Loading...
RFQ/WWTP Equalization Basin Project Engineering ConsultantsSTATE OF MONTANA FLATHEAD COUNTY AFFIDAVIT OF PUBLICATION MARY BOOTH BEING DULY SWORN, DEPOSES AND SAYS: THAT SHE IS THE LEGAL CLERK OF THE DAILY INTER LAKE A DAILY NEWSPAPER OF GENERAL CIRCULATION, PRINTED AND PUBLISHED IN THE CITY OF KALISPELL, IN THE COUNTY OF FLATHEAD, STATE OF MONTANA, AND THAT NO. 26934 LEGAL ADVERTISMENT WAS PRINTED AND PUBLISHED IN THE REGULAR AND ENTIRE ISSUE OF SAID PAPER, AND IN EACH AND EVERY COPY THEREOF ON THE DATES OF APRIL 12, MAY 30, 2020 AND THE RATE CHARGED FOR THE ABOVE PRINTING DOES NOT EXCEED THE MINIMUM GOING RATE CHARGED TO ANY OTHER ADVERTISER FOR THE SAME PUBLICATION, SET IN THE SAME SIZE TYPE AND PUBLISHED FOR THE SAME NUMBER OF INSERTIONS. Subscribed and sworn to Before me this, May 30, 2020 Dorothy I. Gle1wross Notary Public for the State of Montana Residing in Kalispell My commission expires 9/12/2021 ❑4o tTGtF ❑OROTHY I GLENCROSS yc9°� Notary Public for the Q State of Montana N$ea9rjal Residing at KALISPELL, MT s $ My Comrnission Expires September 12, 2021 No. 26934 CITY OF KALISPELL REQUEST FOR QUALIFICATIONS ENGINEERING CONSULTANTS FOR KALISPELL WWTP EQUALIZATION BASIN PROJECT Pursuant t❑ the authority granted to it under MCA 7-5-4301(2)(a)., the City of Kalispell seeks to procure a qualified professional consulting engineer to perform analysis and design services for the Kalispell Wastewater Treatment Plant Equalization Basin Project. Please see full submittal requirements and details at the City of Kalispell website at https://www.kalispell.com/bids.aspx The Statement of Qualifications (SOQ) must be received by the City Clerk at 201 First Avenue East (PO Box 1997), Kalispell, Montana, by 5:00 p.m. local time, June 12, 2020. Questions pertaining to the selection process should be directed to Susie Turner, Public Works Director, at 406-758-7852 or sturner@kalispell.com and Aaron Losing, Wastewater Treatment Plant Manager, at 406-871-6961 or alosing@kalispell.com. A pre -submittal conference for the contract may be held at the Kalispell Wastewater Treatment Plant Conference Room at 2001 Airport Road, Kalispell, MT on June 3, 2020 at 2:00 p.m. City staff will discuss the scope of work, general contract issues, and respond t❑ questions from the attendees. Staff will be available t❑ respond to individual inquiries regarding the project scope ❑utside of this pre -submittal conference, however, attendance at this pre -submittal conference is highly recommended. 2.1 Background Flow Equalization Basin (EQ) Alternative The existing EQ basin is at operational limits for the current flows, with a storage volume deficient of 240,000 gallons. Additional equalization volume is required to provide the ability to continue consistent facility performance. This project was identified in the 2019 WWTP Facility Plan update and consists of constructing one 75-FT diameter tank which provides 395,000 gallons ❑f additional equalization basin storage. Design of the 75-FT diameter EQ tank will include considerations for future conversion to a primary clarifier anticipated for the year 2030. Once the 75-FT diameter tank is converted to primary clarification (in the future), the existing rectangular clarifiers adjacent to the existing EQ basin will be modified for additional equalization basin capacity. Aimee Brunckhorst City Clerk & Communications Manager City of Kalispell April 12, May 30, 2020 MNAXLP