RFQ/WWTP Equalization Basin Project Engineering ConsultantsSTATE OF MONTANA
FLATHEAD COUNTY
AFFIDAVIT OF PUBLICATION
MARY BOOTH BEING DULY
SWORN, DEPOSES AND SAYS: THAT SHE IS THE LEGAL
CLERK OF THE DAILY INTER LAKE A DAILY
NEWSPAPER OF GENERAL CIRCULATION, PRINTED AND
PUBLISHED IN THE CITY OF KALISPELL, IN THE
COUNTY OF FLATHEAD, STATE OF MONTANA, AND
THAT NO. 26934
LEGAL ADVERTISMENT WAS PRINTED AND
PUBLISHED IN THE REGULAR AND ENTIRE ISSUE OF
SAID PAPER, AND IN EACH AND EVERY COPY THEREOF
ON THE DATES OF APRIL 12, MAY 30, 2020
AND THE RATE CHARGED FOR THE ABOVE
PRINTING DOES NOT EXCEED THE MINIMUM
GOING RATE CHARGED TO ANY OTHER
ADVERTISER FOR THE SAME PUBLICATION,
SET IN THE SAME SIZE TYPE AND PUBLISHED
FOR THE SAME NUMBER OF INSERTIONS.
Subscribed and sworn to
Before me this, May 30, 2020
Dorothy I. Gle1wross
Notary Public for the State of Montana
Residing in Kalispell
My commission expires 9/12/2021
❑4o
tTGtF ❑OROTHY I GLENCROSS yc9°� Notary Public for the
Q State of Montana
N$ea9rjal Residing at KALISPELL, MT
s $ My Comrnission Expires
September 12, 2021
No. 26934
CITY OF KALISPELL
REQUEST FOR QUALIFICATIONS ENGINEERING CONSULTANTS FOR KALISPELL WWTP
EQUALIZATION BASIN PROJECT
Pursuant t❑ the authority granted to it under MCA 7-5-4301(2)(a)., the City of
Kalispell seeks to procure a qualified professional consulting engineer to perform
analysis and design services for the Kalispell Wastewater Treatment Plant
Equalization Basin Project. Please see full submittal requirements and details at
the City of Kalispell website at https://www.kalispell.com/bids.aspx
The Statement of Qualifications (SOQ) must be received by the City Clerk at 201
First Avenue East (PO Box 1997), Kalispell, Montana, by 5:00 p.m. local time, June
12, 2020.
Questions pertaining to the selection process should be directed to Susie Turner,
Public Works Director, at 406-758-7852 or sturner@kalispell.com and Aaron Losing,
Wastewater Treatment Plant Manager, at 406-871-6961 or alosing@kalispell.com.
A pre -submittal conference for the contract may be held at the Kalispell Wastewater
Treatment Plant Conference Room at 2001 Airport Road, Kalispell, MT on June 3, 2020
at 2:00 p.m. City staff will discuss the scope of work, general contract issues,
and respond t❑ questions from the attendees. Staff will be available t❑ respond to
individual inquiries regarding the project scope ❑utside of this pre -submittal
conference, however, attendance at this pre -submittal conference is highly
recommended.
2.1 Background Flow Equalization Basin (EQ) Alternative
The existing EQ basin is at operational limits for the current flows, with a storage
volume deficient of 240,000 gallons. Additional equalization volume is required to
provide the ability to continue consistent facility performance. This project was
identified in the 2019 WWTP Facility Plan update and consists of constructing one
75-FT diameter tank which provides 395,000 gallons ❑f additional equalization basin
storage. Design of the 75-FT diameter EQ tank will include considerations for
future conversion to a primary clarifier anticipated for the year 2030. Once the
75-FT diameter tank is converted to primary clarification (in the future), the
existing rectangular clarifiers adjacent to the existing EQ basin will be modified
for additional equalization basin capacity.
Aimee Brunckhorst
City Clerk & Communications Manager
City of Kalispell
April 12, May 30, 2020