Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Sidewalk and Curbing Bid Tab Sheet 2022
Sidewalk and Curbing Construction for the Year Ending December 31,2022 (#8147928) Owner: Kalispell MT, City of Solicitor: Kalispell MT, City of 03/24/2022 04:00 PM MDT Sandon Knife River Engineer Estimate construction co Corporation - Line Item Item Coc Item Description UofM Quant Unit Price Extension Unit Price Extension Unit Price Extension $0.00 $6,704.10 $13,223.05 1 1 Project Mobilization LS 1 $4,200.00 $4,200.00 $10,500.00 $10,500.00 2.A 2.A 4" Concrete Pavement SF 1 $11.30 $11.30 $16.00 $16.00 2.B 12.B 4" Concrete Pavement SF 1 $7.50 $7.50 $11.00 $11.00 2.0 2.0 4" Concrete Pavement SF 1 $6.30 $6.30 $9.50 $9.50 3 3 6" Concrete Pavement SF 1 $9.50 $9.50 $17.50 $17.50 4 4 8" Concrete Pavement SF 1 $18.40 $18.40 $18.65 $18.65 5.A 5.A Concrete Curb & Gutte LF 1 $24.00 $24.00 $45.00 $45.00 5.B 5.B Concrete Curb & Gutte LF 1 $21.00 $21.00 $35.00 $35.00 6.A 6.A Concrete Standup CurL LF 1 $22.00 $22.00 $42.00 $42.00 6.B 6.B Concrete Standup CurL LF 1 $21.00 $21.00 $32.00 $32.00 7 7 Concrete Valve Collar EA 1 $525.00 $525.00 $400.00 $400.00 8 8 Concrete Manhole Coll EA 1 $600.00 $600.00 $730.00 $730.00 9.A 9.A Concrete Removal, 4 Ir SF 1 $2.10 $2.10 $2.10 $2.10 9.B 9.B Concrete Removal, Mo SF 1 $2.75 $2.75 $3.50 $3.50 10 10 Concrete Curb Remova LF 1 $3.95 $3.95 $5.30 $5.30 11 11 4" Irrigation Sidewalk EA 1 $50.00 $50.00 $235.00 $235.00 12 12 Landscape - Reseed SF 1 $2.30 $2.30 $5.50 $5.50 13 13 Truncated Dome Panel EA 1 $310.00 $310.00 $300.00 $300.00 14 14 3/4" Crush Gravel CY 1 $90.00 $90.00 $105.50 $105.50 15 15 Irrigation Reset SF 1 $10.50 $10.50 $13.00 $13.00 16 16 Asphalt Removal SY 1 $31.50 $31.50 $11.50 $11.50 17 17 Inlet Apron EA 1 $650.00 $650.00 $600.00 $600.00 18 181 Laborer JHR 1 1 $85.00 1 $85.00 1 $85.00 1 $85.00 Base Bid Total $0.00 $6,704.10 $13,223.05