Loading...
06. Public WorksP is PUBLIC SERVICES CITY OF KALISPELL PUBLIC SERVICES - $129088,008 Administration $ 57,904 Central Garage $294,632 Street Department $107,734 Gas Tax $456,711 Special Street Asses. $692,833 Traffic Signs & Signals $148,880 Light Maintenance $127,033 Decorative Light Maint. $ 7,172 FY 2003 Budget Expenditures by Function - $30,595,769 General Parks & Other ov1. Public Rec. Safety 16% 15% NN m. Dev. 13% Public Services 39% • Sidewalk & Curb Const. $ 25,000 MACI Grant - Sidewalks $ 607,000 Hwy 93 South $2,491,690 Water $1,981,505 Sewer/W WTP $3,467,451 Storm Sewer $ 802,993 Solid Waste $ 747,470 FY 2003 Public Services Expenditures- $12,088,008 PC Waste 6% MACI 5% Storm Adnin. Hwy.93 )7% 0% South 21% S&C ConstrucGarage 00/6 2% Streets Sew er° TSSaq,� 30% Lights Water 1% 1% 16% The overall public services function is down by over $750,000. Comparisons between years are very difficult to make because of the high cost of almost any project or capital expenditure within this function. Last years budget included the Sunnyview Drive reconstruction. The first budget with any substantive changes is the Gas Tax budget. This budget does not fund personnel but concentrates on street chip seals and asphalt overlays in addition to regular street maintenance. The $100,000 decrease is related to the 2002 MACI grant match and the City's portion of the Sunnyview project. The $200,000 increase in the Special Streets budget is almost exclusively related to capital equipment replacements. One single axle dump truck is being purchased to replace our 1972 dump truck (Two were requested but one needed to be eliminated and is expected to be purchased in the 2004 budget). The storage lean-to is being replaced with a new structure at an estimated $52,000 cost. The current structure is beyond repair. The purchase of a 3/4 ton pick up which was unfunded in the current budget and will • allow us to retire a 1970 pick up truck. 119 There is only one notable change in the Traffic Signs and Signals budget. The department will be is replacing their 1987 service truck which currently has over 155,000 miles. Two substantial carry over budgets are the air and congestion grant and the US-93 South project. In 2000 the City was awarded an Air and Congestion grant totaling $526,131. This grant is expected to be utilized during the 2002 construction season for sidewalks in the northwest part of town. We have also carried over the Highway 93 South Utility Extension project fund. We estimate the total cost of this project, including bonding costs, to be $2,491,690. The water main is estimated at $920,800 with the sewer improvements estimated at $1,414,900. Two revenue resources exist. 1 ', the City has sold both Dailey Field lots. The closing on the second sale is expected to take place prior to budget adoption. At the time of closing the City will have $1,000,000 in cash from the sale of these properties. The 2n0 funding mechanism would be through utility rates. To fund a revenue bond, water rates would increase by 10 cents per 1,000 gallons (6.8%) and sewer rates would increase by 22 cents per 1,000 gallons (6.8%). In addition to these capital projects, the electricity line items within the Public Services function have increased by approx. $150,000 in the past 18 months. This is in spite of all of our efforts with Bonneville Power to maximize efficiency. We did not increase either water or sewer rates in the current budget to assist in these increased cost. Electric costs are estimated to increase by $53,000 within the water operation. This increase can be funded without an overall rate increase if we restructure our rate system. Currently we provide customers who utilize more than 30,000 gallons per billing cycle with a discount, however, the cost of providing • water is exactly the same for each gallon produced, be it one or 30,001. This will also put an end to the current practice which in essence has residents paying a disproportionate share of the cost of water. Other changes in the Water fund include a decrease in capital expenditures of approximately $170,000. The status quo budget requires only the elimination of the 30,000 gallon rate brake in order to be financed. Because of time constraints we will be providing you with a supplement to this budget prior to its review. Status quo is not acceptable when so many infrastructure improvements are necessary. Please review the unfunded portion of the statement of function review. We are working hard to find the best possible financing of the water meters replacements phase II, fire hydrant installments, US-93 south and water main project near the Jr. High School. These projects total over $1.7 million. Also of note, is the fact that the water main replacement reserve has less than $350,000. This fund must be replenished in order to pay for future repairs and water main replacements. One emergency could deplete this fund to almost nothing. The budget also includes the second phase of the facility plan. This rate study will determine how the City should be funding water and sewer enterprise accounts. Currently, only hook-up fees are set aside for replacement. The electric line item to run the Waste Water Treatment Plant has increased by $70,000. With the exception of electricity nearly all of the increased expenses are found in sewer operating capital (over 5400,000). These expenditures can be found in three items. 1", the replacement of Lift Station #3 which was installed in 1968 and is the oldest in the system ($200,000). 2nd, the replacement of our sewer cleaning truck. The 1983 Vactor will be retired and the 1994 will become the back-up unity($193,500). • Finally, a building addition for indoor storage of equipment (72,000). The cost and value of equipment is too high to leave outdoors. Weather deteriorates the equipment unnecessarily. This item has been budgeted in previous years but has never been constructed. 120 A sewer rate increase is not needed to cover M&O (maintenance and operations) however, it is needed to fund the US-93 south project and a certain percentage of the sewer rate should be funding sewer replacement. Currently only hook-up fees finance the replacement funds for both water and sewer. Tap fees should be set aside for improvements and upgrades not normal wear and tear replacements. The Storm Sewer fund includes a carry over of $408,000 in order to pay for storm water work associated with the US-93 South project. Cash for this project is available within the fund and therefore will not be included in the overall bond sale necessary to finance the water and sewer portions of this project. The Solid Waste budget has increased by approx. $160,000 for the replacement of one of our side -arm garbage trucks. The truck is seventeen years old and is expensive to maintain and operate. The 1999 solid waste study indicated that the department was doing an exceptional job. However, we were keeping equipment too long. The industry standard for garbage truck replacements is every 80,000 miles. This truck has 117,274 miles. Since 1998 over $40,582 has been spent maintaining this vehicle. In 2000 three of the five trucks were out on repairs at one time with repairs totaling over $40,000 to get the vehicles back on the road. In preparation for future equipment replacements the Solid Waste fund needs to finance its depreciation. The following is comparison of our solid waste charges as compared to Evergreen Disposals rates. Evergreen Disposal City of Kalispell Residential $102/yr. $80/yr Commercial 300 Gallon 1 pick-up/week $408/yr. $217/yr. 400 Gallon 1 pick-up/week $492/yr. $290/yr. Remember that solid waste is an enterprise fund and revenues must cover expenditures and depreciation should be a funded expenditure. Residential rates were increased two years ago and commercial rates have remained unchanged for over ten years. We propose increasing the residential rate by $5 and commercial rate by $50 this year and $50 next year. We also proposes eliminating the price break that we currently provide to users who we pick up multiple times per week. The actual cost of additional commercial pick-ups only adds cost because they have to put into our daily residential routes. Currently only 11 businesses receive this service twice or three times per week. • 121 P • 0 PROGRAM OF SERVICES EXPENDITURE SUMMARY FUND: GENERAL 1000... DEPT 410--- PUBLIC WORKS... FUNCTION... 430100 ACTUAL ACTUAL BUDGET STAFF'S ACCOUNT FY99/00 FY00101 FY01/02 FY02/03 Personal Services $64,111 $66,271 $70,128 $47,054 Materials & Services $8,618 $10,061 $11,450 $10,850 Capital Outlay $0 $0 $0 $0 $72,729 $76,332 $81,578 $57,904 STATEMENT OF FUNCTION: The responsibility of the Public Works Administration/Engineering Department is the design, construction, maintenance and administration of the City's infrastructure. These areas include streets, curbs, sidewalks, traffic signals, signage, water production and distribution, storm water drainage, sewage collection, wastewater treatment and equipment maintenance. Line Item Detail : Public Works 335 Membership & Dues - $850 $180 - Montana Board of Professional Engineers & Land Surveyor's $150 - Montana Association of Registered Land Surveyor's $365 - American Public Works Association $1.55 - American Society of Civil Engineers 373 School & Travel - $1,500 $1,200 - American Public Works Association Conference $300 - AutoCAD instructor as needed basis CM'OF KALISPELL 122 PROGRAM OF SERVICES EXPENDITURE DETAIL FUND: GENERAL 1000... DEPT 410... PUBLIC WORKS ... FUNCTION... 430100 ACTUAL ACTUAL BUDGET STAFFS ACCOUNT FY99/00 FY00/01 FY01/02 FY02/03 Personal Services: 110 Salaries and payroll costs $63,388 $65,897 $68,628 $46,554 121 Overtime $723 $374 $1,500 $500 Total Personal Services $64,111 $66,271 $70,128 $47,054 Materials &Services 210 Office Supplies $954 $721 $1,100 $1,000 213 Small Office Equipment $349 $650 $950 $650 215 Computer Supplies $890 $592 $900 $900 216 Computer Equipment $628 $270 $500 $800 229 Other Supplies $1,435 $1,963 $1,850 $1,850 241 Consumable Tools $309 $300 $300 $300 320 Printing $104 $229 $400 $400 331 Publication $650 $843 $1,000 $1,000 335 Membership &Dues $880 $657 $850 $850 345 Telephone &Communications $520 $804 $800 $800 362 Equipment Maintenance $289 $215 $300 $300 369 Radio Maint. &Supplies $278 $1,366 $500 $500 373 School &Travel $1,332 $1,451 $2,000 $1,500 Subtotal $8,618 $10,061 $11,450 $10,850 Capital Outlay: 940 Equipment $0 $0 $0 $0 Subtotal $0 $0 $0 $0 TOTAL $72,729 $76,332 $81,578 $57,904 • CITY OF KALISPELL 123 i • PROGRAM OF SERVICES PERSONNEL SCHEDULE FUND: GENERAL. 1000--- DEPT 410... PUBLIC WORKS... FUNCTION --- 430100 ***FTE*** ***BUDGET*** POSITION TITLE FY00/01 FY01/02 FY02/03 FY00/01 FY01102 FY02/03 Director/City Engineer 0.25 0.25 0.25 $13,959 $14,503 $14,938 Design Tech/Proj Mgr. 0.50 0.50 0.20 $21,380 $22,171 $9,134 Administrative Coord. 0.00 0.00 0.20 $0 $0 $6,056 Civil Engineer 0.00 0.00 0.20 $0 $0 $7,401 Construction Inspector 0.50 0.50 0.00 $14,239 $14,592 $0 Clerk II 0.50 0.50 0.20 $11,130 $11,378 $4,677 vehicle allowance $900 $900 subtotal salaries 1.75 1.75 1.05 $60,708 $63,544 $43,106 Payroll taxes: Fica/medt $4,644 $4,861 $3,298 Unemployment tax $212 $222 $151 General Fund total for line item 110 $65,565 $68,628 $46,554 Other fund payroll costs: 2001 2002 2003 Workers Compensation $2.972 $1,016 $274 Health Insurance $9549 $9,549 $6,584 Retirement 6.8% $4.414 $4.321 $2931 Total $16.935 $14.886 $9.789 CITY OF KALISPELL 124 PROGRAM OF SERVICES EXPENDITURE SUMMARY FUND: GENERAL 1000 ... DEPARTMENT 410... CENTRAL GARAGE ... FUNCTION ... 431330 ACTUAL ACTUAL BUDGET STAFFS ACCOUNT FY99/00 FY00/01 FY01/02 FY02/03 Personal Services $93,276 $96,627 $98,582 $101,182 Maintenance & Operations $173,686 $193,571 $216,175 $193,450 Capital Outlay $1,600 $18,445 $5,000 $0 $268,562 $308,643 $319,757 $294,632 STATEMENT OF FUNCTION: The Central Garage is responsible to maintain all city vehicles and equipment in a safe and dependable condition at the lowest cost per mile or hour with the least inconvenience to each department. An extensive record keeping system of repairs and maintenance is maintained and recommendations are provided to insure the City is receiving cost effective use of vehicles and equipment. Line Item Detail: CENTRAL GARAGE 215 Computer Supplies - $3,700 Complete Shop Information System on CD Rom. The shop is in need of many repair manuals. Many electrical manuals are no longer available for purchase. This system will have complete coverage from 1982 till present and allow access to up to date diagnostic procedures without the storage problems associated with manuals and books. 373 School &Travel - $3,000 In order to diagnose and repair some of the newer equipment that has been purchased it requires specialized training, most of which, is not available in Montana. $1,000 -Heil Training for Garbage Trucks in Phoenix $ 500 -Training on Elgin Sweepers $1,500 -Certification Training for the Fire Trucks available in Oregon or Colorado • CITY OF KALISPELL 125 0 0 • PROGRAM OF SERVICES EXPENDITURE DETAIL FUND: GENERAL 1000... DEPARTMENT 410... CENTRAL GARAGE...FUNCTION... 