Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Conrad Drive Water Main Replacement Project Bid Results Tabulation
Conrad Dr Water Main Replacement Project (#6146553) Owner: Kalispell MT, City of Solicitor: Kalispell MT, City of 03/08/2019 01:30 PM MST Section Tit Line Item Item Code Item Description White's Civil Contracting LLC UofM Quantity Unit Price Sandry Construction Extension Unit Price Extension Base Bid $281,094.00 $382,705.00 1 1 Mobilization/Demobilization LS 1 $18,000.00 $18,000.00 $40,000.00 $40,000.00 2 2 Construction Traffic Control LS 1 $6,000.00 $6,000.00 $5,000.00 $51000.00 3 3 Construction Survey LS 1 $3,500.00 $3,500.00 $27,498.00 $27,498.00 4 4 Temporary Water LS 1 $71800.00 $7,800.00 $5,575.00 $5,575.00 5 5 8" C900 PVC water main LF 1276 $54.00 $68,904.00 $56.50 $72,094.00 6 6 6" C900 PVC Water Main LF 51 $50.00 $2,550.00 $49.00 $2,499.00 7 7 8" MJ Gate Valve EA 9 $1, 600.00 $14,400.00 $1, 865.00 $16, 785.00 8 8 6" MJ Gate Valve EA 2 $1,250.00 $2,500.00 $1,380.00 $2,760.00 9 9 Fire Hydrant EA 2 $3,750.00 $7,500.00 $2,840.00 $5,680.00 10 10 811x6" MJ Swivel Tee LS 2 $550.00 $1,100.00 $550.00 $1,100.00 11 11 8" MJ Tee EA 2 $400.00 $800.00 $685.00 $1,370.00 12 12 8" MJ Bend EA 14 $400.00 $51600.00 $530.00 $7,420.00 13 13 6" MJ Bend EA 6 $400.00 $2,400.00 $450.00 $2,700.00 14 14 811x6" Reducer EA 3 $400.00 $1,200.00 $300.00 $900.00 15 15 8" Water Main Connection EA 1 $1,800.00 $1,800.00 $2,175.00 $2,175.00 16 16 6" Water Main Connection EA 3 $11500.00 $4,500.00 $2,145.00 $6,435.00 17 17 Water Main Testing Requirements LS 1 $3,000.00 $3,000.00 $4,570.00 $4,570.00 18 18 1" Residential Service EA 1 $1,800.00 $1,800.00 $2,680.00 $2,680.00 19 19 Water Service for 350 College Ave EA 1 $5,000.00 $5,000.00 $6,995.00 $6,995.00 20 20 Water Service for 610 2nd ST E EA 1 $5,000.00 $51000.00 $7,045.00 $7,045.00 21 21 Woodland Ave Storm Sewer Crossing LS 1 $2,500.00 $2,500.00 $1,985.00 $1,985.00 22 22 Existing Road Removal SY 2631 $4.00 $101524.00 $14.00 $36,834.00 23 23 Fire Hydrant Salvage EA 1 $400.00 $400.00 $640.00 $640.00 24 24 4" Asphalt Roadway Restoration SY 2631 $36.00 $94,716.00 $40.00 $105,240.00 25 25 Type 2 Bedding LF 100 $18.00 $1,800.00 $2.40 $240.00 261 26 Landscape Island Restoration LS 1 $2,000.00 $2,000.00 $5,635.00 $5,635.00 27 27 Landscape Restoration LS 1 $2,500.00 $2,500.00 $1,600.00 $1,600.00 28 28 Exploratory Excavation HR 10 $180.00 $1,800.00 $350.00 $3,500.00 