Resolution 4268 - Woodland Court Change Order1328 RESOLUTION NO. 4268 A RESOLUTION TO ALTER AND AMEND THE PLANS AND SPECIFICATIONS OF CONTRACT WITH PACK & COMPANY ON THE WOODLAND COURT PROJECT. WHEREAS, the City on November 14, 1995 did enter into a contract with Pack & Company of 2335 Highway 93 North, Kalispell, Montana for construction of the Woodland Court project, and WHEREAS, upon the advice and recommendation of Fred Phillips, who is the City's consultant on said project, certain changes and alterations of design and specifications have been found necessary and advisable and in the best interests of the City; and said changes and alterations could not have been necessarily foreseeable when the original design and specifications were prepared on this phase of the construction of the Woodland Court project, and said changes are contained in Exhibit "A", attached hereto and are by this reference made a part hereof; and WHEREAS, it appears in the best interests of the City to approve said changes and alterations, NOW THEREFORE, pursuant to the provisions of Section 7-5- 4306{1} MCA be it hereby resolved: 1. The alterations and modifications of the specifications and plans of the contract between the City of Kalispell and Pack & Company, dated April 30, 1996, as set out in Exhibit "A" attached hereto are hereby approved, and 2. As soon as the price to be paid for said alterations and modifications are agreed to in writing, signed by the contractor, as hereby approved by the Council, this approval thereof shall be in effect. PASSED AND APPROVED BY THE CITY C UNCIL AND MAYOR OF THE CITY OF KALISPELL THIS .3Rd DAY OF 1996. Douglas . Rauthe, Mayor ATTEST: 0—/ Debbie Gifforoor Clerk of Counci � 4� t 32 9 1 1 EXHIBIT "A" (:MANGE ORDER ORDER NO. 2 AGREEMENT DATE: 1/14/95 NAME OF PROJECT_ C OF KALiSPELL, MT _` "WOODLAND COURT PROJECT MT HOME MM5G300117/MT-CDBG-94HR-06 OWNER CITY f KALISPELL CONTRACTOR. PACK & CO. f NUPACI The following changes are hereby made to the CONTRACT 1. Change contract to a "Working Day Contract" for period 3/16/96 through the end of contract. Working days shall be defined as any day on which site conditions allow proceeding with the remaining work on the project. Justification: The contract reverted from a working day contract to a calendar day contract on 3/16/96. The Engineer has stopped work on the project due to soil conditions. The Contractor has completed work when conditions allow. The contract time will be based on the actual days worked Days on which conditions allow work to proceed that the Contractor chooses not to work wdl be counted against contract time. 2 Add "Connect Existing Water Service" to the contract. Justification: The water services were encountered on the South Woodland water main which were not located as part of utility locates and not shown on the plans. The Contractor was required to provide temporary water service as part of the contract. New connections constitute additional work. Cost of connecting eidsting services is based on hourly labor rates as specified in the contract, hourly equipment rates, invoiced material costs, and markup for allowable overhead and profit. . 1330- ORDER NO. 2 DATE: 4l39M -- AGREEMENT DATE- 11/14I95 The cost for cagnecting existing services is outlined in Exhibit A. The contract time is extended 1 days lor.Ahe water main adjustment work. The ' cost for connecting existing services is $1,16&01. 