431330 ACTUAL ACTUAL BUDGET STAFF'S ACCOUNT FY99/00 FY00/01 FY01102 FY02103 Personal Services: 110 Salaries and payroll costs $91,694 $95,341 $97,092 $99,682 121 Overtime $1,582 $1,286 $1,500 $1,500 Total Personal Services $93,276 $96,627 $98,582 $101,182 Maintenance & Operations: 210 Office Supplies $377 $235 $500 $500 215 Computer Supplies $0 $0 $2,400 $3,700 221 Safety Equip & Supplies $258 $77 $700 $350 229 Other Supplies $2,492 $2,597 $2,600 $2,600 231 Gas and Oil $44,611 $48,481 $49,500 $48,500 232 Motor Vehicle Parts $63,188 $77,295 $77,175 $70,000 233 Tires $13,377 $15,351 $21,000 $15,000 238 Filters $2,098 $2,974 $3,300 $3,300 241 Consumable Tools $835 $1,518 $1,500 $1,500 322 Books ($40) $273 $500 $0 341 Electricity $3,165 $2,075 $2,600 $2,600 342 Water $161 $155 $175 $175 344 Natural Gas $3,674 $5,194 $5,000 $4,500 345 Telephone & Communications $21 $17 $75 $75 354 Contract Services -repairs $37,506 $31,827 $43,600 $35,000 362 Equipment Maint $246 $1,564 $1,000 $1,200 366 Building Maint $476 $1,017 $700 $700 369 Radios $0 $1,163 $500 $500 373 School & Travel $1,087 $1,605 $3,100 $3,000 388 Medical Services $154 $153 $250 $250 Subtotal M&O $173,686 $193,571 $216,175 $193,450 Capital Outlay 940 Machinery & Equipment $1,600 $18,445 $5,000 $0 Subtotal Capital Outlay $1,600 $18,445 $5,000 $0 TOTAL $268,562 $308,643 $319,757 $294,632 CITY OF KALISPELL 126 PROGRAM OF SERVICES PERSONNEL SCHEDULE FUND: GENERAL 1000 ... DEPARTMENT 410... CENTRAL GAR -AGE ... FUNCTION ... 431330 ***FTE*** ***BUDGET*** POSITION TITLE FY00/01 FY01/02 FY02l03 FY00l01 FY01/02 FY02/03 Foreman 1 1 1 $29,685 $30,431 $31,236 Mechanic/Service Tube 2 2 2 $56,852 $58,260 $59,862 Tool Allowance $1,200 $1,200 $1,200 subtotal salaries: 3 3 3 $87,737 $89,891 $92,298 Payroll taxes: Fica/Medt $6,712 $6,877 $7,061 Unemployment tax $307 $315 $323 General Fund total for line item 110 $94,756 $97,082 $99,682 Other fund payroll costs: 2001 2002 2003 Workers Comp. $4,807 $4,387 $4,955 Health Insurance $15,924 $15,924 $19,460 Retirement 6.8% $5 966 6.113 $6 276 Total $26,697 $26,424 $30,691 • CITY OF KALISPELL 127 • • • PROGRAM OF SERVICES EXPENDITURE SUMMARY FUND: GENERAL 1000...DEPT 421... STREET DEPT... FUNCTION... 430240 Amended ACTUAL ACTUAL BUDGET STAFF'S ACCOUNT FY99/00 FY00/01 FY01102 FY02/03 Personal Services $104,178 $77,420 $88,633 $90,509 Maintenance & Operations $7,052 $3,319 $15,025 $17,225 Capital Outlay $13,386 $0 $31,000 $0 $124,616 $80,739 $134,658 $107,734 STATEMENT OF FUNCTION: The function of the Street Department is to maintain Kalispell platted streets, alleys, and public right-of-way areas. The funds provided to this division are used to finance salaries for personnel engaged in maintenance activities such as surface sealing, patching, crack sealing and utility cut repair. These employees also assist in operational activities such as street sweeping, sanding, flushing, leaf pick-up, snow plowing, snow removal and de-icer application. Line Item Detail: Street Department 362 Equip. Maint. Supplies - $4,100 Decreased this line item by $1,000. It is needed to purchase fire chains and cutting edges on our Graders and Loader for snow removal. 366 Building Maintenance - $7,500 The street equipment building is 30 years old and has had no major maintenance up to this point. The increase in this line item will include the cost of refacing the east side of the building with new metal and trim and will allow us to finish adding insulation and plywood to the walls in order to reduce energy costs_ CITY OF KALISPELL 128 PROGRAM OF SERVICES EXPENDITURE DETAIL FUND: GENERAL 1000... DEPT 421... STREET DEPT... FLTNCTION... 430240 Amended ACTUAL ACTUAL BUDGET STAFFS ACCOUNT FY99100 FY00/01 FY01/02 FY02103 Personal Services: 110 Salaries $98,790 $71,233 $81,633 $83,509 112 Retirement - amended $0 $0 $1,850 121 Overtime $5,388 $6,187 $5,150 $7,000 Total Personal Services $104,178 $77,420 $88,633 $90,509 Maintenance & Operations: 215 Computer Supplies $522 $110 $500 $400 221 Safety Equip/Supplies $697 $95 $500 $400 224 Janitorial Supplies $255 $226 $400 $300 229 Other Supplies $756 $538 $900 $800 241 Consumable Tools $469 $621 $800 $700 341 Electrical $2,736 $483 $1,500 $1,000 342 Water $161 $155 $175 $175 345 Telephones & Communications $477 $447 $1,050 $750 362 Equipment Maint. Supplies $0 $0 $5,100 $4,100 366 Building Maintenance $278 $389 $3,000 $7,500 369 Radio Equipment & Maint. $318 $140 $600 $600 373 School & Travel $383 $115 $500 $500 Subtotal $7,052 $3,319 $15,025 $17,225 Capital Outlay: 940 Machinery & Equipment $0 $0 $31,000 $0 940 CMAQ equipment match $13,386 $0 $0 $0 $0 Subtotal $13,386 $0 $31,000 $0 TOTAL $124,616 $80,739 $134,658 $107,734 CITY OF KALISPELL • 0 • 129 • • • PROGRAM OF SERVICES PERSONNELSCHEDULE FUND: GENERAL 1000... DEPT 421 ... STREET DEPT... FUNCTION... 430240 *a*FrE*** ***BUDGET*** POSITION TITLE FY00101 FY01r02 FY02/03 FY00101 FY01102 FY02/03 Superintendent -vacant 025 0.25 0.25 $10,520 $10,846 $10,846 Working Foreman 025 0.25 0.25 $7,603 $7,790 $7,992 Equip Operators 2 2 2 $55,563 $56,950 $58,485 Equipment Oper/Drivers -solid waste ($7,333) $0 $0 subtotal salaries: 2.5 2.5 2.5 $66,353 $75,586 $77,323 Payroll taxes: Fica/Medt. $5,076 $5,782 $5,915 Unemployment tax $232 $265 $271 General fund total for line item 110 $71,661 $81,633 $83,509 Other fund payroll costs : 2001 2002 2003 Workers Compensation $4,038 $3,218 $3,633 Health Insurance $14,532 $12,165 $11,464 Retirement 6.8% $4512 $5140 $5258 Total $23,082 $20,523 $20,355 CITY OF KALISPELL 130 CASH: Gas Tax Apportionment Total Available Street Department Cash Carry Over PROGRAM OF SERVICES 2420 GAS TAX REVENUE PROJECTION ACTUAL BUDGET ESTIMATED PROPOSED FY00/01 FY01/02 FY01/02 FY02/03 $347,874 $289,285 $289,285 $176,300 $302,652 $287,015 $287,015 $287,015 $650,526 $576,300 $576,300 $463,315 EXPENDITURE PROJECTION $361,241 $555,574 $400,000 $456,711 $289,285 $20,726 $176,300 $6,604 * Street overlays not completed by 6/30/02 are re -appropriated in FY2003. Section 15-90-101 MCA requires the State to allocate gas tax revenues to cities, towns and counties. One-half of the city's allocation is based on population and one-half on street and alley mileage. The funds may be used for construction, reconstruction, maintenance and repair of streets, right of ways and alleys. The funds cannot be spent for equipment purchases. The funds can be used for labor in maintaining streets. • • • CITY OF KALIJFELL 131 • 0 0 PROGRAM OF SERVICES EXPENDITURE SUMMARY FUND: GAS TAX 2420 ... STREET DEPT. 421... FUNCTION ... 430240 ACTUAL ACTUAL BUDGET STAFF'S ACCOUNT FY99100 FY00/01 FY01/02 FY02/03 Materials and Services $204,358 $361,241 $555,574 $456,711 Capital Outlay $0 $0 $0 $0 $204,358 $361,241 $555,574 $456,711 STATEMENT OF FUNCTION: Funds received from Gas Tax will be used to support the street and alley maintenance/ construction program. This program is accomplished by prioritizing construction and maintenance projects through the use of the pavement management information system. Line Item Detail: Gas Tax 354 Contract Services - $40,000 Increased this line item by $25,000. The striping is done every other year. We striped in FY01 and budgeted for miscellaneous striping in FY02. Therefore, the schedule calls for the striping to be completed again this year. 360 Contract Labor/Maintenance - $17,000 This line item is for snow removal or construction support. 368 Overlays & Chipseals - $277,411 Amount includes carryover for this construction season and new appropriation for next spring. 386 Sidewalk Replacement - $25,000 New Appropriation As per Resolution 4291 CITY OF KALISPELL 132 w w 2003 Overlay Project 2003 Overlay Project 6th Ave. WN West Idaho St. West Washington 1 337' 33' 3" 2 1,235 206 $5,972.00 6th Ave. WN West Washington West Oregon St. 1 381' 35' 3" 2 1,481 247 $7,161.00 6th Ave. WN West Oregon St. West California 1 336' 35' 3" 2 1,306 217 $6,315.00 7th Ave. WN West Idaho St. West Washington 1 295' 28' 3" 2 917.7 153 $4,435.00 7th Ave. WN West Washington West Oregon St. 1 392' 24' 3" 1 1,045 174 $5,052.00 7th Ave. WN West Oregon St. West California 1 362' 23' 3" 1 925 154 $4,471.00 7th Ave. WN West California West Nevada 1 342' 23' 3" 1 874 145 $4,224.00 7th Ave. WN West Nevada West Wyoming 1 399' 23' 3" 1 1,019 170 $4,928.00 7th Ave. WN West Wyoming St. W. Wyoming Cury 1 247' 23' 3" 3 631 105 $3,050.00 1 st Ave. WN West Idaho St. West Washington 1 308' 44' 3" 2 1,505 250 $7,278.00 1st Ave. WN West Washington West Oregon St. 1 335' 44' 3" 2 1,637 273 $7,916.00 1st Ave. WN West Oregon St. West California 1 368' 44' 3" 2 1,799 299 $8,695.00 1 st Ave. WN West California West Nevada St. 1 350' 44' 3" 2 1,711 285 $8,270.00 1st Ave. WN West Nevada St. Hwy 93 North 0.25 51, 44' 3" 3 249 41.5 $1,205.00 3" 4th Street West Meridian Road IRR - ROW 2 663' 33' 3" 0 2,431 405 $11,749.00 3rd Street West I Meridian Road RR -ROW 2 723' 33' 3" 0 2,651 442 $12,818.00 TOTAL OVERLAY ESTIMATED COST 17.25 21,417 3,567 $103,539.00 mom ', Traffic Control Lump Sum $9,000.00 Pre -Leveling Asphalt 500 Tons $14,872.00 Total Estimate $127,411.00 Thickness 3" layed - 2 1l2" rolled compacted 0 0 0 2003 Overlay Project scB xu MEMI-tg MAN 111W �i 6m- 4 1.lJfi TyY H F.i[ a nu ,5 .,� Im06T641 • 1Ik W sF I sc 1c am 2 1K (� 14y t 'i�I ¢ i1P a � �� 1, _� Y ^_ � �� �L•� �-tp�1 M-1 s a 1, l YUIXJII� - Is Y s = n S --nu 1".. Y ` a l/1�(� ) 1ry1-np�. ,1 ) ; .. ..a 1, _ —'f ✓ - (� 111 j �111 � 1' 134 EXPENDITURE DETAIL FUND: GAS TAX 2420 ... STREET DEFT. 421... FLJNCTION... 430240 ACTUAL ACTUAL BUDGET STAFFS ACCOUNT FY99/00 FY00/01 FY01/02 FN02/03 Materials and Services 231 Gas &Oil $9,285 $11,137 $11,500 $10,500 344 Natural Gas $4,014 $2,434 $4,000 $4,000 354 Contract Services -striping $0 $29,960 $15,000 $40,000 360 Contract Services/Maintenance $545 $17,228 $17,000 $17,000 368 Overlays & Chipseals (new approp.) $116,659 $251,820 $277,986 $277,411 369 Radio Maintenance $945 $2,567 $800 $800 452 Gravel $6,282 $3,653 $10,000 $8,000 453 Materials -Contract Preparation $283 $7,073 $10,000 $10,000 471 De-Icer/RoadOil $22,158 $15,944 $31,000 $31,000 472 Asphalt $10,984 $9,953 $21,000 $21,000 473 Crack Sealing Material $10,042 $11,000 $11,000 533 Equipment Rental $0 $260 $1,000 $1,000 Total Materials &Services $181,197 $352,029 $410,286 $431,711 430234 823 Contract (MAGI Grant match) $23,161 $81,500 386 Sidewalks (Carryover) $9,212 $1,788 386 Sidewalks (New) $25,000 $25,000 822 Participation 5ID 343 $37,000 $23,161 $9,212 $145,288 $25,000 Total $204,358 $361,241 $555,574 $456,711 PROGRAM OF SERVICES • CITY OF KALISPELL 135 • • CASH: PROGRAM OF SERVICES 2500 SPECIAL STREET MAINTENANCE REVENUE PROJECTION ACTUAL BUDGET ESTIMATED PROPOSED FY00/01 FY01/02 FY01/02 FY02/03 $168,772 $154,903 $154,903 $199,069 (Increase)Decrease in A/R $18,811 Public Works Charges $4,843 Maintenance Assessments Billed $411,868 $504,559 $522,904 $532,904 Inception of Lease $57,700 $0 $0 $161,000 Penalty & Interest $2,204 $2,000 $1,980 $2,000 Total Available $664,198 $661,462 $679,787 $894,973 EXPENDITURE PROJECTION Street Department $400,229 $443,222 $443,222 $444,373 Debt Service $21,924 $33,996 $33,996 $77,460 Capital Outlay $87,142 $3,500 $3,500 $171,000 Total Expenditures $509,295 $480,718 $480,718 $692,833 Cash Carry Over $154,903 $180,744 $199,069 $202,140 The 2001/2002 assessment system is based on a single rate applied to all properties. No rate increase is planned for the current year. However, a revenue neutral change is being considered that would replace the single rate with a tiered four rate system that better matches the assessment with the maintenance impact of the property on the street system. This new street assessment rate structure would closely mirror the one in place for Storm Drainage. Budget based on current rate of .0055 per sq. foot. CITY OF KALISPELL 136 PROGRAM OF SERVICES EXPENDITURE SUMMARY FUND: SPECIAL STREET MAINT. 2500... DEPT. 421... FUNCTION ... 430240 ACTUAL ACTUAL BUDGET STAFF'S ACCOUNT FY99/00 FY00101 FY01/02 FY02/03 Personal Services $242,241 $290,874 $319,059 $327,515 Materials and Services $96,370 $109,355 $124,163 $116,858 Debt Service $0 $21,924 $33,996 $77,460 Capital Outlay $122,389 $87,142 $3,500 $171,000 $461,000 $509,295 $480,718 $692,833 STATEMENT OF FUNCTION: Special Street Maintenance funds will be primarily used for street sweeping, flushing, leaf pick-up, sanding, deicing, snow plowing and snow removal. The overall goal is to maintain all city streets in a clean, safe and driveable condition during all seasons. Line Item Detail: Special Street Maintenance 354 Contract Services - $18,750 Increase of $8,750 represents 25% cost of Photo Grammetry. The photo Grammetry is needed to update 28 sections of aerial photos, many of them 10 years out of date, in our GPS mapping system. Water, Sewer and Storm will each fund 25%. Debt Service 610 $47,701 Principal payment to Montana Board of Investments. 620 $ 6,126 Interest payment to Montana Board of Investments Road Grader-3rd year of 7 year debt schedule Leaf Loader-2nd yr of 5 Year debt schedule. New debt service estimates 1/2 year principal & interest at $20,000 & $2,000 respectively for items proposed in this budget. -finance 5 years 9 • CITY OF KALISPELL 137 � J • PROGRAM OF SERVICES Line Item Detail: Special Street Maintenance con't. Capital Outlay: 920 Building - $52,000 financed Remove the old lean-to. The lack of structural integrity warrants replacing it with a new 48' x 96' eight bay lean-to. 940 Machinery & Equipment - $91,500 ($81,500 financed) $81,500 - (1) Single Axle Dump Truck w/Plow and Sander. This would replace unit #335, a 1972 Sand Truck. This truck is over thirty years old and is in very poor condition. $10,000 - Dump Box w/Hoist. As part of the City wide equipment upgrade program the 1992 Kenworth that was part of the WWTP fleet will now become part of the Street Divisions fleet. The dump box on this Kenworth is rusted out and needs to be replaced. 944 Vehicles - $27,500 financed 3/4 Ton 4x4 Pick-up w/plow. This will allow us to continue the turnover of used pick-ups. As part of the equipment upgrade program in FY02 we were able to retire a pick-up that was 32 years old. At this time, our oldest pick-up is still over 21 years old. The purchase of this pick-up was requested in FY02 and was left unfunded. r flWK11N 138 EXPENDITURE DETAIL FUND: SPECIAL STREET MAINT. 2500... DEPT. 421... FUNCTION ... 