Loading...
Conrad Drive Water Main Replacement Project Bid Results TabulationConrad Dr Water Main Replacement Project (#6146553) Owner: Kalispell MT, City of Solicitor: Kalispell MT, City of 03/08/2019 01:30 PM MST Section Tit Line Item Item Code Item Description White's Civil Contracting LLC UofM Quantity Unit Price Sandry Construction Extension Unit Price Extension Base Bid $281,094.00 $382,705.00 1 1 Mobilization/Demobilization LS 1 $18,000.00 $18,000.00 $40,000.00 $40,000.00 2 2 Construction Traffic Control LS 1 $6,000.00 $6,000.00 $5,000.00 $51000.00 3 3 Construction Survey LS 1 $3,500.00 $3,500.00 $27,498.00 $27,498.00 4 4 Temporary Water LS 1 $71800.00 $7,800.00 $5,575.00 $5,575.00 5 5 8" C900 PVC water main LF 1276 $54.00 $68,904.00 $56.50 $72,094.00 6 6 6" C900 PVC Water Main LF 51 $50.00 $2,550.00 $49.00 $2,499.00 7 7 8" MJ Gate Valve EA 9 $1, 600.00 $14,400.00 $1, 865.00 $16, 785.00 8 8 6" MJ Gate Valve EA 2 $1,250.00 $2,500.00 $1,380.00 $2,760.00 9 9 Fire Hydrant EA 2 $3,750.00 $7,500.00 $2,840.00 $5,680.00 10 10 811x6" MJ Swivel Tee LS 2 $550.00 $1,100.00 $550.00 $1,100.00 11 11 8" MJ Tee EA 2 $400.00 $800.00 $685.00 $1,370.00 12 12 8" MJ Bend EA 14 $400.00 $51600.00 $530.00 $7,420.00 13 13 6" MJ Bend EA 6 $400.00 $2,400.00 $450.00 $2,700.00 14 14 811x6" Reducer EA 3 $400.00 $1,200.00 $300.00 $900.00 15 15 8" Water Main Connection EA 1 $1,800.00 $1,800.00 $2,175.00 $2,175.00 16 16 6" Water Main Connection EA 3 $11500.00 $4,500.00 $2,145.00 $6,435.00 17 17 Water Main Testing Requirements LS 1 $3,000.00 $3,000.00 $4,570.00 $4,570.00 18 18 1" Residential Service EA 1 $1,800.00 $1,800.00 $2,680.00 $2,680.00 19 19 Water Service for 350 College Ave EA 1 $5,000.00 $5,000.00 $6,995.00 $6,995.00 20 20 Water Service for 610 2nd ST E EA 1 $5,000.00 $51000.00 $7,045.00 $7,045.00 21 21 Woodland Ave Storm Sewer Crossing LS 1 $2,500.00 $2,500.00 $1,985.00 $1,985.00 22 22 Existing Road Removal SY 2631 $4.00 $101524.00 $14.00 $36,834.00 23 23 Fire Hydrant Salvage EA 1 $400.00 $400.00 $640.00 $640.00 24 24 4" Asphalt Roadway Restoration SY 2631 $36.00 $94,716.00 $40.00 $105,240.00 25 25 Type 2 Bedding LF 100 $18.00 $1,800.00 $2.40 $240.00 261 26 Landscape Island Restoration LS 1 $2,000.00 $2,000.00 $5,635.00 $5,635.00 27 27 Landscape Restoration LS 1 $2,500.00 $2,500.00 $1,600.00 $1,600.00 28 28 Exploratory Excavation HR 10 $180.00 $1,800.00 $350.00 $3,500.00 29 29 Abandon Existing Manhole