Loading...
1st Ave Alley EN Sanitary Sewer Replacement Project Bid Tab Sheet1st Ave Alley EN Sanitary Sewer Replacement (#8198059) Owner: Kalispell MT, City of Solicitor: Kalispell MT, City of 05/19/2022 02:00 PM MDT Sandry NCC Neumann Engineer Estimate Construction Construction Co. Line Item Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Unit Price Extension $921, 344.00 $1,123, 647.00 $1, 318,447.50 1 1 Mobilization LS 1 $89,000.00 $89,000.00 $68,000.00 $68,000.00 $44,850.00 $44,850.00 21 2 Traffic Control BLOCK 1 5 $5,000.00 $25,000.00 $4,985.00 $24,925.00 $3,850.00 $19,250.00 3 3 Construction Surveying LS 1 $3,200.00 $3,200.00 $28,730.00 $28,730.00 $21,000.00 $21,000.00 4 4 8" SDR 35 PVC LF 1600 $200.00 $320,000.00 $260.00 $416,000.00 $332.00 $531,200.00 5 5 4' Basic Manhole EA 8 $4,670.00 $37,360.00 $4,862.00 $38,896.00 $8,750.00 $70,000.00 6 6 4' Additional Depth Manhole VF 50 $250.00 $12,500.00 $282.00 $14,100.00 $240.00 $12,000.00 71 7 4" Sanitary Sewer Service EA 1 50 $2,500.00 $125,000.00 $2,254.00 $112,700.00 $4,250.00 $212,500.00 81 8 6" Sanitary Sewer Service EA 5 $3,000.00 $15,000.00 $2,510.00 $12,550.00 $5,250.00 $26,250.00 9 9 Remove Manhole EA 4 $1,720.00 $6,880.00 $1,733.00 $6,932.00 $825.00 $3,300.00 10 10 Sanitary Bypass Pumping LS 1 $72,000.00 $72,000.00 $84,518.00 $84,518.00 $115,000.00 $115,000.00 11 11 Remove Concrete (All Depths) SF 1100 $8.00 $8,800.00 $2.42 $2,662.00 $4.20 $4,620.00 12 12 Remove Curb LF 150 $5.00 $750.00 $6.82 $1,023.00 $12.00 $1,800.00 131 131 Remove Pavement SY 2500 $15.00 $37,500.00 $33.97 $84,925.00 $5.20 $13,000.00 14 14 4" Asphalt Pavement SY 2500 $52.00 $130,000.00 $72.16 $180,400.00 $75.00 $187,500.00 15 15 Landscaping SY 104 $21.00 $2,184.00 $39.00 $4,056.00 $85.00 $8,840.00 16 16 Curb and Gutter LF 120 $25.00 $3,000.00 $50.00 $6,000.00 $36.00 $4,320.00 17 17 Straight Curb LF 100 $30.00 $3,000.00 $50.00 $5,000.00 $31.80 $3,180.00 181 18 4" Concrete Sidewalk SF 250 $11.00 $2,750.00 $21.00 $5,250.00 $12.80 $3,200.00 19 19 6" Concrete Sidewalk SF 850 $18.00 $15,300.00 $18.00 $15,300.00 $18.75 $15,937.50 20 20 Flowable Fill Crossing EA 2 $1,260.00 $2,520.00 $2,740.00 $5,480.00 $3,600.00 $7,200.00 21 21 Type 2 Bedding LF 500 $8.00 $4,000.00 $6.20 $3,100.00 $18.00 $9,000.00 22 22 Sanitary Sewer Connection EA 1 $5,600.00 $5,600.00 $3,100.00 $3,100.00 $4,500.00 $4,500.00 Additive Alternate 1 Total $233,150.00 $191,314.00 $325,657.50 1a 1a IMobilization LS 1 $22,000.00 $22,000.00 $2,500.00 $2,500.00 $18,500.00 $18,500.00 2a 12a ITraffic Control IBLOCK 1 1 $5,000.00 $5,000.00 $3,835.00 $3,835.00 $3,850.00 $3,850.00 3a 3a Construction Surveying LS 1 $4,000.00 $4,000.00 $2,954.00 $2,954.00 $8,850.00 $8,850.00 4a 4a 8" SDR 35 PVC LF 440 $200.00 $88,000.00 $182.00 $80,080.00 $332.00 $146,080.00 5a 5a 4' Basic Manhole EA 1 $4,670.00 $4,670.00 $3,666.00 $3,666.00 $8,750.00 $8,750.00 6a 6a 4' Additional Depth Manhole VF 6 $250.00 $1,500.00 $211.00 $1,266.00 $240.00 $1,440.00 7a 17a 4" Sanitary Sewer Service EA 12 $2,500.00 $30,000.00 $1,732.00 $20,784.00 $4,250.00 $51,000.00 9a 9a Remove Manhole EA 1 $1,720.00 $1,720.00 $1,333.00 $1,333.00 $825.00 $825.00 10a 10a Sanitary Bypass Pumping LS 1 $18,000.00 $18,000.00 $4,000.00 $4,000.00 $16,500.00 $16,500.00 11a 11a Remove Concrete (All Depths) SF 250 $8.00 $2,000.00 $1.86 $465.00 $4.25 $1,062.50 12a 12a Remove Curb LF 50 $5.00 $250.00 $5.21 $260.50 $20.00 $1,000.00 13a 113a I Remove Pavement SY 650 $15.00 $9,750.00 $26.13 $16,984.50 $5.20 $3,380.00 14a 14a 4" Asphalt Pavement SY 650 $52.00 $33,800.00 $61.00 $39,650.00 $75.00 $48,750.00 15a 15a Landscaping SY 10 $21.00 $210.00 $30.00 $300.00 $98.00 $980.00 17a 17a Straight Curb LF 50 $30.00 $1,500.00 $39.00 $1,950.00 $31.80 $1,590.00 18a 18a 4" Concrete Sidewalk SF 250 $11.00 $2,750.00 $30.00 $7,500.00 $12.80 $3,200.00 21a 121a, IType 2 Bedding LF 300 $8.00 $2,400.00 $4.75 $1,425.00 $18.00 $5,400.00 22a 122a Isanitary Sewer Connection EA 1 $5,600.00 $5,600.00 $2,361.00 $2,361.00 $4,500.00 $4,500.00 $921,344.00 $1,123,647.00 $1,318,447.50