430240 ACTUAL ACTUAL BUDGET STAFFS ACCOUNT FY99/00 FY00/01 FY01l02 FY02/03 Personal Services: 110 Salaries and payroll costs $184,641 $222,921 $244,577 $251,552 112 Retirement $0 $0 $1,850 121 Overtime $8,339 $21,795 $18,150 $20,000 153 155 Health Insurance Retirement $37,230 $12,031 $32,394 $13,764 $39,086 $15,396 $40,815 $15,148 Total Personal Services $242,241 $290,874 $319,059 $327,515 Materials and Services: 216 Computer Equipment $226 $0 $500 $500 218 Equipment (Non Capital) $0 $1,380 $3,600 $0 221 Safety Equipment $0 $220 $1,500 $500 229 Other Supplies $977 $665 $1,000 $1,000 231 Gas &Oil $6,829 $6,894 $11,000 $8,000 354 Contract Services $0 $3,574 $10,000 $18,750 355 Billing Costs $710 $400 $600 $600 369 Radio Maintenance $1,014 $2,422 $1,000 $1,000 373 School &Travel $484 $89 $600 $600 388 Medical services/drug test $943 $1,027 $600 $600 521 Central Garage Transfer $65,000 $65,000 $65,000 $65,000 522 Administrative Transfer $17,132 $23,816 $24,680 $17,216 528 Data Processing Transfer $3,055 $3,868 $4,083 $3,092 Subtotal $96,370 $109,355 $124,163 $116,858 610 Debt -includes 1/2 year new equip $0 $15,467 $26,714 $69,936 620 Interest expense $0 $6,457 $7,282 $7,524 $0 $21,924 $33,996 $77,460 Capital Outlay: 920 Building $52,000 940 Machinery &Equipment $122,389 $87,142 $3,500 $91,500 944 Vehicles $27,500 Subtotal $122,389 $87,142 $3,500 $171,000 Total $461,000 $509,295 $480,718 $692,833 PROGRAM OF SERVICES • CITY OF KALISPELL 139 0 • PROGRAM OF SERVICES PERSONNEL SCHEDULE FUND: SPECIAL STREET MAINT. 2500... DEPT. 421... FUNCTION ... 430240 ***FTE*** ***BUDGET*** POSITION TITLE FY00/01 FY01/02 FY02/03 FY00/01 FY01/02 FY02/03 Superintendent -vacant 0.25 0.25 0.25 $10,520 $10,846 $10,846 Project Manager 0.25 0.25 0.25 $10,690 $11,085 $11,418 Working Foreman 0.75 0.75 0.75 $22,071 $23,369 $23,975 Equipment Oper/Drivers 6.00 6.00 6.00 $162,903 $172,683 $177,312 Equipment Oper/Drivers -solid waste*** ($21,000) ($10,500) ($10,500) Surveyor 0.30 030 0.30 $9,152 $9,445 $9,719 Merit $1,000 $0 subtotal salaries: 7.55 7.55 7.55 $194,336 $217,928 $222,770 Payroll taxes: Fica/Medt $14,867 $16,671 $17,042 Unemployment tax $854 $763 $780 Workers Comp $11,800 $10,000 $10,960 TOTAL 110 $221,857 $245,362 $251,552 * Hourly wages for FY02 will bebased on 2080 hours, FY 03 will be based on 2088 hours. ***Work for the benefit of Solid Waste by Street employees will be charged directly to Solid Waste Budget Fund 5510. FY01/02 estimated reduction of personnel costs has been decreased because we added a full time operator to the Solid Waste Fund in FYOO/O 1, CITY OF KALISPELL 140 PROGRAM OF SERVICES EXPENDITURE SUMMARY FUND: GENERAL 1000..DEPT 410..TRAFFIC SIGNS & SIGNALS ... FUNCTION ... 430264 ACTUAL ACTUAL BUDGET STAFFS ACCOUNT FY99/00 FY00/01 FY01/02 FY02/03 Personal Services $68,306 $68,100 $75,839 $76,080 Maintenance &Operations $22,302 $26,519 $40,725 $39,550 Capital Outlay $0 $15,878 $0 $27,000 Debt Service $1,415 $2,721 $2,674 $6,250 $92,023 $113,218 $119,238 $148,880 STATEMENT OF FUNCTION: This division has the responsibility for determining proper sign location, maintenance of signs, striping of crosswalks and streets, maintenance of traffic signals and placement of emergency signage where needed to provide the safe and orderly passage of vehicles and pedestrians in the City of Kalispell. This division supports the Police Department for emergency traffic control and street blockage for parades and other unique events. • CITY OF KALISPELL 141 0 • • PROGRAM OF SERVICES Line Item Detail: TRAFFIC SIGNS & SIGNALS 121 Overtime - $3,500 Decreased this line item by $1,500. 218 Equipment (Non Capital) - $1,900 (Decreased this line item $1,500) $ 800 - Motorized Extension Saw for Pruning $ 300 - Two - Three Legged Ladders $ 150 - Pipe Cutter $ 150 - Cutting Torch $ 300 - Aluminum Pipe Wrenches $ 200 - File Cabinet 243 Traffic Signals - $5,000 Decreased this line item by $2,000. The City owns 7 traffic signals. Repairs and replacement parts for these signals are very costly. Our relationship with the State have been curtailed, so we do not anticipate support of parts and supplies that we have received in the past. 366 Building Maintenance - $5,000 The $4,500 increase in this line item will be used to insulate the ceiling in the TSS building as well as minor building repairs. 369 Radio Maintenance - $500 Decreased this line item by $950 610/62o Debt Service-$5,400 Prin, $850 Int. on new Truck 940 Machinery & Equipment - $27,000 3/4 Ton 4x4 Service Truck w/Utility Box. This is the primary vehicle for TSS and would replace a 1987 Dodge with 155,000 miles on it (unit # 240). Out of all the vehicles that are used on a daily basis this truck is in the poorest condition. It was requested in in FY02 but was left unfunded. UNFUNDED: 110 Personal Services - $31,000 Our traffic Sign Division consists of two employees who are nearing retirement. These two individuals have many years of experience working on the traffic signals, information that is crucial to this division. It would be in the city's best interest to implement training for an additional employee at this time. OF KALISPELL 142 PROGRAM OF SERVICES EXPENDITURE DETAIL FUND: GENERAL 1000..DEPT 410..TRAFFIC SIGNS & SIGNALS... FUNCTION ... 430264 ACTUAL ACTUAL BUDGET STAFF'S ACCOUNT FY99/00 FY00/01 FY01/02 FY02/03 Personal Services: 110 Salaries $62,761 $64,583 $70,839 $72,580 121 Overtime $5,545 $3,517 $5,000 $3,500 Total Personal Services $68,306 $68,100 $75,839 $76,080 Maintenance & Operations: 218 Equipment (Non Capital) $0 $3,225 $3,400 $1,900 221 Safety Equip & Supplies $169 $145 $450 $250 224 Janitorial Supplies $277 $279 $350 $350 229 Other Supplies $444 $223 $500 $500 241 Consumable Tools $380 $231 $500 $500 242 Street Signs $7,939 $9,496 $10,000 $10,000 243 Traffic Signals ($2,225) $1,113 $7,000 $5,000 245 Barricade Materials $1,232 $651 $1,200 $1,200 341 Electricity $1,685 $2,776 $5,800 $5,000 345 Tele. & Communications $94 $218 $775 $450 354 Contract Services $7,664 $2,013 $3,000 $3,000 362 Equipment Maintenance $90 $525 $300 $400 366 Building Maintenance $35 $302 $500 $5,000 369 Radio Maintenance $500 $1,934 $1,450 $500 373 School & Travel $125 $361 $500 $500 428 Paint Materials $3,893 $3,027 $5,000 $5,000 Subtotal $22,302 $26,519 $40,725 $39,550 Capital Outlay 940 Machinery & Equipment $0 $15,878 $0 $27,000 Subtotal $0 $15;878 $0 $27,000 610/620 Debt /Principal/Interest $1,415 $2,721 $2,674 $6,250 TOTAL $92,023 $113,218 $119,238 $148,880 CITY OF KALISPELL • • • 143 • • • PROGRAM OF SERVICES PERSONNELSCHEDULE FUND: GENERAL 1000..DEPT 410..TRAFFIC SIGNS & SIGNALS... FUNCTION ... 430264 ***FTE*** ***BUDGET*** POSITION TITLE FY00/01 FY01/02 FY02103 FY00/01 FY01/02 FY02/03 Traffic Sign Tech 1 1 1 $30,246 $30,950 $31,758 Traffic Sign Tech 1 1 1 $28,998 $29,702 $30,506 Pager Pay-$95 per week $4,940 $4,940 $4,940 subtotal salaries: 2 2 2 $64,184 $65,592 $67,204 Payroll taxes: Fica/Medt. $4,910 $5,018 $5,141 Unemployment tax $225 $230 $235 General Fund total for line 110 $69,319 $70,839 $72,580 Other fund payroll costs include: 2001 2002 2003 Worker's Comp. $3,247 $3,201 $3.608 Health $10 356 $10356 $12,065 Retirement $4.365 $4,460 $4570 Total $17,968 $18.017 $20,243 CITY OF KALISPELL 144 PROGRAM OF SERVICES 2400 LIGHT MAINTENANCE FUND REVENUE PROJECTION ACTUAL BUDGET ESTIMATED PROPOSED FY00/01 FY01/02 FY01102 FY02/03 CASH: $38,990 $16,291 $16,291 $26,183 Maintenance Assessments $79,664 $130,624 $131,567 $131,567 Penalty & Interest $409 $350 $325 $325 Total Available $119,063 $147,265 $148,183 $158,075 EXPENDITURE PROJECTION Street Lighting $102,772 $116,797 $122,000 $127,033 • Cash Carry Over $16,291 $30,468 $26,183 $31,042 The Light Maintenance rate for FY2002 was $ .002420 per square foot for those properties served by the light district. No change is proposed. • 145 • � J • PROGRAM OF SERVICES EXPENDITURE SUMMARY FUND: LIGHT MAINTENANCE 2400...PUBLIC WORKS 410..FUNCTION... 430263 ACTUAL ACTUAL BUDGET STAFF'S ACCOUNT FY99/00 FY00/01 FY01102 FY02/03 Personal Services $0 $0 $0 $0 Materials and Services $71,499 $77,772 $116,797 $127,033 Capital Outlay $0 $25,000 s0 $0 $71,499 $102,772 $116,797 $127,033 STATEMENT OF FUNCTION: The Street Lighting District is provided to improve visibility during darkness and to promote safe and efficient use of street facilities. This is accomplished by reducing pedestrian accidents at night, by reducing vandalism, and by reducing other crimes. CITY OF KALISPELL 146 EXPENDITURE DETAIL FUND: LIGHT MAINTENANCE 2400... PUBLIC WORKS 410..FUNCTION... 430263 ACTUAL ACTUAL BUDGET STAFFS ACCOUNT FY99/00 FY00/01 FY01/02 FY02l03 Materials and Services 244 Lighting Supplies $571 $413 $1,500 $1,500 341 Electricity $67,361 $73,896 $108,500 $119,350 355 Billing Costs $400 $200 $800 $800 360 Repair & Maint Services $165 $1,200 $1,200 522 Administrative Transfer $3,002 $3,263 $4,797 $4,183 Total M & S $71,499 $77,772 $116,797 $127,033 Capital Outlay 944 Vehicles $0 $25,000 $0 $0 Total Capital Outlay $0 $25,000 $0 $0 Total $71,499 $102,772 $116,797 $127,033 PROGRAM OF SERVICES • • CITY OF KALISPELL 147 n L-A is PROGRAM OF SERVICES 2401 DECORATIVE LIGHT MAINTENANCE REVENUE PROJECTION ACTUAL BUDGET ESTIMATED PROPOSED FY00101 FY01/02 FY01/02 FY02/03 CASH: $2,480 $4,036 $4,036 $4,567 Maintenance Assessments Penalty & Interest Total Available $4,394 $6,250 $6,365 $6,365 $31 $15 $31 $25 $6,905 $10,301 $10,432 $10,957 EXPENDITURE PROJECTION Street Lighting $2,869 $6,884 $5,865 $7,172 Cash Carry Over $4,036 $3,417 $4,567 $3,785 *Note: Properties in the district are assessed by front footage. Due to increases in electricity a rate of $1.50 ft. will be needed this year. This rate was increased last year and remains the same for the coming year. C11Y OF KALISFELL 148 PROGRAM OF SERVICES EXPENDITURE SUMMARY FUND: DECORATIVE LIGHTS 2401... PUBLIC WORKS 410..FUNCTION... 430263 ACTUAL ACTUAL BUDGET STAFFS ACCOUNT FY99l00 FY00/01 FY01/02 FY02/03 Materials and Services $3,210 $2,869 $6,884 $7,172 $3,210 $2,869 $6,884 $7,172 STATEMENT OF FUNCTION: The Decorative Street Light Maintenance District is provided as an aesthetic feature in the business district as well as to promote beautification by landscaping and other appurtenances. • • CITY OF KALISPELL 149 n t� • • PROGRAM OF SERVICES EXPENDITURE DETAIL FUND: DECORATIVE LIGHTS 2401... PUBLIC WORKS 410..FUNCTION... 430263 ACTUAL ACTUAL BUDGET STAFF'S ACCOUNT FY99/00 FY00/01 FY01/02 FY02103 Materials and Services 244 Lighting Supplies $821 $583 $1,200 $1,500 341 Electricity $2,023 $1,834 $3,875 $3,875 355 Billing Costs (County) $100 $200 $200 $200 360 Repair & Maint. Service $2 $1,350 $1,350 522 Administrative Transfer $264 $252 $259 $247 Total M & S $3,210 $2,869 $6,884 $7,172 Total $3,210 $2,869 $6,884 $7,172 CITY OF KALISPELL 150 PROGRAM OF SERVICES n LJ 4290 SIDEWALK & CURB CONSTRUCTION REVENUE PROJECTION ACTUAL BUDGET ESTIMATED PROPOSED FY00/01 FY01/02 FY01/02 FY02/03 CASH: $0 $0 $0 $0 Proceeds S & C Warrants $2,315 $85,000 $25,000 $25,000 Owner Contribution $251 $0 $60,000 $0 Total Available $2,566 $25,000 $85,000 $85,000 EXPENDITURE PROJECTION Construction Costs $2,566 $85,000 $85,000 $25,000 Cash Carry Over $0 $0 $0 $0 • OF KALISPELL 151 �J • PROGRAM OF SERVICES EXPENDITURE SUMMARY FUND: 4290....... SIDEWALK AND CURB CONSTRUCTION ACTUAL ACTUAL BUDGET STAFF'S ACCOUNT FY99/00 FY00/01 FY01/02 FY02/03 Sidewalk Construction $4,142 $2,566 $85,000 $25,000 $4,142 $2,566 $85,000 $25,000 STATEMENT OF FUNCTION: The sidewalk and curb construction fund is used to record expenditures for replacing sidewalks and curbs which residents request or which the City orders in. The costs are paid for by the property owner. They are billed for the cost of construction plus 5% for administration. The property owner can have the cost put on the tax notice for a period of 8 years. The City sells sidewalk and curb warrants for the amount of the assessment. The sidewalk and curb construction fund appropriations have been changed due to the recent history of construction. CITY OF KALISPELL 152 PROGRAM OF SERVICES EXPENDITURE DETAIL FUND: 4290....... SIDEWALK AND CURB CONSTRUCTION ACTUAL ACTUAL BUDGET STAFF'S ACCOUNT FY99/00 FY00/01 FY01/02 FY02/03 410 430234 937 Construction $3,728 $2,566 $23,750 $22,500 Claremont Sidewalk $57,000 410 430631 522 Administration $414 $4,250 $2,500 Total $4,142 $2,566 $85,000 $25,000 0 11 CITY OF KALISPELL 153 u PROGRAM OF SERVICES 2825 MT. AIR & CONGESTION INITIATIVE GRANT CASH: MACI Grant for Sidewalks MACI Grant for Equipment Transfer from Gas Tax Total Available REVENUE PROJECTION BUDGET ESTIMATED PROPOSED FY01102 FY01102 FY02/03 $0 $0 $81,000 $526,131 $0 $526,000 $81,000 $526,131 $81,000 $607,000 EXPENDITURE PROJECTION CAPITAL OUTLAY $526,131 $0 $607,000 Cash Carry Over $0 $81,000 $0 Grant approval has been received. The amount of the match is approximately $81,000. The match was taken from the Gas Tax Fund. Match is 13.4% CITY OF KALISPELL 154 PROGRAM OF SERVICES EXPENDITURE SUMMARY FUND: MT. AIR &CONGESTION GRANT 2825 ... STREET 421... FUNCTION...430240 BUDGET STAFFS ACCOUNT FY01/02 FY02/03 Personal Services $0 $0 Materials and Services $0 $0 Capital Outlay $526,131 $607,000 $526,131 $607,000 STATEMENT OF FUNCTION: Grant approval has been received. The amount of the match is approximately $81,000. The match was taken from the Gas Tax Fund in FY2002. Match is 13.4% The Grant funds will be used to construct sidewalks on the West North part of town. MOOT will be administering the grant funds. • • CITY OF KALISPELL 155 • • PROGRAM OF SERVICES EXPENDITURE DETAIL FUND: MT. AIR & CONGESTION GRANT 2825... STREET 421... FUNCTION ... 430240 BUDGET ACCOUNT FY01/02 STAFF'S FY02/03 950 Construction in Progress -sidewalks $526,131 TOTALS $526,131 $607,000 $607,000 CITY OF KALISPELL 156 PROGRAM OF SERVICES 4393 HWY 93 SO. UTILITY EXTENSION PROJECT CASH: Proceeds of bonds Total Available Utility Extension Project Reserve requirements REVENUE PROJECTION BUDGET ESTIMATED PROPOSED FY01/02 FY01/02 FY02/03 $0 $0 $0 $2,491,690 $0 $2,491,690 $2,491,690 $0 $2,491,690 EXPENDITURE PROJECTION FiTv nF $0 $0 $0 $0 0 • is 157 n U 0 • PROGRAM OF SERVICES EXPENDITURE DETAIL/SUMMARY FUND: HWY 93 SOUTH PROJECT FUND 4393 ... FUNCTION 430550 ... 