 $79,950.00 $162.00 $66,420.00 360 AA2.24 Concrete Curb LF 346 $50.00 $17,300.00 $75.00 $25,950.00 $51.00 $17,646.00 370 AA2.25 Concrete Collar EA 5 $650.00 $3,250.00 $500.00 $2,500.00 $2,453.00 $12,265.00 380 AA2.26 Concrete Flatwork - 4" Thick with Base Gravels SY 2627 $20.00 $52,540.00 $16.00 $42,032.00 $25.00 $65,675.00 390 AA2.27 Vegetation Restoration - Lawn LS 1 $4,650.00 $4,650.00 $35,000.00 $35,000.00 $22,747.00 $22,747.00 Base Bid Total: $0.00 $0.00 $0.00 $0.00 $0.00 $0.00