29 29 Abandon Existing Manhole EA 1 $500.00 $500.00 $3,530.00 $31530.00 30 30 Seal Pipe Ends 12" to 4" EA 4 $100.00 $400.00 $222.00 $888.00 31 31 Seal Pipe Ends Larger than 12" EA 4 $150.00 $600.00 $333.00 $1,332.00 Add Alternate 1 $36,616.00 $40,936.00 32 1A Construction Traffic Control LS 1 $5,000.00 $5,000.00 $3,533.00 $3,533.00 33 2A Temporary Water LS 1 $3,000.00 $3,000.00 $3,200.00 $3,200.00 34 3A 8" C900 PVC water main LF 109 $54.00 $51886.00 $57.00 $6,213.00 35 4A 6" C900 PVC Water Main LF 8 $50.00 $400.00 $110.00 $880.00 36 5A 8" MJ Gate Valve EA 1 $1,600.00 $1,600.00 $1,865.00 $1,865.00 37 6A 6" MJ Gate Valve EA 1 $11250.00 $1,250.00 $1,380.00 $1,380.00 38 7A Fire Hydrant EA 1 $31750.00 $3,750.00 $2,800.00 $2,800.00 39 8A 811x6" MJ Swivel Tee LS 1 $550.00 $550.00 $550.00 $550.00 40 9A 6" MJ Bend EA 2 $400.00 $800.00 $450.00 $900.00 41 10A 811x6" Reducer EA 1 $400.00 $400.00 $300.00 $300.00 42 11A 6" Water Main Connection EA 1 $1,500.00 $1,500.00 $2,145.00 $2,145.00 43 12A Water Main Testing Requirements LS 1 $1,800.00 $1,800.00 $2,625.00 $2,625.00 44 13A Existing Road Surface Removal SY 172 $4.00 $688.00 $14.00 $2,408.00 45 14A Fire Hydrant Salvage EA 1 $400.00 $400.00 $640.00 $640.00 46 15A 4" Asphalt Roadway Restoration SY 172 $36.00 $61192.00 $46.00 $7,912.00 47 16A Landscape Restoration LS 1 $2,000.00 $2,000.00 $1,600.00 $1,600.00 48 17A Force Main Conflict LS 1 $1,400.00 $11400.00 $1,985.00 $11985.00 Add Alternate 2 $45,947.00 $34,967.00 491B Mobilization/Demobilization LS 1 $4,000.50 $4,000.50 $1,800.00 $1,800.00 50 2B 2" Mill SY 1951 $1.50 $2,926.50 $4.00 $7,804.00 51 3B 2" Asphalt Concrete Pavement SY 1951 $20.00 $39,020.00 $13.00 $25,363.00 Base Bid Total: $363,657.00 $458,608.00 Downing Underground Inc. LHC, Inc Cutting Edge Excavation, LLC Unit Price Extension Unit Price Extension Unit Price Extension $396,834.00 $448,873.01 $439,667.50 $5,000.00 $5,000.00 $20,025.00 $20,025.00 $44,100.00 $44,100.00 $3,700.00 $3,700.00 $14,000.00 $14,000.00 $2,000.00 $2,000.00 $5,000.00 $5,000.00 $17,000.00 $17,000.00 $25,511.50 $25,511.50 $21,000.00 $21,000.00 $10,200.00 $10,200.00 $15,550.00 $15,550.00 $144.00 $183,744.00 $69.47 $88,643.72 $71.00 $90,596.00 $141.00 $7,191.00 $75.24 $3,837.24 $90.00 $4,590.00 $1,800.00 $16,200.00 $2,313.00 $20,817.00 $1,770.00 $151930.00 $1,500.00 $3,000.00 $1,876.00 $3,752.00 $1,500.00 $3,000.00 $5,000.00 $10,000.00 $3,500.00 $71000.00 $3,600.00 $7,200.00 $500.00 $1,000.00 $727.00 $1,454.00 $800.00 $1,600.00 $600.00 $1,200.00 $792.00 $1,584.00 $830.00 $1,660.00 $500.00 $7,000.00 $607.00 $8,498.00 $585.00 $8,190.00 $400.00 $2,400.00 $492.00 $2,952.00 $720.00 $4,320.00 $400.00 $1,200.00 $367.00 $1,101.00 $575.00 $1,725.00 $2,500.00 $2,500.00 $1,094.00 $1,094.00 $2,000.00 $2,000.00 $1,500.00 $4,500.00 $1,030.00 $3,090.00 $1,930.00 $5,790.00 $2,000.00 $2,000.00 $2,915.00 $2,915.00 $3,800.00 $3,800.00 $2,700.00 $2,700.00 $3,865.00 $3,865.00 $4,400.00 $4,400.00 $6,000.00 $6,000.00 $23,630.00 $23,630.00 $10,000.00 $10,000.00 $6,000.00 $6,000.00 $23,800.00 $23,800.00 $10,000.00 $10,000.00 $3,000.00 $3,000.00 $5,505.00 $5,505.00 $2,200.00 $2,200.00 $3.00 $7,893.00 $13.41 $35,281.71 $12.00 $31,572.00 $500.00 $500.00 $425.00 $425.00 $330.00 $330.00 $26.00 $68,406.00 $47.14 $124,025.34 $43.00 $113,133.00 $30.00 $31000.00 $15.23 $1,523.00 $30.00 $3,000.00 $4, 000.00 $4, 000.00 $14, 200.00 $14, 200.00 $5,000.00 $5,000.00 $15, 000.00 $15, 000.00 $ 3,100.00 $ 3,100.00 $13, 500.00 $13, 500.00 $250.00 $2,500.00 $385.00 $3,850.00 $285.00 $2,850.00 $300.00 $300.00 $725.00 $725.00 $2,000.00 $2,000.00 $100.00 $400.00 $100.00 $400.00 $515.00 $2,060.00 $125.00 $500.00 $145.00 $580.00 $515.00 $2,060.00 $38,954.00 $50,878.93 $59,172.00 $1, 000.00 $1, 000.00 $11000.00 $11000.00 $200.00 $200.00 $3,500.00 $3,500.00 $1,300.00 $1,300.00 $16,333.00 $16,333.00 $142.00 $15,478.00 $110.29 $12,021.61 $85.00 $9,265.00 $159.00 $1,272.00 $300.56 $2,404.48 $95.00 $760.00 $1,100.00 $1,100.00 $2,315.00 $2,315.00 $1,770.00 $1,770.00 $800.00 $800.00 $1,875.00 $1,875.00 $1,500.00 $1,500.00 $2,600.00 $2,600.00 $3,450.00 $3,450.00 $3,600.00 $3,600.00 $300.00 $300.00 $1,200.00 $1,200.00 $1,560.00 $1,560.00 $250.00 $500.00 $495.00 $990.00 $720.00 $1,440.00 $200.00 $200.00 $370.00 $370.00 $575.00 $575.00 $400.00 $400.00 $1, 065.00 $1, 065.00 $2,000.00 $ 2, 000.00 $500.00 $500.00 $1,175.00 $1,175.00 $3,000.00 $3,000.00 $3.00 $516.00 $22.15 $3,809.80 $12.00 $2,064.00 $300.00 $300.00 $425.00 $425.00 $333.00 $333.00 $29.00 $4,988.00 $64.32 $11,063.04 $51.00 $8,772.00 $1,500.00 $1,500.00 $1,315.00 $1,315.00 $3,000.00 $3,000.00 $4,000.00 $4,000.00 $5,100.00 $5,100.00 $3,000.00 $3,000.00 $33,816.00 $28,103.02 $32,691.50 $2,600.00 $2,600.00 $750.00 $750.00 $500.00 $500.00 $6.00 $11,706.00 $3.16 $6,165.16 $6.00 $11,706.00 $10.00 $19,510.00 $10.86 $21,187.86 $10.50 $20,485.50 1$469,604.00 $527,854.96 $531,531.00