430640 BUDGET STAFF'S ACCOUNT FY01/02 FY02/03 430550 950 WATER $920,800 $920,800 reserve requirement $92,000 $92,000 issue costs/contingency $30,000 $30,000 430640 950 SEWER $1,289,900 $1,289,900 reserve requirement $128,990 $128,990 issue costs/contingency $30,000 $30,000 $2,491,690 $2,491,690 US 93 South Water Improvements In conjunction with MDT improvements to US Highway 93 from Ashley Creek to Kalispell, the City intends to install water improvements within the highway right of way. These improvements include water mains, valves, hydrants, utility crossings and appurtenant structures to extend utilities from their present terminus south to approximately the intersection of US Highway 93 and Cemetery Road. The estimated construction cost of these facilities is $920,800. The current MDT project schedule anticipates this work in 2002. Additional cost are for bonding and Bond reserve requirements. US 93 South Sewer Improvements In conjunction with MDT improvement of US Highway 93 from Ashley Creek to Kalispell, the City intends to install sewer improvements within the highway right of way. These improvements include sewage collection gravity mains, pressure force mains, pumping facilities and appurtenant structures to extend utilities from their present terminus south to approximately the intersection of US Highway 93 and Cemetary Road. The estimated construction cost of these facilities is $1,414,900. The current MDT project schedule anticipates this work in 2002. Additional cost are for bonding and Bond reserve requirements. SEE WATER & SEWER FUNDS FOR RATE INCREASES NEEDED TO FUND THE DEBT SERVICE. CITY OF KALISPELL 158 PROGRAM OF SERVICES 5210 WATER FUND REVENUE PROJECTION CASH: Operating Replacement Account.* Meter Replacement Cash ** (Increase) in A/R, adj. comp. abs. Metered Water Sales Metered Water Sales $ .30 adjustment Metered Water Sales -after meter project Hook-up Fees (Replacement account.)* Meter fee ** Installation Charges Turn on fees & mist. Water Tower Rental Board of Investments Loans Revenue Bond 2000 issue 4% SRF amended'OI Interest Earnings Total Available Water Billing Water Operating Debt Service Capital Outlay Capital Outlay - Replacement funds * Capital Outlay - Meter Replacement funds ** Capital Outlay -Bonded construction Depreciation -Unfunded ,'99,'00.'01 Total Operating Expenditures Add back: unfunded Deprec/Replacement Operating Funds moved to Bond Reserve Cash Cam' Over: Operating Cash Replacement Cash Account* Meter Cash replacement account ** ACTUAL BUDGET ESTIMATED PROPOSED FY00/01 FY01/02 FY01/02 FY02/03 $622,763 $572,796 $572,796 $370,420 $780,836 $437,456 $437,456 $527,456 $0 $16,844 $16,844 $M844 ($15,379) $1,039,725 $1,110,000 $LI10,000 $1,L50,000 $60,000 $0 $60,000 $40,000 $27,000 $29,000 $58,108 $65,000 $90,000 $75,000 $16,844 $42,000 $44,000 $44,000 $13,746 $15,000 $25,000 $20,000 $6,484 $1,000 $12,000 $10,000 $9,435 $9,435 $7,899 $0 $0 $0 $0 $0 $605,350 $140,000 $140,000 $0 $84,747 $100,000 $30,000 $20,000 $3,222,659 $2,609,531 $2,512,995 $2,324,720 EXPENDITURES $88,271 $96,635 $96,635 $96,596 $801,370 $896,430 $775,000 $920,323 $112,457 $164,423 $164,423 $167,587 $186,627 $518,217 $378,217 $164,000 $401,488 $256,000 $0 $423,000 $0 $40,000 $40,000 $40,000 $605,350 $140,000 $140,000 $0 $170.000 $170,000 $170,000 $170,000 $2,365,563 $2,281,705 $1,764,275 $1,981,505 $170,000 $170,000 $170,000 $170,000 $572,796 $232,526 $370,420 $310,915 $437,456 $246,456 $527,456 $179,456 $16,844 $18,844 $20,944 $22,844 * the bond ordinance requires hook up fees to be put in a replacement account ** meter replacement fees are a designation established by the budget appropriation. CITY OF n LJ 0 11 159 • • 0 PROGRAM OF SERVICES WATER Bond coverage - proposed budget FY2003 est. water service charge * Miscellaneous revenue Total operating revenue Less operating expenses before deprec. Available for debt service Maximum debt service $1,239,000 $30,000 $1,269,000 Billing $96,596 Water $920,323 Total M&O $1,016,919 $252,081 current bonds $167,587 current coverage 150.42% need 167,587 x 125% $209,484 coverage $42,597 *Estimate includes about $29,000 revenue from new meters (not a full year.) Council authorized 2% ( $.03) for replacement estimated to generate approximately $22,000 annually. Not Implemented. $0.03 Elimination of the $ .30 price break after 30,000 gallons would net the City about $60,000 in revenue. Recommended by Council at worksession. Not Implemented. Hwy 93 South Water Main Project -revenue bond 2002 revenue bond 20 years new bond $76,241 $1,042,800 @ 4% new max debt $243,828 (includes 10% bond reserve and issue costs) coverage available 103.38% needed $243,828 x 125% $304,785 available $252,081 shortfall ($52,704) Water Project rate required for debt $0.10 Total rate required $0.13 current rate $1.39 perthousand new rate $1.52 per thousand spinkling $0.85 per thousand C11 Y Uk KALISPELL 160 PROGRAM OF SERVICES EXPENDITURE SUMMARY FUND: WATER OPERATING 5210 ... 447 ... WATER FACILITIES FUNCTION ... 430550 Amended ACTUAL ACTUAL BUDGET STAFFS ACCOUNT FY99/00 FY00/01 FY01/02 FY02103 Personal Services $361,631 $402,595 $397,126 $428,176 Materials and Services $289,419 $399,812 $499;304 $492,147 Capital Outlay $83,099 $186,627 $518,217 $164,000 Water Bond Project $605,350 $140,000 Capital Outlay Replacement Funds $94,045 $401,488 $256,000 $423,000 Capital Outlay Meter Funds $0 $0 $40,000 $40,000 Debt Service $105,038 $112,457 $164,423 $167,587 Deprec./Replacement $140,000 $170,000 $170,000 $170,000 $1,073,232 $2,278,329 $2,185,070 $1,884,909 STATEMENT OF FUNCTION: The responsibility of the Water Department is to provide safe; potable and palatable waterm for the needs of the domestic, institutional, industrial and comercial consumers and to provide adequate pressure and flow to meet fire fighting and irrigation needs. Maintenance of the five wells and Noffsinger Spring as water sources along with maintenance of the distribution system, storage facilities; fire hydrants, valves, meters and related controls is an integral part of the function of this department. This budget is responsible for pumping and treating millions of gallons annually. Line Item Detail: WATER FUND 218 Equipment (Non Capital) - $3,000 (Reduced $3,600) $1,000 - 14" Cut Off Saw $ 300 - 9" Hand Grinder $ 900 - 1/2" Air Drive Impact Sockets, Wrench &Air Regulator $ 275 - 7 1/4" Power Saw $ 275 - 24' Extension Ladder $ 250 -Cordless Drill cont. • CITY OF KALISPELL 161 • • • PROGRAM OF SERVICES Line Item Detail: WATER FUND, continued 312 Postage & Shipping - $3,000 Cost of mailing Consumer Confidence Report. 320 Printing - $5,500 Blueprints and printing of Consumer Confidence Report, required by the EPA. 349 Lab Services - $20,000 Increase of $12,500 - As a result of new EPA rules our costs have significantly increased. Two new tests that are now required will cost an additional $10,080. We also brought Noffsinger Springs on line last year which increased costs by $4,160 and a new population formula that the State has applied will add an additional $720 in testing as well. 354 Contract Services - $21,300 (Reduced $26,400 from FY02) $ 4,200 - Contract Mowing at Well Sites $12,000 - Estimated System Repairs $ 600 - U-Dig Fees $ 4,500 - Install Auto Gate Opener & Manual Walk Thru Gate at Noffsinger Springs 356 Consultants - $15,000 Facility Plan 2000 recommended redistribution of the City's water rights at its present supply wells and Noffsinger Spring. Several water wells are producing above their permitted rates, and Noffsinger is regulated to a production level below the granted water right. This needs correction to place the City in the best position when water rights adjudication takes place in the Flathead drainage. Building Maintenance - $13,000 (Reduced $9,050 from FY02) Perform various maintenance tasks at the Water Maintenance Building, Noffsinger Springs, the reservoirs and booster stations at the Buffalo Hill site and Armory. Depot and Grandview wells. Also includes $7,000 to rebuild and pave drive approaches at Noffsinger Springs, Armory Well, Buffalo Well and Booster Stations. 421 Meter Supplies - $40,000 Increase of $10,000 is for purchasing radio read transmitters that we began installing on the system in FY02. Capital Outlay Replacement 931 Main Replacement - Carryover $6,000 $6,000 - Construct a bypass to transfer water from the upper zone to the lower zone by utilizing elevated reservoir overflow. KALISPELL 162 PROGRAM OF SERVICES Line Item Detail: WATER FUND, continued Capital Outlay Replacement Telemetry & Control System Engineering & Construction - Carryover $35,000 & New Appropriation $25,000 Includes preliminary engineering, project engineering and estimated construction costs. The telemetry system was upgraded about four years ago when the Grandview wells were constructed. However, the upgrade project salvaged all the old communications and interface equipment. This equipment is obsolete and was severely damaged by a lightning strike last year. The damaged equipment was repaired or replaced where possible, but spare parts are no longer available from arty source. The communications units, interfaces and related programmable controllers must now be upgraded to current equipment types. Preliminary engineering has determined that original estimates for equipment were accurate but neglected to include the cost of re -programming new equipment into the system. This must be done to allow for proper operation in automated modes and functioning of remote alarm systems. Buffalo Hill Production & Upper Zone Booster Electrical Upgrade Engineering & Construction- Phase I - Carryover $165,000 & New Appropriation $72,000 This item was identified during the facility plan process and includes preliminary engineering, project engineering and estimated construction costs. The current emergency power system at Buffalo Hill includes two diesel generators, neither of which has the capacity to fully operate all the required equipment. This project will replace these units with a single generator to power the well and the booster pumps. This upgrade is essential to allow for transfer of water from the lower pressure zone to the upper to meet fire flow needs because of inadequate upper zone storage capacity. Old units will be installed at other well sites where their capacity will meet requirements. This would be a future project. Additional appropriation is needed to replace the existing switchgear, transfer switches and wiring. These are obsolete items that must be replaced in order to reduce costs of work in the long term. These items would have been replaced as part of the phased electrical, system reliability, safety and security upgrade project. It is less costly to include them into this work than do it separately later. Work on this will be done late in the season to avoid system disruption during peak demand months. Phase I -Water Supply Electrical System, Reliability, Safety, and Security Upgrades - $120,000 This is phase I of an upgrade project for the City's water supply sites at Noffsinger Spring, Armory Well and Depot Well. These water supply sources are among the oldest serving the City. The age of the building wiring, power and control systems in most cases exceeds 50 _years. These components have deteriorated to the point they are an operational problem and a serious safety hazard. Further, many components are totally obsolete and no longer serviced for parts necessitating extended time out of service while components are located and installed. Operator safety has become a serious issue because many building circuits have faulted to ground and cannot be fully isolated by disconnecting breakers. Operators have repeatedly received electric shocks when tn'ing to diagnose and repair minor items. • 0 • PROGRAM OF SERVICES Line Item Detail: WATER FUND, continued Capital Outlay 933 Facility Plan Consultants - Carryover $140,000 - New Appropriation $10,000 Carryover $20,000 for cost -of -service rate study and evaluation of system development charges (connection fees). Carryover $120,000 for Source Water Delineation Study with MDEQ. New, appropriat- ion of $10,000 is to ensure adequate funding for system development charge (connection fees) evaluation. 