Loading...
08-25-22 Site Development Review Committee MinutesSITE DEVELOPMENT REVIEW COMMITTEE SUMMARY Thursday, August 25, 2022 First Floor Conference Room 201 First Avenue East ATTENDING: Kari Barnhart, Planner II Keith Haskins, Deputy Public Works Director Chad Fincher, Parks Director Patrick Jentz, Engineer Shane Cooke, Building Inspector Rebecca Franke, MDT Jeff Clawson, Building Official Rick Parker, Commercial Plan Reviewer GUESTS: Wade Rademacher (Edge, LLC), Garrett Muonio HEAR THE PUBLIC: None PERFORMANCE BOND REMINDERS: Kalispell Foot and Ankle – 58 Village Loop (Expired 7/1/22) – Public Works needs record drawings. Clark Nissan/Hyundai – 2915/2955 Hwy 93 S (Expired 8/15) – Public Works inspected site last week. The storm pond still needs correction and the onsite manholes (private) are paved over. Project was conditionally approved pending completion of storm pond under previous owner who bonded for the pond. Flathead Warming Center – 889 N Meridian Rd (Expired 8/15) – They are working to complete work but paving and parking is not completed. Planning is in communication with them. Silverbrook Apts Phase 1 – 150 Day Lily Lane (Expired 8/15) – Public Works stated they are getting close; Parks hasn’t been to the site recently. Fourth & Zuri – 55 4th Ave WN (Expired 8/17) – Per Public Works, the drive approach and trail connection are still pending. Parks noticed a trench between the fence and the trail last week. Public Works stated it could be Sandry making the trench. They are not done. Stillwater Crossing Apts – 430 Stillwater (Expired 8/22) – They are bringing a new bond to replace the expired one. Chipotle – 2264 Hwy 93 N (Expires 8/31) – And Taco Bell – Parks stated that the Chipotle should be done but Taco Bell is not due to possible firing of their landscaper. Parks will check today. Public Works added Bergman Phase 1 on South Meridian – They changed their project but never did their approach onto Meridian and there is no bond in place. Planning will make a note of it. Planning is still reviewing expired bonds. OLD BUSINESS: The Silos Ph 2 (Building D, E, F & G)- 655 Center St; 3 new multifamily buildings and clubhouse – Planning received comments from Joe Gilpin for his thoughts on trail crossings. He did not agree with their current proposal and sent a site plan with his proposals. Parks requested conduit under the crossings from Ruis & Jackola in case of future irrigation and controller wire repair. Gilpin commented that the pavement should not be stamped so it would match the rest of the trail and that there is too much parking. Public Works is still waiting on pre-treatment comments and will be sending comments on latest plans. DEQ submittal has not been received. Plan Reviewer will be reviewing this soon. This will be on the agenda next week. The Harper- 1280 Highway 2 E; new 40-unit multifamily development – Nothing new; Plan Review has comments out. This will be on the agenda next week. Jiffy Lube- 1290 Highway 2 E; new auto service/repair facility – Nothing new; Plan Review has comments out. This will be on the agenda next week. Diamond Aire - 1893 Airport Rd; addition to existing hanger – Owner is very ill and has likely put the project on hold. Removing from agenda while project is on hold. Parkland Meadows – Airport Rd; 2 new multifamily apartment buildings (Buildings A&B) – Parks spoke with Jackola regarding landscaping and POA maintenance. They may be landscaping in phases; Parks told them they will need to resubmit to Site Review. Final Plat is still pending. Public Works has reviewed as sub-phases in some discussions with MDT due to possible future MDT projects. Jackola is working on Parks’ comments. Public Works gave approval for Phase 1, DEQ, and City excluding lift station drawings and electrical. They still need to go through Structural and Mechanical but they can start on water, sewer, and storm. This will be on the agenda next week. Skip’s Hangar – 20 Ryan Lane; new hangar – They will call Planning to determine who it was that told them they were could be no construction by the tie downs. This will be on the agenda next week. Gateway Community Center – 1203 Hwy 2 W – parking lot remodel – Nothing new. This will be on the agenda next week. Fed Ex Expansion – 165 Schoolhouse Loop; 96,256 SF expansion to existing FedEx Building – Nothing new. This will be on the agenda next week. NW MT Head Start – 79 7th Ave EN; addition – Public Works is waiting on storm water routing. This will be on the agenda next week. Eagle Valley Ranch Apartments – Bldgs E,F,G&H – 2000 Jefferson Blvd – Public Works sent comments out 8/15; no response has been received from them. Public Works may be reviewing DEQ. This will be on the agenda next week. Creekside Commons – Glenwood Dr; new apartment building – Public Works sent comments out 8/12. This will be on the agenda next week. Flathead County Courthouse West – 935 1st Ave W; adding enclosed pedestrian walkway – Public Works has still not received the letter from the County. Planning will follow up on letter status. This will be on the agenda next week. Laird Noller Truck & RV – 3178 Hwy 93 S; new truck & RV service center – Public Works has still not received a complete submittal. This will be on the agenda next week. Silverbrook Garages – updated site plan/garage layout – Nothing new. This will be on the agenda next week. NEW BUSINESS: None. OTHER COMMENTS: Taco Bell- 535 E Idaho St; building remodel and parking lot modification – They will not be replacing the parking lot due to cost. Works would not require a reimbursable deposit. Public Works review fees would go under the building permit. MDT will probably still need an encroachment permit or agreement. Plan Review will look at ADA requirements. Parks will require an updated landscape plan to confirm compliance. Public Works to recommend new sidewalks and that they coordinate with MDT. Meridian Apartments – 50 Meridian Ct; new 36-unit multifamily building (Building E) – Parks sent Public Works comments regarding backflow. DEQ approval is still pending. The meeting was adjourned at 10:35 am. cc: Police City Manager City Clerk Building Fire Community Development Planning Parks Public Works MDT