Loading...
10-21-21 Site Development Review Committee MinutesSITE DEVELOPMENT REVIEW COMMITTEE SUMMARY Thursday, October 21, 2021 First Floor Conference Room 201 First Avenue East ATTENDING: Rachel Ezell, Planner II PJ Sorenson, Senior Planner Jarod Nygren, Planning Director Rick Parker, Commercial Plan Examiner Chad Fincher, Parks & Rec Director Tom Tabler, Senior Civil Engineer Dan Pearce, Fire Chief GUESTS: 3 HEAR THE PUBLIC: None PERFORMANCE BOND REMINDERS: Gateway Center North Parking Lot- 1203 Hwy 2 W; Parking lot improvements (PIA Extension 10/30/21; Letter of Credit) Copper Mountain Coffee Ph 1- 31 Three Mile Dr; Grading, paving, drainage facilities, signs, lighting, landscaping, record drawings (PIA Extension 10/30/21; Cashier’s check) Town Pump- 2910 Hwy 93 S; Building Demo, Curb, Gutter, Landscaping, RV Dump (PIA Extension 11/5/21; Performance Bond) The Cottages A&B at Immanuel Lutheran Communities- 189 & 191 Crestline Ave; grading, paving, sidewalks, curb and gutters, landscaping, irrigation, record drawings (PIA Expiration 11/1/21; Cashier’s check) Silverbrook Ph 2B-B- NW 1/4 Section 1 T28N R22W; infrastructure (PIA Expiration 11/5/21; Letter of Credit) G4 Wolfpack Properties LLC- 650 Wolfpack Way; USFS Storage Building, Extension of Wolfpack Way (PIA Expiration 11/7/21; Completion Bond) OLD BUSINESS: Kalispell Tap and Games - 2400 Hwy 93 S: remodel to arcade/tap house – Civil drawings have been submitted. Rachel has advised the owner that they are not allowed to remove any asphalt and a fence will need to be installed around the anticipated Phase 2. This will be on the agenda next week. Owl View Ph 2 Building 2 - 210 Sawyer Ln; new apartment building – Nothing new. This will be on the agenda next week. Penco - 2310 Hwy 93 S; building addition. Nothing new. This will be on the agenda next week. Northwestern Energy – 890 N Meridian; shop addition to existing building. Public Works has comments out. Building plans have not been received. This will be on the agenda next week. Black Kaiju/Black Rifle Coffee – 305-313 2nd Ave W; new coffee shop, remodeled office, studio, and residential apartment. Building has been in contact regarding ADA access as well as some discussion on Phase 2. This will be on the agenda next week. 3rd Ave East Apartments - 2015 3rd Ave E- 48-unit apartment complex – Parks & Public Works sent out comments, waiting on resubmittals. This will be on the agenda next week. Whitefish Credit Union - 2000 Hwy 93 S; new credit union with drive thru – Rachel still needs a letter from Hilton giving the ok to remove some of their parking spots. ARC required some additional landscaping; a new landscape plan has been submitted. Also need a letter from FAA with ok to build next to airport. Public Works needs an approval letter from MDT for connection to their stormwater system. This will be on the agenda next week. The Silos - 501 W Center St; Apartment buildings A&B – Public Works and zoning waiting on resubmittal. Planning is working on issuing licenses for encroachments. This will be on the agenda next week. Flathead Liquor Addition- 1121 Hwy 2 W; 880 sq ft storage addition – More discussion about parking spots. This will be on the agenda next week. Clark Hyundai Addition- 2955 Hwy 93 S; additions to existing dealership – Public Works is ready to sign off. Other departments are still under review. This will be on the agenda next week. NEW BUSINESS: PLANNING OFFICE ITEMS: OTHER DEPARTMENT ITEMS: The meeting was adjourned at 10:36 am. cc: Police City Manager City Clerk Bldg. Fire Comm. Dev. Planning Parks Public Works MDOT