EA 1 $500.00 $500.00 $3,530.00 $31530.00 30 30 Seal Pipe Ends 12" to 4" EA 4 $100.00 $400.00 $222.00 $888.00 31 31 Seal Pipe Ends Larger than 12" EA 4 $150.00 $600.00 $333.00 $1,332.00 Add Alternate 1 $36,616.00 $40,936.00 32 1A Construction Traffic Control LS 1 $5,000.00 $5,000.00 $3,533.00 $3,533.00 33 2A Temporary Water LS 1 $3,000.00 $3,000.00 $3,200.00 $3,200.00 34 3A 8" C900 PVC water main LF 109 $54.00 $51886.00 $57.00 $6,213.00 35 4A 6" C900 PVC Water Main LF 8 $50.00 $400.00 $110.00 $880.00 36 5A 8" MJ Gate Valve EA 1 $1,600.00 $1,600.00 $1,865.00 $1,865.00 37 6A 6" MJ Gate Valve EA 1 $11250.00 $1,250.00 $1,380.00 $1,380.00 38 7A Fire Hydrant EA 1 $31750.00 $3,750.00 $2,800.00 $2,800.00 39 8A 811x6" MJ Swivel Tee LS 1 $550.00 $550.00 $550.00 $550.00 40 9A 6" MJ Bend EA 2 $400.00 $800.00 $450.00 $900.00 41 10A 811x6" Reducer EA 1 $400.00 $400.00 $300.00 $300.00 42 11A 6" Water Main Connection EA 1 $1,500.00 $1,500.00 $2,145.00 $2,145.00 43 12A Water Main Testing Requirements LS 1 $1,800.00 $1,800.00 $2,625.00 $2,625.00 44 13A Existing Road Surface Removal SY 172 $4.00 $688.00 $14.00 $2,408.00 45 14A Fire Hydrant Salvage EA 1 $400.00 $400.00 $640.00 $640.00 46 15A 4" Asphalt Roadway Restoration SY 172 $36.00 $61192.00 $46.00 $7,912.00 47 16A Landscape Restoration LS 1 $2,000.00 $2,000.00 $1,600.00 $1,600.00 48 17A Force Main Conflict LS 1 $1,400.00 $11400.00 $1,985.00 $11985.00 Add Alternate 2 $45,947.00 $34,967.00 491B Mobilization/Demobilization LS 1 $4,000.50 $4,000.50 $1,800.00 $1,800.00 50 2B 2" Mill SY 1951 $1.50 $2,926.50 $4.00 $7,804.00 51 3B 2" Asphalt Concrete Pavement SY 1951 $20.00 $39,020.00 $13.00 $25,363.00 Base Bid Total: $363,657.00 $458,608.00 Downing Underground Inc. LHC, Inc Cutting Edge Excavation, LLC Unit Price Extension Unit Price Extension Unit Price Extension $396,834.00 $448,873.01 $439,667.50 $5,000.00 $5,000.00 $20,025.00 $20,025.00 $44,100.00 $44,100.00 $3,700.00 $3,700.00 $14,000.00 $14,000.00 $2,000.00 $2,000.00 $5,000.00 $5,000.00 $17,000.00 $17,000.00 $25,511.50 $25,511.50 $21,000.00 $21,000.00 $10,200.00 $10,200.00 $15,550.00 $15,550.00 $144.00 $183,744.00 $69.47 $88,643.72 $71.00 $90,596.00 $141.00 $7,191.00 $75.24 $3,837.24 $90.00 $4,590.00 $1,800.00 $16,200.00 $2,313.00 $20,817.00 $1,770.00 $151930.00 $1,500.00 $3,000.00 $1,876.00 $3,752.00 $1,500.00 $3,000.00 $5,000.00 $10,000.00 $3,500.00 $71000.00 $3,600.00 $7,200.00 $500.00 $1,000.00 $727.00 $1,454.00 $800.00 $1,600.00 $600.00 $1,200.00 $792.00 $1,584.00 $830.00 $1,660.00 $500.00 $7,000.00 $607.00 $8,498.00 $585.00 $8,190.00 $400.00 $2,400.00 $492.00 $2,952.00 $720.00 $4,320.00 $400.00 $1,200.00 $367.00 $1,101.00 $575.00 $1,725.00 $2,500.00 $2,500.00 $1,094.00 $1,094.00 $2,000.00 $2,000.00 $1,500.00 $4,500.00 $1,030.00 $3,090.00 $1,930.00 $5,790.00 $2,000.00 $2,000.00 $2,915.00 $2,915.00 $3,800.00 $3,800.00 $2,700.00 $2,700.00 $3,865.00 $3,865.00 $4,400.00 $4,400.00 $6,000.00 $6,000.00 $23,630.00 $23,630.00 $10,000.00 $10,000.00 $6,000.00 $6,000.00 $23,800.00 $23,800.00 $10,000.00 $10,000.00 $3,000.00 $3,000.00 $5,505.00 $5,505.00 $2,200.00 $2,200.00 $3.00 $7,893.00 $13.41 $35,281.71 $12.00 $31,572.00 $500.00 $500.00 $425.00 $425.00 $330.00 $330.00 $26.00 $68,406.00 $47.14 $124,025.34 $43.00 $113,133.00 $30.00 $31000.00 $15.23 $1,523.00 $30.00 $3,000.00 $4, 000.00 $4, 000.00 $14, 200.00 $14, 200.00 $5,000.00 $5,000.00 $15, 000.00 $15, 000.00 $ 3,100.00 $ 3,100.00 $13, 500.00 $13, 500.00 $250.00 $2,500.00 $385.00 $3,850.00 $285.00 $2,850.00 $300.00 $300.00 $725.00 $725.00 $2,000.00 $2,000.00 $100.00 $400.00 $100.00 $400.00 $515.00 $2,060.00 $125.00 $500.00 $145.00 $580.00 $515.00 $2,060.00 $38,954.00 $50,878.93 $59,172.00 $1, 000.00 $1, 000.00 $11000.00 $11000.00 $200.00 $200.00 $3,500.00 $3,500.00 $1,300.00 $1,300.00 $16,333.00 $16,333.00 $142.00 $15,478.00 $110.29 $12,021.61 $85.00 $9,265.00 $159.00 $1,272.00 $300.56 $2,404.48 $95.00 $760.00 $1,100.00 $1,100.00 $2,315.00 $2,315.00 $1,770.00 $1,770.00 $800.00 $800.00 $1,875.00 $1,875.00 $1,500.00 $1,500.00 $2,600.00 $2,600.00 $3,450.00 $3,450.00 $3,600.00 $3,600.00 $300.00 $300.00 $1,200.00 $1,200.00 $1,560.00 $1,560.00 $250.00 $500.00 $495.00 $990.00 $720.00 $1,440.00 $200.00 $200.00 $370.00 $370.00 $575.00 $575.00 $400.00 $400.00 $1, 065.00 $1, 065.00 $2,000.00 $ 2, 000.00 $500.00 $500.00 $1,175.00 $1,175.00 $3,000.00 $3,000.00 $3.00 $516.00 $22.15 $3,809.80 $12.00 $2,064.00 $300.00 $300.00 $425.00 $425.00 $333.00 $333.00 $29.00 $4,988.00 $64.32 $11,063.04 $51.00 $8,772.00 $1,500.00 $1,500.00 $1,315.00 $1,315.00 $3,000.00 $3,000.00 $4,000.00 $4,000.00 $5,100.00 $5,100.00 $3,000.00 $3,000.00 $33,816.00 $28,103.02 $32,691.50 $2,600.00 $2,600.00 $750.00 $750.00 $500.00 $500.00 $6.00 $11,706.00 $3.16 $6,165.16 $6.00 $11,706.00 $10.00 $19,510.00 $10.86 $21,187.86 $10.50 $20,485.50 1$469,604.00 $527,854.96 $531,531.00