Loading...
Sidewalk and Curbing Bid Tab Sheet 2022Sidewalk and Curbing Construction for the Year Ending December 31,2022 (#8147928) Owner: Kalispell MT, City of Solicitor: Kalispell MT, City of 03/24/2022 04:00 PM MDT Sandon Knife River Engineer Estimate construction co Corporation - Line Item Item Coc Item Description UofM Quant Unit Price Extension Unit Price Extension Unit Price Extension $0.00 $6,704.10 $13,223.05 1 1 Project Mobilization LS 1 $4,200.00 $4,200.00 $10,500.00 $10,500.00 2.A 2.A 4" Concrete Pavement SF 1 $11.30 $11.30 $16.00 $16.00 2.B 12.B 4" Concrete Pavement SF 1 $7.50 $7.50 $11.00 $11.00 2.0 2.0 4" Concrete Pavement SF 1 $6.30 $6.30 $9.50 $9.50 3 3 6" Concrete Pavement SF 1 $9.50 $9.50 $17.50 $17.50 4 4 8" Concrete Pavement SF 1 $18.40 $18.40 $18.65 $18.65 5.A 5.A Concrete Curb & Gutte LF 1 $24.00 $24.00 $45.00 $45.00 5.B 5.B Concrete Curb & Gutte LF 1 $21.00 $21.00 $35.00 $35.00 6.A 6.A Concrete Standup CurL LF 1 $22.00 $22.00 $42.00 $42.00 6.B 6.B Concrete Standup CurL LF 1 $21.00 $21.00 $32.00 $32.00 7 7 Concrete Valve Collar EA 1 $525.00 $525.00 $400.00 $400.00 8 8 Concrete Manhole Coll EA 1 $600.00 $600.00 $730.00 $730.00 9.A 9.A Concrete Removal, 4 Ir SF 1 $2.10 $2.10 $2.10 $2.10 9.B 9.B Concrete Removal, Mo SF 1 $2.75 $2.75 $3.50 $3.50 10 10 Concrete Curb Remova LF 1 $3.95 $3.95 $5.30 $5.30 11 11 4" Irrigation Sidewalk EA 1 $50.00 $50.00 $235.00 $235.00 12 12 Landscape - Reseed SF 1 $2.30 $2.30 $5.50 $5.50 13 13 Truncated Dome Panel EA 1 $310.00 $310.00 $300.00 $300.00 14 14 3/4" Crush Gravel CY 1 $90.00 $90.00 $105.50 $105.50 15 15 Irrigation Reset SF 1 $10.50 $10.50 $13.00 $13.00 16 16 Asphalt Removal SY 1 $31.50 $31.50 $11.50 $11.50 17 17 Inlet Apron EA 1 $650.00 $650.00 $600.00 $600.00 18 181 Laborer JHR 1 1 $85.00 1 $85.00 1 $85.00 1 $85.00 Base Bid Total $0.00 $6,704.10 $13,223.05