940 Machinery & Equipment - $14,000 $14,000 - Meter Test Bench - Current bench was made in 1944, we bought it used in 1959. Parts are no longer available and the accuracy is questionable. UNFUNDED: Prioriy, #1- $385,000 - Phase I Residential Meter Changeout (Capital Outlay) In FY02 the City changed out its large water meters to a more reliable and accurate design. Also included in the program was a remote reading system to allow simpler and faster meter reading with direct transfer of billing data into the City's computerized billing system. The intent of the program was to improve reliability, increase accountability, and enhance revenue. The program has been hugely successful. It was originally estimated that the project payback would be 5 years, our data indicates our actual payback to be closer to 2.5 years. We would now like to continue by changing out our residential meters. This would be done in three phases. Phase I would consist of changing out one third of our residential meters, approximately 1.700 the first year. Rather than contract this project the City will use employees and temporary help, thus saving the City approximately $600,000 over the three phases of the project. Priority 42 -Hydrant Installations - $100,000 (Capital Outlay) The Fire Department has identified several areas within Citv limits that do not have adequate hydrants. While this is a fire safetyissue, it also impacts the rating that will be issued by the ISO in 2 1/2 years. Our plan is to meet the 2 1/2 year target date for completion of this project. In order to accomplish this we will need to install 30 - 35 hydrants in FY03 and FY04 until completed. Priority #3 - US 93 South Water Improvements - $920,800 ($629,800 Capital Outlay/$291,800 Replacement) See Capital Project Fund #4293 In conjunction with MDT improvements to US HigMva% 93 from Ashley Creek to Kalispell, the City intends to install water improvements within the highway right of way. These improvements include water mains. vat es. hN drants. utilit} crossings and appurtenant structures to extend utilities from their present terminus south to approximately the intersection of US Higbw aN 93 and Cemcten Road. The estimated construction cost of these facilities is $920.800. The current MDT project schedule anticipates this work in 2002. We do not believe this is realistic because of continuing ROW and design problems that are not yet resolved. However. we must continue to earn this item to ensure funding availability whenever the project finally proceeds. CITI' OF KALISPELL Cont. 164 PROGRAM OF SERVICES Line Item Detail: WATER FUND, continued UNFUNDED CONT.: Priority #4- Water Main Extensions - $540,000 (Capital Outlay) $340,000 - Project I: Northern Lights Blvd. to Parkway Drive - This project would include extending the main from Northern Lights and Three Mile Dr. east on Three Mile to Meridian Rd. and then north on Meridian approximately 350 ft. and connecting to an existing main. Another main would extend Three Mile, north on Northwest Lane to the south side of the Junior High School and then run east to Parkway Dr. and west to Northern Lights Blvd. The project would consist of 1,400 L.F. of 12" main, 3,720 L.F. of 8" main and eleven (11) fire hydrants. This addition to our water distribution system would make water services available to seventeen (17) properties that do not now have service, greatly improve the fire flows in this area. This project is designated WEX 2 and WEX 7 in our Capital Improvement Program. This project would also provide for the possible future connection of the upper and lower pressure zones. The total project cost would be $340,000 which includes engineering and contingencies. $200,000 - Project II: Eighth Avenue East - This project extends the water main from 14th St. East to the south end of 8th Ave. East and includes 1,584 L.F. of 8" main and four (4) fire hydrants. This area is outside of the City limits and is served by a 2" water main. The only available fire protection is a fire hydrant located at 14th St. The project is designated as WEX 3 in the Capital Improvements Program. The total project cost would be $200,000 which includes engineering and contingencies. Priority #5 - Main Replacement - Carryover $50,000 (Capital Outlay Replacement) $50,000 - Replace old 6" cast iron water main on Washington Street between 5th Avenue WN and 4th Avenue WN and replace with 8" PVC water main. Priority #6 - Machinery & Equipment - $93,000 (Capital Outlay) $93,000 - Low Profile Tandem Truck - This will allow us to continue the turnover of used trucks. We will pass a 1994 Ford Tandem to the Street Division, which would then replace a 1985 Chevy Kodiak Tandem. Priority # 7 - Vehicles - $49,000 (Capital Outlay) $26,000 - Meter Van w/Tool Boxes - Replacing the current meter van which is ten years old. $23,000 - 1/2 Ton 4x4 Extended Cab Pick-up - This will replace a 1993 Ford Ranger that the meter reader uses. The Ford Ranger is too small to cam, the equipment needed for the radio read meter reading system. KALISPELL • • • 165 n LJ • PROGRAM OF SERVICES EXPENDITURE DETAIL FUND: WATER OPERATING 5210... 447... WATER FACILITIES FUNCTION ... 430550 Amended ACTUAL ACTUAL BUDGET BUDGET ACCOUNT FY99/00 FY00/01 FY01/02 FY02/03 Personal Services: 110 Salaries & Wages $293,672 $313,561 $320,562 $340,551 112 Retirement -Severance $0 $0 $0 $1,680 121 Overtime/Call Outs $10,423 $23,377 $14,000 $14,000 153 Health Insurance $39,216 $45,054 $43,224 $51,329 155 PERD $18,320 $20,603 $19,340 $20,616 Total Personal Services $361,631 $402,595 $397,126 $429,176 Materials and Services: 210 Office Supplies 5184 $169 $250 $250 213 Small Office Equip $0 $148 $500 $500 214 GIS Supplies $0 $1,023 $2,000 $1,000 215 Computer Supplies $507 $819 $1,500 $1,000 216 Computer Equipment $926 $260 $1,000 $2,000 218 Equipment (Non Capital) $0 $1,744 $6,600 $3,000 221 Safety Equip & Supplies $541 $1,585 $4,400 $1,600 224 Janitorial Supplies $489 $384 $500 $500 226 Chlorine & Chemical $4,820 $5,641 $7,500 $7,500 229 Other Supplies $2,001 $1,091 $2,500 $2,500 231 Gas & Oil $7,098 $6,797 $9,000 $8,000 241 Consumable Tools $1,087 $1,017 $1,300 $1,300 312 Postage $2,188 $1,726 $3,000 $3,000 320 Printing (maps) $1,957 $1,826 $5,500 $5,500 335 Membership, Dues & Certification $1.254 $715 $1,200 $1,200 336 Public water supply fee $IL760 $11114 $15,500 $15,500 341 Electricity $73.470 $83,986 $129.580 $129,580 342 Water/Sewer $173 $187 $300 $600 344 Natural Gas $5,957 $8,684 $8,900 $8,000 345 Telephone & Communications $6,096 $6,115 $8,000 $8,000 349 Lab Services $7,914 $5,427 $7,500 $20,000 353 Auditing $1000 $2,000 $2,000 $2.000 354 Contract Services $4.845 $42,328 $47,700 $21,300 355 Billing Costs $0 $338 $0 $0 356 Consultants $12.783 $13,175 $15,000 $15,000 360 Repair & Maintenance $1,053 $9,759 $9,500 $9,500 362 Equipment Maintenance $2,608 $3,349 $5.000 $5,000 363 Office Equip Maintenance $35 $0 $400 $400 366 Building Maintenance $7,314 $1L675 $22,050 $13.000 369 Radio Maintenance $438 $4,576 $1,800 $HOO CITY OF KALISPELL 166 EXPENDITURE DETAIL, continued FUND: WATER OPERATING 5210...447 ... WATER FACILITIES FUNCTION ... 430550 Amended ACTUAL ACTUAL BUDGET STAFFS ACCOUNT FY99100 FY00/01 FY01102 FY02l03 373 School &Travel $2,648 $3,026 $3,000 $3,000 380 Training Materials $77 $200 $200 388 Medical Services/drug testing $268 $476 $500 $500 395 Equipment Rental $841 $745 $1,000 $1,500 410 Construction Materials $6,339 $7,847 $10,000 $10,000 421 Meters supplies $29,760 $31,663 $25,000 $40,000 422 Hydrants $1,731 $9,431 $10,000 $10,000 423 Materials - Mains $4,993 $13,950 $13,000 $13,000 424 Materials -Service lines $9,055 $9,174 $13,000 $13,000 425 Materials -Pumps $1,245 $4,081 $5,000 $5,000 510 Property &Liability his. $9,902 $13,849 $14,500 $14,500 512 Uninsured loss -deductible $3,631 $7,500 $7,500 521 Central Garage Transfer $8,500 $8,800 $8,800 $8,500 522 Administrative Transfer $43,081 $58,290 $58,771 $72,168 528 Data Processing Transfer $7,850 $8,785 $9,053 $5,749 810 Bad Debt Expense $0 $1,037 $0 Total Material &Services $289,419 $399,812 $499,304 $492,147 Capital Outlay Replacement Funds: 934 Roof Reservoirs $401,488 931 Mains (R&D Fund) $94,045 $56,000 $6,000 942 Electrical Upgrade &Telemetry $200,000 $297,000 942 Water Supply Electrical Safety Upgrade $0 $120,000 $94,045 $401,488 $256,000 $423,000 Capital Outlay Meter Funds: 948 Meters from Replacement $ $40,000 $40,000 Total Capital Outlay/Replacement $0 $0 $40,000 $40,000 Capital Outlay: 920 Buildings (carryover) $6,250 $6,865 933 Facility Planning Consultants $7,339 $72,698 $163,300 $150,000 934 Capital Improvements, carryover $41,270 $4,548 $5,452 940 Equipment $34,490 $78,456 $21,600 $14,000 944 Vehicles $24,675 $59,000 $0 948 Meters -capital project $262,000 $0 Total CapitalOuday $83,099 $186,627 $518,217 $164,000 con't. PROGRAM OF SERVICES • • CITY OF KALISPELL 167 • PROGRAM OF SERVICES EXPENDITURE DETAIL,continued FUND: WATER OPERATING 5210... 447... WATER FACILITIES FUNCTION ... 430550 Amended ACTUAL ACTUAL BUDGET BUDGET ACCOUNT FY99/00 FY60/01 FY01/02 FY02/03 Debt Service: 490545 610 Loan - Loader Principal $0 $4,256 $4,373 $4.621 620 Interest $0 $1,738 $1,377 $773 490200 1996 Revenue Bond 610 Principal $60,000 $60,000 $60.000 $65,000 620 Interest $44.763 $46,188 $42,738 $39,798 630 Fiscal Agent Fees $275 $275 $275 $275 49o25o 2001 SRF Loan - 4% 610 Principal $0 $0 $26,000 $28r000 620 Interest $0 $0 $29,660 $29,120 Total Debt Service $105,038 $112,457 $164,423 $167,587 510400 831 Depreciation expense $140,000 $170,000 $170MO $170.000 Total Water Operating $1.073 232 $1.672,979 $2,045 070 $1.884.909 430552 950 No. Main Water Improvements $0 $605,350 $140.000 $0 Grand Total $1,073.232 $2,278,329 $2.185.070 SL884.909 CITY OF KALISPELL 168 PROGRAM OF SERVICES EXPENDITURE DETAIL,continued FUND: WATER OPERATING 5210 ... 447... WATER FACILITIES FUNCTION ... 430550 Amended ACTUAL ACTUAL BUDGET BUDGET ACCOUNT FY99/00 FY00/01 FY01102 FY02103 Debt Service: 490545 Loan - Loader 610 Principal $0 $4,256 $4,373 $4,621 620 Interest $0 $1,738 $1,377 $773 490200 1996 Revenue Bond 610 Principal $60,000 $60,000 $60,000 $65,000 620 Interest $44,763 $46,188 $42.738 $39,798 630 Fiscal Agent Fees $275 $275 $275 $275 49025o 2001 SRF Loan - 4% 610 Principal $0 $0 $26,000 $28,000 620 Interest $0 $0 $29,660 $2%120 Total Debt Service $105,038 $112,457 $164,423 $167,587 510400 831 Depreciation expense $140,000 $170.000 $170,000 $1707000 Total Water Operating $1,073.232 $1.672,979 $2.045.070 $1.884.909 430552 950 No. Main Water Improvements $0 $605.350 $140.000 SO Grand Total $1.073.232 $2,278329 $2.185,070 $1.884,909 Ll • • CITY OF KALISPELL 169 • PROGRAM OF SERVICES PERSONNEL SCHEDULE FUND: WATER OPERATING 5210... 447... WATER FACILITIES FUNCTION ... 430550 ***FTE*** ***BUDGET*** POSITION TITLE FY00/01 FY01r02 FY02/03 FY00r01 FY01v02 FY02iO3 Public Works Director 0.25 0.25 0.25 $13,959 $14,503 $14,938 Asst.CityEngineer 0.35 0.35 0.35 $14,294 $14,823 $18,025 Superintendent -vacant 0.25 0.25 0.25 $10,520 $10,846 $10,846 Design Tech/Project Manager 0.15 $6,651 Construction Inspector 0.25 0.25 0.00 $9,458 $7,296 $0 Civil Engineer 0.20 $7,401 Admin. Coordinator 0.25 025 0.20 $7,087 $7,349 $6,056 Working Foreman 1.00 1.00 1.00 $30,410 $31,159 $31,967 Maintenance & Repair 6.00 6.00 6.00 $168,163 $179,255 $184.078 Surveyor 0.40 0.40 0.40 $12,202 $12,593 $12,958 Clerk II 0.25 025 0A0 $5,543 $5,689 $9,354 vehicle allowance $900 $900 merit & comptime buyout $7,305 $1,600 subtotal salaries 9.00 9.00 9.20 $278,941 $286,013 $303,174 Pavrolltaxes Fica/Medt $21,339 $21,880 $23.193 Worker's comp. $14.326 $11,668 $13.123 Unemployment tax $976 $1,001 $1,061 Total for line item 110 $315.582 $320,562 $340.551 CITY OF KALISPELL 170 EXPENDITURE SUMMARY FUND: WATER 5210..WATER BILLING COSTS 447... FUNCTION ... 430560 ACTUAL ACTUAL BUDGET STAFFS ACCOUNT FY99/00 FY00/01 FY01/02 FY02/03 Personal Services $52,136 $64,105 $68,534 $72,039 Materials and Services $22,503 $23,154 $25,601 $24,557 Capital Outlay $0 $1,012 $2,500 $0 $74,639 $88,271 $96,635 $96,596 STATEMENT OF FUNCTION: The water rates which went into effect September 1st 1996 segregate the billing costs as a flat fee, $2.65 per bill. We bill approximately 6,000+ customers six times a year. The billing fee generates approximately $100,000. Line Item Detail: 354 Contract Services-$2,000. Includes $750 to Grizzley Security to pickup utility bills at the grocery store locations and $375 (25%) of the cost to have Grizzley Security take daily deposits to the bank (costs shared with Finance). Maintenance contract for ADG software for the Utility Billing Program is $500 year. Additional $375 for bank charges or customize software. 355 Billing costs -anticipate increased costs for postage. Additionally we plan to go to laser printed water bills in place of the current bills which are printed on aline printer. The cost will be about $1,000 more per 50,000 bills. 373 School & travel/ membership &dues Funds for the utility clerk to attend training and partial funding for the City Accountant for continuing education. 25% of City accountant funded by water billing. City accountant membership in CPA society, license and GFOA. PROGRAM OF SERVICES • • CITY OF KALISPELL 171 • • PROGRAM OF SERVICES EXPENDITURE DETAIL FUND: WATER 5210..WATER BILLING COSTS 447... FUNCTION ... 430560 ACTUAL ACTUAL BUDGET STAFF'S ACCOUNT FY99/00 FY00/01 FY01/02 FY02/03 Personal Services: 110 Salaries & Wages $41,241 $52,396 $55,459 $57,355 153 Health Insurance $8,352 $8,584 $9,744 $11,352 155 Retirement - PERD $2,543 $3,125 $3,331 $3,332 Total Personal Services $52,136 $64,105 $68,534 $72,039 Materials and Services: 210 Office Supplies $249 $24 $300 $300 320 Printing $2,366 $2,309 $2,500 $0 335 Membership & Dues $0 $226 $250 $500 354 Contract Services $1,697 $1,481 $2,000 $2,000 355 Billing Costs & postage $7,185 $7,245 $7,500 $12,500 373 School & Travel $0 $378 $750 $1,000 522 Administrative transfer $3,156 $3,466 $4,201 $3,461 528 Data Processing $7,850 $8,025 $8,100 $4,796 Total Materials and Services $22,503 $23,154 $25,601 $24,557 Capital Outlay: 940 PC for Water/Billing (1/2) $0 $1,012 $2,500 $0 Total Billing Costs $74,639 $88,271 $96,635 $96,596 CITY OF KALISPELL 172 PROGRAM OF SERVICES PERSONNEL SCHEDULE FUND: WATER 5210..WATER BILLING COSTS 447... FUNCTION ... 