3, Add "Adjust Water Main" to the contract. Justification: The separation between the new sewer main and existing Green Acres Water System water main on Haven Drive and South Woodland was less than 12". The water main adjustment was required to provide separation in accordance with MDEQ regulations for water and sewer mains. Cost of the water main adjustment is based on hourly labor rates as specified in the contract, hourly equipment rates, invoiced material costs, and markup for allowable overhead and profit. The cost for the water crossing is outlined in Exhibit B. The contract time is extended 2 days for the water main adjustment work. Total cost for the water crossing is $8,261.11. 4, Add "Asphalt Pavement Replacement" to the Schedule I & II contract.. Justification: Asphalt pavement replacement for private driveways was not included in the contract for Schedule I and 11. Asphalt pavement replacement for street crossings is moved from Schedule III to Schedule I do II and quantities increased so work can be completed as soon as conditions permit. Estimated asphalt replacement is 500 square yards. Contract price for asphalt replacement is $10.00 per square yard. The contract time will be extended by the actual number of days for the asphalt pavement replacement work. 500 Sy * $10.00 / SY = $5,000.00 Change to CONTRACT PRICE: $ Original CONTRACT PRICE: $280,847.00 Current CONTRACT PRICE adjusted by previous CHANGE ORDER: $280.847.00 e 1 1 1 1331 s ORDER NO.._ AGREEMENT DATE: 11114M-- The CONTRACT PRICE due to this CHANGE ORDER will increase $14,4 LI The new CONTRAC'1`PRJC� including this CHANGE ORDER wiq be CHANGE of CONTRACT TIME: The CONTRACT TIME will increase from 60 days to 63 days, Adjustment for paving will be made when work is complete. Requested By: Recommended By- Accepted By: - .F11U y Jr a%,a a %.v. Hoskins, Inc. Al Thelen, City Manager, City of Kalispell • 1332 Kalispell Development Woodland Court Project Schedule I & Y Contract Pack & Co. Exhibit B Change Order 2 Additional work for water main adjustment, Haven Drive oescdpdm Materials 1 Gate Vale A Boat 2 Watsr made ktsulation 3 Fittings V 45 bends megalug 3/r saddle 314' Corp stop 4 V water pipe 5 we service pipe 6 Equipment Trash Pump Rental Pickup Truck Air Comp wl Jack Hammer Vibratory Roller 821 B Loader Case Excavator 590 Extendahoe non-DBA Dump Truck (waste haul) Dump Truck (AC haul) 7 Labor / Operators Operaw Laborer Laborer (AC Patch) non-DBA Dump Driver a Materials Non Shrink Backrill Concm W ele washed nods Pit Run Gravel 1-I/,V Crushed Gravel Asphalt 9 Resock - Familian NW coexhb.wkl 4 @ 32.45 10 Q 23.64 1 @ 24.58 1 @ 33.00 29 Q 2.38 5' 0 0.26 cost 15% markup 290.40 43.56 6720 10.06 129.80 19.47 236.40 35.46 24.58 3.69 33.00 4.95 E-1111-�111111111111111111111[-I�?� 1.30 0.20 83&96 77" 149.27 271.86 28.27 37.95 68.43 1.50 28.00 4.20 32.20 5 His @ $5.00 26.00 3.75 26.75 2 Hrs 0 $35 70.00 10.50 80.50 1.25 His 0 15.00 18.75 2.81 21.56 6 His Q $24.00 144.00 21.80 185.60 10 Firs i&SM00 550.00 82.50 6W.5t: 2.25 His 0 $20.00 45.00 6.75 51.75 18.75 Hrs Q $19.60 367.50 55.13 422.83 0.5 His @ $14.50 7.25 1.09 8.34 13.75 His @ S26.61 $93.39 5911 452.40 32.5 Hrs @ $24A8 780.96 117.15 "ILIS 6 Mrs @ $2422 145.32 21.00 167.12 19 His @ MAO 372.40 55.86 420.26 50 CY @ $45.00 2250.00 337.50 2587.50 1 CY @ $moo 62.00 9.30 71.30 29.08 CY @ tit0.75 312.61 46.89 359.50 38.25 CY @ $5.70 218.03 32.70 250.73 19.77 CY @ $8.25 163.10 24.47 187.57 9.5 Ton 0 $29.00 275.50 41.32 316.83 112.56 16.08 129.44 Total 6261.11 ✓ coexhb.wkl K94-46-4 1 1353 • Kalispell'Development Woodland Court Project Schedule I & 11 Contract Pack & Co. Exhibit A Change Order 2 Addition for oonnecting 3 exftting water srvices on South Woodt wl Drive Materiels Equipment Backhoe 3 Hrs @ $20.00 Compactor 3 Hrs @ $15 Operator 1.5 Hrs @ $28.61 Laborer 7.5 Hrs @ $24.03 Total c oexha.wkl K94-46--4 1 cost 15% markup Amount 687.51 103.13 790.64 60.00 9.00 69.00 45.00 6.75 51.75 42.92 6.44 49.36 180.23 27.03 207.26 1168.01 l