430560 ***FTE*** ***BUDGET*** POSITION TITLE FY00/01 FY01/02 FY02/03 FY00/01 FY01/02 FY02/03 Meter Reader 0.50 0.50 0.50 $14,787 $15,120 $15,501 Billing Clerk 1.00 1.00 1.00 $23,917 $24,499 $25,134 City Accountant 0.25 0.25 0.25 $7,105 $8,127 $8,371 Vacation fill-in $1,642 $2,610 $3,000 subtotal salaries 1.75 1.75 1.75 $47,451 $50,356 $52,006 Payroll taxes: Fica/Medt $3,630 $3,852 $3,978 Unemployment tax $166 $176 $182 Worker's comp. $1,149 $1,075 $1,189 Water billing total for line item 110 $52,396 $55,459 $57,355 0 • • CITY OF KALISPELL 173 • 0 • 5310 SEWER/WWTP FUND REVENUE/CASH FLOW PROJECTION ACTUAL BUDGET ESTIMATED PROPOSED FY00/01 FY01/02 FY01/02 FY02/03 CASH:OperatingSewer/WWTP $803,992 $783,965 $783,965 $701,392 *** WWTP Capital Improvement $1,652,528 $1,841,019 $1,841,019 $2,030,114 **WWTPEquipment Repl/Evergreet $1,447,521 $1,849,862 $1,949,862 $2,084,389 * SANITARY sewer Replacement $548,650 $518,884 $519,884 $606,969 Subtotal Cash $4,452,691 $4,993,730 $4,993,730 $5,422,864 REVENUE and sources of cash: Change in A/R, comp abs. ($30,984) SEWER SERVICE -billed $2,307,396 $2,420,000 $2,500,000 $2,500,000 *** Hookup-WWTP $93,979 $90,000 $129,095 $95,000 * Hookup -Sewer $55,137 $60,000 $92,290 $65,000 Interest -operations $86,060 $42,000 $30,000 $20,000 ** Interest-WWTP/Evergreen $105,172 $108,000 $60,000 $40,000 *** Interest-WWTP capital imp $94,512 $110,000 $60,000 $40,000 * Interest -Sanitary Replaceme $38,023 $40,000 $17,736 $13,000 DNRC & CDBG Grants for WWTP $30,000 Subtotal Revenue $2,749.285 $2,870,000 $2,889,111 $2,803,000 Total Available $7,201,976 $7,863,730 $7,882,841 $8.225,864 EXPENSES and uses of cash: SANITARY operating/debt/capital $579,706 $710,298 $679,000 $862,111 * Sewer Replacement funds $122,926 $86,931 $21,931 $320,000 Billing Costs $88,845 $92,573 $92,573 $92,151 WWTP operating/capital $1,750,467 $2,068,375 $1.921,000 $1,928,189 *** WWTP Cap. Impr. $0 $0 $0 $100,000 ** WWTP Replace/Evergreen $11,232 $128,200 $128,200 $186,000 Subtotal Expenses $2,553,176 $3.086,377 $2,842,704 $3,488,451 Add unfunded depreciation to cash $80,000 $80,000 $80,000 $80,000 Increase Debt service reserve ($43,471) CASH CARRY OVER: Sewer Fund - operating $783.965 54 7 $701.392 S448.941 ***WWTP Capital Improvement $1.841,019 $2,041,019 $2,030,114 $2,065,114 ** WWTP Equipment Repl/Evergreei $1,849,862 $2,132,389 $2,084,389 $2,246,790 * Sewer Replacement $518,884 $531.953 $606,969 $364,969 Total $4,993,730 $5,160,080 $5,422,864 $5,125,814 Current Rate $3.28 per 1000 gallons, anticipate rate increase during the year. $2.65 bi-monthly billing costs - flat fee generates approximately $100,000 UIIY Uk KALISPELL 174 PROGRAM OF SERVICES EXPENDITURE SUMMARY FUND: SEWER SEWER OPERATING 5310... 454... SEWER FACILITIES FUNCTION ... 430630 ACTUAL ACTUAL BUDGET STAFF'S ACCOUNT FY99/00 FY00/01 FY01/02 FY02103 Personal Services $166,197 $182,324 $230,658 $205,695 Materials and Services $87,119 $104,341 $144,508 $161,808 Capital/Construction $40,962 $108,287 $114,192 $295,500 Replacement $22,996 $122,926 $86,931 $320,000 Debt Service $96,580 $104,754 $140,940 $119,109 Depreciation (unfunded) $80,000 $80,000 $80,000 $80,000 $493,854 $702,632 $797,229 $1,182,111 STATEMENT -OF FUNCTION: It is the responsibility of the Sewer Maintenance Division to operate and maintain the sewer collection and transmission system. Maintenance procedures includejet rodding, flushing, TV inspection, mechanical and chemical cleaning methods as required. Line Item Detail: SEWER OPERATING 218 Equipment (Non Capital) - $3,500 $1,500 - Diamond Blade Tap Cutter $1,000 - Manhole Locator $1,000 - Fireproof Storage File 221 Safety Equipment & Supplies - $2,000 Increase of $1,200 to include cost of a Gas Monitor and fire cabinet to meet OSHA requirements. u • CITY OF KALISYELL 175 • PROGRAM OF SERVICES Line item detail: SEWER FUND, CONTINUED 354 Contract Services - $19,300 $6,500 - Temporary Help-Spring/Summer - Needed in order to maintain our maintenance schedule, particularly the old clay pipe section of town where we have an excessive amount of tree roots. $8,750 - Represents 25% cost of Photo Grammetry. The Photo Grammetry is needed to update 28 sections of aerial photos, many of them 10 years out of date, in our GPS mapping system. Water, Spec Street and Storm will each fund 25%. 366 Building Maintenance - $9,000 $8,000 - Chain link enclosures for eight unfenced lift stations are needed to prevent tampering, vandalism and trespass. These stations start and stop automatically and employ very high voltages, they should be fenced for liability purposes as well. Capital Outlay: 920 Building Addition - S72,000 A 40' x 60' addition to the Sewer Maint Bld. The Sewer Maintenance Division has the smallest building in the complex and have outgrown their space. They have several pieces of equipment that are presently being stored in the parking lot and are exhibiting signs of deterioration due to weather. The sewer maintenance operation is year round, not seasonal in any way, and all of the equipment is used continuously. It needs to be readily available and not subject to freezing the sewage that remains in the mechanism even after draining. The addition would allow this equipment to be moved inside and weather protected. Cost represents 80% - Storm will fund 20%. 933 Cost -of -Service Rate Study - Carryover $20,000, New Appropriation $10,000 This provides for completion of a comprehensive cost -of -service rate study of the sewer system in conjunction with the water, wastewater and storm drainage systems. The study will also include a review of system development charges with the overhaul of rates. This rate study is required in order to identify how best to fund the identified improvements. 940 Machinery & Equipment - S193,500 $180,000 - We currently have a 1983 Vactor and a 1994 VacCon for sewer cleaning. The 1994 unit is becoming less reliable for continuous service. We will purchase a new sewer cleaning truck and dispose of the 1983 Vactor. We plan to use the 1994 VacCon as the secondary unit. Cost represent 80% - Storm will fund 20%. S13,500 - Mini TV Camera for Sewer Inspections. At this time we are unable to inspect our 6" and smaller mains or to accurately locate service w ves for customers. This frequently causes unnecessary digging which has resulted in unnecessary damage to service lines. We have over 3 miles of 6" main. 112MAlitL1931M0 176 PROGRAM OF SERVICES Line item detail: SEWER FUND, CONTINUED REPLACEMENT FUNDS - 950 Construction in Progress - Carryover $65,000 and New Appropriation $40,000 $105,000 - Lift Station #4 replacement - Liberty Street - This replacement is recommended in the Facility Plan and included in the Capital Improvement Plan. The new appropriation is for a back-up generator not previously budgeted. 952 Manhole Rehabilitation - S15,000 This involves installation of a high strength lining in deteriorating manholes in lieu of complete replacement. This will arrest deterioration of the structure and avoid the cost of a total replacement. Ten manholes are budgeted for FY03. 953 Lift Station #3 (Grandview & 93) Replacement - S200,000 Lift Station #3 is the oldest in the system (1968). The wet well is in questionable condition and the demands on this station are increasing. In the event of failure this station is the most difficult to deal with. See Capital Project Fund #4293 Capital Improvements -US 93 South Sewer improvements - S1,289,900 (replacement $125,000) In conjunction with MDT improvement of US Highway 93 from Ashley Creek to Kalispell, the City intends to install sewer improvements within the highway right of way. These improvements include sewage collection gravity mains, pressure force mains, pumping facilities and appurtenant structures to extend utilities from their present terminus south to approximately the intersection of US Highway 93 and Cemetery Road. The estimated construction cost of these facilities is S1,414,900. The current MDT project schedule anticipates this work in 2002. We do not believe this is realistic because of continuing ROW and design problems that are not yet resolved. However, we must continue to carry this item to ensure funding availability whenever the project finally proceeds. 11 0 • CITY OF KALISPELL 177 • LJ • PROGRAM OF SERVICES EXPENDITURE DETAIL FUND: SEWER SEWER OPERATING 5310...454... SEWER FACILITIES FUNCTION ... 430630 ACTUAL ACTUAL BUDGET STAFF'S ACCOUNT FY99/00 FY00/01 FY01/02 FY02/03 Personal Services: 110 Salaries & Wages $132,210 $148,245 $186,440 $164,363 121 Overtime $3,712 $2,103 $5,000 $5,000 153 Health Insurance $21,912 $22,498 $27,901 $25,433 155 Retirement - PERD $8,363 $9,478 $11,317 $9,939 112 Employee Severance/retirement $960 Total Personal Services $166,197 $182,324 $230,658 $205,695 Materials and Services: 210 Office Supplies $55 $181 $200 $200 213 Small Office Equipment $68 $402 $2,000 $1,000 214 GIS Supplies $0 $1,143 $2,000 $1,000 215 Computer Supplies $340 $778 $1,500 $800 216 Computer Equipment $645 $735 $1,200 $1,500 218 Equipment (Non Capital) $0 $2,467 $1,000 $3,500 221 Safety Equip & Supplies $642 $612 $800 $2,000 224 Janitorial Supplies $269 $298 $300 $350 229 Other Supplies $1,073 $478 $800 $800 231 Gas & Oil $2,154 $2,234 $3,000 $2,500 241 Consumable Tools $651 $1,044 $1,200 $1,200 312 Postage & Shipping $481 $15 $350 $350 320 Printing $154 $263 $200 $200 336 Licenses & Fees $0 $70 $350 $350 341 Electricity $7,893 $10,834 $14,250 $15,250 342 Water $161 $155 $150 $150 344 Natural Gas $2,914 $4,147 $4,400 $4,000 345 Telephone & Comm. $9,821 $10,845 $11,350 $11,350 353 Auditing $1,500 $1,000 $1,500 $1,500 354 Contract Services $2,660 $2,792 $7,000 $19,300 362 Equipment Maintenance $3,869 $1,623 $3,500 $3,500 366 Building Maintenance $90 $157 $5,500 $9,000 369 Radio Maintenance $142 $2,120 $850 $500 373 School & Travel $1,001 $1,926 $2,000 $2,000 388 Medical Services $209 $182 $350 $300 CITY OF KALISPELL 178 EXPENDITURE DETAIL FUND: SEWER SEWER OPERATING 5310... 454... SEWER FACILITIES FUNCTION ... 430630 ACTUAL ACTUAL BUDGET STAFFS ACCOUNT FY99l00 FY00l01 FY01/02 FY02/03 395 Equipment Rental $0 $250 $250 410 Construction Materials $1,328 $2,941 $1Q000 $1Q000 425 Materials - Pumps $2,828 $2,182 $3,500 $3,500 510 Property &Liability Ins. $7,271 $8,391 $9,500 $10,450 512 Uninsured loss -deductible $1,572 $7,500 $7,500 521 Central Garage Transfer $2,750 $4,500 $4,500 $4,000 522 Administrative Transfer $30,153 $34,553 $38,005 $38,005 528 Data Processing Transfer $4,425 $5,273 $5,503 $5,503 Subtotal $87,119 $104,341 $144,508 $161,808 Capital Outlay: 920 Buildings-Add't to maim bld $0 $0 $0 $72,000 933 Facility Plan Consultants $6,479 $64,963 $40,992 $30,000 940 Machinery &Equipment $34,483 $43,324 $13,200 $193,500 944 Vehicles $0 $0 $15,000 $0 948 Meter replacement carry over $0 $0 $45,000 $0 Subtotal $40,962 $108,287 $114,192 $295,500 430635 Sewer Replacement Funds: 931 Sanitary Sewer Carryover $21,397 $122,926 $21,931 $0 950 Liberty Station -New &Cam $1,599 $0 $65,000 $105,000 952 Manhole Rehabilitation $0 $0 $0 $15,000 953 Replace Lift Station #3 Gran( $0 $0 $0 $200,000 $22,996 $122,926 $86,931 $320,000 4902oo Debt Service 610 Principle-2002 sewer bonds $60,000 $65,000 $105,000 $100,700 620 Interest/fiscal agent fees $36,580 $33,760 $3Q190 $13,015 490545 610 Principle -Loader $0 $4,256 $4,373 $4,621 620 Interest $0 $1,738 $1,377 $773 454-510400 $96,580 $104,754 $140,940 $119,109 831 Depreciation (unfunded) $80,000 $80,000 $80,000 $80,000 Total Sanitary Sewer 49$ 3.854 $702.632 $797.229 $1.182.111 PROGRAM OF SERVICES • • CITY OF KALISPELL 179 • • PROGRAM OF SERVICES PERSONNEL SCHEDULE FUND: SEWER SEWER OPERATING 5310...454... SEWER FACILITIES FUNCTION ... 430630 ***FTE*** ***BUDGET*** POSITION TITLE FY00/01 FY01/02 FY02/03 FY00/01 FY01/02 FY02/03 Public Works Director 0.25 0.15 0.15 $13,959 $8,702 $8,963 Assistant City Engineer 0.20 0.20 0.20 $8,168 $8,470 $10,300 Design Tech/Proj Mgr 0.15 $6,651 Working Foreman 1.00 1.00 1.00 $31,250 $32,199 $32,385 Interim Working Foreman* 1.00 $31,574 $0 Maintenance & Repair 2.00 2.00 2.00 $58,332 $59,600 $65,171 Engineering Technician 0.40 0.40 0.40 $10,675 $10,949 $11,250 Construction Inspector 0.25 0.25 0.00 $6,880 $7,296 $0 Civil Engineer 0.00 0.00 020 $0 $0 $7,401 Clerk 11 0.15 $3,508 vehicle allowance $540 $540 merit & comptime buyout $3,252 $6,455 $0 Subtotal Salaries 4.10 5.00 4.25 $132,516 $165,785 $146,169 Payroll taxes: Fica/medt $10,137 $12,683 $11,182 Worker's comp. $8,004 $7,392 $6,500 Unemployment $464 $580 $512 Total for line item 110 $151,121 $186,440 $164,363 CITY OF KALISPELL 180 PROGRAM OF SERVICES EXPENDITURE SUMMARY FUND: SEWER 5310... WASTE WATER TREATMENT DEPT. 455... 430640 ACTUAL ACTUAL BUDGET STAFF'S ACCOUNT FY99/00 FY00/01 FY01102 FY02/03 Personal Services $262,241 $279,811 $299,309 $320,408 Materials and Services $539,289 $599,248 $793,352 $720,032 Capital Outlay $0 $19,018 $116,000 $145,000 Debt Service $552,283 $549,663 $551,313 $534,348 WWTP Replacement/equip. $136,005 $11,232 $128,200 $186,000 Replacement Reserve $302,727 $302,727 $308,401 $308,401 $1,792,545 $1,761,699 $2,196,575 $2,214,189 STATEMENT OF FUNCTION: The Wastewater Treatment Plant Facility is responsible for treating domestic wastewater to meet the discharge permit issued by the Montana Department of Environmental Quality. The treated wastewater is discharged to Ashley Creek in accordance with specific limitations, requirements, and conditions. Facility Maintenance: 7 buildings, 53 pumps, 14 gear reducers, 24 mixers, 6 large & 7 small submersible pumps, 1 scum buster pump, 200 valves of all sizes, 5 air compressors, 1 electric generator, 2 gas boilers, 3 make-up air units, 8 ventilation fans, 16 electric heaters, 1 air conditioner, 3 gas heaters, 16 sand filters, 3 200hp air blowers, 9 auto electric valves, 15 flow meters, 4 gas detectors, 2 programmable logic controllers, 2 ultraviolet light disinfection units, 4 clarifiers, 11 bio-cells, 1 equalization tank, 3 digesters, 2 fermenter tanks, 2 dissolved air floatation tanks, 2 belt filter presses, 1 5000 gal. Alum tank, 2 pickups and 2 sludge trucks. OBJECTIVES: WWTP 1. Monitor and adjust the wastewater treatment process to meet the discharge permit; monitor Ashley Creek above and below the plant discharge outlet to insure that this discharge meets certain permit limitations. • CJ • CITY OF KALISPELL 181 E 0 • PROGRAM OF SERVICES OBJECTIVES, Con't.: WWTP 2. Perform a minimum of 6,200 laboratory analyses per year to monitor and control the biological nutrient removal process, and perform analyses of specific parameters to meet the discharge permit requirements. 3. Continue efforts to reduce the inflow into the Plant which occurs during rainfall events. 4. Continue work on the Pretreatment Program to control wastewater quality; monitor the sludge for heavy metals and nutrients to ensure that it is acceptable for disposal. 5. Perform work orders (approximately 1500 per year) to keep equipment and processes functioning properly; perform equipment repairs and respond to alarms quickly so that the treatment process is interrupted as infrequently as possible. 6. Continue public relations (tours and articles) to educate the public on this unique process and the excellent quality of the treated wastewater. Line Item Detail - Wastewater Treatment Plant 225 Alum - $5,000 Additional alum for digester cleaning & 5 year coating inspection 336 Licenses & Fees - $6,500 $6,125 - Discharge Permit (State Discharge Fee Increase) $ 300 - Operator Certification $ 75 - Boiler Licenses 341 Electricity - $240,000 Electricity rate and Treatment Plant flow increase. 344 Natural Gas - $40,000 Additional for digester cleaning and increased plant flow. 349 Lab Services - $5,000 More frequent toxicity testing required in Permit 354 Contract Services - $110,000 This line item is sludge disposal fees to Glacier Gold. 355 Contract Services - $10,000 This line item includes rag/grit disposal and other contract services. 360 Maintenance, Digester & Fermenter Cleaning and Inspection - $30,000 The digesters need to be cleaned; the 5 year coating inspection of the digesters and fermenter is due. 362 Equipment Maintenance - $75,000 Estimated cost for equipment maintenance and repair. CITY OF KALISPELL 182 PROGRAM OF SERVICES Line Item Detail - Wastewater Treatment Plant, continued 366 Building Maintenance - $38,000 Increase of $35,000 needed to paint building exteriors and repair the insulation on the digester. 373 School & Travel - $6000 Need to attend in-depth wastewater technical schools; not available in Montana Capital Outlay: 933 Facility Plan Consultants - Carryover $10,000 - New Appropriation - $5,000 The carryover provides for completion of a cost -of service rate study with a new appropriation of $5,000 to fund analysis and revision of system development charges (connection charges) to fund expansion caused by growth. 933 Plant Expansion Preliminary Engineering Report - Carryover $100,000 - New Appropriation $30,000 $100,000 paid from WWTP capital reserve account. We will carryover $100,000, comprised of an amended FY 2002 budget of $100,000 in reallocated FY 2002 expenditures, new funding will consist of $10,000 in DNRC resource planning grant funding and $20,000 in CDBG block grant planning funds. Replacement Funds: 940 Machinery & Equipment Replacement Fund - $186,000 $ 5,000 - Replacement of primary clarifier weirs $ 10,000 - Replacement of primary clarifier scum troughs $ 10,000 - Replace outdated lift station PLC units $ 8,500 - Replace DAF air bubble diffuser pumping system $ 16,000 - Replace anaerobic recycle pump $ 16,500 - Replace submersible fermenter mixer $120,000 - Replace 1992 Kenworth sludge truck 0 is • CITY OF KALISPELL 183 0 0 • PROGRAM OF SERVICES EXPENDITURE DETAIL FUND: SEWER 5310... WASTEWATER TREATMENT DEPT. 455... 430640 ACTUAL ACTUAL BUDGET STAFF'S ACCOUNT FY99/00 FY00/01 FY01/02 FY02103 Personal Services: 110 Salaries & Wages $206,973 $224,553 $239,150 $253,751 112 Severance -Retirement $960 121 Overtime $13,243 $11,332 $13,000 $13,000 153 Health Insurance $28,252 $29,761 $32,268 $37,267 155 Retirement -PERD $13,773 $14,165 $14,891 $15,430 Total Personal Services $262,241 $279,811 $299,309 $320,408 Materials and Services: 210 Office Supplies $496 $539 $500 $500 213 Small Office Equip $0 $1,475 $250 $250 215 Computer Supplies $733 $1,199 $700 $250 216 Computer Equipment $380 $1,516 $0 $0 221 Safety Equipment & Supply $1,073 $2,156 $1,200 $1,000 222 Lab Supplies $3,703 $3,437 $3,000 $3,000 224 Janitorial Supplies $58 $529 $300 $300 225 Alum $2.044 $2,493 $2,500 $5,000 226 Chemicals $10,888 $11,244 $10,000 $11,000 229 Other Supplies $3,048 $4,347 $3,500 $3,500 231 Gas & Oil $5,988 $6,608 $8,000 $7,000 241 Consumable tools $1,519 $3,039 $2,500 $2,500 312 Postage & Shipping $513 $470 $700 $700 335 Membership and Dues $600 $469 $600 $600 336 Licenses and Fees $3,605 $3,856 $5,875 $6,500 341 Electricity $147,702 $1467574 $210,000 $240,000 342 Water $2,476 $2,120 $3,000 $3,000 344 Natural Gas $30,655 $36,858 $37,500 $40,000 345 Telephone & Alarms $3,033 $3,239 $3,500 $3,500 349 Lab Services $3,849 $3,148 $3,500 $5,000 353 Auditing $1,800 $1,800 $1,800 $1,800 354 Contract Services $94,295 $102,966 $100,000 $110,000 355 Other Contract Services $0 $0 $10,000 $10,000 356 Consultant - Electrical engineer $1,047 $0 $2,000 $3,000 356 Consultant - Gravity Thickener Coat $0 $22,775 $15,000 $0 360 Maintenance Service -misc. $4,662 $5,326 $5,000 $5,000 360 Maintenance -Digester clean/inspect $30,000 CITY OF KALISPELL 184 PROGRAM OF SERVICES EXPENDITURE DETAIL -continued FUND: SEWER 5310... WASTEWATER TREATMENT DEPT. 455... 430640 ACTUAL ACTUAL BUDGET STAFF'S ACCOUNT FY99/00 FY00/01 FY01/02 FY02103 Materials and Services-con't. 362 Equipment Maintenance $80,372 $106,140 $70,000 $75,000 362 Equip. Maint. - Sec. Clarifier Cting $0 $0 $175,000 $0 366 Building Maintenance $6,628 $3,500 $3,000 $38,000 369 Radio Maintenance $319 $1,124 $100 $100 373 School & Travel $3,898 $5,937 $6,000 $6,000 380 Training Materials $94 $381 $300 $300 388 Medical Services $367 $197 $250 $250 395 Equipment Rental $45 $100 $150 510 Property & Liability Insurance $27,524 $24,102 $28,500 $30,858 521 Central Garage Transfer $4,000 $4,000 $4,500 $4,500 522 Administrative Transfer $87,450 $80,411 $69,174 $67,623 528 Data Processing Transfer $4,425 $5,273 $5,503 $3,851 Total Materials & Services $539,289 $599,248 $793,352 $720,032 Capital Outlay% 933 Facility Plan Consultants, carryover $0 $19,018 $16,000 $15,000 933 Plant expansion -engineering report $100,000 $130,000 Total Capital Outlay $0 $19,018 $116,000 $145,000 490210 Debt Service/Revenue Bonds 610 Principal $120,000 $125,000 $135,000 $189,300 620 Interest/Fiscal Agent Fees $146,883 $139,083 $131,333 $59,428 490215 Debt Service/SRF Loan 610 Principal $169,000 $176,000 $182,000 $190,000 620 Interest $116,400 $109,580 $102,980 $95,620 $552,283 $549,663 $551,313 $534,348 455 430645 WWTP Replacement 940 Machinery & Equipment $0 $11,232 $128,200 $186,000 940 Machinery & Equipment (carryover) $33,282 $0 $0 $0 944 Vehicles $102,723 $0 $0 $0 Total Replacement $136,005 $11,232 $128,200 $186,000 455 510400 831 Depreciation/Replacement Reserve $302,727 $302,727 $308,401 $308,401 Total WWTP $1,792,545 $1,761,699 $2,196,575 $2,214,189 CITY OF KALISPELL 185 • 0 • r LJ • 11 PROGRAM OF SERVICES PERSONNEL SCHEDULE FUND: SEWER 5310... WASTEWATER TREATMENT DEPT. 455... 430640 ***FFE*** ***BUDGET*** POSITION TITLE FY00/01 FY01/02 FY02iO3 FY00r01 FY01/02 FY02103 Director/City Engineer 0.10 0.10 0.10 $5,584 $5,801 $5,975 WWTP Manager 1.00 1.00 1.00 $38,344 $39,801 $40,955 Assistant City Engineer 0.20 0.20 0.20 $8,168 $8,470 $10,300 Administrative Coordinator 0.25 0.25 0.20 $7,087 $7,349 $6,056 Civil Engineer 0.20 $7,401 Working Foreman/differential 0.00 0.00 0.00 $1,070 $1,070 $1,070 Operator/Maintenance 4.00 4.00 4.00 $111,717 $114,544 $117,741 Lab Tech 1.00 1.00 1.00 $28,267 $28,975 $29,775 Clerk H 0.10 0.10 0.10 $2,217 $2,276 $2,339 vehicle allowance $360 $360 Pager pay-$95 per week $4,940 $4,940 $4,940 merit & comptime buyout $7,860 $751 $0 subtotal salaries 6.65 6.65 6.80 $215,254 $214,337 $226,912 Payroll taxes: Fica/Medt $16,467 $16,397 $17,359 Unemployment tax $718 $750 $794 Worker's comp. $11,938 $7,666 $8,686 WWTP total for line item 110 $244,377 $239,150 $253,751 ** wages for FY's 01 and 02 will be for 2080 hours, FY 03 is based on 2088 hours. CITY OF KALISPELL 186 PROGRAM OF SERVICES EXPENDITURE SUMMARY FUND: SEWER 5310... SEWER BILLING COSTS DEPT. 454... FUNCTION ... 430620 ACTUAL ACTUAL BUDGET STAFF'S ACCOUNT FY99/00 FY00/01 FY01/02 FY02/03 Personal Services $68,415 $63,258 $64,819 $68,040 Materials and Services $22,550 $23,564 $25,254 $24,111 Capital Outlay $0 $2,023 $2,500 $0 $90,965 $88,845 $92,573 $92,151 STATEMENT OF FUNCTION: The billing costs are for one billing clerk, 50% of the meter reader, 25% of the City Accountant and 15% of and the public works clerk. Also included are administrative costs of billing and data processing based on our formula. Billing costs include postage and printing of the forms and other costs attributable to collection. Note: we bill 6,000+ customers six times a year for $2.65 per billing which equals approximately $100,000 in revenue for billing costs. Line Item Detail: 354 Contract Services-$2,000. Includes $750 to Grizzley Security to pick up utility bills at the grocery store locations and $375 (25%) of the cost to have Grizzley Security take daily deposits to the bank (costs shared with Finance). Maintenance contract for ADG software for the Utility Billing Program is $500 year. Additional $375 for bank charges or customize software. 355 Billing Costs-$12,500 Combined printing with billing costs. Going to laser printed bills will cost a little more than our old bills but will be much more user friendly. Additionally, postage rates are rising 10% this June. 373 School & travel - $750 ; Dues $250 Funds for the utility clerk to attend training and partial funding for the City Accountant for continuing education. 25% of City accountant funded by water billing. City accountant memebership in CPA society, license and GFOA. n 0 CITY OF KALISPELL 187 • Lj PROGRAM OF SERVICES EXPENDITURE DETAIL FUND: SEWER 5310... SEWER BILLING COSTS DEPT. 454... FUNCTION ... 430620 ACTUAL ACTUAL BUDGET STAFF'S ACCOUNT FY99/00 FY00/01 FY01/02 FY02/03 Personal Services: 110 Salaries & Wages $56,536 $50,772 $54,207 $56,102 153 Health Insurance $8,726 $9,279 $7,280 $8,480 155 Retirement - PERD $3,153 $3,207 $3,332 $3,458 Total Personal Services $68,415 $63,258 $64,819 $68,040 Materials and Services: 210 Office Supplies $0 $9 $0 $0 320 Printing (utility bills) $2,366 $2,309 $2,500 $0 335 Membership & Dues $0 $0 $250 $500 354 Contract services $1,995 $1,413 $2,000 $2,000 355 Billing Costs/postage $6,648 $7,809 $7,500 $12,500 373 School & Travel $0 $750 $1,000 522 Administrative transfer $3,691 $3,999 $4,154 $3,315 528 Data Processing $7,850 $8,025 $8,100 $4,796 Total Materials and Services $22,550 $23,564 $25,254 $24,111 Capital Outlay 940 PC for Utility Billing $0 $2,023 $2.500 $0 Total Billing Costs $90,965 $88,845 $92,573 $92,151 CITY OF KALISPELL 188 PERSONNEL SCHEDULE FUND: SEWER 5310... SEWER BILLING COSTS DEPT. 454... FUNCTION ... 430620 **•F'1'E**+ *""BUDGET*'* POSITION TITLE FY00ro1 FYovaz FYozraa FY00ro1 FYotroz FYozroa Meter Reader 0.50 0.50 0.50 $14,787 $15,120 $15,501 Billing Clerk 1.00 1.00 1.00 $21,757 $22,339 $22,968 City Accountant 0.25 0.25 0.25 $7,105 $8,127 $8,371 Clerk II (DPW) 0.15 0.15 0.15 $4,252 $3,413 $3,508 Vacation fill in $740 $225 $500 subtotal salaries 1.90 1.90 1.90 $48,641 $49,224 $50,848 Payroll taxes: Fica/Medt $3,721 $3,766 $3,890 Unemployment tax $170 $172 $178 Worker's comp. $1,655 $1,045 $1,186 Sewer billing total for line item 110 $54,187 $54,207 $56,102 PROGRAM OF SERVICES CITY OF KALISPELL 189 n L_J r7 LJ • PROGRAM OF SERVICES SEWER FUND - DEBT FY 2003 SANITARY 2002 Sewer Bond Principal $100,700 Interest $13,015 Subtotal Sewer $113,715 WWTP 2002 Sewer Bond Principal $189,300 Interest $58,928 Fiscal Agent Fees $500 $248,728 WWTP SRF Loan-20 year Principal $190,000 Interest $95,120 Fiscal Agent Fees $500 $285,620 Subtotal WWTP $534,348 Total Debt Service $648,063 r4i V 11`ZII—M.M 11 U /I! 190 PROGRAM OF SERVICES 5349 STORM SEWER FUND REVENUE PROJECTION ACTUAL BUDGET ESTIMATED PROPOSED FY00/01 FY01/02 FY01/02 FY02/03 CASH: Operating STORM $281,322 $368,219 $371,969 $454,572 Designated Cash Hwy 93 So. $395,000 $395,000 $395,000 $395,000 lid►%FI�UIe Storm Assessments -billed $263,809 $266,128 $268,235 $268,235 Penalty & interest $1,393 $2,000 $2,000 $2,000 Interest $3,053 $1,500 $1,500 $1,000 Decrease(increase) in A/R $3,265 $0 $0 $0 Increase in Comp. Abs. $442 Subtotal cash available $948,284 $1,032,847 $1,038,704 $1,120,807 EXPENDITURE PROJECTION EXPENSES Operations/Capital $200,259 $327,259 $215,000 $402,599 Hwy 93 SO. Project $0 $395,000 $0 $395,000 Debt Service $12,674 $5,750 $5,750 $5,394 Subtotal Expenses $212,933 $728,009 $220,750 $802,993 * Add Depreciation to cash $31,618 $31,618 $31,618 $0 Operating Cash- Carryover $371,969 $336,457 $454,572 $317,814 Designated Hwy. 93 So. $395,000 $0 $395,000 $0 Designated for replacement ** $35,000 * * Amount of depreciation added to "designated cash for replacement" for FY2003. Storm drain assessments are not expected to change to any significant degree. However, there is consideration for setting a ceiling on assessments for property in category I, vacant land, and category 2 , residential property, which would lower the assessments for large parcels. This change would be proposed to be revenue neutral and would require adjustment of the individual rates to accomplish. 41 U r� LJ KALISPELL 191 • 0 PROGRAM OF SERVICES EXPENDITURE SUMMARY FUND: STORM SEWER 5349... STORM SEWER OPERATIONS... 453... FUNCTION ... 430246 ACTUAL ACTUAL BUDGET STAFF'S ACCOUNT FY99/00 FY00/01 FY01/02 FY02103 Personal Services $73,668 $75,150 $78,365 $86,950 Materials and Services $24,812 $28,528 $43,084 $52,649 Capital Improvements $54,738 $64,963 $569,192 $623,000 Debt Service $38,325 $42,674 $5,750 $5,394 Depreciation $31,618 $31,618 $31,618 $35,000 $223,161 $242,933 $728,009 $802,993 STATEMENT OF FUNCTION: The Storm Sewer Maintenance Division is responsible for the maintenance and operation of the Storm water collection, transmission, detention and disposal facilities of the City of Kalispell. The purpose of this system is to collect and properly dispose of storm water from snow melt, rainfall and other sources without going through the wastewater treatment plant. The division maintains over nine miles of storm water facilities including catch basins, inlet, culverts, storm drains, detention basins and outfalls. Line Item Detail: STORM SEWER FUND 610 Debt Service Principal: $4,621 620 Debt Service Interest: S 773 3rd year of 7 year contract on Loader purchased in FY2000. CITY OF KALISPELL 192 PROGRAM OF SERVICES Line Item Detail: STORM SEWER FUND 354 Contract Services - $13,750 Increase of $8,750 represents 25% cost of Photo Grammetry. The photo Grammetry is needed to update 28 sections of aerial photos, many of them 10 years out of date, in our GPS mapping system. Water, Spec Street, and Sewer will each fund 25%. 371 Curb & Gutter - $5,500 Increase of $3,500 to finish the curb and gutter replacement on Claremont Street. Capital Outlay: 920 Building Addition - $18,000 A 40' x 60' addition to the Sewer Maint Bld. The Sewer Maintenance Division has the smallest building in the complex and have outgrown their space. They have several pieces of equipment that are presently being stored in the parking lot and are exhibiting signs of deterioration due to weather. The sewer maintenance operation is year round, not seasonal in any way, and all of the equipment is used continuously. It needs to be readily available and not subject to freezing the sewage that remains in the mechanism even after draining. The addition would allow this equipment to be moved inside and weather protected. Costs represent 20% - Sewer will fund 80%. 933 Facility Plan Consultants - Carryover $10,000 Carryover to complete the rate study begun last year. Capital Improvements - Carryover 15,000 Ashley Creek Storm water outfall - 50/50 cost share with State to mitigate impact of oily shop run-off to small wetland area south of City Shop. This project is carried each year to ensure funding when US 93 project is finally begun. 935 Mosquito Drain Lift Station Replacement - $40,000 It was hoped that this L.S. replacement could be avoided by connecting into new US 93 facilities. However, final design was not able to overcome grade differences between the systems. The old L.S. will be abandoned and a new L.S. built to lift flows from east of US 93 into the new system on 18th Street. 940 Machinery & Equipment - $45,000 We currently have a 1983 Vactor and a 1994 VacCon for sewer cleaning. The 1994 unit is becoming less reliable for continuous service. We will purchase a new sewer cleaning truck and dispose of the 1983 Vactor. We plan to use the 1994 VacCon as the secondary unit. Cost represent 20% - Sewer will fund 80%. con't. 0 • E rim rILIA 193 0 • PROGRAM OF SERVICES Line Item Detail: STORM SEWER FUND Capital Outlay - con't. 950 Construction in Progress - Carryover $65,000 Lower Spring Creek Design - Improvements are necessary to correct and reduce flood elevations at Zauners/Hampton Inn area. This item is carried over each year to assure FEMA that the City has a plan to address drainage issues in this area. Design is anticipated to be done when funding for construction is identified. 950 Construction in Progress - $35,000 Carryover Center Street Project -Raise Storm Drain Inlets - 1st Ave. E. to 5th Ave. W. This project is anticipated to be completed in conjunction with the Streetscape project. 951 Capital Improvements - US 93 South Storm Improvements - Carryover - $395,000 In conjunction with MDT improvements to US Hwy 93 So. from Ashley Creek to Kalispell, the City intends to oversize the highway storm drainage system to accommodate adjacent commercial developments. The estimated construction cost of these facilities is $395,000. The current MDT project schedule anticipates this work in 2002. We do not believe this is realistic because of continuing ROW and design problems that are not yet resolved. However, we must continue to carry this item to ensure funding availability whenever the project finally proceeds. ($37,000 is considered replacement) CITY UY KALISYELL 194 PROGRAM OF SERVICES EXPENDITURE DETAIL FUND: STORM SEWER 5349...STORM SEWER OPERATIONS... 453... FUNCTION ... 430246 Amended ACTUAL ACTUAL BUDGET STAFF'S ACCOUNT FY99/00 FY00/01 FY01/02 FY02/03 Personal Services: 110 Salaries & Wages $59,659 $60,817 $61,807 $68,951 121 Overtime $651 $820 $1,500 $1,500 153 Health Insurance $9,744 $9,744 $11,258 $12,325 155 Retirement $3,614 $3,769 $3,800 $4,174 Subtotal Personal Services $73,668 $75,150 $78,365 $86,950 Materials and Services: 214 GIS Supplies $0 $576 $1,000 $500 215 Computer Supplies $0 $270 $500 $500 216 Computer Equipment $201 $475 $500 $500 221 Safety Equip. & Supplies $225 $200 $200 231 Gas & Oil $2,209 $1,974 $2,500 $2,500 241 Consumable Tools $306 $172 $200 $200 320 Printing -blueprints, etc. $191 $129 $200 $200 353 Auditing $500 $500 $500 $500 354 Contract Services $664 $794 $5,000 $13,750 355 Billing Costs -County $1,000 $1,000 $1,600 $1,600 360 Repair & Maint. Services $0 $108 $1,000 $1,000 371 Curb & Gutter $0 $1,042 $2,000 $5,500 373 School & Travel $0 $0 $500 $500 410 Construction Materials $353 $825 $10,000 $10,000 510 Property & Liability Ins. $3,345 $1,835 $4,500 $1,969 522 Administrative Transfer $11,063 $14,120 $8,154 $8,500 528 Data Processing Transfer $3,055 $3,108 $3,130 $3,130 532 Lease Payments $1,700 $1,600 $1,600 $1,600 Subtotal materials & services $24,812 $28,528 $43,084 $52,649 con't. is CITY OF KALISPELL 195 E 0 PROGRAM OF SERVICES EXPENDITURE DETAIL, Continued FUND: STORM SEWER 5349... STORM SEWER OPERATIONS... 453...FUNCTION... 430246 ACTUAL ACTUAL BUDGET STAFF'S ACCOUNT FY99/00 FY00101 FY01/02 FY02/03 430246 910 Building Addition $18,000 933 Facility Plan (carryover) $6,479 $64,963 $30,992 $10,000 934 Ashley Cr. Outfall (carryover) $13,776 $0 $15,000 $15,000 935 Mosquito Drain Lift Station $40,000 940 Machinery & Equipment $34,483 $0 $13,200 $45,000 944 Vehicles $0 $0 $15,000 $0 950 Spring Creek Engineering (carq $0 $0 $65,000 $65,000 950 Construction -1st Ave. E to 5th $0 $0 $35,000 $35,000 951 Construction Hwy 93 So. $0 $0 $395,000 $395,000 Subtotal Capital Outlay $54,738 $64,963 $569,192 $623,000 49022o Debt Service -Bonds 610 Principal $35,000 $35,000 $0 $0 620 Interest $3,325 $1,680 $0 $0 453 490225 Debt Service -Loans 610 Principal $0 $4,256 $4,373 $4,621 620 Interest $0 $1,738 $1,377 $773 $38,325 $42,674 $5,750 $5,394 510400 831 Depreciation -unfunded $31,618 $31,618 $31,618 $35,000 TOTAL Storm Sewer $223,161 $242,933 $728,009 $802,993 CITY OF KALISPELL 196 PROGRAM OF SERVICES PERSONNEL SCHEDULE FUND: STORM SEWER 5349... STORM SEWER OPERATIONS... 453...FUNCTION ... 430246 ***FTE*** ***BUDGET*** POSITION TITLE FY00/01 FY01/02 FY02/03 FY00101 FY01/02 FY02/03 Engineer/Tech 0.20 0.20 0.20 $5,462 $5,475 $5,625 Maintenance & repair person 1.00 1.00 1.00 $30,502 $31,778 $32,586 Administrative Coordinator 0.25 0.25 0.20 $7,087 $7,349 $6,056 Surveyor 0.30 0.30 0.30 $9,152 $9,445 $9,719 Civil Engineer 0.20 $7,401 merit & comptime buyout $50 $1,000 $0 1.75 1.75 1.90 $52,253 $55,047 $61,387 Payroll taxes: Fica/Medt $3,997 $4,211 $4,696 Unemployment tax $183 $193 $215 Workers Comp $2,737 $2,356 $2,653 TOTAL 110 $59,170 $61,807 $68,951 0 10 0 CITY OF KALISPELL 197 11 • r1 U PROGRAM OF SERVICES 5510 SOLID WASTE FUND REVENUE PROJECTION ACTUAL BUDGET ESTIMATED PROPOSED FY00/01 FY01/02 FY01/02 FY02103 CASH: operating $248,530 $170,818 $159,909 $231,240 *Replacement Account $234,054 $85,760 $85,760 $76,760 Bond Reserve - sinking funds $0 $16,000 $26,909 $26,909 Change in A/R, Comp. Abs. $3,633 $0 $0 $0 Inception of lease -truck $159,265 $0 $0 $0 Assessments $488,733 $490,730 $503,000 $503,000 Rate increase to replacement acct. $54,500 Penalty & Interest $3,608 $3,000 $3,000 $3,000 Sale of equipment $0 $16,000 $16,000 $11,405 Interest Earnings $16,340 $18,000 $4,000 $3,000 Total Available $1,154,163 $800,308 $798,578 $909,814 Operations $417,852 $450,745 $425,000 $435,167 Capital Outlay -financed $159,265 $0 $0 $0 Capital Outlay -operations $3,750 $10,000 $7,850 $72,000 CapitalOutlay-replacement $148,294 $0 $0 $110,000 Debt Service $152,424 $32,728 $32,728 $30,303 *Depreciation/ReplacementFund $100,000 $100,000 $100,000 $100,000 Total Expense $981,585 $593,473 $565,578 $747,470 add unfunded depreciation to operating transfer funds to debt reserve $100,000 $75,000 $75,000 $100,000 ($16,000) Cash Carry Over: Operating $170,818 $205,075 $231,240 $204,679 *Replacement Account $85,760 $76,760 $76,760 $57,665 Total $256,578 $281,835 $308,000 $262,344 198 PROGRAM OF SERVICES EXPENDITURE SUMMARY FUND: SOLID WASTE OPERATING 5510... GARBAGE 460... FUNCTION ... 430840..430845 ACTUAL ACTUAL BUDGET STAFFS ACCOUNT FY99100 FY00/01 FY01/02 FY02/03 Personal Services $261,758 $296,873 $303,734 $314,152 Materials and Services $108,944 $120,979 $147,011 $121,015 Capital Outlay $193,582 $163,015 $10,000 $72,000 Capital Outlay- Replacement $0 $148,294 $0 $110,000 Debt Service/Board of Inv. $346 $152,424 $32,728 $30,303 Depreciation & Replacement $100,000 $100,000 $100,000 $100,000 $664,630 $981,585 $593,473 $747,470 STATEMENT OF FUNCTION: The Solid Waste Operating Division is responsible for the collection, conveyance and disposal of all refuse accumulated within the city in an efficient and sanitary manner. GARBAGE RATES The garbage rates: Residential: $80.00 per year Proposed Residential Increase: $85.00 per year Non -Residential: 300 Gal. 300 Gal. 400 Gal. 400 Gal. Current Proposed Current Proposed DUMPSTER Rates Increase Rates Increase 1 Weekly $217.00 $267.00 2 Weekly $400.00 $534.00 3 Weekly $516.00 $801.00 $290.00 $480.00 $668.25 $340.00 $680.00 $1,020.00 n U CITY OF I(ALISPELL 199 0 l J PROGRAM OF SERVICES Line Item Detail : Solid Waste Fund Washbay/Materials & Services - $8,350 Decreased the costs for this function by $2,150. Wash bay costs are being tracked separately from garbage service. Debt Service - $30,303 - Garbage Truck 610 Principal - $ 26,544 620 Interest - $ 3,759 940 Machinery & Equipment - $12,000 $10,000 - Additional containers -various sizes 944 Garbage Truck - $170,000 ($110,000 replacement funds/$60,000 capital outlay) Tandem Axle Side Arm Parker This will replace a side arm that is seventeen years old. The cost of maintenance significantly increases as these trucks age. Debt Service calculation: Revenue from assessments $503,000 less M & O ($435,167) Available for debt $67,833 Debt service $30,303 x 125% = $37,879 coverage = 179% CITY OF KALISPELL 200 PROGRAM OF SERVICES EXPENDITURE DETAIL FUND: SOLID WASTE OPERATING 5510... GARBAGE 460... FUNCTION ... 430840..430845 ACTUAL ACTUAL BUDGET STAFF'S ACCOUNT FY99/00 FY00/01 FY01102 FY02/03 Personal Services: 110 Salaries & Wages $215,081 $246,461 $247,508 $256,027 121 Overtime/Call outs $7,201 $3,197 $5,000 $5,000 153 Health Insurance $25,269 $32,013 $36,041 $37,605 155 Retirement -PERD $14,207 $15,202 $15,185 $15,520 Total Personal Services $261,758 $296,873 $303,734 $314,152 Materials and Services: 213 Small Office Equipment $1,000 $500 216 Computer Equipment $497 $150 $500 $750 221 Safety Equipment & Supplies $17 $422 $950 $600 224 Janitorial Supplies $342 $371 $400 $400 229 Other Supplies $330 $394 $2,000 $2,000 231 Gas and Oil $12,913 $12,208 $16,000 $15,000 241 Consumable Tools $140 $204 $250 $250 331 Publications $101 $101 $500 $300 341 Electricity $514 $716 $1,500 $1,500 344 Natural Gas $2,169 $3,505 $4,500 $4,000 345 Telephone - $0 $0 $1,000 $500 354 Contract Services $10,671 $7,958 $7,000 $7,000 355 Billing Costs (County) $1,000 $1,010 $1,500 $1,500 360 Repair & Maintenance $32 $60 $1,500 $1,500 366 Building Maintenance $1,622 $681 $1,000 $1,000 369 Radio Maintenance $374 $2,288 $800 $800 373 School & Travel $1,033 $1,621 $1,500 $1,500 388 Medical services $663 $794 $500 $800 510 Property & Liability Insurance $17,076 $11,552 $17,000 $17,000 521 Central Garage Transfer $28,000 $40,000 $40,000 $35,000 522 528 Administrative Transfer Data Processing Transfer $28,395 $3,055 $27,920 $3,868 $33,028 $4,083 $17,673 $3,092 Total M & O $108,944 $115,823 $136,511 $112,665 11 0 9 C11Y OF KALISPELL 201 0 0 PROGRAM OF SERVICES EXPENDITURE DETAIL,con't: FUND: SOLID WASTE OPERATING 5510... GARBAGE 460... FUNCTION ... 430840..430845 ACTUAL ACTUAL BUDGET STAFF'S ACCOUNT FY99100 FY00/01 FY01/02 FY02/03 430845 Washbay/Materials & Services 224 Janitorial Supplies $0 $578 $1,000 $750 341 Electricity $0 $876 $1,500 $1,100 342 Water $0 $0 $500 $500 344 Natural Gas $0 $3,122 $4,000 $3,000 360 Repair & Maint Services $0 $286 $2,500 $2,000 366 Building Maintenance $0 $294 $1,000 $1,000 $0 $5,156 $10,500 $8,350 430840 Capital Outlay 920 Washbay Building & equip. $193,582 944 Garbage Truck $159,265 $60,000 940 Containers $3,750 $10,000 $12,000 $193,582 $163,015 $10,000 $72,000 Capital Outlay: Replacement funds 944 Garbage Truck $0 $148,294 $0 $110,000 Subtotal Capital Outlay $0 $148,294 $0 $110,000 490545 610 Debt Service/Wash Bay Principal $0 $145,000 $0 $0 620 Interest $346 $7,424 $0 $0 490545 Debt Service/Truck 610 Principal $0 $0 $26,544 $26,544 620 Interest $0 $0 $6,184 $3,759 $346 $152,424 $32,728 $30,303 510400 831 Depreciation (unfunded) $100,000 $100,000 $100,000 $100,000 Total Solid Waste $664,630 $981,585 $593,473 $747,470 CITY OF KALISPELL 202 PROGRAM OF SERVICES PERSONNEL SCHEDULE FUND: SOLID WASTE OPERATING 5510... GARBAGE 460... FUNCTION ... 430840..430845 ***FTE*** ***BUDGET*** POSITION TITLE FY00/01 FY01/02 FY02/03 FY00/01 FY01102 FY02/03 Director/City Engineer 0.25 0.25 0.25 $13,959 $14,503 $14,938 Assistant City Engineer 0.25 0.25 0.25 $10,210 $10,588 $12,875 Superintendent 0.25 0.25 0.25 $10,520 $10,846 $10,846 Project Manager 0.25 0.25 0.25 $10,690 $11,085 $11,418 Administrative Coordinator 0.25 0.25 0.20 $7,087 $7,349 $6,056 Foreman ** 1.00 1.00 1.00 $30,907 $31,783 $32,594 Equipment Operators ** 4.00 4.00 4.00 $108,813 $112,256 $115,362 Engineer/Tech ** 0.40 0.40 0.40 $10,675 $10,949 $11,250 vehicle allowance $900 $900 Street Employees working alleys** $32,000 $10,500 $10,500 merit & comptime buyout $5,899 $1,100 $1,500 subtotal salaries: 6.65 6.65 6.60 $240,760 $221,859 $228,239 Payroll taxes: Fica/Medt $18,418 $16,972 $17,460 Unemployment tax $843 $777 $799 Workers Comp $10,634 $7,900 $9,529 TOTAL 110 - $270,655 $247,508 $256,027 ** wages for FY's 01 & 02 were for 2080 hours, FY 2003 is for 2088 hours. *** FY2001 we added a full time operator to the Solid Waste Fund enabling us to reduce charges to this fund for Street personnel by $21,500 for FY2002. n LJ 01Y OF HALiSFELL 203